Description
The Avon Refinery Crude Oil Shipping, Receiving and Handling Study and Utah Construction Company Dredge specifications (SAFR-23819,
HDC 1662) consists of a report produced by the Bechtel Corporation, Refinery Division of San Francisco for the Tidewater Oil
Company about the feasibility and strategies for lightering deep draft super and hyper tankers in order to accommodate their
transit to the Avon Refinery located upstream of the Carquinez straits, and a specifications document produced by the Utah
Construction Company for a 30 foot hydraulic dredge driven by a steam turbo-electric plant.
Background
The Tidewater Oil company operated the Avon refinery in 1957, and the Utah Construction company purchased dredging machinery
in 1956.
Restrictions
Some material may be copyrighted or restricted. It is the researcher's obligation to determine and satisfy copyright or other
case restrictions when publishing or otherwise distributing materials found in the collections.
Availability
This collection is open for use unless otherwise noted.