Guide to the NACA Ames Aeronautical Laboratory Records at NARA San Francisco, 1939-1958
Guide to the NACA Ames Aeronautical Laboratory Records at NARA San Francisco, 1939-1958
Collection number: Record Group 255.4.1
NASA Ames Research Center History Office- National Archives and Records Administration, Pacific Region, at San Francisco
- 1000 Commodore Drive
- San Bruno, California 94066-2350
- Phone: (650) 876-9009
- Email: archives@sanbruno.nara.gov
- URL: http://www.archives.gov/san-francisco/
- NASA Ames Research Center History Office
- URL: http://history.arc.nasa.gov
- Date Completed:
- September 1998
- Encoded by:
- Gabriela A. Montoya
Volume: 250 linear feet
Common Abbreviations in the Ames Records
1. Branch Codes used by the Ames Report Unit
- AA 7-by-10 foot Wind Tunnel Branch
- AB 16 foot High Speed Wind Tunnel Branch
- AC 1-by-3 foot Speed Wind Tunnel Branch
- AD 40-by-80 foot Wind Tunnel Branch
- AE 1-by-3 foot Supersonic Wind Tunnel
- AF 12 foot Pressure Wind Tunnel Branch
- AG 6-by-6 foot Supersonic Wind Tunnel Branch
- AH Flight Research Branch
- AK Flight Engineering Branch
- AL Theoretical Aerodynamics Branch
- AM Instrument Development Branch
- AN 10-by-14 inch Supersonic Wind Tunnel Branch
- AO Supersonic Free Flight Wind Tunnel Branch
- AP Low Density Heat Transfer Wind Tunnel Branch
- AQ Unitary Plan Design Group
2. NACA and NASA Report Abbreviations
- ACR= Advance Confidential Report
- ARR= Advance Restricted Reports
- CMR= Confidential Memorandum Report
- CR= Contract Report
- CRM= Confidential Research Memorandum
- Memo= Memorandum
- MR= Memorandum Report
- Rep= Report
- RM= Research Memorandum
- RMR= Restricted Memorandum Report
- TM= Technical Memorandum
- TN= Technical Note
- TR= Technical Report
- WR= Wartime Report
Additional Note
Central Files, 1939-1957
Scope and Content Note
Arrangement
Report Unit Files, 1947-1954
Scope and Content Note
Arrangement
Records of the Ames Unitary Plan Design Group, 1950-1953
Scope and Content Note
Arrangement
Records of the Research Instrumentation Division, 1941-1956
Scope and Content Note
Arrangement
Central Files, 1939-1957
A1-5 Aberdeen Proving Grounds - Ballistic Res. Laboratories. 1947-1948
A1-10 Airfoils - General. 1947-1948
A1-10 Airfoils. General. [1940-1946]
A1-10a Ordinator Test Results. [1942-1944]
A2-10 Baldwin Locomative Works. [1944-1945]
A3-10 Compressibility Effects. (General), [1941-1945]
A3-20 Computations - General. [1941-1946]
A3-20 Computations - General. 1947-1948
A3-20a Computations - REAC. 1948
A4-20 Engineering Designs (General).
A4-20a Engineering Designs Drawings. [1941-1945]
A4-25 Duct Inlets (Submerged Types). [1945-1948]
A5-10 Engines. [1941-1945]
A5-10 Engines. (1948)
A10-10 Jet Propulsion. [1943-1946]
A10-10 Jet Propulsion. (1947-1948)
A12-5 Lubricants and Fuels. [1942-1946]
A14-5 Metals - General. [1942-1946]
A14-10 Missiles. (1944-1948).
A19-10-20b Research. Aerodynamic. - General. [1940-1945]
A19-10 Research - Aerodynamic - General. (1948)
A19-20d Research - Compressibility Effects Upon Tail Surfaces. [1941].
A21-5-15 Tailess Airplanes - Reports (General). [1942-1944]
A21-20-24-10 Tests. Progress Reports. Water Channel. [1941-1945]
A-159 (MX-583). 1944
A-248 Vickers-Armstrong M-235, (1948-1955)
A-248 Vickers-Armstrong M-235.[1948-1955]
A-1-1 A21. Effect of Leading-Edge Shock Wave on Initial Boundary-Layer Development on a Wedge. [1953-1955]
A-1-2 A13 Study of Nonlinear Conical Flow over Triangular Wings at Supersonic Speeds. [1951-1953]
A-1-2 A22 Transonic Flow Over A Curved Leading Edge. [1953-1955]
A-1-4 A14 Development of Technique for Investigating Heat Transfer at Mach Numbers of the Order of 10. [1953-1956.
A-1-4 A34 Calibration of a Vortex Type True Free Air Thermometer at Transonic Mach Numbers (2x2). [1954-1955.]
A-2-1 A1 Investigation of the Static Stability of Swept-Back Wing and Wing-Body Combinations. [1953-1955]
A-2-1 A3 Investigation of the Effects of Operating Propellers on the Aerodynamic Char. of a Swept-Wing Airplane. [1951-1954]
A-2-1 A5. Investigation of the Static Stability of Missiles with Wings & Tails. [1951-1955.
A-2-1 A8. Determination of the Effect of Wing Plan Form on Damping in Pitch. [1956]
A-2-1 A9. Effect of Wing Plan Form and Aircraft Configuration on Dynamic Derivations. 1954.
A-2-1 A11. Search for, and Evaluation of Criteria for Satisfactory Lateral and Directional Dyn. Stability and Control. [1951-1952]
A-2-1 A13. Inv. of the Rel. of Servomechanism Char. and Aircraft & Dynamic Stability Char. required for Aut. Stabil. [1954]
A-2-1 A14. Investigation of the Requirements of Artificial Fuel System. [1954]
A-2-1 A17. Wing Tunnel Investigation of the MX-656 Research Airplane. [1952-1954]
A-2-2 A21. Investigation of Controls for Triangular Wings. [1952]
A-2-2 A22. Investigation of Controls for Wings with Large Angles of Sweep. [1951]
A-2-2 A23. Flight Inv. of Longitudinal and Lateral Control Char. of Fighter-Type Airplanes at Transonic Speeds. [1951]
A-2-1 A31. Spersonic WT Invest. of the Control Effectivness of the Hughes MX-904 (Falcon) Missile. 1951-1953.
A-2-1 A33. Stability and Control Inv. of an Infra-Red Seeking Rocket and an 8-Centimeter Oerlikon Rocket [1951-1954
A-2-1 A33. Sidewinger. U.S. Naval Ordinance Test Station (NOTS). [1952-56
A-2-1 A35. Inv. of Static Stability Character of the Lockheed XFO-1 Airplane Model at High Supersonic Speeds [1952
A-2-1 A36. Free Flight Investigation of Powered Dynamic Model of the Lockheed XFO-1 Airplane [1952.
A-2-1 CF A41. Effect of the Tail Height on the Longitudinal Stability of a Swept-Wing Fighter Airplane [N.D.]
A-2-2 A39. Investigations of Supersonic Speeds of Trailing-Edge Flap Controls. 1951.
A-2-1 A52. Preliminary Studies of a Simple Mechanical Analogue for Evaluating the Dynamic Stability of Aircraft. [1954].
A-2-1 A54. Lateral Stability Characteristics of Triangular Wings at High Subsonic and Supersonic Speed. [1954].
A-2-1 A60. Experimental Investigation of Horizontal Tail Hinge-Moment Characteristics of Bomarc Missile [1951-1953.
A-2-1 A65 Study of Coordinate System for Simplifiying the Calculations of Missile Trajectories in Three Dimensions. 1953-1954.
A-2-2 A67 Simulations of Lateral Oscillatory Characteristics of the Convair XB-58 (MX-1964) Airplane. (C) [1954.
A-2-1 A72 Investigation of the Dynamic Longitudinal Stability of Bodies of Revolution.
A-2-1 A77 Investigation of the Stability Characteristics of the B-62 Missile (Northrop N-69). (C). [1954.
