Jump to Content

Collection Guide
Collection Title:
Collection Number:
Get Items:
A guide to the Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications, 1957, 1956
HDC1662 (SAFR 23819)  
View entire collection guide What's This?
Search this collection
Collection Details
 
Table of contents What's This?
  • Access
  • Publication and Use Rights
  • Processing Note
  • Preferred Citation
  • Acquisition Information
  • Historical or Biographical Note
  • Collection Scope and Content
  • Collection Arrangement

  • Title: Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications
    Date: 1957, 1956
    Identifier/Call Number: HDC1662 (SAFR 23819)
    Originating agency ||Utah Construction Company: Tidewater Oil Company Utah Construction Company
    Physical Description: 2 items
    Repository: San Francisco Maritime National Historical Park, Historic Documents Department
    Building E, Fort Mason
    San Francisco, CA 94123
    Abstract: The Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications (SAFR-23819, HDC 1662) consists of a report produced by the Bechtel Corporation, Refinery Division of San Francisco for the Tidewater Oil Company about the feasibility and strategies for lightering deep draft super and hyper tankers in order to accommodate their transit to the Avon Refinery located upstream of the Carquinez straits, and a specifications document produced by the Utah Construction Company for a 30 foot hydraulic dredge driven by a steam turbo-electric plant.
    Physical Location: San Francisco Maritime NHP, Historic Documents Department
    Language(s): In English.

    Access

    This collection is open for use unless otherwise noted.

    Publication and Use Rights

    Some material may be copyrighted or restricted. It is the researcher's obligation to determine and satisfy copyright or other case restrictions when publishing or otherwise distributing materials found in the collections.

    Processing Note

    Note on Description: The descriptions in this collection guide were compiled using the best available sources of information. Such sources include the creator's annotations or descriptions, collection accession files, primary and secondary source material and subject matter experts. While every effort was made to provide accurate information, in the event that you find any errors in this guide please contact the reference staff in order for us to evaulate and make corrections to this guide.
    Please cite the title and collection number in any correspondence with our staff.

    Preferred Citation

    [Item description], [Location within collection organization identified by Collection Number/Series Number/File Unit Number/Item Number], HDC1662 (SAFR 23819), Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications, San Francisco Maritime National Historical Park

    Acquisition Information

    SAFR-02213
    Field Collection

    Historical or Biographical Note

    The Tidewater Oil company operated the Avon refinery in 1957, and the Utah Construction company purchased dredging machinery in 1956.
    In 1913, the Associated Oil Company, a small drilling and pipeline manufacturer owned by the Southern Pacific Railroad, built a refinery at the point where the railroad crossed the Carquinez straits and where the Suisun bay empties into the larger San Pablo bay, near the city of Martinez, California. The refinery was named the Avon refinery because it was located within the Avon section of the Southern Pacific Railroad track system. The refinery was acquired in 1920 by the Pacific Oil Company which expanded the operations in 1923 and 1924 to include the manufacture of gasoline. In 1931, the Avon refinery was purchased by the Tidewater Oil Company, which was a subsidiary of J. Paul Getty's Standard Oil of California. In the mid 1950's, Tidewater Oil needed a plan to deal with the advent of supertankers and hyper-tankers to transport oil and gasoline in and out of the Avon refinery. These much larger draft vessels could enter San Francisco Bay, but not the shallower waters beyond the Carquinez straits. The plan involved a system of "lightering" the ships by offloading a portion of their cargo into smaller tankers thereby raising the draft of the super-tankers sufficiently to allow them to continue to the wharf. This system, developed in 1957. is still in effect and supertankers that have too deep a draft are "lightered" to this day.
    The Utah Construction Company was founded in 1900 by Edmund Wattis and his three brothers to support the building of the Western Pacific Railroad through the Sierra Nevada Mountains. After the completion of the railroad route from Salt Lake City to Oakland, California the company expanded to other construction projects and in 1931 was the leader of a six company conglomerate that built the Hoover Dam. In 1942, the Utah Construction Company with US Army and contractor help built the 1,500 mile Alaskan Highway in just seven months. In the early 1950's the company diversified into mining and dredging operations, and in 1955 signed a contract with the city of Alameda to fill in the tidal mud-flats beyond the old sea wall and created the area now known as South Shore. In 1971 the company changed its name to Utah International, merging with General Electric in 1976. In 1984 the company's assets were sold to a multinational conglomerate (BHP) and the company ceased to exist.

    Collection Scope and Content

    The Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications (SAFR-23819, HDC 1662) consists of a report produced by the Bechtel Corporation, Refinery Division of San Francisco for the Tidewater Oil Company about the feasibility and strategies for lightering deep draft super and hyper tankers in order to accommodate their transit to the Avon Refinery located upstream of the Carquinez straits, and a specifications document produced by the Utah Construction Company for a 30 foot hydraulic dredge driven by a steam turbo-electric plant.
    The Avon Refinery study, produced in 1957, was created at a time when the Tidewater Oil Company was considering expansion options at the plant and contains maps, charts, tables, drawings, foldouts, economic data and narrative studies of recommendations for the problems of lightering ships in the channel prior to their transit up to the existing wharf facilities. The 117 page report is contained in a three posted cardboard binder with seven tabbed sections labeled as follows: (1) General; (2) Shipping; (2.6) Charts; (3) Receiving; (3.7) Drawings & Charts; (4) Handling Facilities; and (4.7) Drawings & Charts.
    The Utah Construction Company Dredge specifications is a 133 page document created in 1956, that lists in detail the company's requirements for a dredge to be built by a contractor. The document was bound at the top margin with an Acco clip and a cover and is divided into 15 tabbed sections labeled as follows: Addendums; Dredge Hull; Turbo Generator; Condenser; Small Pumps; Machinery; Boiler; Heat Exchanger; Deaerator; Distilling Plant; Duplex Fuel Oil Pumps; Electrical Equipment; Pneumatic Controls; Swing and Spud Hoists; and Gear Reducers.

    Collection Arrangement

    Each report in a single folder

    Subjects and Indexing Terms

    Dredging.
    Associated Oil Company
    Tidewater Oil Company
    Utah Construction Company
    San Francisco Bay Area (Calif.)
    Official reports
    Corporation reports
    Economic development