Series 1: Long-Range Planning and Audits 1982-1984

box 1, folder 1

Photos undated

Scope and Contents

3 portrait-style photographs of Jacki Bacharach during her career at LACMTA.
box 1, folder 2

Long-Range Rail Projects 1982 May - December; undated

Scope and Contents

Transportation Initiative for the 80s: Evolution of a Unified Transit System in Los Angeles County; memos regarding light rail transit development, proposals, implementation; Land Use Development Objectives, Policies, and Implementation, May - December 1982.
 

Subseries 1.1: Rail Transit Implementation Strategy 1983 February - 1984 March

box 1, folder 3

Rail Transit Implementation Strategy Correspondence 1983 February - March

Scope and Contents

Memos regarding Rail Transit Implementation Strategy policy issues and scheduling for the completion of Stage 1 of the Rail Transit Implementation Strategy.
box 1, folder 4

Rail Transit Implementation Strategy Stage 1 Draft and Work Outlines 1983 April

Scope and Contents

Rail Transit Implementation Policy Stage 1 Draft; memo regarding assignment of responsibilities for Stage 2 work; Work Outline for Stage 2 Rail Transit Implementation Strategy.
box 1, folder 5

Rail Transit Implementation Strategy Stage 2 1983 May

Scope and Contents

Rail Transit Implementation Strategy Stage 2: Alternative Rail Routes (includes map of each transit corridor with proposed alternate routes); memo regarding schedule for selecting rail transit projects.
box 1, folder 6

Rapid Transit Committee Meeting 1983 October

Scope and Contents

Rapid Transit Committee Meeting Agenda from October 17, 1983 (includes information on Rail Transit Implementation Strategy).
box 1, folder 7

Long Range Rail Projects Correspondence 1984 February - March

Scope and Contents

Correspondence regarding long range rail projects, implications of organization decisions for other rail projects beyond Long Beach - Los Angeles Rail, Proposition A.
 

Subseries 1.2: Public Affairs Audit 1982 August - June 1983

box 1, folder 8

Public Affairs Consultant Program and Interviews August 1982 - June 1983

Scope and Contents

Memos regarding the LACTC Public Affairs Program and request for proposal for public affairs consultant assistance; evaluation form and notes regarding public relations firms' proposals to LACTC.
box 1, folder 9

Public Consultant Affairs Audit 1983 June

Scope and Contents

LACTC: A Powerful Partner in Transportation - A Public Affairs Audit by David Abel & Associates, June 15, 1983.
box 1, folder 10

Performance Audit of the LACTC 1983 June - 1983 July

Scope and Contents

LACTC Performance Audit of the Commission by Deloitte, Haskins, and Sells, June 1983; notes regarding the performance audit, memo regarding the performance audit recommendations.
 

Subseries 1.3: Rail Fraud Reports 1984 August - 1984 October

box 1, folder 11

Fraud Rate Survey Final Report 1984 August

Scope and Contents

Rail fraud study submitted to the LACTC by Evaluation and Training Institute and Cordoba regarding the San Diego Trolley Line.
box 1, folder 12

Fare Evasion Psychology Report 1984 August

Scope and Contents

Paper by Marijana Benesh Weiner, PhD at the Department of Psychology at UCLA regarding the psychological factors surrounding rail fare evasion.
box 1, folder 13

Sociological Factors Related to Fraud in Fare Collection Report 1984 August

Scope and Contents

Sociological Factors Related to Fraud in Fare Collection on Proposed Public Transit Systems in Los Angeles by Hamilton, Rabinovitz & Stanton, Inc., August 3, 1984 (includes notes).
box 1, folder 14

Comparative Operating and Maintenance Costs Report 1984 October

Scope and Contents

Comparative Operating and Maintenance Costs and Revenue Effects for Three Alternatives for the Metro Rail Line and Long Beach Line by J.W. Leas & Associates, October 26, 1984 (includes statistical analysis and projected fare evasion loses).
 

Series 2: Projects, Services, Policies 1982-1985

 

Subseries 2.1: Paratransit Coordination Project 1982 March

box 2, folder 1

Los Angeles County Social Services Paratransit Coordination Project (Chapters I - III) 1982 March

Scope and Contents

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapters I - III entitled Overall Approach and Objectives; The Basis and Strategies for the Action Plan; Recommended Policies, Guidelines and County-wide Actions.
box 2, folder 2

Los Angeles County Social Services Paratransit Coordination Project (Chapter IV) 1982 March

Scope and Contents

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter IV entitled Subarea Development Guidelines.
box 2, folder 3

Los Angeles County Social Services Paratransit Coordination Project (Chapter V) 1982 March

Scope and Contents

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter V entitled Financial Analysis and Management Recommendations.
box 2, folder 4

Los Angeles County Social Services Paratransit Coordination Project (Chapter VI) 1982 March

Scope and Contents

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter VI entitled Evaluation Criteria and Service Standards.
box 2, folder 5

Los Angeles County Social Services Paratransit Coordination Project (Appendices) 1982 March

Scope and Contents

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Appendices 1 - 5.
 