A-2-1 A41 Stability of Bodies of Revolution at High Supersonic Speeds S/C Stability and Control. (C). [1953-1954]
A-2-1 A41 Drawings. F-86. 1950
A-2-1 A41 Drawings. F-86. 1952
C-F A-2-1 A44 Investigation of Ground Effect on Longitudinal Stability and Control of Low-Aspect-Ratio Airplanes. N.D.
A-2-1 A91 Chance-Vought Aircraft Report #10,035. 1955.
A-2-1 A91 Chance-Vought Aircraft Report #10,109. 1956.
A-2-1 A91 Drawings Recieved. 1957.
A-2-1 A91 Ames 9x7 SSWT T-11. CVA Regulus II.
A-2-1 A91 Regulus II,N.D.
A-2-1 A91 Ames 9x7 T-11. CVA Regulus II Model Photos. [1956]
A-2-2 A91 9x7 Tk SSWT. Test 11. Regulus II. [Computer Print-Outs. 1956.]
A-2-3 A-46 Study of the Characteristics of Airplanes in the Region of the Stall. (F-86). [1953]
A-2-3 A-47 Investigation of Electromagnetic Model Restrain for Dynamic Stability Tests in Wind Tunnels. 1952-1955
A-2-1 A44 Investigation of Ground Effect on Longitudinal Stability and Control of Low-Aspect-Ratio Airplanes
C-F A-2-2 A48 Evaluation of the Dynamic Stability and Control Characteristics of a Triangular Wing Airplane Design. 1952-1955.
A-2-2 A50 Force and Moment Measurements on the XSSM-AX23 Dart Missile. 1954.
A-3-1 A2 High Speed Characteristics of Scoop Inlets for Operation at Supersonic Speeds. 1953
A-3-1 A3 Low Speed Char. of Scoop Inlets for Operation at Supersonic Speeds. [1954]
A-3-1 A8 [F-93A. Drawings. 1954]
A-3-1 A8 Flight Investigations of Air-Induction Systems. [1950-1953]
A-3-1 A10 Wind Tunnel Tests of Air Sampling Devices. [1952]
A-3-1 A12 Flight Investigation of Effects of Jet Exit Configuation on Exit Losses. (C). [1951-1954]
A-3-1 A13 Supersonic Tunnel Tests of Fixed Geometry Nose Inlet for the F-100 (Sabre 45) Airplane. 1951-1954]
A-3-1 A13 [Drawings for above. 1951]
A-3-1 A13 [As above. 1951-1952]
A-3-1 A13 [As above. 1951-1952]
A-3-1 A14 Investigation of F100 Nose Inlet. [1952]
A-3-1 A15 Investigation of Inlets of F-104 (Lockheed L-246) Airplane. (C).1952-1955
A-3-1 A15 LAL 218 Model Drawings (Wind Tunnel) April 27, 1953
A-3-1 A15 [Loose Drawings]
A-3-3 A31 Enclosures w/Shipping List. 1956-1957]
A-3-3 A31 [Drawings. 1956]
A-3-3 A31 [Drawings. 1956]
A-3-3 A31 [Drawings. 1956]
A-3-3 A31 Data Pertinent to Wind Tunnel Tests of the 0.122 Scale XSM64A Air Indution System Evaluation Model. 1957
A-3-3 A31 Working Papers. [1957]
A-3-3 A31 Structural Analysis of the XSM-64A (G-38). 122-Scale D54 Diffucer Evaluation Model. 1956]
A-3-3 A31 Factor Board Typewriter Tabulation. Test 20. NAVA110.
A-3-3 A31 Preliminary Analysis of the Missile Plus Booster Installation. Revised. 1957
A-3-3 A31 Determination of the Engine Air-Diffuser Characteristics of the NAVAHO Missile (XSM-64A). 1956
A-3-3 A31 Preliminary Analysis of the Missile Plus Booster Installation. 1956]
A-3-3 A32 Drawings to the Above. 1956
A-4-1 A1 Investigation of a Propeller-Spinner Combination. [1953]
A-4-1 A3 Investigation of Dual Rotating Propellers. (C). [1954]
A-4-1 A4 Tests of a Wide-Blade Propeller at Negative Thrust. [1954]
(CF) A-4-1 A5 Investigation of a Supersonic Propeller Having Blunt Trailing Edges. [1953-1955]
(CF) A-4-2 A2 Investigation of Wing Interference and Nacelle Interference on the First-Order Vibratory Stresses on Propeller Blades. 1951-1955
A-4-3 A6 Tests of Lockheed YC-130 Turbo-Propeller Installations in Ames 40-by-80 Foot Wind Tunnel. [1954]
A-6-2 A1 Full-Scale Tunnel Investigation of McDonnell Model 82 Convertiplane Rotor [1953]
A-7-1 A1 Investigation of Airfoils with Blunt Trailing Edges. [1951]
A-7-1 A1 Development of a Method for Estimating Three-Dimensional Data from Two Dimensional [1953]
A-7-1 A41 Boundry-Layer Control Inves. with Wing and Horizontal Tail Panels. [1950-1953]
A-7-1 A41 [Drawings Douglas. 1950-51]
A-7-1 A44 Exper. Investi. of Effects of Variation of Plan Form, Sweepback, Thickness and Camber Wings of Moderate Aspects Ratio. [1953]
A-7-1 A46 The Effects of Taper on the Transonic Characteristics of Airfoils. 1951-1955
A-7-1 A47 Summary and Analysis of Hi-Sp Airfoil Data Obtained in 1 and 3½ Hi-Sp W/T at the Ames Aero Lab. (C). [1953]
A-7-1 A48 Static Two-Dimensional-Airfoil Character of Transonic Spds.
A-7-1 A52 Experimnetal Study of Boundry-Layer Control on Triangular Wings. 1952-1955
A-7-1 A56 Effect of Taper Ratio and Sweep Angle on Low-Aspect-Ratio Wings at Transonic and Super-Sonic Speeds. 1953-1955
A-7-2 A21 Investigation of the Interrelation of Body Shape Parameters in Determining Optimum Supersonic Bodies, [1951-1953]
A-7-2 A55 Supersonic Wind Tunnel Investigation of the MX-1593 Missile. USAF. (C).1954
A-7-2 A102 Investigation of Multiple Body Configurations of Termsonic + Supersonic Speeds, 1955
A-7-3 A31 High Speed Wind-Tunnel Investigational Aerodynomic Characteristics of XB-52 Airplane [1951-1953]
A-7-3 A32 Wind-Tunnel Investigation of the Aerodynamic Characteristics of the MX-656 Research Airplane at Supersonic Speeds. [1951]
A-7-3 A32 W/T Investigation of the MX-656 in AMES 6 x 6. 1945-1953
A-7-3 A32 [Dwgs w/ltr. 2-17-49
A-7-3 A32 [Dwgs w/ltr. 11-1-48
A-7-3 A35 Supersonic Wind-Tunnel Investigation of MX-775A Missile. [1952]
A-7-3 A36 Investigation of External Stores and Nacelles on Supersonic Airplanes. [1953]
A-7-3 A37 Supersonic Wind-Tunnel Inv. of Aerodynamic Characteristics of Douglas XF40-1 Airplane. [1953]
A-7-3 A42 Effect of Vertical Position of Wing on Fuselage At Transonic and Supersonic Spds. (c). [1951]
A-7-3 A49 Investigation in Ames 40 x 80 W/T of Low Speed Stalling Characteristics of Republic RF-84F Airplane, (R) [1951-1952]
A-7-3 A50 Drag Cleanup Study on Lockheed F-94C Airplane. (C).[1952]
A-7-3 A43 Experimental Investigation of a 0.07 - Scale Model of the XM-770 Missile. (C).1951-1952
A-7-3 A43 [Drawings, Douglas, 1951]
A-7-3 A51 Supersonic Wind Tunnel Tests of a Model of the Republic XF-103. Airplane (MX-1554). (C).
