CLIPI Records
Subseries: Interim Technical Reports
Interim Technical Report: Evaluation of the Quality Aassurance Program and Implementation Reviews, TR-5511-1, Revision 0, June 23, 1982 1982
Additional Verification and Additional Sampling, Revision 1, October 15, 1982 1982
Shake Table Testing, Revision 0, July 23, 1982 1982
Design Chain, Revision 0, August 19, 1982 1982
Auxiliary Building, Revision 0, September 10, 1982 1982
Electrical Raceway Supports, Revision 0, September 17, 1982 1982
Verification Program for PG&E Corrective Action, Revision 0, October 5, 1982 1982
Interim Technical Report 10, Verification of Design Analysis Hosgri Spectra, Revision 0, October 29, 1982 1982
Interim Technical Report 12, Piping, Revision 0, November 5, 1982 1982
Interim Technical Report 13, Soils-Intake Structure, Revision 0, November 5, 1982 1982
Interim Technical Report 15, HVAC Duct and Supports Report, Revision 0, December 10, 1982 1982
Interim Technical Report 16, Soils-Outdoor Water Storage Tanks, Revision 0, December 8, 1982 1982
Interim Technical Report 17, Piping - Additional Samples, Revision 0, December 14, 1982 1982
Interim Technical Report 14, Verification of the Pressure, Temperature, Humidity, and Submergence Environments Used for Safety-Related Equipment Specification Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressure System, Revisions 0-2, December 6, 1982 1982
Interim Technical Report 18, Verification of the Fire Protection Provided for Auxiliary Feedwater Systems, Control Room Ventilation and Pressurization System, Safety-Related Portion of the 4160V Electric System, Revisions 0-1, December 13, 1982 1982
Interim Technical Report 19, Verification of the Post-Loca Portion of the Radiation Environments Used for Safety-Related Equipment Specification Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revision 0, December 16, 1982 1982
Interim Technical Report 22, Verification of the Mechanical/Nuclear Portion of the Auxiliary Feedwater System, Revisions 0-2, December 17, 1982 1982
Interim Technical Report 20, Verification of the Mechanical/Nuclear Design of the Control Room Ventilation and Pressurization System, Revisions 0-2, December 16, 1982 1982
Interim Technical Report 21, Verification of the Effects of High Energy Line Cracks and Moderate Energy Line Breaks for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revisions 0-1, December 15, 1982 1982
Interim Technical Report 23, Verification of High Energy Line Break and Internally Generated Missile Review Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revisions 0-1, December 20, 1982 1982
Interim Technical Report 24, Verification of the 4160V Safety-Related Electrical Distribution System, Revisions 0-1, December 21, 1982 1982
Interim Technical Report 25, Verification of the Auxiliary Feedwater System Electrical Design, Revisions 0-1, December 21, 1982 1982
Interim Technical Report 26, Verification of the Control Room Ventilation and Pressurization System Electrical Design, Revisions 0-1, December 21, 1982 1982
Interim Technical Report 27, Verification of the Instrument and Control Design of the Auxiliary Feedwater System, Revisions 0-2, December 23, 1982 1982
Letter from J.E. Krechting Concerning Interim Technical Report 27, Revision 1, and Interim Technical Report 28, Revision 1, May 18, 1983 1983
Summary and Evaluation of Interim Technical Report 9, Revision 0, October 15, 1982 1982
Seismic Interface Review, TR-5511-2, Interim Technical Report 11, Revision 0, November 2, 1982 1982
Interim Technical Report 28, Verification of Control Room Ventilation and Pressurization, Stone & Webster Engineering Corp., 12/23/82, 5/13/83, 7/25/83 1982-1983
Interim Technical Report 29, Design Chain Sample, Stone & Webster Engineering Corp., 1/17/83 1983
Interim Technical Report 30, Small Bore Piping Report, Robert L. Cloud and Associates, Inc., 1/12/83, 8/4/83 1983
Interim Technical Report 31, HVAC Components, Robert L. Cloud and Associates, Inc., 1/14/83, 8/4/83 1983
Interim Technical Report 32, Pumps, Robert L. Cloud and Associates, Inc., 2/17/83, 4/1/83 1983
Interim Technical Report 33, Electrical Equipment Analysis, Robert L. Cloud and Associates, Inc., 2/18/83, 4/28/83 1983
Interim Technical Report 34, Verification of Diablo Canyon Effort, Stone & Webster Engineering Corp., 2/4/83, 3/24/83 1983
Interim Technical Report 35, Diablo Canyon Activities, Robert L. Cloud and Associates, Inc., 4/1/83 1983
Interim Technical Report 37, Valves, Robert L. Cloud and Associates, Inc., 2/22/83 1983
Interim Technical Report 38 Revision 1 - Evaluation of Construction Quality Assurance by Stone & Webster Engineering Corporation, 3/16/1983 (2 folders) 1983
