Records of the San Luis Obispo Mothers for Peace MS0195

Laura Sorvetti, Manikandan Ravi, Miranda Ward
Special Collections and Archives, Robert E. Kennedy Library, California Polytechnic State University, San Luis Obispo
2024


Contributing Institution: Special Collections and Archives, Robert E. Kennedy Library, California Polytechnic State University, San Luis Obispo
Title: Records of the San Luis Obispo Mothers for Peace
Creator: Mothers for Peace
Creator: San Luis Obispo Mothers for Peace
Identifier/Call Number: MS0195
Physical Description: 100 Linear Feet 98 boxes
Date (inclusive): 1969-2017
Abstract: Records related to the activities of Mothers for Peace to educate and inform the public of the dangers of nuclear power, weapons, and waste as well as legal resistance to eliminate the propagation of nuclear power. Records include work related to the Diablo Canyon Nuclear Power Plant and the litigation and public hearings involving seismic safety, County Emergency Response Plan, high level radioactive water storage, rate structure and deregulation, degradation of coastal waters and plant security.
Language of Material: English .

Access

Collection is open to researchers by appointment. For more information on visiting, access policies, and reproduction requests, please visit our Reference Services page online at http://lib.calpoly.edu/search-and-find/collections-and-archives/reference-services/.

Publication Rights

Digital copies are provided to researchers for the purpose of study, research, and personal use only, unless otherwise specified in writing. Materials that are the property of Cal Poly Special Collections and Archives require written permission prior to publication. No complete collection may be reproduced. For print and online publication, please visit our Reproduction Services page online at http://lib.calpoly.edu/support/sca-policies/reproduction/. Special Collections and Archives reserves the right to review all reproduction requests and to withhold permission if scanning would endanger the material, would violate copyright law, or would violate institutional restrictions.

Preferred Citation

Records of the San Luis Obispo Mothers for Peace, Special Collections and Archives, California Polytechnic State University, San Luis Obispo.

Acquisition Information

Gift

Organizational History

The San Luis Obispo Mothers for Peace came together in 1969. A young mother had written a letter to the editor of the local newspaper asking that people who shared her sadness and frustration at the needless loss of life in the Vietnam War join her in searching out ways to act effectively as a group. The shared values and compelling need to act that originally brought the group together have continued to characterize the Mothers for Peace.
Non-profit: The group is a local, non-profit organization (501c3). Its members include mothers, grandmothers, and non-parents. Its membership is predominantly, but not exclusively, women.
Mission: The organization's concerns include the dangers of nuclear power, weapons, and waste on national and global levels. Additionally, the Mothers for Peace cares about peace, social justice, and a safe environment. The group takes on all of these issues, working to make the world safer and more humane for generations to come.
Legal Intervention: Since 1973, the Mothers for Peace has focused much of its attention on the local dangers involving Diablo Canyon Nuclear Power Plant. It has been the legal intervenor for over three decades of controversy concerning the construction, licensing, and operation of the Diablo Canyon facility. The organization utilizes all legal means to ensure safe operation and compliance with State and Federal Laws. See the Path of Legal Resistance.

Scope and Content of Collection

Documents, photographs, copy prints, legal documentation and reports, and ephemera related to the activities of the San Luis Obispo Mothers for Peace organization in its efforts to educate and inform the public of the dangers of nuclear power, weapons, and waste as well as legal resistance to eliminate the propagation of nuclear power.
Website archive including multiple website captures between 2016 – 2017 located at: https://wayback.archive-it.org/7324/*/https://mothersforpeace.org/

Subjects and Indexing Terms

Radioactive waste disposal
Nuclear energy
Nuclear power plants--California
Diablo Canyon Nuclear Powerplant (Calif.)
California
San Luis Obispo
Morro Bay

 

CLIPI Records

 