A-7-3 A53 Tests of a Model of the USAF Republic XF-103 in the Ames 6-by-6 Foot Supersonic Tunnel. [1953]
A-7-3 A54 Tests of Wing Tip Tank with Internal Flow. (C). [1952]
A-7-3 A58 Experimental Investigation of the Subsonic and Supersonic Drag and Stability of MX-1964. 1952-1956
A-7-3 A58 Dimensional Data Report for the 1/17 - Scale Pressure and Hinge Moment Model of Project MX-1964. Convair. 10 February 1954
A-7-3 A58 Addendum C [to the above]
A-7-3 A58 [Drawings. 1952]
A-7-3 A58 Addendum B [to demi. Report above. 2nd Copy of Demi Report MX1964]
A-7-3 A58 Enclosures to Convair Shipment Notice to Ames No 8904. 18 Nov 1954
A-7-3 A58 Enclosure to Langley Letter to AFD Feild Report, Langley Air Force Base. January 22, 1953.
A-7-3 A59 Wind-Tunnel Investigation of Aerodynamic Characteristics of Lockheed L-246 Airplane. 1952-1956.
A-7-3 A59 [Loose Drawings. 1954]
A-7-3 A59 F-104. (L-246) (1953)
A-7-3 A60 Tests of a Model of the USAF McDonnell XF-101A Airplane in the Ames 6-by-6 foot Supersonic Tunnel, (C). 1953-1955
A-7-3 A60 [Loose Drawings and Blueprints for the F-101 8% Scale Wind Tunnel Model. 1953]
RA A-7-3 A60 F-101A. McDonnell Aircraft Corp. 1952-1955.
[As above. 1953.
A-7-3 A66 XF8U Chance Vought. 1953
A-7-3 A66 Experimental Investig of the Drag, Stability, Inlet Characts. of the Chance Vought XF8U-1. (C) 1953-1956
A-7-3 A66 [Loose Drawings 1953]
A-7-3 A72 Shock-Expansion Methods of Determining Wing-Body Interference at High Supersonic Speeds 1953-1955]
A-7-3 A78 Investigation of Aerodynamic Charact [eristics] of Complete Model (approx. 1/8 scale) XF 40-2 Airplane in 6-by 6 foot W/T. 1953-55
A-7-3 A80 Ivestig of Methods of Drag Reduction for the F-102 Airplane Config. (C). 1954-1955
A-7-3 A82 Investigation of Performance and Aerodynamic Stability and Control of RQ-2 Drone (C) October-November 1954
A-7-3 A103 Tests of Air Sampling Probe in 2 by 2 foot Tunnel.
A-7-4 A73 Aerodynamic Tests of Dalmo Victor Antenna AN-SPS-5A
A-7-4 A94 Shakedown and Calibration Tests of Ames Unitary Wind Tunnel. 1955
A-71 15 Airplanes-Ice Research (General) 1941-1948
A-71 15a Airplanes-Lockheed 12 A. General. 1938-1948
A-71 15b-15e Airplanes-Lockheed 12 A. [reports of inspections of aircraft specifications (15b) Maint/equip orders, problems, blueprints (15c) Radio Equip (including bid material) (15d) transmital statements (for reports) (15e) P.D. & Reports (re-thermal ice prevention (15c)]
AF1-15K-AF1-15-L Airplanes 0-47A. 1940-1945 [ General correspondence, shipping tickets invoices maint equipemnt and standards, orders for spares, etc.]
AF1-20 Airports, in Contact with 1941 [Air Corp Circular on price & location of aircraft POL; request for fuel]
A71-25 Air Transport Assoc of America [List of key men in Assoc; agenda for conference]
AF1-30 American Airlines. 1941-1946 [Correspondence between AA, CA Board and NACA re deicing problems]
AF1-35 & AF1-35a Army Air Forces Material Command. [General Correspondence re icing problems and suggestions.]
AF2-30 British Air Commission De Icing Investigation [December 23, 1941-February 17, 1947]
AF3-3 Cabin Heating or Cooking. 1945-1946
AF3-3 Corres only re TN1682 (1948)
AF3-5 Carburetor Icing Problems. August 17, 1940-June 26, 1945
AF3-6 Civil Aronautics Admin. April 10, 1941-August 4, 1944
AF3-8 Compounds and Solutions, [Weather aids] 1941-1947
AF3-9a Conferences Aircraft Ice Prevention Conference 1945
AF3-10 Consolidated and Vultee [de-icing] March 8, 1941-August 22, 1945
AF3-12 Contact Speed. - Alternater Drive September 8, 1944-April 9, 1946
AF3-15 Contact-DeIcing. General. October 17, 1940-March 1, 1941
AF3-15b Contracts, Drawings-Lockheed. 1941
AF3-15c Contracts, Lockheed 12-A. 1940-1941
AF3-20a Contracts. B-24. Consolidated. Deicing General. February 20, 1942-March 13, 1944
AF3-20a Preliminary Data Report. 26 October 1942
AF3-20b [Contracts B-24 Dwgs, Supplies,] Consolidated. 1942-1943
AF3-20b B-24 Blueprints 1939-1942
AF3-20b [Loose B-24 blueprints]
AF3-20b [Loose B-24 blueprints]
AF3-20b [Loose B-24 blueprints]
AF3-20b [Loose B-24 blueprints]
AF3-20b [Loose B-24 blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
AF3-20b [Loose blueprints]
(AF) 3-20c. Contracts. B24 Consolidated
AF3-20c Preliminary Results. 1943-1944
(AF) 3-25a. Contracts. B17f. Boeing. October 21, 1942-July 16, 1943
(AF) 3-25b "Instructions for Operation, Inspection, and Maintenance of Thermal Ice Prevention System on B-17F"
(AF) 3-25. Contracts. B-17. Boeing. 1943-1944.
(AF) 3-25b. Preliminary Results of Tests of Super-Charger, Excharger, Design Number 2, B-17F. January 2, 1943.
(AF 3-25a. BAC Standards BR. 1942-1944
(AF) 3-25b P/D "Tests of Army Plate-Type Heat Exchanger, Model 1, on XB-17F" Look. August 3, 1943.
(AF) 3-25b Preliminary Performance Data, B-17F Thermal Ice-Prevention Equipment. Dec. 23, 1942
(AF) 3-25b P/D "Tests of Army Plate-Type Heat Exchanger, Model 2, on XB-17F." Selna. August 18, 1943.
(AF) 3-25b "Analysis of Thermal Ice - Prevention Equipment for the Boeing B-17F Airplane." November 10, 1943.
(AF) 3-25c P/D "Details of the XB-24F Airplane Fuselage Static Airspeed Installation." Jones and Schearer. February 25, 1943
(AF) 3-25c P/D "Flight Tests of thermal Ice-Prevention Equipment on XB-24F" Neel and Rodert. April 6, 1943.
(AF) 3-30 Contracts. C-46 Curtiss Wright. 1943-45 [General Correspondence, photographs of parts, loose blueprints etc.
(AF) 3-30a Contracts. C-46 Curtiss-Wright. [Drawings, Supplies, Etc. 1943-46
(AF) 3-30a [Loose Drawings and blueprints]
(AF) 3-30a [Loose drawings and blueprints]
(AF) 3-30a [Loose drawings and blueprints w/attached correspondence March 1943
AF 3-30b P/D I "Flight Tests of Thermal Ice Prevention Equipment System on B-24 D Airplane" [dtd 11/20/1942.]
AF 3-30b Corres re only TN 1599. 1948.
AF 3-30b Corres re only TN 1235 1948.
AF 3-30b Corres re only RM A5F11 1945.
AF 3-30b Corres re only MR A5B15 1945.
AF 3-30b Corres re only MR A5E15. 1946.
