California Toll Bridge Authority
1. RECORDS OF MEETINGS. 1933-1971.
Scope and Content Note
Board of Consulting Engineers, San Francisco-Oakland Bay Bridge
1a. PRELIMINARY BRIDGE DRAWINGS. 1931-1932.
Scope and Content Note
San Francisco-Oakland Bay Bridge Division
2. ANNUAL REPORTS AND BROCHURES. 1934-1935.
Scope and Content Note
3. LOG BOOK AND INDEX. 1929-1936.
Scope and Content Note
4. CENTRAL FILE. 1927-1943.
Scope and Content Note
000.000 Monthly Progress Charts (1934-1935),
Scope and Content Note
Trackwork Weekly Reports (1932-1939),
Scope and Content Note
000.050 Engineers' Memoranda (1932-1936),
Scope and Content Note
000.90 A-Z Internal (1934-1938)
Scope and Content Note
200.471 Toll Bridges - Misc. (1928-1932),
Scope and Content Note
200.5 Board of Consulting Engineers (1932-1933),
Scope and Content Note
200.60 Weekly Reports (1931-1940),
Scope and Content Note
200.6001 Reports to the Director (1933-1934),
Scope and Content Note
200.601-640 External Design Correspondence (1931-1938),
Scope and Content Note
200.650-660 Proposed Designs (1927-1936),
Scope and Content Note
200.661 G. M. Stimson, Consulting Engineer (1938-1939),
Scope and Content Note
200.70 Estimates of Cost (1931-1934),
Scope and Content Note
300.2 Bids (1933),
Scope and Content Note
400.10-312 Specifications and Equipment (1933-1936),
Scope and Content Note
400.35 Biography of Charles H. Purcell (1937),
Scope and Content Note
400.50 Engineer's Daily Diaries (1933-1943),
Scope and Content Note
402-455 Contract Records (1933-1936),
Scope and Content Note
2. Construction of West Bay Crossing Substructure (1933-1935),
3. San Francisco Anchorage and Viaduct (1933-1936),
4. Construction of East Bay Crossing Substructure (1933-1934),
5. Yerba Buena Island Construction (1933-1936),
6. Construction of West Towers and Spans (1933-1936),
7. Construction of Eastern Cantilever and Suspended Spans (1934-1936),
8. Substructure, Girders, Spans on Mole Construction (1934),
9. Final Painting of Bridge (1936-1937),
10. Toll Plaza Construction (1936),
11. Electrical Work (1935-1937),
12. Signs (1935-1939),
13. Tunnel Lining (1936),
14. Yerba Buena Storage Garage (1936-1937),
15. San Francisco Ramps and Landscaping (1936),
18. Sprinklers (1936),
19. Facilities for 1939 Exposition Traffic (1938),
20. Reinforcing Details (1939),
21. Fire Extinguishers (1939),
22. Alteration of Maintenance Building (1939),
23. Beautification of Rincon Hill (1939),
25. Fill at Administration Building (1939),
41. Distribution Structure (1935-1936),
42. Folger Underpass (1935),
43. San Pablo Avenue Subway (1935-1936),
52. Cables for Protection Against Sabotage (1936),
455 T. E. Stanton, Materials and Research Engineer (1934-1936),
Scope and Content Note
460 John M. Bailey - Principal Steel Inspector (1933-1936),
Scope and Content Note
480 Progress Report on Contracts Let Prior to June 30, 1936 (1936),
Scope and Content Note
490 Misc. Daily Reports (1934-1937),
Scope and Content Note
495 Interurban Railway Construction Contract Records (1936-1938),
Scope and Content Note
General Correspondence (1938-1939),
Scope and Content Note
Contract Records (1938-1939),
Scope and Content Note
R-1A, B San Francisco Terminal Location Demolition (1936-1940),
Scope and Content Note
R-2 San Francisco Terminal Construction (1936-1939),
R-3 San Francisco Viaduct (1938-1939),
R-4 Substructure - East Bay Yard (1937),
R-5 Signals and Interlocking (1936-1939),
R-6 Telephone System (1937-1939),
R-7 Substructure - East Bay Yard (1937-1938),
R-8 Buildings - East Bay Yard (1937-1939),
Scope and Content Note
R-9 Trackwork and Rail Construction (1937-1938),
R-10 Cantenary and Feeders (1937-1938),
