Finding Aid for the Jacqueline Bacharach Office Records

Finding aid prepared by Patrick A. Stawski, 2006.
Los Angeles County Metropolitan Transportation Authority Research Library and Archive
One Gateway Plaza
15th Floor
Los Angeles, CA 90012-2952
Phone: (213) 922-4859
Fax: (213) 922-7955
Email: library@metro.net
URL: http://www.metro.net/library
© 2006 Los Angeles County Metropolitan Transportation Authority. All rights reserved.


Descriptive Summary

Title: Jacqueline Bacharach office records
Dates: 1982-2000
Collection number: 02-DPGTL
Creator: Bacharach, Jacqueline
Collection Size: 9 boxes 3.34 linear feet
Repository: Los Angeles County Metropolitan Authority (LACMTA) Research Library and Archive
Los Angeles, CA 90012-2952
Abstract: The Jacqueline Bacharach office records document late twentieth century Los Angeles transit history. By the early 1980's it became clear that the division of power and responsibilities between the Los Angeles County Transportation Commission (LACTC), local transit agencies such as the Southern California Rapid Transit District (SCRTD), and local government bodies was proving to be an obstacle to the rational and efficient development of a countywide mass transit system. The reports and office correspondence in this collection illustrate how these problems and their solutions were being formulated and developed by the LACTC. Also at this time, the LACTC and its sister transit agencies were preparing to re-introduce rail lines as part of the mass transit system of Los Angeles County. Samples of the reports and studies generated at the early stages of these projects are represented here. Detailed descriptions of series and folders is contained in the Arrangement and Description section of this finding aid.
Physical location: LACMTA Research Library and Archive
Languages: English

Conditions Governing Access

Open for research. Advance notice required for access. Contact LACMTA Research Library and Archive to make an appointment.

Terms Governing Use and Reproduction

For permission to reproduce or publish, please contact the LACMTA Research Library and Archive. Permission for reproduction or publication is given on behalf of the LACMTA Research Library and Archive as the owner of the physical items. The researcher assumes all responsibility for possible infringement that may arise from reproduction or publication of materials from the LACMTA Research Library and Archive collections.

Preferred Citation

[Identification of item], Jacqueline Bacharach office records, 02-DPGTL. Los Angeles County Metropolitan Transportation Agency Research Library and Archive.

Acquisition Information

The collection was donated to the Metro archives by Jacki Bacharach in 2006.

Processing Information

Processed by Patrick A. Stawski, 2006.

Biography / Administrative History

The Los Angeles County Transportation Commission (LACTC) was created by the California State legislature in 1976 as part of the County Transportation Commissions Act. The privately owned and operated companies which had dominated public transit in Los Angeles since the 1890's had given way in the 1960's to an array of uncoordinated and disconnected publicly held agencies operating at state, county and local levels. The mandate of the commissions was to oversee mass transit planning and policy setting at the regional level, coordinating the previously disparate efforts of the various local agencies and government bodies involved in mass transit construction and operations.
The LACTC consisted of elected representatives from both county and municipal governments and a private citizen appointed by the LA mayor and approved by the city council. In 1980 LA County voters approved Proposition A, which established a half-cent sales tax to fund regional transit planning and construction. 35% of the revenues were to be allocated to rail, 25% to local cities for their local transit needs, and the remaining 40% were designated as discretionary funds that would be allocated as the LACTC saw fit. Due to legal wrangling, the tax did not go into effect until 1982.
Jacqueline Bacharach came on board the commission in April of 1982. In 1980 she had been elected to the city council of Rancho Palos Verdes, where she would serve as mayor for three terms. Jacqueline was born in Chicago and raised in the San Fernando Valley. She attended UCLA and graduated with a degree in Political Science. While at UCLA she was active in the Young Democrats.
Bacharach was an active and committed commissioner. She chaired the Planning and Mobility Improvement Committee for most of her years on the LACTC. She was part of the inter-county agency that spearheaded commuter rail in the five counties of Southern California. Later she was its first chairwoman when it became the Southern California Regional Rail Authority (SCRRA) in 1991 (SCRRA today operates Metrolink service). Jacqueline also headed the Rail Construction Corporation and the Blue Line Committee at the time that Los Angeles was just beginning to rebuild its passenger rail service.
During her term as LACTC Chairwoman, Bacharach prioritized system integration and good public relations. In 1985, shortly after being elected Chairwoman, she stated in ProMotion, the LACTC newsletter, her belief that "the key to progress...is a high degree of cooperation and coordination among the other agencies involved with transportation, such as SCRTD, SCAG, CTC, and Caltrans. Therefore, more understanding and consideration of each other's needs and perspectives is one of my highest priorities for my term as Commission chair". Bacharach also understood that LA's transportation system was more than government business, it impacted every citizen of the county. According to her, "everyone in this county, no matter who they are, is affected by our transportation system. Therefore, we must share the message of our activities as often as we can". Underlying her goals and principles, was a keen awareness of the unique and important role that transportation played in weaving together the urban fabric: "The transportation network is the spine upon which the body grows. Housing, air quality, water availability, goods movement, commercial and industrial success - all depend on adequate transportation."
Since leaving the LACTC, Jacqueline Bacharach has continued to be involved in transit planning and design. She has served as Executive Director of the South Bay Cities Council of Governments (SBCCOG), is part of the Executive Committee of Mobility 21, a transit advocacy group in Los Angeles County, and is also involved in Compass, an organization dedicated to sustainable development in Southern California. In addition, Bacharach launched her own transit consultation firm, Jacqueline Bacharach & Associates.