AF 3-30b Corres re only re Rept "Measurements of Free Water in Cloud Under Conditions of Icing" (1944-1948)
A3-30b Corres only re RM On C-46 1945
AF 3-35 XC-53a. Douglas. General 1943-44
AF 3-40 XB-35. Northrop. General 1943-44
AF 3-45 Contracts. D-5. General. November 23, 1943-December 28, 1943
AF 3-50 Preliminary Data.
AF 4-10 Douglas Aircraft Company. August 5, 1941-November 18, 1947. [Decing]
AF 5-5 Engine Research Laboratory (Program) Cleveland. February 7, 1944-July 25, 1945. [Deicing]
AF 5-10 Engine Research Tunnel. LMAL. (Ice Research) May 28, 1941-December 7, 1944.
AF 5-20 and AF 520a Equipment and De-Icing Specifications - General. July 9, 1941- September 17, 1946]
AF 5-30 Exhaust Heat De-Icing (General) September 9, 1940- August 9, 1946.
AF 5-40 Exhaust Heat Exchanges. July 9, 1942-May 23, 1947
AF 5-40 [Loose drawings and blueprints. 1941]
AF 5-40 [Loose drawings and blueprints. July 1941-August 1942]
AF 5-40a Exhaust Heat Exchange (Airesearch Mfg. Co.) 1942-1944
AF 5-40b Exhaust Heat Exchangers, Wm. Chace Co. - General Plate Division July 13, 1942-September 28, 1942
AF 5-40c Exhaust Air Heat Exchangers, General Electric Co. May 28, 1942-November 6, 1946
AF 5-40d Exhaust Air Heat Exchanger (Harrison Radiator Company)
AF 5-40e (Industrial Engineers, Inc)
AF 5-40f (International Nickel Company) 1942-45
AF 5-40g Preliminary Data
AF 5-40h Preliminary Data Solar Aircraft 1942-1945
AF 5-40i Preliminary Data. Trane Co. 1943-1945
AF 5-45 Corres only re RMR A5B05. (1945).
AF 5-45 Corres only re RM ABE14. (1948).
AF 5-45 Corres only re RMR A5H23. (1947).
AF 5-45 Corres only re RMR TN 1312. (1947).
AF 5-45 P/D "Tests of Heat Exchange Design No. 35 Fabricated for AAF" by Kushnick March 15, 1943
AF 5-50 Exhaust Flame Suppression. October 16, 1942-March 29, 1943.
AF 6-20 Franklin Institute. 21 Oct 44 - Nov 20, 1944
AF 7-20 BF Goodrich Company. Sept. 11, 1941-Ap 13, 45
AF 8-5 Hamilton Standards Propellers. August 13, 1940- October 8, 1947
AF 8-10 Heaters Combination. October 20, 1941- August 6, 1945
AF 8-15 Hanlon Wilson Co. October 31, 1942-July 25, 1945
AF 9-10 Instruments - Ice Research General. November 22, 1940- October 14, 1946
AF 9-10a Air Speed Indicator. May 28, 1941-July 1, 1941
AF 9-10b Ice Indication (Instruments) June 14, 1941-November 3, 1944
AF 9-10b Instruments- Ice Indicating. 1950-1951
AF 9-10b Preliminary Data. April 26, 1943
AF 9-10c Instruments-Aerometeorograph
10d Stall Warning Device
10e Measurement of Pressure Pulsations in Exhaust Gas Stream
10f Instruments (Actuators). 1948-1952
AF 10-10 Jack and Heintz Inc. January 5, 1945-August 9, 1945
AF 12-10 Landing Light de-icing.
12-15 Lightening, General.
12-15a Lightening, (Lockheed 12-a) 1941-1946
12-15b Lightening, (XC-35 LMAL)
AF 12-20 Lockheed Air Corp. Blueprints. November 6, 1941- April 23, 1947
AF 13-5 Martin Co. Glenn L. 1940-1946
AF 13-10 Massachussets Inst. Tech.
AF 13-15 Mount Washington Observatory [Icing Data] 1944-1945
AF 15-3 National Bureau of Standards
15-5 Northrop Aircraft, Inc.
15-10 Northwest Airlines
15-15 North American Aviation Inc. [suggestions on antiicing methods] 1941-1945
AF 16-10 Operation Aircraft in Icing Condition. 1941-1946
AF 16-10 [As above 1948]
AF 17-10 Program - Ice Investigation. March 24, 1941- September 18, 1944.
AF 17-10 [As above] 1952-1954
AF 17-20 Propeller De-icing - General. 1940-1946
[As above 1949-1950]
AF 17-20 [As above 1947-1948]
AF 17-20 Loose blueprints and correspondence [Propeller icing data] 1945-1946
AF 17-20 Propeller De-Icing - General. [1949-1950]
AF 17-20a Propeller - Electric de-icing of prop. 1941-1947
AF 17-20b Prob de-icing (Geer Studies) July 8, 1942-March 17, 1943
AF 17-20c Prop de-icing. MIT
AF 17-20d Nat. Research Council of Canada
AF 17-20e Shere. Kahn. [de-icing shoes for prop]
AF 17-20f Propeller de-Icing. Trans-Canada Airlines
AF 17-20f-i TWA
AF 17-20g U.S. Rubber
AF 17-24 Corres. only re A6G31 (1946-1947)
AF 17-25 Propeller De-Icing Reports. April 1943-July 45.
AF 17-25 P/D I "Illus. of Ice Formation on Props & Engine Cowling Fits..." Selna. June 30, 1945
AF 17-25 P/D "A Flight Investigation on the Effects of Air Discharge Orifices at the Tips of a Curtiss Air-Heated on the Propeller Thrust"
AF 17-25 P/D "Tests of Electric Thermal De Icing Equipment for Propellers." Rodert and Scherrer. April 17, 1943
AF 17-25 Corres only re CMR "Tests of Thermal-Electric De-Icing---by R. Scherrer and Lewis Rodert. (1943)
AF 17-25 Corres only re A6D09. (1946-1947)
AF 17-25 Corres only re A5E16. (1945)
AF 19-5 RANCO Inc. 1943
AF 19-10 Reports - De Icing - General
AF 19-10a Reports-Progress-Special Sub Com on De-Icing. 1941-1942
AF 19-106 Reports-Progress-Weekly. AAL Progress Reports. 1941-1946
AF 19-106-1 Reports-Progress MK Reports on B-24, B-17.
AF 19-106-2 Reports-Progress RAE Quarterly Statements.
AF 19-106-3 Reports-Progress Monthly Report for M/C.
AF 19-10c Prelim. Exhaust-Heat Wing De-Icing 1941.
AF 10-10d AR R-51 Exhaust Heat Wing De-Icing June 1941.
AF 19-10e [Title as above. 1941.]
AF 19-10f ARR-S2 Exhaust-Heat Wing De-Icing. August 12, 1941
AF 19-10h RMR Prelim. Invest. Air Healed Wing. March 14, 1942
AF 19-10h Corres. only re RMR "Prelim Inv. & Design of an Air Healed Wing for Lockheed 12 A Airplane" by Rodert & Jackson (1942-1943)
AF 19-10i ARR Anti-Ice Equipment. Empl. Heated Air. June 26, 1942
AF 19-10j ACR Ju88 Anti-Icing Equip.
AF 19-10k CMR Thermal Ice Prevention Equipment B-24D September 11, 1942-January 28, 1943.
AF 19-101 Corres. only re A7122. (1948).
AF 19-20 Research-Ice Prevention-General. 1940-1946.
AF 19-20 [As above. 1944-1951]
AF 19-20a Research-Exhaust gas-air mixture (RAN-1) August 31, 1944- May 23, 1947 [ice prevention]
AF 20-5 Specifications [De-Icing Systems] June 28, 1944-5 November 1946
AF 20-10 Stewart Warner Corp. September 1944-June 1947 [deicing]
AF 20-10 [Loose blueprints, drawings, correspondence Stewart Warner Corporation, AAL, NACA 1941-1944]
AF 20-10 Preliminary Data Reports. Tests of Heat Excharger Designs and Carbon Monoxide Indicator. 16 February 1943-30 July 1943.