Subseries 2.2: Proposition A 1983 February - 1985 January

box 2, folder 6

Proposition A: Local Return Program Guidelines (Folder 1 of 2) 1983 February

Scope and Contents

Proposition A: Local Return Program Guidelines by the LACTC for fiscal year 1982 - 83, includes chapters entitled Guidelines, Apportionments, Eligible Fund Uses.
box 2, folder 7

Proposition A: Local Return Program Guidelines (Folder 2 of 2) 1983 February

Scope and Contents

Proposition A: Local Return Program Guidelines by the LACTC for fiscal year 1982-83, includes chapters entitled Project Description, Assurances, Quarterly Report, Audit Guidelines, Fund Exchanges.
box 2, folder 8

Roles and Responsibilities of Agencies in Implementing the Proposition A Rail Transit System 1985 January

Scope and Contents

Roles and Responsibilities of Agencies in Implementing the Proposition A Rail Transit System report on the elements of the Proposition A Program and its coordination, includes handwritten notes by Jacki Bacharach.
 

Subseries 2.3: Private-Public Sectors 1983 March 15

box 2, folder 9

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation 1983 March 15

Scope and Contents

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation on March 15, 1983 includes agenda; Los Angeles - Long Beach Rail Transit Project brochure; promotional brochure from RTD; guide brochure for Southern California Assocation of Governments; copy of folder cover from the event, "Jacki" is written in blue pencil on the top right corner.
box 2, folder 10

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation 1983 March 15

Scope and Contents

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation: Background Material on Los Angeles Area Transportation Activities and Issues, Washington D.C.
 

Series 3: National and International Transit Systems 1982–1984

 

Subseries 3.1: Canadian Transit Tour 1982 September

box 3, folder 1

Canadian Transit Tour Montreal, Canada 1982 September

Scope and Contents

Schedule and members of The LACTC Canadian Transit Tour Group, brochures from various rail stations in Montreal depicting station design; copies of folder covers from Montrreal Metro.
box 3, folder 2

Canadian Transit Tour Montreal, Canada 1982 September

Scope and Contents

Postcard, transit map, Montreal Metro brochure, Safety in the Metro de Montreal booklet.
box 3, folder 3

Canadian Transit Tour Toronto, Canada 1982 September

Scope and Contents

Brochure for The Articulated Light Rail Vehicle, Governmental Organizational Chart in Metropolitan Toronto 1982, Metropolitan Toronto booklet describing Metropolitan responsibilities and service departments.
box 3, folder 4

Canadian Transit Tour Toronto, Canada Visitor's Kit 1982 September

Scope and Contents

Brochures for The Canadian Light Rail Vehicle, The Witt Car, The Presidents' Conference Committee Car, Scarborough Rapid Transit, Senior Citizens Transit, Toronto Transit operating statistics; The Variable Work Hours Book; newsletter for Timeline phone system for bus schedules; organization chart index.
box 3, folder 5

Canadian Transit Tour Itinerary and Thank You Letters 1982 September

Scope and Contents

Itinerary of The LACTC Canadian Transit Tour, background information on Canada, Montreal, Quebec fact sheet; Toronto, Ontario fact sheet; Edmonton, Alberta fact sheet; thank you letters to various Canadian transit personnel for tours and hospitality.
 

Subseries 3.2: Transurb Consult, Brussells, Belgium circa 1983

box 3, folder 6

Transurb Consult, Brussels, Belgium Introduction circa 1983

Scope and Contents

Introductory report on Transurb Consult's organizational structure, field of activity, background, and projects abroad.
box 3, folder 7

Presentation of Transurb Consult, Brussels, Belgium, Folder 1 of 2 circa 1983

Scope and Contents

Outline of Transurb Consult presentation to members of the Board of LACTC and SCRTD section 1, includes company infrastructure and types of cars.
box 3, folder 8

Presentation of Transurb Consult, Brussels, Belgium, Folder 2 of 2 circa 1983

Scope and Contents

Outline of Transurb Consult presentation to members of the Board of LACTC and SCRTD section 2, includes transit references in Belgium and in urban transit in Manila, Philippines.
box 3, folder 9

Process: Architecture 1984 April

Scope and Contents

Process: Architecture: New Transportation Systems Worldwide Part II book, describes transit systems throughout Asia and Europe, written in both English and Japanese.
box 3, folder 10

Critical Success Factors of LRT Projects undated

Scope and Contents

Summary of "Critical Success Factors" in LRT Implementation compares various national and international transit systems and what the key "critical success" points were.
box 3, folder 11

Roles and Responsibilities Charts of Transit Systems Across the Country undated

Scope and Contents

Organizational charts for various national transit agencies.
 