Note

List of Abbreviations
  • CTC - California Transportation Commission
  • LACMTA - Los Angeles County Metropolitan Transportation Authority
  • LACTC - Los Angeles County Transportation Commission
  • SCAG - Southern California Association of Governments
  • SCRRA - Southern California Regional Rail Authority
  • SCRTD - Southern California Rapid Transit District

Note

List of Sources
  • - Compass Southern California, http://www.socalcompass.org/index.php (accessed May 5, 2006).
  • - Los Angeles County Metropolitan Transportation Authority Research Library and Archive, Los Angeles Transit History , available at http://www.mta.net/about_us/library/transit_history.htm , (April 6,2006).
  • - Los Angeles County Transportation Commission records, 06-DPGTL. Los Angeles County Metropolitan Transportation Authority Research Library and Archive.
  • - LACMTA, "Goodbye Jacki, Ray, Judy and Jinny - We'll Miss You!", Inside Moves, n. 3, March 1993, Los Angeles County Metropolitan Transportation Authority Research Library and Archive, LACTC Publications.
  • - LACTC, "New Commission Chairwoman Jacki Bacharach Looks Ahead - Discusses Her Objectives and Priorities for the LACTC's Next 12 Months", Promotion, v.1, n.2, Winter 1985, Los Angeles County Metropolitan Transportation Authority Research Library and Archive, LACTC Publications.
  • - Mobility 21, http://www.mobility21coalition.com/overview/index.html (accessed May 5, 2006).
  • - Palos Verdes Library District.
  • - South Bay Cities Council of Government (SBCCOG), http://www.southbaycities.org/ (accessed May 5, 2006).

Scope and Content of Collection

The collection consists mainly of reports, studies, and correspondence produced by the LACTC. Please see individual series descriptions for more detail.
Another important source for researchers interested in Jacki Bacharach is the Los Angeles Transportation Commission (LACTC) Collection at the MTA Archives. Especially significant is Series #7: Board Meeting Minutes. The meeting minutes are in digital format; researchers can use a Google search option to search the meeting minutes for "Bacharach". Researchers can access this series via the LACMTA Research Library and Archive intranet website, under the section titled "Board of Directors Policy Archives". Please contact the LACMTA Research Library and Archive for more information.

Arrangement

This collection is arranged chronologically and by subject matter with the exception of material that was part of larger binders of documents has been arranged according to its original order. Oversized materials, which are mainly maps, are found in Box 9 of the collection. This collection is arranged in 10 series: 1. Long Term Planning/Audits, 1982 – 1984. 2. Projects, Services, Policies, March 1982 – January 1985. 3. National and International Transit Systems, 1982 – 1984. 4. Long Beach – Los Angeles Rail Transit Project, February 1982 – 1984. 5. Environmental Impact Reports, 1982 – 1988. 6. LACTC and SCRTD Merger, 1985 – 1990. 7. Transit Studies in Southern California Corridors, 1985 – 1991. 8. Workshops and Committee Meetings, 1991 – 1992. 9. Alameda Corridor/ Directories and Manuals, 1992 – 1993. 10. Jacki Bacharach and Associates Consulting Firm Transit Studies, 1992 – 2002, 2012.

Indexing Terms

The following terms have been used to index the description of this collection in the library's online public access catalog.
Bacharach, Jacqueline
Bacharach, Jacki
Los Angeles County Metropolitan Transportation Authority
Los Angeles County Transportation Commission
Los Angeles Metropolitan Transit Authority
Rail Construction Corporation
Southern California Rapid Transit District
Local Transit -- California -- Los Angeles County
Transportation -- California -- Los Angeles County
Local Transit -- Design and construction -- California -- Los Angeles County
Local Transit - Community relations - California - Los Angeles County
Women - Transportation

Other Finding Aids

Los Angeles County Transportation Commission records, 06-DPGTL.

 

1 Long Range Planning/ Audits 1982 – 1984

 

1 %dummy% %dummy%

box 1, folder 1

Photos Undated

Scope and Content Note

3 portrait style photographs of Jacki Bacharach during her career at LACMTA.
box 1, folder 2

Long-Range Rail Projects May, 1982 - December, 1982; Undated

Scope and Content Note

Transportation Initiative for the 80s: Evolution of a Unified Transit System in Los Angeles County; memos regarding light rail transit development, proposals, implementation; Land Use Development Objectives, Policies, and Implementation, May - December 1982.
 

1.1 Rail Transit Implementation Strategy February 1983 - March 1984

box 1, folder 3

Rail Transit Implementation Strategy Correspondence February - March, 1983

Scope and Content Note

Memos regarding Rail Transit Implementation Strategy policy issues and scheduling for the completion of Stage 1 of the Rail Transit Implementation Strategy.
box 1, folder 4

Rail Transit Implementation Strategy Stage 1 Draft and Work Outlines April, 1983

Scope and Content Note

Rail Transit Implementation Policy Stage 1 Draft; memo regarding assignment of responsibilities for Stage 2 work; Work Outline for Stage 2 Rail Transit Implementation Strategy.
box 1, folder 5

Rail Transit Implementation Strategy Stage 2 May, 1983

Scope and Content Note

Rail Transit Implementation Strategy Stage 2: Alternative Rail Routes (includes map of each transit corridor with proposed alternate routes); memo regarding schedule for selecting rail transit projects.
box 1, folder 6

Rapid Transit Committee Meeting October, 1983

Scope and Content Note

Rapid Transit Committee Meeting Agenda from October 17, 1983 (includes information on Rail Transit Implementation Strategy).
box 1, folder 7

Long Range Rail Projects Correspondence February - March 1984

Scope and Content Note

Correspondence regarding long range rail projects, implications of organization decisions for other rail projects beyond Long Beach - Los Angeles Rail, Proposition A.
 

1.2 Public Affairs Audit August 1982 - June 1983

box 1, folder 8

Public Affairs Consultant Program and Interviews August 1982 - June 1983

Scope and Content Note

Memos regarding the LACTC Public Affairs Program and request for proposal for public affairs consultant assistance; evaluation form and notes regarding public relations firms' proposals to LACTC.
box 1, folder 9

Public Consultant Affairs Audit June, 1983

Scope and Content Note

LACTC: A Powerful Partner in Transportation - A Public Affairs Audit by David Abel & Associates, June 15, 1983.
 

1.25 %dummy% %dummy%

box 1, folder 10

Performance Audit of the LACTC June - July 1983

Scope and Content Note

LACTC Performance Audit of the Commission by Deloitte, Haskins, and Sells, June 1983; notes regarding the performance audit, memo regarding the performance audit recommendations.
 