AF 20-10 [Loose blurprints 1942]
AF 20-20 Suggested Studies-Ice Research. (1941-1945)
AF 21-5 Tail Surface De-Icing (General) and AF 21-10 Temperature Measurements 1940-1944
AF 21-20 Terminology
21-30 Tests, De-Icing (General)
21-30a Tests conducted at LMAL
21-30f Tests, Participation-Discussion with Air Cos. 1941-1947
21-35 Trans Canada Air Lines
21-40 Trans Continental Western Air Lines, Inc.
AF 22-10 United Air Lines
22-15 US Rubber Co.
22-20 Calibration of Stainless - Steel Venturi Meter and U.C. 9 heat Meter 1941-1945
De-Icing information
AF 22-20 University of California Research Program 1942-1945
AF 23-10 Vega Aircraft Company. 1943
AF 24-10 Weather Data. (1947-1948)
AF 24-10 Weather Data. 1943-57
AF 24-15 Corres re Weather Data. (1947-1948)
AF 24-15 Corres re TN 1424. (1947-1948).
AF 15 Corres re TN 1387. (1947).
AF 15 Corres re TN 1393. (1948).
AF 15 Corres re TN 1434. (1948).
AF 15 Corres re TN 1472. (1947-1948).
AF 15 Corres re TN Gen Results of Flt Res - during Winter 1945-1946 TN (1947).
AF 24-15 Corres re ARR No 5613. (1945).
AF 24-20 Windshield De-Icing. [1943 and 1948]
AF 24-20a Windshield De-Icing Aerotorque Company. [1940-1944]
AF 24-20a [Loose drawings, Blueprints. Windshield Assemblys. 1940]
AF 24-20b Windshield De-Icing American Air Lines
AF 24-20c Windshield De-Icing Repellant Lacquer
AF 24-20c Windshield De-Icing Rain Repellant Lacquer [1942-1948]
[As above. 1949]
AF 24-20d. [As above. Geer Frost Shield]
AF 24-20e. Patterson De-Icing System. [1943].
AF 24-25 Windshield De-Icing Reports, General. 1940-1942
AF 24-25 P.D. "A Flt. Inv. in Natural Icing Condition of a Heated-Air External Discharge System for Wind-Shield Ice Prevention" by Holdaway. 6/20/46.
AF 24-25 P.D. "Investigation of Eff. of Two Types of Alcohol on Windshield of XB-24F." Rodert and Neel. April 12, 1943.
AF 24-25 Corres only re A5E25. (1947)
AF 24-25 Corres only re A6I30. (1947)
AF 24-25 Corres only re A5:21. (1946)
AF 24-30 Wing De-Icing - General. 1949-1950
AF -30a Wing De-Icing - Navy. (PBY). [1941-1944]
AF -35 Corres only re TN 1675. (1948)
AF 24-65 Tests. 1955.
AM 1-5 Accidents. [1943-1945]
AM 1-10 Airsearch Manufacturing. [1942-1943]
AM 1-20a Airplanes - B-24. [1943-1944]
AM 1-20b Airplanes - B-17. [1943-1944]
AM 1-20c Airplanes - C-46 [1943-1945]
AM 1-20d Airplanes - Lockheed 12-A. [1943]
AM 1-20e Airplanes - XC-53. [1943]
AM 1-20f Airplanes - P-42. [1942]
AM 1-20g Airplanes - XC-60B. [1943-1944]
AM 1-20h Airplanes - B-26. [1942-1943]
AM -20i Airplanes - Wellington Bomber. [1943]
AM -20j Airplanes - B-25. [1942-1943]
AM -25 American Airplanes. [1942-1943]
AM -27 Antennae De-Icing - Radio, Radar. [1943]
AM -30 Army Air Forces - Material Command. [1943-1944]
AM -30a Army Air Forces - ADTIC. [1943]
AM 2-10 Bendex Aviation Corporation. [1941-1943]
AM -30 British Air Commission. [1942-1944]
AM 3-15 Compounds and Solutions - De-Icing. [1942-1945]
3-10 Cars-Storage, Gas, Etc. [1943]
AM 3-30 Correspondence - General. [1942-1944]
AM 3-30 Curtiss-Wright Corporation - General. [1945]
AM -30a Curtiss-Wright Corporation - Propeller Division [1942-1945]
AM 5-20 Engine Research Laboratory. [1943-1945]
AM 7-10 Geer Frost Shields. [1943]
AM -15 General Electric Company. [1942]
AM -20 Goodrich, B.F., Company. [1943-1944]
AM 8-10 Hamilton Standard Propellers. [1942-1943]
AM 8-15 Harlon and Wilson Company. [1943]
AM 8-20 Hartman, E. P. [1943]
AM 9-10 Ice Rsearch Projects - Genreal Correspondence [1944]
AM 9-10a Ice Research Projects - Tests in Vicinity of Seattle. March 1941
AM 9-10b Ice Research Projects. Tests in Vincinity of Minneapolis. April 1944.
AM 9-10c Ice Research Projects. Tests in Vincinity of Minneapolis. Nov-Dec. 1941
AM 910e Ice Research Projects. Tests in Vincinity of Minneapolis. 1944-1945
AM 9-12 Induction System De-Icing. [1942-1945]
AM 9-15 IRB Offices - Regulations, Equipment, Etc. 1942
AM 9-20 Instruments - General. [1943-1944]
AM -20a Instruments - On Loan to IRP. [1943-1944]
AM -20b Instruments - Ice Indicating. [1943-1945]
AM -30 Inventory. [N.D.C. 1943]
AM 12-5 Ladd Field Operations. [1942-1943]
AM 14-5 McQuay, Incorporated. [1943-1944]
AM 14-10 Martin, Glenn L., Company. [1943]
AM -15 Massachusettes Institute of Technology. [1942-1943]
AM 14-20 Meetings - General. [1945]
AM -20a Meetings - SAE Sub-Committee. [1943-1944]
AM 14-20b Meetings - Sub-Committee on De-Icing. [1943-1944]
AM 15-10 NACA-Washington - General Correspondence. [1942-1943]
AM 15-15 National Defence Research Committee. [1943]
AM -20 National Research Council of Canada. [1942-1943]
AM 15-25 Navy Department-Bureau of Aeronautics. [1942]
AM 15-30 Northwest Airlines Incorporation. [1942-1945]
AM 16-10a Olsen, Major A.E. - Progress Reports [1942-1945]
AM 16-15 Organization - General - 1942-1943
AM -15a Organization - General - 1943-1944
AM -15b Organization - General 1944-1945
AM 17-5 Photographs - Films, etc. [1943]
AM -10 Pilots. [1943]
AM -14 Pilot Static Tube Investigation. [1943]
AM -15 Pittsburgh Plato Glass Company. [1943]
AM 17-20 Pratt & Whitney Aircraft. [1943]
AM -25 Precipitation Static Research. [1942-1943]
AM -30 Propeller De-Icing. [1943-1945]
AM 17-35 Program - Research. [1943-1944]
AM 19-10 Research - General. [1942-1945]
AM -15 Reports - General. [1942-1945]
AM -20 Rodert, Lewis A. - General. [1942-1944]
AM -20a Rodert, Lewis A. - General Letters to S. J. DeFrance 1942-1944
AM 20-15 Standard Alcohol Company. [1942-1945]
AM 20-20 Stewart-Warner Corporation. [1942-1945]
AM 21-5 Tests - General. [1942]
AM 21-5a Tests - Progress Reports. [1942-1945]
AM 21-5b Tests - B-24 Engine Nacelle Ground Test. [1942]
AM 21-5c Tests - Blimp De-Icing Tests. [1944-1945]
AM -10 Trane Company. [1943-1944]
AM 21-15 Trms-Canada Air Lines. [1942]
AM 21-20 Transcontinental and Western Air, Inc. [1942-1943]
AM -25 Travel. [1944-1945]
AM 22-10 United Air Lines. [1943-1944]
AM -13 United Aircraft Corporation. [1942]
AM -15 United States Rubber Company. [1943]
AM -20 University of California. [1942]
AM 23-10 Vega Aircraft Corporation. [1943]
AM -15 Visits and Visitors - General. [1942-1945]
AM 24-10 Weather Bureau - General. [1943-1944]
AM 24-10a Weather Bureau - Weather Reports. [1943-1944]
AM 24-15a Windshield De-Icing. [1943]
AM -15a Windshield De-Icing. Bird Impact Tests. [1942]
AR 1-5 Aberdeen Proving Grounds. [1944-1946.