Series 4: Long Beach - Los Angeles Rail Transit Project 1982-1984

 

Subseries 4.1: Preliminary Analysis 1982 February - 1982 August

box 4, folder 1

Preliminary Analysis of Los Angeles - Long Beach Rail Project 1982 February

Scope and Contents

Preliminary analysis report on Los Angeles- Long Beach Light Rail Project by Parsons Brinckerhoff, February 1982.
box 4, folder 2

Recommendations and Draft Scope of Work 1982 April - 1982 August

Scope and Contents

LACTC recommendations and action plan for the Long Beach - Los Angeles Light Rail Project; Draft Scope of Work for the Long Beach - Los Angeles Light Rail Project, August 1982.
box 4, folder 3

Community Involvement Program 1982 October 22

Scope and Contents

Long Beach - Los Angeles Rail Transit Community Involvement Program prepared for the LACTC by David Abel and Associates in cooperation with The Watts Labor Community Action Committee.
box 4, folder 4

Staff Recommendation for Selection of Environmental/ Engineering Firm 1982 November

Scope and Contents

Memo, evaluation form, summary of reference checks, notes and cost analysis of various firms for selection of consulting firm for engineering/ environmental work on Los Angeles - Long Beach Rail Transit Project.
box 4, folder 5

Consultant for Railroad Operations 1983 March

Scope and Contents

Proposal to Los Angeles County Transportation Commission for Long Beach - Los Angeles Rail Transit Project: Consultant for Railroad Operations, March 15, 1983.
 

Subseries 4.2: Community Ascertainment Findings 1983 March

box 4, folder 6

Community Ascertainment Finding and Recommended Community Involvement Programs 1983 March

Scope and Contents

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes sections labeled Introduction (Statement of Need, Purpose of Study, Structure of Study, Strategy for Utilization of Report), Overview of Findings, Review of Findings (Long Beach); handwritten notes by Jacki Bacharach regarding the report.
box 4, folder 7

Community Ascertainment Finding and Recommended Community Involvement Programs 1983 March

Scope and Contents

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes section labeled Review of Findings (Mid-Corridor).
box 4, folder 8

Community Ascertainment Finding and Recommended Community Involvement Programs 1983 March

Scope and Contents

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes section labeled Review of Findings (Los Angeles).
box 4, folder 9

Community Ascertainment Finding and Recommended Community Involvement Programs 1983 March

Scope and Contents

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes appendices.
box 4, folder 10

Community Involvement Program Implementation Plan 1983 April - 1983 May

Scope and Contents

Memo; CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes chapters entitled Introduction, Description of CIP Implementation Plan, Mid-Corridor CIP; handwritten notes by Jacki Bacharach.
box 4, folder 11

Community Involvement Program Implementation Plan 1983 April

Scope and Contents

CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes Appendices A-I.
box 4, folder 12

Community Involvement Program Implementation Plan 1983 April

Scope and Contents

CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes Appendices I-P.
 

Subseries 4.3: Concept Plan 1983 July

box 4, folder 13

Concept Plan for Management of Design and Construction 1983 July

Scope and Contents

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes memo; chapters entitled General Goals, Table of Contents, Introduction.
box 4, folder 14

Concept Plan for Management of Design and Construction 1983 July

Scope and Contents

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes chapter entitled What Needs To Be Accomplished.
box 4, folder 15

Concept Plan for Management of Design and Construction 1983 July

Scope and Contents

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes chapters entitled How to Accomplish It, When.
box 4, folder 16

Project Authorization for Long Beach - Los Angeles Rail 1984 February

Scope and Contents

Handwritten notes by Jacki Bacharach regarding project authorization; memo entitled Recommendations from RTC Meeting February 6; documents depicting activities to prepare for project authorization; appendices.
box 4, folder 17

Draft Environmental Impact Report for The Long Beach - Los Angeles Rail Transit Project 1984 May

Scope and Contents

Draft Environmental Impact Report Summary for The Long Beach - Los Angeles Rail Transit Project, includes chapters entitled Purpose of Project, Project Description, Description of Proposed Rail Alternatives, Environmental Consequences, Areas of Controversy, Areas To Be Resolved.
 