1.3 Rail Fraud Reports August 1984 - October 1984

box 1, folder 11

Fraud Rate Survey Final Report August, 1984

Scope and Content Note

Rail fraud study submitted to the LACTC by Evaluation and Training Institute and Cordoba regarding the San Diego Trolley Line.
box 1, folder 12

Fare Evasion Psychology Report August, 1984

Scope and Content Note

Paper by Marijana Benesh Weiner, PhD at the Department of Psychology at UCLA regarding the psychological factors surrounding rail fare evasion.
box 1, folder 13

Sociological Factors Related to Fraud in Fare Collection Report August, 1984

Scope and Content Note

Sociological Factors Related to Fraud in Fare Collection on Proposed Public Transit Systems in Los Angeles by Hamilton, Rabinovitz & Stanton, Inc., August 3, 1984 (includes notes).
box 1, folder 14

Comparative Operating and Maintenance Costs Report October, 1984

Scope and Content Note

Comparative Operating and Maintenance Costs and Revenue Effects for Three Alternatives for the Metro Rail Line and Long Beach Line by J.W. Leas & Associates, October 26, 1984 (includes statistical analysis and projected fare evasion loses).
 

2 Projects, Services, Policies March 1982 – January 1985

 

2.1 Paratransit Coordination Project Mar-82

box 2, folder 1

Los Angeles County Social Services Paratransit Coordination Project (Chapters I - III) March, 1982

Scope and Content Note

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapters I - III entitled Overall Approach and Objectives; The Basis and Strategies for the Action Plan; Recommended Policies, Guidelines and County-wide Actions.
box 2, folder 2

Los Angeles County Social Services Paratransit Coordination Project (Chapter IV) March, 1982

Scope and Content Note

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter IV entitled Subarea Development Guidelines.
box 2, folder 3

Los Angeles County Social Services Paratransit Coordination Project (Chapter V) March, 1982

Scope and Content Note

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter V entitled Financial Analysis and Management Recommendations.
box 2, folder 4

Los Angeles County Social Services Paratransit Coordination Project (Chapter VI) March, 1982

Scope and Content Note

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Chapter VI entitled Evaluation Criteria and Service Standards.
box 2, folder 5

Los Angeles County Social Services Paratransit Coordination Project (Appendices) March, 1982

Scope and Content Note

Los Angeles County Social Services Paratransit Coordination Project - Phase II Report Action Plan Appendices 1 - 5.
 

2.2 Proposition A February 1983 - January 1985

box 2, folder 6

Proposition A: Local Return Program Guidelines (Folder 1 of 2) February, 1983

Scope and Content Note

Proposition A: Local Return Program Guidelines by the LACTC for fiscal year 1982 - 83, includes chapters entitled Guidelines, Apportionments, Eligible Fund Uses.
box 2, folder 7

Proposition A: Local Return Program Guidelines (Folder 2 of 2) February, 1983

Scope and Content Note

Proposition A: Local Return Program Guidelines by the LACTC for fiscal year 1982 - 83, includes chapters entitled Project Description, Assurances, Quarterly Report, Audit Guidelines, Fund Exchanges.
box 2, folder 8

Roles and Responsibilities of Agencies in Implementing the Proposition A Rail Transit System January, 1985

Scope and Content Note

Roles and Responsibilities of Agencies in Implementing the Proposition A Rail Transit System report on the elements of the Proposition A Program and its coordination, includes handwritten notes by Jacki Bacharach.
 

2.3 Private - Public Sectors Mar-83

box 2, folder 9

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation March, 1983

Scope and Content Note

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation on March 15, 1983 includes agenda; Los Angeles - Long Beach Rail Transit Project brochure; promotional brochure from RTD; guide brochure for Southern California Assocation of Governments; copy of folder cover from the event, "Jacki" is written in blue pencil on the top right corner.
box 2, folder 10

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation March, 1983

Scope and Content Note

Private-Public Sectors Presentation to the Los Angeles Area Congressional Delegation: Background Material on Los Angeles Area Transportation Activities and Issues March 15, 1983, Washington D.C.
 

3 National and International Transit Systems 1982 – 1984

 

3.1 Canadian Transit Tour Sep-82

box 2, folder 11

Canadian Transit Tour Montreal, Canada September, 1982

Scope and Content Note

Schedule and members of The LACTC Canadian Transit Tour Group, brochures from various rail stations in Montreal depicting station design; copies of folder covers from Montrreal Metro.
box 2, folder 12

Canadian Transit Tour Montreal, Canada September, 1982

Scope and Content Note

Postcard, transit map, Montreal Metro brochure, Safety in the Metro de Montreal booklet.
box 2, folder 13

Canadian Transit Tour Toronto, Canada September, 1982

Scope and Content Note

Brochure for The Articulated Light Rail Vehicle, Governmental Organizational Chart in Metropolitan Toronto 1982, Metropolitan Toronto booklet describing Metropolitan responsibilities and service departments.
box 2, folder 14

Canadian Transit Tour Toronto, Canada Visitor's Kit September, 1982

Scope and Content Note

Brochures for The Canadian Light Rail Vehicle, The Witt Car, The Presidents' Conference Committee Car, Scarborough Rapid Transit, Senior Citizens Transit, Toronto Transit operating statistics; The Variable Work Hours Book; newsletter for Timeline phone system for bus schedules; organization chart index.
box 2, folder 15

Canadian Transit Tour Itinerary and Thank You Letters September, 1982

Scope and Content Note

Itinerary of The LACTC Canadian Transit Tour, background information on Canada, Montreal, Quebec fact sheet; Toronto, Ontario fact sheet; Edmonton, Alberta fact sheet; thank you letters to various Canadian transit personnel for tours and hospitality.
 

3.2 Transurb Consult, Brussells, Belgium circa 1983

box 2, folder 16

Transurb Consult, Brussels, Belgium Introduction circa 1983

Scope and Content Note

Introductory report on Transurb Consult's organizational structure, field of activity, background, and projects abroad.
box 2, folder 17

Presentation of Transurb Consult, Brussels, Belgium, Folder 1 of 2 circa 1983

Scope and Content Note

Outline of Transurb Consult presentation to members of the Board of LACTC and SCRTD section 1, includes company infrastructure and types of cars.
box 2, folder 18

Presentation of Transurb Consult, Brussels, Belgium, Folder 2 of 2 circa 1983

Scope and Content Note

Outline of Transurb Consult presentation to members of the Board of LACTC and SCRTD section 2, includes transit references in Belgium and in urban transit in Manila, Philippines.
 