AR 1-5 Accidents - Ames [1944]
AR 1-5 Accidents October 14, 1944-March 31, 1947. [Reports and Ames regarding air crashes during tests. Included in the reports are a discription of the cause, the accident, some explanation for the accident, photographs of the equipment, and testimony regarding the accidents.]
AR 1-5 Accidents - Airplane. 1941-1947
AR 1-5 Accidents - Airplane. 1948
AR 1-10 Aircraft Movement - SAL 1941-1951
AR 1-12 Airfields. (1947-1948)
AR 1-14 Airplanes - General. 1942-1949
AR 1-14 Airplanes - Estimates of Air Force Airplanes Desired at Ames, July 1942 to Nov. 1951
AR 1-15a Airplanes F2A-3 Brewster.
Scope and Content Note
AR 1-15a-1 Airplane Calibration F6F-3. 1945
AR 1-15a-2 Airplane Calibration XBT2D-1. 1945-1948
AR 1-15a-3 Airplanes. F404. 1945-1946
AR 1-15a-4 Airplanes. P-80A (R.A.A. - 183). (1946-1948)
AR 1-15a-5 Dynamic Stability and Control of Airplanes. (RA A-181) (1947)
AR 1-15a-9 Flight Operations. Aug. 1944-June 1948.
AR 1-15b Airplanes - OS20-2. [1951]
AR 1-15b Airplanes. 1942-1944. [Navy OS20-2. research memos, Naval specification bulletins, requisitions, accident report.]
AR 1-15c Airplanes. F24 1941-45. [Accident report, bill of lading, Commos between NACA & Mfg.]
AR 1-15d Airplanes F4F [As w/15b.]
AR 1-15e Airplanes P38. [1943-45. as above]
No Code YP-80 A. 1946
AR 1-15f Airplanes C-46. 1943-44 [Requisitions, shipping notices, info on bulge controls, blueprints.]
AR 1-15g Airplanes A20-A 1939-1943
Scope and Content Note
AR 1-15h Airplanes B-25D. 1941-1943
Scope and Content Note
AR 1-15i Airplanes P-39 N 1943-1944
Scope and Content Note
AR 1-15j Airplanes a-35. 1943 [as above]
AR 1-15k Airplanes A25 1943 [re testing]
AR 1-151 Airplanes P51 1943-47 [as with A20a]
AR 1-15m B-26 B 1943-1947 [as above]
AR 1-15n Airplanes SB2C-1. 1943 [re testing]
AR 1-15n PV-1 (Lockheed) 1944-45. [Flight test reports, modifications, blueprints]
AR 1-15p Airplanes P-61A [Shipping tickets, receipts, memos on testing, specifications]
AR 1-15q Airplanes VTD-1 1944-45 [Correspondence, blueprints as above.]
AR 1-15r Airplanes XP56. July 44
AR 1-15s Airplanes XF7F-1. 1945 [As with 15p]
AR 1-15t XBT 20-1. Airplane - [1946]
AR 1-15t Airplanes
(AR 1-15u) P-75 General Motors
AR 1-15v Airplanes YP-80. July 1944-Feb. 1948
AR 1-15w Airplanes P-47
AR 1-15x Airplanes FR-1. 1945-46
AR 1-15y Airplanes FN-2. 1945
AR 1-15z Airplanes F6F-3. 1945. [as above w/drawings]
AR 1-15-1 XS-3 (Douglas). [1948]
AR 1-15-2 XS-4 (Douglas). (MX-810) [1949]
AR 1-15-4 D-558-I & D-558-II (Douglas) 1947 thru Oct. 1948.
AR 1-15-4 D-558-I & D-558-II (Douglas) Nov. 1948-1949
AR 2-10
AR 3-10 [Carbon Monoxide Indicators. 1945-1948]
AR 5-5 Engines. [1946-1948]
AR 6-10 Flight Regulations. [1943-1945]
AR 8-10 High Altitude Flying. [1942-1948]
AR 2-10 Booster Units. (1947-1948)
AR 9-5 Instrument Ratings - Pilots. (1942-1945)
AR 9-10 Instruments 1940-1946 [Re instruments needed or ulitized at Ames. Also requests for equip.]
AR 9-10a-10f Instruments. 1943-47 [as above w/photos, blueprints, reports, etc.
AR 9-15 Insurance - Flight. 1944-45.
AR 12-10 Link Trainer Instruction. 1942
AR 17-10 Pilots - Test. [1941-1949]
AR 17-17 Pressure Suits. [1943]
AR 17-20 Propeller, Balancing Equipment, General Correspondence
AR 17-25 Propellers-General. [1944-1948]
AR 17-25a Propellers-Reserve Pitch. 1947
AR 19-5 Radio-General. [1947]
AR 19-5a Radio Controlled Models. 1941-1946
AR 19-5a Radio Controlled Models. (1947)
AR 19-6 Radio - Range Trainer. [1949]
AR 19-8 Radar 1944-1945
AR 19-8 Radar - 1947
AR 19-10 Reports - General 1943-1945
AR 19-10a-8 RA A199. Drawings - F-86. 1947
AR 19-10a-8 RA A199. Drawings. XF-86. 1948
AR 19-10b Reports OSU-2. 1945
AR 19-10b PD Reports. April 26, 1945-July 24, 1945
AR 19-10c Reports F2A3. July 25, 1942 [contains PD Report]
AR 19-10e Reports - B-24D. [Contains Gen Cor & PD Report dtd. April 8, 1943]
AR 19-10f Reports B17f. [GC & PD dated April 27, 1943]
AR 19-10g Log Reports. P-38F.
Scope and Content Note
AR 19-10h Reports C46. May 3, 1944-October 9, 1944
AR 19-10i Reports. B25D. January 29, 1944 - June 22, 1945
AR 19-10j Reports A20A. 30 June 43
AR 19-10k Reports P-39N-1. January 3, 1944-28 June 1946
AR 19-10m Reports P51-B. June 1, 1944
AR 19-10p Reports P61-A.
10p Reports FR-1.
AR 19-10r Reports FR-1.
AR 19-10q Reports YP-4FM-1; P-47N-1.
AR 19-10r Reports FR-1.
AR 19-10s Reports P75A-1.
AR 19-10t Reports. XBT2 0-1.
AR 19-10v Reports YP-80a.
AR 19-10w Reports A 26 B.
AR 19-10z Reports P-80a.
AR 19-15 Research - Flight - General.
AR 19-15 Research-Flight-General. (1947-1948).
AR 19-15a - AR 19-15d. Research. 1943-1945. [Reports, flight studies and minutes of conferences held by NACA officials with USAAF and Navy Personnel regarding fighter specifications and problems in fighter design.]
AR 19-15d Research - Specification "Stability & Control Char." [1947-50]
AR 19-25 Research Problems Suggested. [1940-1950]
AR 20-5 Scales-Aircraft. July 1943 - 31 July 194
AR 20-10a Supplies & Equip.-General. 1942-45
AR 20-10 Supplies & Equipment-General (1947-48)
AR 20-10b Supplies & Equip-Langley. 1941-1943
AR 21-5 Tests-General. (1943-1945)
AR 21-5a Tests-Progress Reports. Flight Research July 18, 42-Feb. 5, 46
Scope and Content Note
AR 21-5b Tests-Progress Reports. Flight Operations [Section] May 1, 1943-October 26, 1944
AR 21-5c Priority of tests (1947-1948).