Series 5: Environmental Impact Reports 1982-1988

 

Subseries 5.1: Environmental Impact Statement - Harbor Freeway Corridor 1982 November

box 5, folder 1

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor 1982 November

Scope and Contents

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapters 1-2; Public Hearing Notice concerning I-110 Harbor Freeway Transit.
box 5, folder 2

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor 1982 November

Scope and Contents

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapter 3: Alternatives.
box 5, folder 3

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor 1982 November

Scope and Contents

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapter 4: Environmental Consequences.
box 5, folder 4

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor 1982 November

Scope and Contents

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapters 5-13.
box 5, folder 5

Century Freeway Rail Transit Project Program Plan Draft 1986 May

Scope and Contents

Report focusing on the scope, budget, and schedule for the Century Rail Transit Project, May 27, 1986.
 

Subseries 5.2: Century-El Segundo Extension Rail Transit Project 1986 July

box 5, folder 6

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project 1986 July

Scope and Contents

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Sections 1 - 3: Project Description and Alternatives.
box 5, folder 7

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project 1986 July

Scope and Contents

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Section 4: Environmental Impact.
box 5, folder 8

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project 1986 July

Scope and Contents

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Section 5: Appendix.
 

Subseries 5.3: Coastal Corridor Rail Transit Project Northern Segment 1988 August - 1989 January

box 5, folder 9

Coastal Corridor Rail Transit Project North Segment: Initial Alternatives Evaluation Report 1988 August

Scope and Contents

Memo regarding Coastal Corridor North Branch Environmental Impact Notice of Preparation, includes map of area; report on route alternatives for the North Branch making it more feasible for engineering.
box 5, folder 10

Draft Environmental Impact Report Executive Summary on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Summary report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives.
box 5, folder 11

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Sections 1 - 3: Introduction, Summary, and Project Description.
box 5, folder 12

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Section 4: Environmental Setting, Impacts, Mitigation Measures, and Unavoidable Adverse Impacts.
box 5, folder 13

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendix A: Initial Study and Notice of Preparation.
box 5, folder 14

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendices B and C: Engineering Drawings (separately bound, not in collection), Traffic Study.
box 5, folder 15

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment 1989 January

Scope and Contents

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendix D: Noise and Vibration Study.
 

Subseries 5.4: Airport Southwest Area Transportation Study 1988 December

box 5, folder 16

Airport Southwest Area Transportation Study Executive Summary 1988 December

Scope and Contents

Summary report on the study of transportation and land use issues in the Airport Southwest area. The study is concerned with economic growth, community development, and the need for an improved transportation system to serve the residents.
box 5, folder 17

Airport Southwest Area Transportation Study Executive Summary 1988 December

Scope and Contents

Summary report on the study of transportation and land use issues in the Airport Southwest area. The study is concerned with economic growth, community development, and the need for an improved transportation system to serve the residents, Appendix: Transit Characteristics.
 

Series 6: LACTC/SCRTD Merger 1985–1990

box 6, folder 1

Correspondence, Notes 1986-1988

Scope and Contents

Page 361 of an appendix from a transit planning handbook with handwritten notes by Jacki Bacharach; memo from Paul Taylor regarding "Lessons Learned" Workshop on November 19, 1987 which highlights integration strategies with RTD; United States Postal Service notice.
 

Subseries 6.1: LACTC and SCRTD Joint Organizing Committee 1987 January - 1989 December

box 6, folder 2

LACTC and SCRTD Merger - Report on Public Transportation (Folder 1 of 5) 1987 January

Scope and Contents

Report on Public Transportation by the County of Los Angeles Chief Administrative Office dated January, 1987; includes sections labeled alternatives to improve administration, conceptual designs, and transit organization structures.
box 6, folder 3

LACTC and SCRTD Merger - Joint Organizing Committee (Folder 2 of 5) 1989 January

Scope and Contents

LACTC and SCRTD Joint Organizing Committee meeting agendas, Senate Bills 1 and 2489, memos, California State Legislation documents.
box 6, folder 4

LACTC and SCRTD Merger - Joint Organizing Committee Agreement (Folder 3 of 5) 1988 December

Scope and Contents

Resolution and agreement between SCRTD and LACTC that describe system integration and funding.
box 6, folder 5

LACTC and SCRTD Merger - SCRTD Public Utilities Code (Folder 4 of 5) undated

Scope and Contents

Copy of SCRTD Public Utilities Code.
box 6, folder 6

LACTC and SCRTD Merger - LACTC Public Utilities Code (Folder 5 of 5) undated

Scope and Contents

Copy of LACTC Public Utilities Code.
box 6, folder 7

LACTC and SCRTD Merger - Reorganization 1988-1989

Scope and Contents

Reorganization principles from the LACTC, Summary Report on the Positions Adopted by the SCRTD, 1989 LACTC and SCRTD Common Legislative Goals.
box 6, folder 8

LACTC and SCRTD Joint Organizing Committee Meeting Minutes 1989 January - 1989 March