Interim Technical Report 38 Revision 2 - Final Report on Construction Quality Assurance Evaluation of Wismer and Becker, 6/20/1983 (2 folders) 1983
Interim Technical Report 36 Revision 0 - Final Report on Construction Quality Assurance Evaluation of Guy F. Atkinson, 3/3/83 1983
Interim Technical Report 36 Revision 1 - Final Report on Construction Quality Assurance Evaluation of Guy F. Atkinson, 6/20/1983 1983
Interim Technical Report 36 Revision 1 - Final Report on Construction Quality Assurance Evaluation of Wismer & Becker, 3/18/1983 1983
Interim Technical Report 38 Revision 0 - Construction Quality Assurance Evaluation of Wismer and Becker, 3/1/1983 1983
Interim Technical Report 39, Soils Intake Structure, Bearing Capacity and Lateral Earth Pressure, Robert L. Cloud and Associates, Inc., 2/25/83 1983
Interim Technical Report 40, Soils Intake Structure, Sliding Resistance, Robert L. Cloud and Associates Inc., 3/9/83, 3/10/83 1983
Interim Technical Report 41, Corrective Action Program and Design Office Verification, R.F. Reedy, Inc., 4/19/83, 4/22/83 1983
Interim Technical Report 42, Review and Audit of PG&E and Design Consultants, R.F. Reedy Inc., 4/13/83 1983
Interim Technical Report 43, Heat Exhcnagers, Robert L. Cloud and Associates, 4/14/83 1983
Interim Technical Report 44, Shake Table Test Mounting Class 1E Electrical Equipment, Robert L. Cloud and Associates, Inc., 4/15/83 1983
Interim Technical Report 45, Additional Verification of Redundancy of Equipment and Power Supplies, Stone & Webster Engineering Corp., 5/17/83, 5/20/83 1983
Interim Technical Report 46, Additional Verification of Selection of System Design and Temperature Differential Pressure, Stone & Webster Engineering Corp., 6/27/83 1983
Interim Technical Report 47, Additional Verification of Environmental Consequences of Postulated Pipe Ruptures, Stone & Webster Engineering Corp., 6/27/83 1983
Interim Technical Report 48, Additional Verification of Jet Impingement Effects of Postulated Pipe Ruptures, Stone & Webster Engineering Corp., 7/27/83, 7/29/83 1983
Interim Technical Report 49, Additional Verification of Circuit Separation and Single Failure Review, Stone & Webster Engineering Corp., 6/22/83 1983
Interim Technical Report 51, Containment Annulus Structure Verification of Diablo Canyon Corrective Action, Teledyne Engineering Services, 9/21/83 1983
Interim Technical Report 54, IDVP Verification of Corrective Action, Containment Building, Robert L. Cloud and Associates, Inc., 9/11/83, 9/14/83, 10/3/83 1983
Interim Technical Report 55, IDVP Verification of Corrective Action, Auxiliary Building, Robert L. Cloud and Associates, Inc., Teledyne Engineering Services, 9/8/83 1983
Open Item Report System Forms and Lookahead Report, Teledyne Engineering Services, 3/11/83-4/8/83 1983
Cost Analysis of Lighter Water Reactor Power Plants, Prepared for the Department of Energy June 1978
A Second Cost Analysis of Lighter Water Reactor Power Plants, Prepared for the Department of Energy December 1979
Staff Report, Assessment of Electric Utility Supply Plans 1978-2000 June 1980
Center for Law in the Public Interest Docket [describes cases being litigated or negotiated by Center attorneys, organized by subject areas, as well as inactive cases] 1976
State of California, The Resource Agency, Department of Water Resources, Wind in California January 1978
Interim Technical Report 61, Small Bore Piping, Revision 1, Robert L. Cloud and Associates, Inc., 10/2/83 1983
Interim Technical Report 63, HVAC Duct, Electrical Raceways, Instrument Tubing and Associated Supports, Robert L. Cloud and Associates, Inc., 10/2/83 1983
Interim Technical Report 60, Large and Small Bore Pipe Supports, Revision 1, Robert L. Cloud and Associates, Inc. 1983 1983
Interim Technical Report 58, Intake Structure, Revision 1, Robert L. Cloud and Associates, Inc., 10/1/83 1983
Interim Technical Report 65, Rupture Restraints, Revision 1, Robert L. Cloud and Associates, Inc., 10/11/83 1983
Interim Technical Report 68, Verification of HLA Soils Work, Revision 1, Robert L. Cloud and Associates, Inc., 10/5/83 1983
Interim Technical Report 63, HVAC Duct, Electrical Raceways, Instrument Tubing and Associated Supports, Revision 0, Robert L. Cloud and Associates, Inc., 8/22/83 1983
Letter of Transmittal by Robert L. Cloud Associates
Interim Technical Report 60, Large and Small Bore Pipe Supports, Revision 0, Robert L. Cloud and Associates, Inc. 1983 1983
Interim Technical Report 43, Heat Exchangers, Teledyne Engineering Services 1983
Interim Technical Report 55, Auxiliary Building, Revision 1, Robert L. Cloud and Associates, Inc., 10/1/83 1983
Interim Technical Report 54, Containment Building, Revision 1, Robert L. Cloud and Associates, Inc., 10/4/83 1983
Teledyne Engineering Services Semimonthly Report, March 11, 1983 1983