Subseries: Interim Technical Reports

box CLIPI 033

Interim Technical Report: Evaluation of the Quality Aassurance Program and Implementation Reviews, TR-5511-1, Revision 0, June 23, 1982 1982

box CLIPI 033

Additional Verification and Additional Sampling, Revision 1, October 15, 1982 1982

box CLIPI 033

Shake Table Testing, Revision 0, July 23, 1982 1982

box CLIPI 033

Design Chain, Revision 0, August 19, 1982 1982

box CLIPI 033

Auxiliary Building, Revision 0, September 10, 1982 1982

box CLIPI 033

Electrical Raceway Supports, Revision 0, September 17, 1982 1982

box CLIPI 033

Verification Program for PG&E Corrective Action, Revision 0, October 5, 1982 1982

box CLIPI 033

Interim Technical Report 10, Verification of Design Analysis Hosgri Spectra, Revision 0, October 29, 1982 1982

box CLIPI 033

Interim Technical Report 12, Piping, Revision 0, November 5, 1982 1982

box CLIPI 033

Interim Technical Report 13, Soils-Intake Structure, Revision 0, November 5, 1982 1982

box CLIPI 033

Interim Technical Report 15, HVAC Duct and Supports Report, Revision 0, December 10, 1982 1982

box CLIPI 033

Interim Technical Report 16, Soils-Outdoor Water Storage Tanks, Revision 0, December 8, 1982 1982

box CLIPI 033

Interim Technical Report 17, Piping - Additional Samples, Revision 0, December 14, 1982 1982

box CLIPI 033

Interim Technical Report 14, Verification of the Pressure, Temperature, Humidity, and Submergence Environments Used for Safety-Related Equipment Specification Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressure System, Revisions 0-2, December 6, 1982 1982

box CLIPI 033

Interim Technical Report 18, Verification of the Fire Protection Provided for Auxiliary Feedwater Systems, Control Room Ventilation and Pressurization System, Safety-Related Portion of the 4160V Electric System, Revisions 0-1, December 13, 1982 1982

box CLIPI 033

Interim Technical Report 19, Verification of the Post-Loca Portion of the Radiation Environments Used for Safety-Related Equipment Specification Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revision 0, December 16, 1982 1982

box CLIPI 033

Interim Technical Report 22, Verification of the Mechanical/Nuclear Portion of the Auxiliary Feedwater System, Revisions 0-2, December 17, 1982 1982

box CLIPI 033

Interim Technical Report 20, Verification of the Mechanical/Nuclear Design of the Control Room Ventilation and Pressurization System, Revisions 0-2, December 16, 1982 1982

box CLIPI 033

Interim Technical Report 21, Verification of the Effects of High Energy Line Cracks and Moderate Energy Line Breaks for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revisions 0-1, December 15, 1982 1982

box CLIPI 033

Interim Technical Report 23, Verification of High Energy Line Break and Internally Generated Missile Review Outside Containment for Auxiliary Feedwater System and Control Room Ventilation and Pressurization System, Revisions 0-1, December 20, 1982 1982

box CLIPI 033

Interim Technical Report 24, Verification of the 4160V Safety-Related Electrical Distribution System, Revisions 0-1, December 21, 1982 1982

box CLIPI 033

Interim Technical Report 25, Verification of the Auxiliary Feedwater System Electrical Design, Revisions 0-1, December 21, 1982 1982

box CLIPI 033

Interim Technical Report 26, Verification of the Control Room Ventilation and Pressurization System Electrical Design, Revisions 0-1, December 21, 1982 1982

box CLIPI 033

Interim Technical Report 27, Verification of the Instrument and Control Design of the Auxiliary Feedwater System, Revisions 0-2, December 23, 1982 1982

box CLIPI 033

Letter from J.E. Krechting Concerning Interim Technical Report 27, Revision 1, and Interim Technical Report 28, Revision 1, May 18, 1983 1983

box CLIPI 033

Summary and Evaluation of Interim Technical Report 9, Revision 0, October 15, 1982 1982

box CLIPI 033

Seismic Interface Review, TR-5511-2, Interim Technical Report 11, Revision 0, November 2, 1982 1982

box CLIPI 017

PG&E Response to NUREG-0578: Short Term Lessons Learned Requirements, 2/29/1980 (2 folders) 1980

Scope and Contents

According to annotations, NUREG-0578 refers to the Three Mile Island accident; Revision 1 is dated 3/14/80, while Revision 0 is dated 2/29/80; includes some figures and diagrams
box CLIPI 017