Scope and Contents

Minutes of SCRTD/ LACTC Joint Organizing Committee, comparisons of powers and functions of LACTC and SCRTD, recommended actions regarding Senate Bill Number 1.
box 6, folder 9

LACTC and SCRTD Joint Organizing Committee Meeting Minutes and Reorganization Drafts 1989 April - 1989 June

Scope and Contents

Minutes of SCRTD/ LACTC Joint Organizing Committee, Agency Approach Drafts.
box 6, folder 10

LACTC and SCRTD Joint Organizing Committee Agreements and Reports November - December 1989

Scope and Contents

Progress reports, memos, draft agreements, Eight Point Agreement, Design and Construction of Minimum Operable Segment Two.
 

Subseries 6.2: LACTC Handbook 1990 September

box 6, folder 11

LACTC and SCRTD Merger - LACTC Handbook: Table of Contents and Introduction (Folder 1 of 3) 1990 September

Scope and Contents

LACTC in Brief: A Handbook for Commissioners and Alternates includes sections labeled Table of Contents, Introduction.
box 6, folder 12

LACTC and SCRTD Merger - LACTC Handbook: Policies and Long Range Plans (Folder 2 of 3) 1990 September

Scope and Contents

LACTC in Brief: A Handbook for Commissioners and Alternates includes sections labeled Travel Expense Policy, Policy on Disadvantaged/ Women - Owned Business Enterprises, 30-Year Plan.
box 6, folder 13

LACTC and SCRTD Merger - LACTC Handbook: Rail Construction and Reorganization (Folder 3 of 3) 1990 September

Scope and Contents

LACTC in Brief: A Handbook for Commissioners and Alternates - Rail Construction Corporation, Commuter Rail, Area Teams, SCRTD/LACTC Transit Reorganization.
 

Series 7: Transit Studies in Southern California Transit Corridors 1985–1991

 

Subseries 7.1: Lincoln Heights 1985 October

box 7, folder 1

Transit Studies: Lincoln Heights Route Refinement Study (Folder 1 of 2) 1985 October

Scope and Contents

Proposal for Lincoln Heights Route Refinement Study submitted by Seelye Stevenson Value and Knecht, includes overview of study area and relevant project experience. Oversized maps and documents are continued in map drawer.
box 7, folder 2

Transit Studies: Lincoln Heights Route Refinement Study (Folder 2 of 2) 1985 October

Scope and Contents

Proposal for Lincoln Heights Route Refinement Study submitted by Seelye Stevenson Value and Knecht includes project approach and organization, hourly rates, and equal opportunity employment.
 

Series 7.2: Los Angeles - San Diego 1987

box 7, folder 3

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Summary 1987 June

Scope and Contents

Los Angeles - San Diego State Rail Corridor Study Summary Report includes existing rail structures, summary of costs, potential future ridership, and environmental impact.
box 7, folder 4

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 1 and 2 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 1 and 2, includes the study scope objectives and work process, and existing rail facilities and operations. Page of handwritten notes by Jacki Bacharach dated October 21, 1988.
box 7, folder 5

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapter 3 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapter 3, includes frieght operations, projected speeds and travel times, alternatives for realignment.
box 7, folder 6

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 4, 5, 6 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 4 - 6, includes freight interference analysis, impacts of new stations on travel time, boarding and passenger procedures, scheduling.
box 7, folder 7

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 7 and 8 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 7 and 8, includes passenger safety and improvement options, patronage/ ridership potentials based on location.
box 7, folder 8

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 9 and 10 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 9 and 10, includes estimated costs, engineering, operating costs, projected fare box recovery.
box 7, folder 9

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 11 - 14 circa 1987

Scope and Contents

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 11 - 14, includes maintenance cost impacts, environmental impacts, cultural and public utilities impacts, recommendations based on study.
box 7, folder 10

A Telephone Survey of Registered Voters in Los Angeles County 1988 May

Scope and Contents

A Telephone Survey of Registered Voters in Los Angeles County conducted by the Werlin Group for LACTC, includes responses regarding freeway and street improvements, attitudes toward financing, and general attitudes towards transit.
box 7, folder 11

Rail Transit Implementation Strategy Blue Line / Green Line 1989 November

Scope and Contents

R.C.C. Meeting Agenda for the Green Line Budget on November 6, 1989, includes budget history, Green Line system features, Norwalk - El Segundo Rail Transit Project; LACTC Blue Line Rail Activation Team presentation slides dated November 6, 1989, includes mission statement, functions, operations, budget summary.
 