3.3 %dummy% %dummy%

box 2, folder 19

Process: Architecture April, 1984

Scope and Content Note

Process: Architecture: New Transportation Systems Worldwide Part II book, describes transit systems throughout Asia and Europe, written in both English and Japanese.
box 2, folder 20

Critical Success Factors of LRT Projects Undated

Scope and Content Note

Summary of "Critical Success Factors" in LRT Implementation compares various national and international transit systems and what the key "critical success" points were.
box 2, folder 21

Roles and Responsibilities Charts of Transit Systems Across the Country Undated

Scope and Content Note

Organizational charts for various national transit agencies.
 

4 Long Beach - Los Angeles Rail Transit Project February 1982 – 1984

 

4.1 Preliminary Analysis February - August 1982

box 2, folder 22

Preliminary Analysis of Los Angeles - Long Beach Rail Project February, 1982

Scope and Content Note

Preliminary analysis report on Los Angeles- Long Beach Light Rail Project by Parsons Brinckerhoff, February 1982.
box 2, folder 23

Recommendations and Draft Scope of Work April - August 1982

Scope and Content Note

LACTC recommendations and action plan for the Long Beach - Los Angeles Light Rail Project; Draft Scope of Work for the Long Beach - Los Angeles Light Rail Project, August 1982.
 

4.15 %dummy% %dummy%

box 3, folder 1

Community Involvement Program October, 1982

Scope and Content Note

Long Beach - Los Angeles Rail Transit Community Involvement Program prepared for the LACTC by David Abel and Associates in cooperation with The Watts Labor Community Action Committee, October 22, 1982.
box 3, folder 2

Staff Recommendation for Selection of Environmental/ Engineering Firm November, 1982

Scope and Content Note

Memo, evaluation form, summary of reference checks, notes and cost analysis of various firms for selection of consulting firm for engineering/ environmental work on Los Angeles - Long Beach Rail Transit Project.
box 3, folder 3

Consultant for Railroad Operations March, 1983

Scope and Content Note

Proposal to Los Angeles County Transportation Commission for Long Beach - Los Angeles Rail Transit Project: Consultant for Railroad Operations, March 15, 1983.
 

4.2 Community Ascertainment Findings Mar-83

box 3, folder 4

Community Ascertainment Finding and Recommended Community Involvement Programs March, 1983

Scope and Content Note

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes sections labeled Introduction (Statement of Need, Purpose of Study, Structure of Study, Strategy for Utilization of Report), Overview of Findings, Review of Findings (Long Beach); handwritten notes by Jacki Bacharach regarding the report.
box 3, folder 5

Community Ascertainment Finding and Recommended Community Involvement Programs March, 1983

Scope and Content Note

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes section labeled Review of Findings (Mid-Corridor).
box 3, folder 6

Community Ascertainment Finding and Recommended Community Involvement Programs March, 1983

Scope and Content Note

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes section labeled Review of Findings (Los Angeles).
box 3, folder 7

Community Ascertainment Finding and Recommended Community Involvement Programs March, 1983

Scope and Content Note

Community Ascertainment Findings and Recommended Community Involvement Programs for the Long Beach - Los Angeles Light Rail Project by David Abel and Associates, March 1983, includes appendices.
box 3, folder 8

Community Involvement Program Implementation Plan April - May 1983

Scope and Content Note

Memo; CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes chapters entitled Introduction, Description of CIP Implementation Plan, Mid-Corridor CIP; handwritten notes by Jacki Bacharach.
box 3, folder 9

Community Involvement Program Implementation Plan April, 1983

Scope and Content Note

CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes Appendices A - I.
box 3, folder 10

Community Involvement Program Implementation Plan April, 1983

Scope and Content Note

CIP Implementation Plan Long Beach - Los Angeles Light Rail Project by David Abel and Associates, April 1983, includes Appendices I -P.
 

4.3 Concept Plan Jul-83

box 3, folder 11

Concept Plan for Management of Design and Construction July, 1983

Scope and Content Note

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes memo; chapters entitled General Goals, Table of Contents, Introduction.
box 3, folder 12

Concept Plan for Management of Design and Construction July, 1983

Scope and Content Note

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes chapter entitled What Needs To Be Accomplished.
box 3, folder 13

Concept Plan for Management of Design and Construction July, 1983

Scope and Content Note

The Long Beach to Los Angeles Rail Transit Project: A Concept Plan for the Management of Design and Construction prepared for the LACTC, July 1983, includes chapters entitled How to Accomplish It, When.
 

4.4 %dummy% %dummy%

box 3, folder 14

Project Authorization for Long Beach - Los Angeles Rail February, 1984

Scope and Content Note

Handwritten notes by Jacki Bacharach regarding project authorization; memo entitled Recommendations from RTC Meeting February 6; documents depicting activities to prepare for project authorization; appendices.
box 3, folder 15

Draft Environmental Impact Report for The Long Beach - Los Angeles Rail Transit Project May, 1984

Scope and Content Note

Draft Environmental Impact Report Summary for The Long Beach - Los Angeles Rail Transit Project, includes chapters entitled Purpose of Project, Project Description, Description of Proposed Rail Alternatives, Environmental Consequences, Areas of Controversy, Areas To Be Resolved.
 

5 Environmental Impact Reports 1982 – 1988

 

5.1 Environmental Impact Statement - Harbor Freeway Corridor Nov-82

box 3, folder 17

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor November, 1982

Scope and Content Note

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapters 1 - 2; Public Hearing Notice concerning I-110 Harbor Freeway Transit.
box 3, folder 18

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor November, 1982

Scope and Content Note

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapter 3: Alternatives.
box 4, folder 1

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor November, 1982

Scope and Content Note

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapter 4: Environmental Consequences.
box 4, folder 2

Draft Environmental Impact Statement for Interstate 110 Freeway Transit Harbor Freeway Corridor November, 1982

Scope and Content Note

Draft Environmental Impact Statement detailing the need for the Harbor Freeway I-110 Corridor Transitway, Chapters 5 - 13.
 