Interim Technical Report 28, Verification of Control Room Ventilation and Pressurization, Stone & Webster Engineering Corp., 12/23/82, 5/13/83, 7/25/83 1982-1983

box CLIPI 017

Interim Technical Report 29, Design Chain Sample, Stone & Webster Engineering Corp., 1/17/83 1983

box CLIPI 017

Interim Technical Report 30, Small Bore Piping Report, Robert L. Cloud and Associates, Inc., 1/12/83, 8/4/83 1983

box CLIPI 017

Interim Technical Report 31, HVAC Components, Robert L. Cloud and Associates, Inc., 1/14/83, 8/4/83 1983

box CLIPI 017

Interim Technical Report 32, Pumps, Robert L. Cloud and Associates, Inc., 2/17/83, 4/1/83 1983

box CLIPI 017

Interim Technical Report 33, Electrical Equipment Analysis, Robert L. Cloud and Associates, Inc., 2/18/83, 4/28/83 1983

box CLIPI 017

Interim Technical Report 34, Verification of Diablo Canyon Effort, Stone & Webster Engineering Corp., 2/4/83, 3/24/83 1983

box CLIPI 017

Interim Technical Report 35, Diablo Canyon Activities, Robert L. Cloud and Associates, Inc., 4/1/83 1983

box CLIPI 017

Interim Technical Report 37, Valves, Robert L. Cloud and Associates, Inc., 2/22/83 1983

box CLIPI 030

Interim Technical Report 38 Revision 1 - Evaluation of Construction Quality Assurance by Stone & Webster Engineering Corporation, 3/16/1983 (2 folders) 1983

Scope and Contents

II.D.3 - Final Report on Construction Quality Assurance Evaluation of Wismer and Becker, Performed by Stone & Webster Engineering Corporation
box CLIPI 030

Interim Technical Report 38 Revision 2 - Final Report on Construction Quality Assurance Evaluation of Wismer and Becker, 6/20/1983 (2 folders) 1983

box CLIPI 030

Interim Technical Report 36 Revision 0 - Final Report on Construction Quality Assurance Evaluation of Guy F. Atkinson, 3/3/83 1983

box CLIPI 030

Interim Technical Report 36 Revision 1 - Final Report on Construction Quality Assurance Evaluation of Guy F. Atkinson, 6/20/1983 1983

box CLIPI 030

Interim Technical Report 36 Revision 1 - Final Report on Construction Quality Assurance Evaluation of Wismer & Becker, 3/18/1983 1983

box CLIPI 030

Interim Technical Report 38 Revision 0 - Construction Quality Assurance Evaluation of Wismer and Becker, 3/1/1983 1983

box CLIPI 017

Interim Technical Report 39, Soils Intake Structure, Bearing Capacity and Lateral Earth Pressure, Robert L. Cloud and Associates, Inc., 2/25/83 1983

box CLIPI 017

Interim Technical Report 40, Soils Intake Structure, Sliding Resistance, Robert L. Cloud and Associates Inc., 3/9/83, 3/10/83 1983

box CLIPI 017

Interim Technical Report 41, Corrective Action Program and Design Office Verification, R.F. Reedy, Inc., 4/19/83, 4/22/83 1983

box CLIPI 017

Interim Technical Report 42, Review and Audit of PG&E and Design Consultants, R.F. Reedy Inc., 4/13/83 1983

box CLIPI 017

Interim Technical Report 43, Heat Exhcnagers, Robert L. Cloud and Associates, 4/14/83 1983

box CLIPI 017

Interim Technical Report 44, Shake Table Test Mounting Class 1E Electrical Equipment, Robert L. Cloud and Associates, Inc., 4/15/83 1983

box CLIPI 017

Interim Technical Report 45, Additional Verification of Redundancy of Equipment and Power Supplies, Stone & Webster Engineering Corp., 5/17/83, 5/20/83 1983

box CLIPI 017

Interim Technical Report 46, Additional Verification of Selection of System Design and Temperature Differential Pressure, Stone & Webster Engineering Corp., 6/27/83 1983

box CLIPI 017

Interim Technical Report 47, Additional Verification of Environmental Consequences of Postulated Pipe Ruptures, Stone & Webster Engineering Corp., 6/27/83 1983