Subseries 7.3: Pasadena - Los Angeles Rail Project 1989 November - 1991 July

box 7, folder 12

Revised Environmental Impact Report - Pasadena - Los Angeles Light Rail Project 1989 November

Scope and Contents

Executive Summary of Revised Environmental Impact Report - Pasadena - Los Angeles Light Rail Project, includes description of project, projected patronage; summary of environmental analysis based on land use, circulation, air quality, noise, light, and public services.
box 7, folder 13

Dodger Stadium Transit Access Study 1990 August

Scope and Contents

Dodger Stadium Transit Access Study includes purpose and need for the connector between The Pasadena Line and Dodger Stadium, route and technology alternatives, concept drawings and maps.
box 7, folder 14

Initial Study for the Relocation of Approved Chinatown Station and Alignment 1991 July

Scope and Contents

Initial Study for the Relocation of Approved Chinatown Station and Alignment for the Pasadena - Los Angeles Rail Transit Project includes alternative locations for the Chinatown Station after originally approved location was determined to be inadequate to serve residents.
box 7, folder 15

Eastside Corridor Transportation Improvements Scoping Information 1991 September

Scope and Contents

Eastside Corridor Transportation Improvements Scoping Information Report and Summary includes schedule of scoping meetings, development process, Metro Eastern Extension alignment alternatives.
 

Series 8: Workshops and Committee Meetings 1991–1992

 

Subseries 8.1: FTA and ULI Joint Development Workshop 1992 January 23

box 8, folder 1

FTA and ULI Joint Development Workshop Section 1 1992 January 23

Scope and Contents

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, Agenda and Introduction/ Class Outline with handwritten notes by Jacki Bacharach.
box 8, folder 2

FTA and ULI Joint Development Workshop Section 2 1992 January

Scope and Contents

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, Reading One entitled Transit Joint Development in the U.S.: An Inventory and Policy Assessment.
box 8, folder 3

FTA and ULI Joint Development Workshop Section 3 1992 January 23

Scope and Contents

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, reading Two entitled Metro Site Joint Development Prospectus Ballston Metro Station Arlington, Virginia.
box 8, folder 4

FTA and ULI Joint Development Workshop Sections 4-5 1992 January 23

Scope and Contents

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, January 23, 1992 Reading Three entitled Joint Development Policies and Procedures Manual; handwritten notes by Jacki Bacharach.
 

Subseries 8.2: Commuter Transportation Services, Incorporated 1991 August 1991 - 1992 September

box 8, folder 5

Commuter Transportation Services, Incorporated Board of Directors Notebook 1992 April - 1992 September

Scope and Contents

Welcome letter to Jacki Bacharach from Commuter Services, Incorporated; agenda for August 5, 1992 meeting; amendments to license agreement between SCRTD and Megadyne Information System.
box 8, folder 6

Commuter Transportation Services, Incorporated Board of Directors Notebook 1992 March - 1992 September

Scope and Contents

Commuter Transportation Services Board of Directors roster noting Jacki Bacharach's elected position as of August, 1992; Finance and Corporate Services organizational charts; Client Services Department Overview; financial statements; strategic plan; mission statement.
box 8, folder 7

Commuter Transportation Services, Incorporated Board of Directors Notebook 1991 August

Scope and Contents

Commuter Transportation Services Board of Directors Notebook sections labeled Directors/ Officers, Advisory Board, Committees. Pages dated August 1991.
box 8, folder 8

Commuter Transportation Services, Incorporated Board of Directors Notebook 1991 August

Scope and Contents

Commuter Transportation Services Board of Directors Notebook sections labeled By-Laws, Articles of Incorporation, CTS Policy Statements. Pages dated August 1991. Copy of Crossroads Monthly News from Commuter Transportation Services, Inc June/July 1992.
box 8, folder 9

Commuter Transportation Services, Incorporated State of the Commute 1992

Scope and Contents

Commuter Transportation Services, Incorporated State of the Commute Executive Summary, includes chapters entitled Survey Results, County Comparisons, and About the Survey.
 

Subseries 8.3: Intercounty Bus Service Study Executive Steering Committee February - October 1992

box 8, folder 10

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program 1992 February

Scope and Contents

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program for Intercounty Express Bus Service Request for Proposals includes chapters entitled Instructions for Offerors, Disadvantaged Business Enterprises, Evaluation and Award Procedures, and Scope of Work.
box 8, folder 11

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program circa 1992 May - 1992 June

Scope and Contents

Regional Implementation Program for Intercounty Express Bus Service includes project updates.
box 8, folder 12

Intercounty Bus Service Study Executive Steering Committee Meeting Agendas 1992 June - 1992 August

Scope and Contents

Intercounty Bus Service Study Executive Steering Committee meeting agendas and minutes, includes intercounty bus routes and proposed service changes, handwritten page of notes by Jacki Bacharach.
box 8, folder 13

Intercounty Bus Service Study Executive Steering Committee Meeting Agendas 1992 August - 1992 October

Scope and Contents

Intercounty Bus Service Study Executive Steering Committee meeting agendas and minutes, includes Intercounty Express Bus Service Study Recommendations and preliminary report entitled Development of a Regional Intercounty Bus Service Program; handwritten note to Jacki Bacharach regarding the Intercounty Bus Study.
 