5.15 %dummy% %dummy%

box 4, folder 3

Century Freeway Rail Transit Project Program Plan Draft May, 1986

Scope and Content Note

Report focusing on the scope, budget, and schedule for the Century Rail Transit Project, May 27, 1986.
 

5.2 Century-El Segundo Extension Rail Transit Project Jul-86

box 4, folder 4

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project July, 1986

Scope and Content Note

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Sections 1 - 3: Project Description and Alternatives.
box 4, folder 5

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project July, 1986

Scope and Content Note

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Section 4: Environmental Impact.
box 4, folder 6

Draft Environmental Impact Report for Century-El Segundo Extension Rail Transit Project July, 1986

Scope and Content Note

Report on the extension of rail from Los Angeles International Airport to El Segundo and Torrance, including alternate routes, Section 5: Appendix.
 

5.3 Coastal Corridor Rail Transit Project Northern Segment August 1988 - January 1989

box 4, folder 7

Coastal Corridor Rail Transit Project North Segment: Initial Alternatives Evaluation Report August, 1988

Scope and Content Note

Memo regarding Coastal Corridor North Branch Environmental Impact Notice of Preparation, includes map of area; report on route alternatives for the North Branch making it more feasible for engineering.
box 4, folder 8

Draft Environmental Impact Report Executive Summary on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Summary report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives.
box 4, folder 9

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Sections 1 - 3: Introduction, Summary, and Project Description.
box 4, folder 10

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Section 4: Environmental Setting, Impacts, Mitigation Measures, and Unavoidable Adverse Impacts.
box 4, folder 11

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendix A: Initial Study and Notice of Preparation.
box 4, folder 12

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendices B and C: Engineering Drawings (separately bound, not in collection), Traffic Study.
box 4, folder 13

Draft Environmental Impact Report on the Coastal Corridor Rail Transit Project - Northern Segment January, 1989

Scope and Content Note

Report on the Coastal Corridor - North Segment with El Segundo Rail Transit to Los Angeles International Airport and Marina Del Rey. The EIR analyzes land use, air quality, noise, public utilities, aesthetics, and alternatives; Appendix D: Noise and Vibration Study.
 

5.4 Airport Southwest Area Transportation Study Dec-88

box 4, folder 15

Airport Southwest Area Transportation Study Executive Summary December, 1988

Scope and Content Note

Summary report on the study of transportation and land use issues in the Airport Southwest area. The study is concerned with economic growth, community development, and the need for an improved transportation system to serve the residents.
box 4, folder 16

Airport Southwest Area Transportation Study Executive Summary December, 1988

Scope and Content Note

Summary report on the study of transportation and land use issues in the Airport Southwest area. The study is concerned with economic growth, community development, and the need for an improved transportation system to serve the residents, Appendix: Transit Characteristics.
 

6 LACTC and SCRTD Merger 1985 – 1990

 

5.5 %dummy% %dummy%

box 4, folder 17

Correspondence, Notes 1986 - 1988

Scope and Content Note

Page 361 of an appendix from a transit planning handbook with handwritten notes by Jacki Bacharach; memo from Paul Taylor regarding "Lessons Learned" Workshop on November 19, 1987 which highlights integration strategies with RTD; United States Postal Service notice.
 

6.1 LACTC and SCRTD Joint Organizing Committee January 1987 - December 1989

box 4, folder 18

LACTC and SCRTD Merger - Report on Public Transportation (Folder 1 of 5) January, 1987

Scope and Content Note

Report on Public Transportation by the County of Los Angeles Chief Administrative Office dated January, 1987; includes sections labeled alternatives to improve administration, conceptual designs, and transit organization structures.
box 4, folder 19

LACTC and SCRTD Merger - Joint Organizing Committee (Folder 2 of 5) January, 1989

Scope and Content Note

LACTC and SCRTD Joint Organizing Committee meeting agendas, Senate Bills 1 and 2489, memos, California State Legislation documents.
box 4, folder 20

LACTC and SCRTD Merger - Joint Organizing Committee Agreement (Folder 3 of 5) December, 1988

Scope and Content Note

Resolution and agreement between SCRTD and LACTC that describe system integration and funding.
box 4, folder 21

LACTC and SCRTD Merger - SCRTD Public Utilities Code (Folder 4 of 5) Undated

Scope and Content Note

Copy of SCRTD Public Utilities Code.
box 4, folder 22

LACTC and SCRTD Merger - LACTC Public Utilities Code (Folder 5 of 5) Undated

Scope and Content Note

Copy of LACTC Public Utilities Code.
box 5, folder 1

LACTC and SCRTD Merger - Reorganization 1988 - 1989

Scope and Content Note

Reorganization principles from the LACTC, Summary Report on the Positions Adopted by the SCRTD, 1989 LACTC and SCRTD Common Legislative Goals.
box 5, folder 2

LACTC and SCRTD Joint Organizing Committee Meeting Minutes January - March 1989

Scope and Content Note

Minutes of SCRTD/ LACTC Joint Organizing Committee, comparisons of powers and functions of LACTC and SCRTD, recommended actions regarding Senate Bill Number 1.
box 5, folder 3

LACTC and SCRTD Joint Organizing Committee Meeting Minutes and Reorganization Drafts April - June 1989

Scope and Content Note

Minutes of SCRTD/ LACTC Joint Organizing Committee, Agency Approach Drafts.
box 5, folder 4

LACTC and SCRTD Joint Organizing Committee Agreements and Reports November - December 1989

Scope and Content Note

Progress reports, memos, draft agreements, Eight Point Agreement, Design and Construction of Minimum Operable Segment Two.
 