R-11 Track Bonding (1937-1938),
R-21 East Bay Yard - Fill and Key System Work (1936-1939),
R-24 San Francisco Offline Connection (1937-1939),
R-25 Substations (1938),
R-30 Southern Pacific Company Equipment Transfer (1937-1939),
Scope and Content Note
R-32 Sacramento Northern Railroad Equipment Transfer (1938-1940),
500 Supplies (1933-1940),
Scope and Content Note
600 Personnel (1933-1943),
Scope and Content Note
700.23 Planned Purchase of Ferries (1933-1938),
Scope and Content Note
700.93 Reconstruction Finance Corporation (hereafter RFC), (1934-1939),
Scope and Content Note
800.3-6 Surveys and Plans (1930-1935),
Scope and Content Note
800.38 Bridge Models (1930-1935),
Scope and Content Note
800.41 Aerial Surveys (1931),
Scope and Content Note
800.50 Triangulation (1930-1939),
Scope and Content Note
800.6 Traffic Problems and Transit Plans (1931-1939),
Scope and Content Note
800.62 Earthquake Data (1933-1939),
Scope and Content Note
800.70 Special Reports (1930-1939),
Scope and Content Note
900.01-05 Misc. Correspondence (1933-1937),
Scope and Content Note
900.09 Hoover-Young Bay Bridge Commission Report (Aug., 1930),
Scope and Content Note
900.11-24 Publicity and Ceremonies (1933-1938),
Scope and Content Note
900.11 General Correspondence (1930-1936),
Scope and Content Note
900.112 Ceremonies and Celebrations (1933-1939),
Scope and Content Note
900.115-116 Inspection Trips (1933-1937),
Scope and Content Note
900.117 Speeches (1933-1939),
Scope and Content Note
900.118 Golden Gate International Exposition (1938-1939),
Scope and Content Note
900.119 Cable Spinning Broadcast (1935),
Scope and Content Note
900.12 Clippings - Photographs (1933-1936),
Scope and Content Note
900.121-24 Miscellaneous Correspondence (1933-1939),
Scope and Content Note
Naming of the Bridge
Monuments and Plaques
Crank Letters
American Institute of Steel Construction Award
5. CONSTRUCTION PHOTOGRAPHS. 1932-1937.
Scope and Content Note
2. Construction of West Bay Crossing Substructure (1933-1935),
Scope and Content Note
3. San Francisco Anchorage and Viaduct (1933-1936),
Scope and Content Note
4. Construction of East Bay Crossing Substructure (1933-1934),
Scope and Content Note
5. Yerba Buena Island Construction (1933-1936),
Scope and Content Note
6. Construction of West Towers and Spans (1933-1936),
Scope and Content Note
7. Construction of Eastern Cantilever and Suspended Spans (1934-1936),
Scope and Content Note
8. Substructure, Girder Spans on Mole Construction (1934),
Scope and Content Note
9. Final Painting of the Bridge (1936-1937),
Scope and Content Note
10. Toll Plaza Construction (1936),
Scope and Content Note
11. Electrical Work (1935-1937),
Scope and Content Note
13. Tunnel Lining (1936),
Scope and Content Note
14. Yerba Buena Storage Garage (1936-1937),
Scope and Content Note
15-15A. San Francisco On Ramps, Off Ramps, and Landscaping (1936),
Scope and Content Note
East Bay Distribution System (1935-1936),
Scope and Content Note
Miscellaneous Photographs (1933-1936),
Scope and Content Note
6. CHECK REGISTER. 1933-1938.
Scope and Content Note
San Francisco-Oakland Bay Bridge Section of the Bridge Department
7. OPERATION AND MAINTENANCE FILE. 1932-1951.
Scope and Content Note
100 Accounting (1936-1939)
Scope and Content Note
300 Equipment and Accessories (1936-1945)
Scope and Content Note
400 Maintenance and Operation (1936-1951)
Scope and Content Note
500 Materials and Supplies (1936-1951)
Scope and Content Note
600 Personnel (1933-1947)
Scope and Content Note
700 Legal (1936-1939)
Scope and Content Note
800 Traffic (1936-1951)
Scope and Content Note
7A. OPERATION AND MAINTENANCE FILE. 1947-60.