Series 9: Alameda Corridor/ Directories and Manuals 1992–1993

box 9, folder 1

Los Angeles Standard Light Rail Vehicle Products and Services Directory 1992 August

Scope and Contents

Los Angeles Standard Light Rail Vehicle Products and Services Directory, interoffice memo from Neil Peterson regarding the directory.
 

Subseries 9.1: Alameda Corridor 1992 December

box 9, folder 2

Alameda Corridor Project Reports 1992 December

Scope and Contents

Alameda Corridor Project Mitigation Monitoring Program and Findings, and Statement of Overriding Considerations include environmental impacts, proposed mitigations to environmental concerns, and the effects of these concerns during construction and operation. The Alameda Corridor is located on Alameda Street from Route 101 to the Port of Los Angeles.
box 9, folder 3

Alameda Corridor Final Environmental Impact Report - Summary 1992 December

Scope and Contents

Alameda Corridor Final Environmental Impact Report Summary includes project description, areas of controversy, issues to be resolved, and unavoidable adverse effects due to construction and operation. Chapters 1 - 6 are not included in this report.
box 9, folder 4

Alameda Corridor Final Environmental Impact Report - Chapter 7 1992 December

Scope and Contents

Alameda Corridor Final Environmental Impact Report Chapter 7 includes an overview of the public comment process on the Draft Environmental Impact Report, copies of letters of response from various Southern California government personnel.
box 9, folder 5

Alameda Corridor Final Environmental Impact Report - Chapter 7 Continued 1992 December

Scope and Contents

Alameda Corridor Final Environmental Impact Report Chapter 7 continued includes copies of letters of response from various Southern California government personnel.
box 9, folder 6

Alameda Corridor Final Environmental Impact Report - Chapter 8 1992 December

Scope and Contents

Alameda Corridor Final Environmental Impact Report Chapter 7 includes corrections and revisions to the Draft Environmental Impact Report.
box 9, folder 7

German "Smart-Bus" Systems 1993 January

Scope and Contents

German "Smart-Bus" Systems Potential for Application in Portland, Oregon Volume 1, Technical Report dated January 1993, includes handwritten notes by Jacki Bacharach.
 

Subseries 9.2: Directories and Manuals 1993 March - 1993 May

box 9, folder 8

Inside Moves Newsletter Issue 3 1993 March

Scope and Contents

Metro newsletter Inside Moves March 1993 issue includes a farewell article about Jacki Bacharach and highlights her career at LACTC.
box 9, folder 9

Metrolink Station Design Manual 1993 May

Scope and Contents

Metrolink Station Design Manual by the SCRRA Engineering Department, Part 1 of the manual consists of text and includes the construction process and a Basis-For-Design Checklist; Part 2 of the manual consists of large scale drawings.
 

Series 10: Jacki Bacharach and Associates Consulting Firm, Transit Studies 1992 – 2002, 2012

 

Subseries 10.1: Central Orange County Fixed Guideway Agency 1993

box 10, folder 1

Central Orange County Fixed Guideway Agency 1993 September

Scope and Contents

Letter from Dave Shuter, executive Director of the Central Orange County Fixed Guideway Agency to Jacki Bacharach regarding material that she requested from the agency; copy of envelope that materials were sent in with handwritten notes from Jacki Bacharach; materials include the history and background of the COCFGA, COCFGA Directors list, board presentation schedule, summary report.
box 10, folder 2

Central Orange County Fixed Guideway Agency - Planning 1993

Scope and Contents

Central Orange County Fixed Guideway Agency - Fixed Guideway Project report, includes station area context and concepts for each Orange County Fixed Guideway Station with photos and diagrams.
box 10, folder 3

Central Orange County Fixed Guideway Agency - Fixed Guideway Project 1993 September

Scope and Contents

Planning Scope and Framework Document for COCFGA and OCTA that includes joint development strategies, conceptual station design, and evaluation criteria.
 