6.2 LACTC Handbook Sep-90

box 5, folder 5

LACTC and SCRTD Merger - LACTC Handbook: Table of Contents and Introduction (Folder 1 of 3) September, 1990

Scope and Content Note

LACTC in Brief: A Handbook for Commissioners and Alternates includes sections labeled Table of Contents, Introduction.
box 5, folder 6

LACTC and SCRTD Merger - LACTC Handbook: Policies and Long Range Plans (Folder 2 of 3) September, 1990

Scope and Content Note

LACTC in Brief: A Handbook for Commissioners and Alternates includes sections labeled Travel Expense Policy, Policy on Disadvantaged/ Women - Owned Business Enterprises, 30 -Year Plan.
box 5, folder 7

LACTC and SCRTD Merger - LACTC Handbook: Rail Construction and Reorganization (Folder 3 of 3) September, 1990

Scope and Content Note

LACTC in Brief: A Handbook for Commissioners and Alternates - Rail Construction Corporation, Commuter Rail, Area Teams, SCRTD/LACTC Transit Reorganization.
 

7 Transit Studies in Southern California Transit Corridors 1985 – 1991

 

7.1 Lincoln Heights Oct-85

box 5, folder 8

Transit Studies: Lincoln Heights Route Refinement Study (Folder 1 of 2) October, 1985

Scope and Content Note

Proposal for Lincoln Heights Route Refinement Study submitted by Seelye Stevenson Value and Knecht, includes overview of study area and relevant project experience. Oversized maps and documents are continued in map drawer.
box 5, folder 9

Transit Studies: Lincoln Heights Route Refinement Study (Folder 2 of 2) October, 1985

Scope and Content Note

Proposal for Lincoln Heights Route Refinement Study submitted by Seelye Stevenson Value and Knecht includes project approach and organization, hourly rates, and equal opportunity employment.
 

7.2 Los Angeles - San Diego 1987

box 5, folder 10

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Summary June, 1987

Scope and Content Note

Los Angeles - San Diego State Rail Corridor Study Summary Report includes existing rail structures, summary of costs, potential future ridership, and environmental impact.
box 5, folder 11

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 1 and 2 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 1 and 2, includes the study scope objectives and work process, and existing rail facilities and operations. Page of handwritten notes by Jacki Bacharach dated October 21, 1988.
box 5, folder 12

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapter 3 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapter 3, includes frieght operations, projected speeds and travel times, alternatives for realignment.
box 5, folder 13

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 4, 5, 6 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 4 - 6, includes freight interference analysis, impacts of new stations on travel time, boarding and passenger procedures, scheduling.
box 5, folder 14

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 7 and 8 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 7 and 8, includes passenger safety and improvement options, patronage/ ridership potentials based on location.
box 5, folder 15

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 9 and 10 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 9 and 10, includes estimated costs, engineering, operating costs, projected fare box recovery.
box 5, folder 16

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 11 - 14 Circa 1987

Scope and Content Note

Transit Studies: Los Angeles - San Diego State Rail Corridor Study Final Report, Chapters 11 - 14, includes maintenance cost impacts, environmental impacts, cultural and public utilities impacts, recommendations based on study.
 

7.25 %dummy% %dummy%

box 5, folder 17

A Telephone Survey of Registered Voters in Los Angeles County May, 1988

Scope and Content Note

A Telephone Survey of Registered Voters in Los Angeles County conducted by the Werlin Group for LACTC, includes responses regarding freeway and street improvements, attitudes toward financing, and general attitudes towards transit.
box 6, folder 1

Rail Transit Implementation Strategy Blue Line/ Green Line November, 1989

Scope and Content Note

R.C.C. Meeting Agenda for the Green Line Budget on November 6, 1989, includes budget history, Green Line system features, Norwalk - El Segundo Rail Transit Project; LACTC Blue Line Rail Activation Team presentation slides dated November 6, 1989, includes mission statement, functions, operations, budget summary.
 

7.3 Pasadena - Los Angeles Rail Project November 1989 - July 1991

box 6, folder 2

Revised Environmental Impact Report - Pasadena - Los Angeles Light Rail Project November, 1989

Scope and Content Note

Executive Summary of Revised Environmental Impact Report - Pasadena - Los Angeles Light Rail Project, includes description of project, projected patronage; summary of environmental analysis based on land use, circulation, air quality, noise, light, and public services.
box 6, folder 3

Dodger Stadium Transit Access Study August, 1990

Scope and Content Note

Dodger Stadium Transit Access Study includes purpose and need for the connector between The Pasadena Line and Dodger Stadium, route and technology alternatives, concept drawings and maps.
box 6, folder 4

Initial Study for the Relocation of Approved Chinatown Station and Alignment July, 1991

Scope and Content Note

Initial Study for the Relocation of Approved Chinatown Station and Alignment for the Pasadena - Los Angeles Rail Transit Project includes alternative locations for the Chinatown Station after originally approved location was determined to be inadequate to serve residents.
 

7.4 %dummy% %dummy%

box 6, folder 5

Eastside Corridor Transportation Improvements Scoping Information September, 1991

Scope and Content Note

Eastside Corridor Transportation Improvements Scoping Information Report and Summary includes schedule of scoping meetings, development process, Metro Eastern Extension alignment alternatives.
 

8 Workshops and Committee Meetings 1991 – 1992

 

8.1 FTA and ULI Joint Development Workshop Jan-92

box 6, folder 6

FTA and ULI Joint Development Workshop Section 1 January, 1992

Scope and Content Note

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, January 23, 1992 Agenda and Introduction/ Class Outline with handwritten notes by Jacki Bacharach.
box 6, folder 7

FTA and ULI Joint Development Workshop Section 2 January, 1992

Scope and Content Note

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, January 23, 1992 Reading One entitled Transit Joint Development in the U.S.: An Inventory and Policy Assessment.
box 6, folder 8

FTA and ULI Joint Development Workshop Section 3 January, 1992

Scope and Content Note

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, January 23, 1992 Reading Two entitled Metro Site Joint Development Prospectus Ballston Metro Station Arlington, Virginia.
box 6, folder 9

FTA and ULI Joint Development Workshop Sections 4 - 5 January, 1992

Scope and Content Note

The Federal Transit Administration and The Urban Land Institute Joint Development Workshop Participant's Manual, Los Angeles, California, January 23, 1992 Reading Three entitled Joint Development Policies and Procedures Manual; handwritten notes by Jacki Bacharach.
 