Scope and Content Note
100.01 Toll Bridges Budgets - Maintenance - Operation (1948-57),
Scope and Content Note
100.02 Accounting Reports & Instructions (1951-57),
Scope and Content Note
100.042 Accounts Receivable, Bay Bridge (1949-52),
100.05 Service Agreements, Bay Bridge (1949-58),
300.04 Automotive Equipment, Bay Bridge (1956-60),
400.30 Accidents, Bay Bridge (1947-57),
Scope and Content Note
400.36 Contracts, Bay Bridge (1948-57),
Scope and Content Note
600.01 General Personnel Correspondence, Bay Bridge (1948-59),
Scope and Content Note
900 Unclassified (1936-1939),
Scope and Content Note
8. SCRAPBOOKS. 1936-1955.
Scope and Content Note
9. TOLL BRIDGE SERGEANT'S DAILY JOURNALS. 1940-1948.
Scope and Content Note
10. CARQUINEZ AND ANTIOCH BRIDGE PURCHASE RECORDS. 1923-1932, 1937.
Scope and Content Note
Survey and Preliminary Study (1939-1941)
Scope and Content Note
American Toll Bridge Co. Exhibits (1923-1938)
Scope and Content Note
Diaries and Field Books (1923-1932, 1937)
Scope and Content Note
Division of San Francisco Bay Toll Crossing
11. ADDITIONAL TOLL CROSSING REPORT. October, 1949.
Scope and Content Note
12. PUBLIC RELATIONS FILE. 1948-1959.
Scope and Content Note
Correspondence (1948-1958),
Scope and Content Note
Press Clippings (1948-1954, 1956-1959),
Scope and Content Note
PUBLIC WORKS-BRIDGE DEPT. SAN FRANCISCO-OAKLAND BAY BRIDGE PHOTOGRAPHS
West Bay, San Francisco Viaduct, San Francisco Viaduct Fill, Pier #1, Pier #A, Pier #B
Pier 2, Pier 3, Pier 4 Vol I & II
Pier 4(cont), Pier 5, Pier E-2, Pier E-8, Pier E-9, Pier 6, Pier 24, Harbor, Miscellaneous
West Approach, West Portal, East Portal, East Approach, Pilot Tunnel #1-#5, Miscellaneous Pilot Tunnels, North Tunnell Wall, South Tunnell Wall
Arch, Tunnel, Y.B. Pier #1-#4, West Anchor Arm, E-1 (pier)
E-1 Pier (cont), West Cantilever Arm, East Anchor Arm, East Cantilever Arm, Span Anchorage W1, Tower W2
Tower W3, Tower W5, Tower W6, Span W4-W5, Pier E-3, Pier E-4
Pier E-5, Pier E-6, Pier E-7, S.F. Anchorage Vol. 1
S.F. Anchorage Vol 1 (cont), Pier E-10, Pier E-11, Pier 3-12, Pier E-13 thru Pier E-22, Miscellaneous Piers (East Bay crossing, Army dock), Y.B. Anchorage/Disposal Chute
Y.B. Anchorage/Disposal Chute (cont), Y.B. Viaduct/West Approach, Y.B. Viaduct/East Approach, North Anchorage Tunnell, South Anchorage Tunnel, Center Anchorage
South Cable-Saddle W2, North Cable-Saddle W3, South Cable-Saddle W3, North & South Cables-Saddle W5, South Cable-Saddle W6, North Cable-Saddle W7, Misc., Continuous Spans Pier #1, San Francisco Anchorage, 288 ft. Spans, 288 ft. Spans/Misc., 288 ft. Spans/Spans E-9, 288 ft. Spans/Spans E-10
288 ft. Spans/Span E-11 thru E-21, Span W1 thru Span W7, Y.B. Viaduct
Y.B. Anchorage, North Catwalk, South Catwalk, Misc. Catwalk, Stiffening Truss, West Suspension Span, East Suspension Span, West Bay, North Cable-Saddle W1, South Cable-Saddle W1, North Cable-Saddle W2, Span Y.B.-1 thru Span Y.B.-4
Y.B. Spans, Spans Y.B.-1, E-1, 288 ft. Spans E-22, East Bay Crossing, Cantilever Span, Suspended Span, 500 ft. Spans, Span E-4 thru Span E-8
Misc. (Piers, deck, bracing, grit plant), Pier E-23 & E-23A thru Pier E-27 & E-27A, Pier E-28 thru E-39, Misc., Lower Deck, East Approach, East Bay Crossing (East & West Anchor, East & West Cantilever Arm) Continuous Spans, Spans A-W1 thru 34
Center Anchorage, East Suspension Span, Span W-4 thru W-7, 288 ft. Spans, 500 ft. Spans, Span E-4 thru E-8, West Bay Crossing, Tower W2, Tower W3, W5, Tower W6, Y.B. Spans, East Bay Crossing, E. Bay Crossing-Cantilever Spans, Toll Plaza, Electrical Work
Electrical Work (cont), Tunnel Lining, Y.B. Island Garage, On Ramp, Off Ramp, Essex Street Roadway, Harrison Street Roadway, Cellular Structure, Fifth Street Plaza, Harrison Street Regrade, Rincon Hill Regrade, Truck Off Ramp, S.F. Approach
S.F. Approach (cont), Distribution Structure B Line, B N Line, A N Line, S A Line, N Line, S B Line, S Line, N C Line, C S LIne, N M Line
M S Line, General, Misc., BN & SB Lines, SA & SB Lines, AN & SA Lines, N & S Lines, MN & CS Lines, CS & NC Lines, MS & CS Lines, NM & MS & N Lines, San Pablo Underpass, Folger Avenue Underpass, Misc.
Misc. (cont), Block 3720 R-1A, Central Views P1 - 1A, Y.B. Anchorage, West Approach
West Portal, Tunnel, East Approach, Y.B. Viaduct, Pier Y.B.-1, Pier Y.B.-2, Pier Y.B.-3, Pier Y.B.-4, Pier E-1, Misc.