Subseries 10.2: Transit Studies 1993 December - 2000 December

box 10, folder 4

Land Use/ Transportation Policy Recommendations Final Report 1993 December

Scope and Contents

Land Use/ Transportation Policy Feasibility Analysis and Recommendations for Implementation - Final Report describes implementation tools and mechanisms that have been used in other locations in the United States and which could be adapted for Metro.
box 10, folder 5

Los Angeles Countywide Bicycle Policy 1994 April

Scope and Contents

Los Angeles Countywide Bicycle Policy Document, includes handwritten notes by Jacki Bacharach.
box 10, folder 6

Comprehensive Rail Plan for Ventura County Transportation Commission 1995 January

Scope and Contents

Comprehensive Rail Plan for Ventura County Transportation Commission and Santa Barbara County Association of Governments Final Report, includes chapters entitled Operating Plans and Assumptions for the Santa Barbara/ Los Angeles Corridor (Coast Main Line), Ridership Forecast, and Socioeconomic Forecasts.
box 10, folder 7

L.A. Story: A Reality Check for Transit-Based Housing 1995 March

Scope and Contents

L.A. Story: A Reality Check for Transit-Based Housing of the Working Paper Series by the Department of Urban and Regional Planning at the University of California, Irvine describes a planning strategy for leveraging rail transit through high-density residential developments near rail stations, or "transit-based housing."
box 10, folder 8

Ridership Projections … at Rail Transit Stations on the Trenton - Camden Line 1997 January

Scope and Contents

Technical Memorandum: Ridership Projections from Induced Residential and Commercial Growth at Rail Transit Stations on the Trenton - Camden Line. This paper describes the concept of growth near rail transit lines as it relates to residential and commercial development within the proximity of rail stations.
box 10, folder 9

Transportation Management Coordination Study - Executive Report 1997 July

Scope and Contents

Cover letter addressed to Jacki Bacharach from Meyer, Mohaddes Associates Incorporated regarding the reports submitted to MTA; copy of the Transportation Management Coordination Study - Executive Report which includes analysis of existing conditions of management centers throughout Los Angeles County that focus on traffic management, transit and rail management, and emergency management.
box 10, folder 10

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (I - IV) May, 1997

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions sections I - IV which was submitted to MTA, includes information regarding the 14 management/ operating centers in Los Angeles County, conceptual map.
box 10, folder 11

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (Appendix A) May, 1997

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Appendix A which was submitted to MTA, includes completed survey forms from various personnel and officials of the 14 management/ operating centers in Los Angeles County.
box 10, folder 12

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (Appendix B) May, 1997

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Appendix B which was submitted to MTA, includes a draft report entitled Los Angeles County Traffic Management Center Needs Assessment Report.
box 10, folder 13

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (1 - 3.3) 1997 July

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (sections 1 - 3.3) which was submitted to MTA, includes information regarding survey results, alternative architecture options for the coordination of transit management agencies in Los Angeles County.
box 10, folder 14

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (3.4 - 5) 1997 July

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (sections 3.4 - 5) which was submitted to MTA, includes information regarding software needed for system coordination, emergency services coordination, and an analysis of the field equipment needed.
box 10, folder 15

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (Appendices) 1997 July

Scope and Contents

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (Appendices) which was submitted to MTA, includesdefinitions of terms, sample surveys, and basic link spectrum requirements for an integrated traffic/ transit/ emergency system.
box 10, folder 16

Ventura Rail Right of Way Restoration Study 1998 November

Scope and Contents

Ventura Rail Right of Way Restoration Study Final Report, includes a 1991 engineering study, evaluation of rail line alternatives, land use and planning policies, funding strategies, and an action plan.
box 10, folder 17

Crenshaw - Prairie Corridor Route Refinement Study Section 1 2000 December

Scope and Contents

Crenshaw - Prairie Corridor Route Refinement Study Section 1, includes information regarding community demographics of the corridor, travel characteristics, and mobility problems.
box 10, folder 18

Crenshaw - Prairie Corridor Route Refinement Study Section 2 2000 December

Scope and Contents

Crenshaw - Prairie Corridor Route Refinement Study Section 2, includes information regarding preliminary planning studies, conceptual maps and alternatives.
box 10, folder 19

Crenshaw - Prairie Corridor Route Refinement Study Section 3 2000 December

Scope and Contents

Crenshaw - Prairie Corridor Route Refinement Study Section 3, includes further analysis of population demographics, conceptual alternatives, and environmental analysis. Section 4 title page.
box 10, folder 20

California Commission on Building for the 21st Century 2002 February

Scope and Contents

Letter of transmittal from the Commission Co-Chairs outlining the priorities for infrastructure in California; Executive Summary from the California Commission on Building for the 21st Century, includes financial analysis of the state budget, goals for transportation by 2020 and recommended options.
box 10, folder 21

Correspondence from Jacki Bacharach to Metro 2012 February

Scope and Contents

Copy of envelope that some materials were sent to Metro in, email from Jacki Bacharach to Michael Bohlke at the LACMTA Library and Archives regarding 41 documents that Bacharach inquired about donating to the library for historical use. All of these documents are in the collection.