Finding Aid to Construction photographs of Pardee Dam, California, 1929-1933, undated
BANC PIC 1996.020 v.2--ALB
Online items available
Request items ↗
Contact UC Berkeley::Bancroft Library
View entire collection guide
Printable Guide [HTML]
Search this collection
Entire Collection Guide
Online Items
Online Items
Table of contents
41 - 60 of 101 results
Results page:
|<<
Previous
1
2
3
4
5
6
Next
>>|
General View of Pardee Dam, Reservoir and Power Plant, with South Spillway at right.
View of South Spillway, with 350 sec. ft. going over.
View of weir of South Spillway, with 350 sec. ft. going over.
Flow from South Spillway down Mexican Gulch. June 5, 1930. Flow in 1,600 cu. ft. per sec.
Interior of Power House at Pardee Dam. June 5, 1930. Two units can generate 7,500 kilowatts each; total capacity, 15,000 kilowatts
View of South Spillway with 1,600 sec. ft. going over.
Power House at Pardee Dam. June 7, 1930. Discharge of 700 cu. ft. per sec. from two 42" sluice pipes.
Sign at Pardee Dam, giving details of project
Sign on Mokelumne Aqueduct at Holt, giving details of Project.
Rolling half section of length of pipe for Mokelumne Aqueduct. Sheets of steel are 30 ft. long, 1/2 inch thick and 8 1/3 ft. wide. They are rolled cold. Work done at Steet [sic] Tank and Pipe Co. Berkeley.
Welding two half section of pipe together to make one complete section. Work done at Steel Tank and Pipe Co. in Berkeley.
Mokelumne Aqueduct, -- Laying steel pipe in trench across upland below Pardee Dam.
Mokelumne Aqueduct, -- Trench digging machine, in operation near Stockton.
Mokelumne Aqueduct, -- Laying sections of pipe in trench, near Stockton.
Mokelumne Aqueduct, -- Back filling over pipe laid in trench; near Stockton.
Volume 2
Mokelumne Aqueduct, -- Pipe laid in trench and back filled over ends of sections, ready for testing.
Mokelumne Aqueduct, -- Dredging San Joaquin River to lay pipe for crossing.
Mokelumne Aqueduct, -- Section of pipe between barges reaady [sic] for sinking at Middle River crossing.
Mokelumne Aqueduct, -- Section of pipe between barges ready for sinking at MIddle River Crossing.
Mokelumne Aqueduct, -- Painting pipe with aluminum paint to keep temperature low.
41 - 60 of 101 results
Results page:
|<<
Previous
1
2
3
4
5
6
Next
>>|
Collection Overview
Collection Details
Collection Summary
Information for Researchers
Administrative Information
Container Listing