8.2 Commuter Transportation Services, Incorporated August 1991 - September 1992

box 6, folder 10

Commuter Transportation Services, Incorporated Board of Directors Notebook April - September 1992

Scope and Content Note

Welcome letter to Jacki Bacharach from Commuter Services, Incorporated; agenda for August 5, 1992 meeting; amendments to license agreement between SCRTD and Megadyne Information System.
box 6, folder 11

Commuter Transportation Services, Incorporated Board of Directors Notebook March, August - September 1992

Scope and Content Note

Commuter Transportation Services Board of Directors roster noting Jacki Bacharach's elected position as of August, 1992; Finance and Corporate Services organizational charts; Client Services Department Overview; financial statements; strategic plan; mission statement.
box 6, folder 12

Commuter Transportation Services, Incorporated Board of Directors Notebook August, 1991

Scope and Content Note

Commuter Transportation Services Board of Directors Notebook sections labeled Directors/ Officers, Advisory Board, Committees. Pages dated August 1991.
box 6, folder 13

Commuter Transportation Services, Incorporated Board of Directors Notebook August, 1991

Scope and Content Note

Commuter Transportation Services Board of Directors Notebook sections labeled By-Laws, Articles of Incorporation, CTS Policy Statements. Pages dated August 1991. Copy of Crossroads Monthly News from Commuter Transportation Services, Inc June/July 1992.
box 6, folder 14

Commuter Transportation Services, Incorporated State of the Commute 1992

Scope and Content Note

Commuter Transportation Services, Incorporated State of the Commute Executive Summary, includes chapters entitled Survey Results, County Comparisons, and About the Survey.
 

8.3 Intercounty Bus Service Study Executive Steering Committee February - October 1992

box 6, folder 15

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program February, 1992

Scope and Content Note

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program for Intercounty Express Bus Service Request for Proposals includes chapters entitled Instructions for Offerors, Disadvantaged Business Enterprises, Evaluation and Award Procedures, and Scope of Work.
box 6, folder 16

Intercounty Bus Service Study Executive Steering Committee Development of a Regional Implementation Program Circa May - June 1992

Scope and Content Note

Regional Implementation Program for Intercounty Express Bus Service includes project updates.
box 6, folder 17

Intercounty Bus Service Study Executive Steering Committee Meeting Agendas June - August 1992

Scope and Content Note

Intercounty Bus Service Study Executive Steering Committee meeting agendas and minutes, includes intercounty bus routes and proposed service changes, handwritten page of notes by Jacki Bacharach.
box 6, folder 18

Intercounty Bus Service Study Executive Steering Committee Meeting Agendas August - October 1992

Scope and Content Note

Intercounty Bus Service Study Executive Steering Committee meeting agendas and minutes, includes Intercounty Express Bus Service Study Recommendations and preliminary report entitled Development of a Regional Intercounty Bus Service Program; handwritten note to Jacki Bacharach regarding the Intercounty Bus Study.
 

9 Alameda Corridor/ Directories and Manuals 1992 – 1993

 

8.4 %dummy% %dummy%

box 6, folder 19

Los Angeles Standard Light Rail Vehicle Products and Services Directory August, 1992

Scope and Content Note

Los Angeles Standard Light Rail Vehicle Products and Services Directory, interoffice memo from Neil Peterson regarding the directory.
 

9.1 Alameda Corridor Dec-92

box 6, folder 20

Alameda Corridor Project Reports December, 1992

Scope and Content Note

Alameda Corridor Project Mitigation Monitoring Program and Findings, and Statement of Overriding Considerations include environmental impacts, proposed mitigations to environmental concerns, and the effects of these concerns during construction and operation. The Alameda Corridor is located on Alameda Street from Route 101 to the Port of Los Angeles.
box 6, folder 21

Alameda Corridor Final Environmental Impact Report - Summary December, 1992

Scope and Content Note

Alameda Corridor Final Environmental Impact Report Summary includes project description, areas of controversy, issues to be resolved, and unavoidable adverse effects due to construction and operation. Chapters 1 - 6 are not included in this report.
box 7, folder 1

Alameda Corridor Final Environmental Impact Report - Chapter 7 December, 1992

Scope and Content Note

Alameda Corridor Final Environmental Impact Report Chapter 7 includes an overview of the public comment process on the Draft Environmental Impact Report, copies of letters of response from various Southern California government personnel.
box 7, folder 2

Alameda Corridor Final Environmental Impact Report - Chapter 7 Continued December, 1992

Scope and Content Note

Alameda Corridor Final Environmental Impact Report Chapter 7 continued includes copies of letters of response from various Southern California government personnel.
box 7, folder 3

Alameda Corridor Final Environmental Impact Report - Chapter 8 December, 1992

Scope and Content Note

Alameda Corridor Final Environmental Impact Report Chapter 7 includes corrections and revisions to the Draft Environmental Impact Report.
 

9.15 %dummy% %dummy%

box 7, folder 4

German "Smart-Bus" Systems January, 1993

Scope and Content Note

German "Smart-Bus" Systems Potential for Application in Portland, Oregon Volume 1, Technical Report dated January 1993, includes handwritten notes by Jacki Bacharach.
 

9.2 Directories and Manuals March - May 1993

box 7, folder 5

Inside Moves Newsletter Issue 3 March, 1993

Scope and Content Note

Metro newsletter Inside Moves March 1993 issue includes a farewell article about Jacki Bacharach and highlights her career at LACTC.
box 7, folder 6

Metrolink Station Design Manual May, 1993

Scope and Content Note

Metrolink Station Design Manual by the SCRRA Engineering Department, Part 1 of the manual consists of text and includes the construction process and a Basis-For-Design Checklist; Part 2 of the manual consists of large scale drawings.
 