AR 21-5c [Subjects: Test Priorities, schedules, weight and center of gravity, dynamic lift of airships, and correlation of wind tunnel and flight tests.]
AR 21-59 MARS PB2M Flying Boat. June 23, 1944-July 1, 1944
AT 1-10 Accidents. Theoretical and Applied Research Division. March 27, 1942 - December 9, 1947.
Scope and Content Note
AT 1-10 Accidents-General. 1943-1948
AT 2-5 Balancing Equipment - General. Theoretical and Applied Research Division. July 30, 1946 - September 21, 1940.
AT 2-5a Balancing Equipment - Hinge Movement. August 29, 1941 and August 25, 1941.
Scope and Content Note
AT 3-10 Couplings. October 20, 1941 - June 9, 1941.
Scope and Content Note
AT 4-20 Design-Wing Tunnel. 1948
AT 4-20 Design-Wind Tunnels - General. October 12, 1943 - December 10, 1940. December 5, 1947 -
AT 4-20 Design - Wind Tunnels - General. October 12, 1943 - December 10, 1940. December 5, 1947 -
Scope and Content Note
AT 4-50 Dynamometer Equipment. August 1944 - March 18, 1941.
Scope and Content Note
AT 5-10 Engine Research Laboratory - General Design. March 31, 1944 - 1940.
AT 5-10a Engine Research Laboratory - Material and Equipment. April 29, 1947 - 1941.
AT 5-10b Engine Research Laboratory - Power Supply. 1941-1948.
AT 5-10c Engine Research Laboratory - Progress Reports - Design. 1944.
AT 5-10d Engine Research Laboratory - Propellors. 1941-1943.
AT 5-10e Engine Research Laboratory - Icing Research. 1943/
AT 5-20 Equipment, General. December 1947 - February 1942.
AT 5-20 Equipment - General. (1946-1948)
AT 5-20 Equipment, General. (1948)
AT 5-20 Equipment, General
AT 5-20 Equipment, General
AT 5-20a Equipment, - Strain (Guage) Equipment. (1948).
AT 5-20a Equipment - Strain Gage. August 8, 1941 - December 1947.
AT 5-20b Equipment - Tachometer
AT 5-20c Equipment - Ear Wardens
AT 5-20d Equipment - Interferometer. (1945-1948/
AT 14-20 Models - General
AT 14-20 General 1948-1949. Also AT 14-20 Models. Conical Shock Differers. 1949
AT 14-20a Models - Specifications
AT 14-20a Models - Specifications 1948
AT 14-20b Models - Supports
AT 14-20b Models - Supports
AT 14-30 Motors - General
Full-Scale Tunnel Power Equipment, Westinghouse
Full-Scale Tunnel Power Equipment, G.E.
AT 14-30a Motors - Generator Equipment
AT 14-30b Motors - Model
AT 14-30c Motors - Self Synchronizing
AT 17-20 Propellors - General
AT 17-20 Drawings. [Supersonic Propeller) 1951.
Drawings.
AT 19-5 Rake Tube April 16 - July 14, 1945.
AT 19-10 Refrigeration
AT 19-20 Research - General March 25, 1941 - April 30, 1947
AT 21-15 Television. (1948)
AT 21-20 Tests - General July 23, 1941 - October 3, 1947
AT 21-40a Tunnels - General. Preliminary Design. 1942.
(AT-1) 4-20 Drawings - General Re 7 x 10 tunnel
(AT-1) 5-20 Equipment - General Re 7 x 10 tunnel
(AT-1) 5-20a Equipment - Survey Apparatus
(AT-1) 16-20 Operations - General
(AT-1) 17-20 Program Research
(AT-1) 19-15 Research Problems XP-5Y-1
(AT-1) 21-5 Tests - General
(AT-1) 21-5b Tests - Progress Reports. September 20, 1941-February 5, 1946.
(AT-1) 21-5c Tests - Turbulence level
(AT-1) 21-10 Tests XB-32
(AT-1) 21-10a Tests. Preliminary Results
Scope and Content Note
(AT-1) 21-20 Tests XSB2D-1
(AT-1) 21-20a Preliminary Results
(AT-1) 21-20a Correspondence
(AT-1) 21-20a Preliminary Results
(AT-1) 21-20a Preliminary Results
(AT-1) 21-20a Preliminary Results
(AT-1) 21-20a Preliminary data reports, 1942-1943.
(AT-1) 21-20a Preliminary data reports, 1943.
(AT-1) 21-20a Preliminary data reports, 1942 and 1944.
(AT-1) 21-20a Preliminary data reports, 1942.
(AT-1) 21-20a Preliminary data reports and loose blueprints, 1942.
(AT-1) 21-20a Loose blueprints and reports, 1942.
(AT-1) 21-25 Tests D-2. Hughes. 1941-1942.
AT-1 21-25 CMR Tests on Hugher D-2 in 7 x 10 - 1942-1944
(AT-1) 21-30 Tests XB-28. 1942.
(AT-1) 21-30a Preliminary Results, 1941-1942.
(AT-1) 21-30b Tests XB-28 1941-1942.
(AT-1) 21-30b Tests. XB. 24" Const. Chord Wing
(AT-1) 21-40 Tests XB-35. Northrop Aircraft. 1942-1943.
(AT-1) 21-45 Tests Ailerons. 1942.
(AT-1) 21-45 Prob. TR "WT Inv of the Effects of Profile Mod. and Tabs on the Charac. of Aikrons on a low-drag Airfoil" by Crane and Holtzclaw. [1947]
(AT-1) 21-50 Tests. XPB3Y-1. Consolidated. 1942-1943.
(AT-1) 21-50a Preliminary Results. 1942.
(AT-1) 21-55 C-47 Drawings
(AT-1) 21-55 Tests. C-47. Douglas. 1942; 1944.
(AT-1) 21-55a Preliminary Results. 1942-1945.
(AT-1) 21-60 Tests. XPV-2. Vega.
(AT-1) 21-60 Tests. XPV-2. Vega. 1942-1943.
(AT-1) 21-60a Preliminary Results. 1943.
(AT-1) 21-65 Tests. XCG-13. Glider, Waco. 1943-1944.
(AT-1) 21-65a Tests XCG-13. Preliminary Results. 1943.
(AT-1) 21-70a Tests. PBY-5B. Preliminary Results. 1943.
(AT-1) 21-75a Tests. PV-1. Preliminary Results.
(AT-1) 21-75a Tests. PV-1. 1943
(AT-1) 21-75 Tests. PV-1. 1943.
(AT-1) 21-80 Tests. XA-39. Fleetwings. 1943.
(AT-1) 21-80 Tests. XA-39. Fleetwings. 1943.
(AT-1 21-80 Tests. XA-39. Fleetwings. 1943.
(AT-1) 21-80a Preliminary Results. 1943.
(AT-1) 21-85 Tests. XFR-1. 1944-1945.
(AT-1) 21-85 Tests. XFR-1. 1943.
(AT-1) 21-85 Tests. XFR-1.
(AT-1) 21-85 Tests. XFR-1.
(AT-1) 21-85a Preliminary Results. 1943-1946.
(AT-1) 21-85a Preliminary Reports. 1943.
(AT-1) 21-85a Preliminary Reports. 1944-1945.
(AT-1) 21-85a Preliminary Reports. 1945.
(AT-1) 21-100 Tests. XP2V-1. Vega. 1943-1945.
(AT-1) 21-100a Preliminary Results. 1943.
(AT-1) 21-100a Preliminary Results. 1944.
(AT-1) 21-100a Preliminary Results. 1943-1944.
(AT-1) 21-105 Tests. C-74. Douglas. 1943.
(AT-1) 21-105a Preliminary Results. 1943-1944.
(AT-1) 21-110 Tests. XB-36. Consolidated. 1943-1944.
(AT-1) 21-110 Tests. XB-36. Consolidated.