box CLIPI 017

Interim Technical Report 48, Additional Verification of Jet Impingement Effects of Postulated Pipe Ruptures, Stone & Webster Engineering Corp., 7/27/83, 7/29/83 1983

box CLIPI 017

Interim Technical Report 49, Additional Verification of Circuit Separation and Single Failure Review, Stone & Webster Engineering Corp., 6/22/83 1983

box CLIPI 017

Interim Technical Report 51, Containment Annulus Structure Verification of Diablo Canyon Corrective Action, Teledyne Engineering Services, 9/21/83 1983

box CLIPI 017

Interim Technical Report 54, IDVP Verification of Corrective Action, Containment Building, Robert L. Cloud and Associates, Inc., 9/11/83, 9/14/83, 10/3/83 1983

box CLIPI 017

Interim Technical Report 55, IDVP Verification of Corrective Action, Auxiliary Building, Robert L. Cloud and Associates, Inc., Teledyne Engineering Services, 9/8/83 1983

box CLIPI 017

Open Item Report System Forms and Lookahead Report, Teledyne Engineering Services, 3/11/83-4/8/83 1983

box CLIPI 012

A Study of the Separation of Functions and Ex Parte Rules in Nuclear Regulatory Commission Adjucations for Domestic Licensing, 3/21/1980 1980

Scope and Contents

Performed by the US Nuclear Regulatory Commission
box CLIPI 012

Cost Analysis of Lighter Water Reactor Power Plants, Prepared for the Department of Energy June 1978

box CLIPI 012

A Second Cost Analysis of Lighter Water Reactor Power Plants, Prepared for the Department of Energy December 1979

box CLIPI 012

Staff Report, Assessment of Electric Utility Supply Plans 1978-2000 June 1980

box CLIPI 012

An Evaluation of Seismic Qualification Tests for Nuclear Power Plant Equipment, Final Report, September 1, 1976 - August 31, 1978 September 1979

Scope and Contents

Daniel D. Kana, Robert W. LeBlanc
box CLIPI 012

Center for Law in the Public Interest Docket [describes cases being litigated or negotiated by Center attorneys, organized by subject areas, as well as inactive cases] 1976

box CLIPI 012

State of California, The Resource Agency, Department of Water Resources, Wind in California January 1978

box CLIPI 012

Interim Technical Report 61, Small Bore Piping, Revision 1, Robert L. Cloud and Associates, Inc., 10/2/83 1983

box CLIPI 012

Interim Technical Report 63, HVAC Duct, Electrical Raceways, Instrument Tubing and Associated Supports, Robert L. Cloud and Associates, Inc., 10/2/83 1983

box CLIPI 012

Interim Technical Report 60, Large and Small Bore Pipe Supports, Revision 1, Robert L. Cloud and Associates, Inc. 1983 1983

box CLIPI 012

Interim Technical Report 58, Intake Structure, Revision 1, Robert L. Cloud and Associates, Inc., 10/1/83 1983

box CLIPI 012

Interim Technical Report 65, Rupture Restraints, Revision 1, Robert L. Cloud and Associates, Inc., 10/11/83 1983

box CLIPI 012

Interim Technical Report 68, Verification of HLA Soils Work, Revision 1, Robert L. Cloud and Associates, Inc., 10/5/83 1983

box CLIPI 012

Interim Technical Report 63, HVAC Duct, Electrical Raceways, Instrument Tubing and Associated Supports, Revision 0, Robert L. Cloud and Associates, Inc., 8/22/83 1983

box CLIPI 012

Letter of Transmittal by Robert L. Cloud Associates

box CLIPI 012

Interim Technical Report 60, Large and Small Bore Pipe Supports, Revision 0, Robert L. Cloud and Associates, Inc. 1983 1983

box CLIPI 012

Interim Technical Report 43, Heat Exchangers, Teledyne Engineering Services 1983

box CLIPI 012

Interim Technical Report 55, Auxiliary Building, Revision 1, Robert L. Cloud and Associates, Inc., 10/1/83 1983

box CLIPI 012

Interim Technical Report 54, Containment Building, Revision 1, Robert L. Cloud and Associates, Inc., 10/4/83 1983

box CLIPI 012

Teledyne Engineering Services Semimonthly Report, March 11, 1983 1983