10 Jacki Bacharach and Associates Consulting Firm, Transit Studies 1992 – 2002, 2012

 

10.1 Central Orange County Fixed Guideway Agency 1993

box 7, folder 7

Central Orange County Fixed Guideway Agency September, 1993

Scope and Content Note

Letter from Dave Shuter, executive Director of the Central Orange County Fixed Guideway Agency to Jacki Bacharach regarding material that she requested from the agency; copy of envelope that materials were sent in with handwritten notes from Jacki Bacharach; materials include the history and background of the COCFGA, COCFGA Directors list, board presentation schedule, summary report.
box 7, folder 8

Central Orange County Fixed Guideway Agency - Planning 1993 - 1993

Scope and Content Note

Central Orange County Fixed Guideway Agency - Fixed Guideway Project report, includes station area context and concepts for each Orange County Fixed Guideway Station with photos and diagrams.
box 7, folder 9

Central Orange County Fixed Guideway Agency - Fixed Guideway Project September, 1993

Scope and Content Note

Planning Scope and Framework Document for COCFGA and OCTA that includes joint development strategies, conceptual station design, and evaluation criteria.
 

10.2 Transit Studies December 1993 - December 2000

box 7, folder 10

Land Use/ Transportation Policy Recommendations Final Report December, 1993

Scope and Content Note

Land Use/ Transportation Policy Feasibility Analysis and Recommendations for Implementation - Final Report describes implementation tools and mechanisms that have been used in other locations in the United States and which could be adapted for Metro.
box 7, folder 11

Los Angeles Countywide Bicycle Policy April, 1994

Scope and Content Note

Los Angeles Countywide Bicycle Policy Document, includes handwritten notes by Jacki Bacharach.
box 7, folder 12

Comprehensive Rail Plan for Ventura County Transportation Commission January, 1995

Scope and Content Note

Comprehensive Rail Plan for Ventura County Transportation Commission and Santa Barbara County Association of Governments Final Report, includes chapters entitled Operating Plans and Assumptions for the Santa Barbara/ Los Angeles Corridor (Coast Main Line), Ridership Forecast, and Socio Economic Forecasts.
box 7, folder 13

L.A. Story: A Reality Check for Transit-Based Housing March, 1995

Scope and Content Note

L.A. Story: A Reality Check for Transit-Based Housing of the Working Paper Series by the Department of Urban and Regional Planning at the University of California, Irvine describes a planning strategy for leveraging rail transit through high-density residential developments near rail stations, or "transit-based housing."
box 7, folder 14

Ridership Projections … at Rail Transit Stations on the Trenton - Camden Line January, 1997

Scope and Content Note

Technical Memorandum: Ridership Projections from Induced Residential and Commercial Growth at Rail Transit Stations on the Trenton - Camden Line. This paper describes the concept of growth near rail transit lines as it relates to residential and commercial development within the proximity of rail stations.
box 7, folder 15

Transportation Management Coordination Study - Executive Report July, 1997

Scope and Content Note

Cover letter addressed to Jacki Bacharach from Meyer, Mohaddes Associates Incorporated regarding the reports submitted to MTA; copy of the Transportation Management Coordination Study - Executive Report which includes analysis of existing conditions of management centers throughout Los Angeles County that focus on traffic management, transit and rail management, and emergency management.
box 7, folder 16

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (I - IV) May, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions sections I - IV which was submitted to MTA, includes information regarding the 14 management/ operating centers in Los Angeles County, conceptual map.
box 7, folder 17

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (Appendix A) May, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Appendix A which was submitted to MTA, includes completed survey forms from various personnel and officials of the 14 management/ operating centers in Los Angeles County.
box 7, folder 18

Transportation Management Coordination Study - Technical Memorandum No.1 - Existing Conditions (Appendix B) May, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.1 - Appendix B which was submitted to MTA, includes a draft report entitled Los Angeles County Traffic Management Center Needs Assessment Report.
box 7, folder 19

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (1 - 3.3) July, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (sections 1 - 3.3) which was submitted to MTA, includes information regarding survey results, alternative architecture options for the coordination of transit management agencies in Los Angeles County.
box 7, folder 20

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (3.4 - 5) July, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (sections 3.4 - 5) which was submitted to MTA, includes information regarding software needed for system coordination, emergency services coordination, and an analysis of the field equipment needed.
box 7, folder 21

Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (Appendices) July, 1997

Scope and Content Note

Copy of the Transportation Management Coordination Study - Technical Memorandum No.2 - Analysis and Recommendations (Appendices) which was submitted to MTA, includesdefinitions of terms, sample surveys, and basic link spectrum requirements for an integrated traffic/ transit/ emergency system.
box 8, folder 1

Ventura Rail Right of Way Restoration Study November, 1998

Scope and Content Note

Ventura Rail Right of Way Restoration Study Final Report, includes a 1991 engineering study, evaluation of rail line alternatives, land use and planning policies, funding strategies, and an action plan.
box 8, folder 2

Crenshaw - Prairie Corridor Route Refinement Study Section 1 December, 2000

Scope and Content Note

Crenshaw - Prairie Corridor Route Refinement Study Section 1, includes information regarding community demographics of the corridor, travel characteristics, and mobility problems.
box 8, folder 3

Crenshaw - Prairie Corridor Route Refinement Study Section 2 December, 2000

Scope and Content Note

Crenshaw - Prairie Corridor Route Refinement Study Section 2, includes information regarding preliminary planning studies, conceptual maps and alternatives.
box 8, folder 4

Crenshaw - Prairie Corridor Route Refinement Study Section 3 December, 2000

Scope and Content Note

Crenshaw - Prairie Corridor Route Refinement Study Section 3, includes further analysis of population demographics, conceptual alternatives, and environmental analysis. Section 4 title page.
 

10.3 %dummy% %dummy%

box 8, folder 5

California Commission on Building for the 21st Century February, 2002

Scope and Content Note

Letter of transmittal from the Commission Co-Chairs outlining the priorities for infrastructure in California; Executive Summary from the California Commission on Building for the 21st Century, includes financial analysis of the state budget, goals for transportation by 2020 and recommended options.
box 8, folder 6

Correspondence from Jacki Bacharach to Metro February, 2012

Scope and Content Note

Copy of envelope that some materials were sent to Metro in, email from Jacki Bacharach to Michael Bohlke at the Metro Transportation Library and Archives regarding 41 documents that Bacharach inquired about donating to the library for historical use. All of these documents are in the collection.