(AT-1) 21-110a Preliminary Results. 1943-1945.
(AT-1) 21-110a Preliminary Results. 1943-1944.
(AT-1) 21-110a Preliminary Results. 1944-1945.
(AT-1) 21-115 Tests. XTB2D-1. Douglas. 1943.
(AT-1) 21-120 Tests. XA-41. Consolidated. 1943-1944.
(AT-1) 21-120a Preliminary Results. 1943-1944.
(AT-1) 21-125 Tests. XFD-1. McDonnell. 1943-1945.
(AT-1) 21-125 Tests. XGD-1. McDonnell.
(AT-1) 21-125a Preliminary Results. 1943-1945.
(AT-1) 21-130 Tests. XBDR-1. 1943-1944.
(AT-1) 21-130 Tests. SBDR-1.
(AT-1) 21-135 Tests. XBDR-1 Flow Model Interstate. 1944.
(AT-1) 21-135a Interstate Preliminary Results.
(AT-1) 21-140 Tests. XB-42. Douglas. 1943-1944.
(AT-1) 21-140a Preliminary Results. 1943-1945.
(AT-1) 21-140a Preliminary Results.
(AT-1) 21-145 Tests. TED-2323. Consolidated Vultee. 1944.
(AT-1) 21-145 Tests. TED-2323. Consolidated Vultee.
(AT-1) 21-145a Preliminary Results. 1944.
(AT-1) 21-150 and 21-150a Tests. F-11. 1944-1945.
(AT-1) 21-152 Tests. XP-79. Avion. 1944
(AT-1) 21-152 Tests. XP-79.
(AT-1) 21-152 Tests. XP-79
(AT-1) 21-152a Preliminary Results. 1944.
(AT-1) 21-155 Tests. BTD-1. Douglas. 1944.
(AT-1) 21-155a Preliminary Results.
(AT-1) 21-20 Tests. XSB2D-1. [see also box 15]
(AT-1) 21-155a BTD-1. Preliminary Results. 1944.
(AT-1) 21-157 Tests. XP-81. Consolidated. 1944.
(AT-1) 21-157 Tests. XP-81. Consolidated
(AT-1) 21-157a Preliminary Results. 1944
(AT-1) 21-157a Preliminary Results. 1944.
(AT-1) 21-160 Tests. VT2D-1. Douglas. 1944-1945.
(AT-1) 21-160 Tests. BT2D-1. Douglas.
(AT-1) 21-160a Preliminary Results. 1944.
(AT-1) 21-160a Preliminary Results. 1944-1945.
(AT-1) 21-162a Tests. NDRC. Douglas missile. Preliminary Results.
(AT-1) 21-162a Preliminary Results.
(AT-1) 21-165 Tests. XF15C-1. Curtiss.
(AT-1) 21-165a Preliminary Results. 1945.
(AT-1) 21-165a Preliminary Results. 1944-1946.
(AT-1) 21-165a Preliminary Results. 1944-1946.
(AT-1) 21-170 Tests. XF15C-1. Curtiss Wright. Duct Entries. 1944.
(AT-1) 21-170 Tests. XF15C-1. Curtiss Wright.
(AT-1) 21-170 Tests. XF15C-1. Curtiss Wright.
(AT-1) 21-170a Preliminary Results. 1944-1945.
(AT-1) 21-170a Preliminary Results. 1944.
(AT-1) 21-175 Tests. F-11 Hughes. 1944-1945.
(AT-1) 21-175 Tests. F-11. Hughes.
(AT-1) 21-175a Preliminary Results. 1944-1945.
(AT-1) 21-175a Preliminary Results. 1944-1945.
(AT-1) 21-180 Duct Entrances. [re submerged-type inlets for engine charge air] 1945
(AT-1) 21-180a Preliminary Results. 1945.
(AT-1) 21-182 Tests. XP-81 Airfoil Section. 1945
(AT-1) 21-182a Preliminary Results. 1944-1945.
(AT-1) 21-185 Tests. XB-35 Propeller Tests. Northrop A-151. 1943-1945.
(AT-1) 21-185 Tests. XB-35 Propeller Tests. Northrop A-151.
(AT-1) 21-185 Tests. XB-35 Propeller Tests. Northrop A-151.
(AT-1) 21-185a Preliminary Results. 1945.
(AT-1) 21-190 Tests. XB-46. Consolidated. 1944-1945.
(AT-1) 21-190a Preliminary Results. 1944-1946.
(AT-1) 21-195 Tests. XB-46. Horizontal Tail Model. 1945.
(AT-1) 21-195a Preliminary Results. 1945-1947.
(AT-1) 21-205 Tests. XP-81. 1945.
(AT-1) 21-205a Preliminary Rssults. 1945.
(AT-1) 21-215 Tests. XF15C-1. 1945
(AT-1) 21-215a Preliminary Results. 1945.
(AT-1) 21-215a Preliminary Results. 1945.
(AT-1) 21-220 Tests. XF2R-1. Inv. of cowling and exit duct pressures, propeller cuffs, and stability of
(AT-1) 21-220a Preliminary Results.
(AT-1) 21-245 Tests. XF2R-2 Airplane, Ryan. 1946.
(AT-1) 21-245 Tests. XF2R-2 Airplane. Ryan.
(AT-1) 21-245a Preliminary Results.
(AT-1) 21-250 Tests. CV model 240. 1946.
(AT-1) 21-250 Tests. CV model 240. 1946.
(AT-1) 21-260. Tests. Conventional and Vee Tail Arrangements. (A-127) 1947
(AT-2) 3-15 Communication System. 1942-1945.
(At-2) 3-20 Design Data. 1942-1945.
(AT-2) 5-20 Equipment, General. [1941-1950 re]
(AT-2) 5-20 Equipment, General. (1942-1947)
(AT-2) 5-20 Equipment, Survey Apparatus (1946-1947)
(AT-2) 16-20 Operations, General. [(1942-1945 re 16 ft. wind tunnel]
(AT-2) 14-10 Medical Certificate-Manufactures Repr. (1942-47)
(AT-2) 17-10 Personnel, physical examination. 1942-1946.
(AT-2) 17-20 Program Research. 1942-1947.
(AT-2) 19-15 Research Problems and Suggestions. 1946-1942.
(AT-2) 21-5 Tests, General. 1942-1945. [reports and samples from camouflage tests in 16 ft. wind tunnel]
(AT-2) 21-5b Tests, Program Reports. 1942-1946. ["Progress reports and tunnel schedules" Monthly re 16 ft. wind tunnel]
(AT-2) 21-10 Loose Blueprints. 1944.
(AT-2) 21-10 Tests. XSB2D-1 Douglas. 1942-1948.
(AT-2) 21-10 Tests. XSB2D-1. Douglas.
(AT-2) 21-10 Tests. XSB2D-1. Douglas.
(AT-2) 21-10 Tests. XSB2D-1. Douglas.
(AT-2) 21-10 Tests. XSB2D-1. Douglas.
(AT-2) 21-10 Tests. XSB2D-1. Douglas.
(AT-2) 21-10a Preliminary Results. 1943-1947.
(AT-2) 21-10a Preliminary Data. August 1943-November 19, 1943.
(AT-2) 21-10a Preliminary Results. November 25, 1943-December 4, 1943.
(AT-2) 21-10a Preliminary Results. December 6, 1943-December 14, 1943.
(AT-2) 21-10a Preliminary Results. December 15, 1943-January 8, 1944.
(AT-2) 21-10a Preliminary Results. January 11-28, 1944.
(AT-2) 21-10a Preliminary Results. February - April 3, 1944.
(AT-2) 21-10a Preliminary Results. April 4-18, 1944.
(AT-2) 21-10a Preliminary Results. April 19, 1944 - September 1944.
(AT-2) 21-10a Preliminary Results. October 1944 - July 1945.
(AT-2) 21-10a Preliminary Results. November 1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-10 Tests XB36. Consolidated. Mat. Div. 1942-1945.
(AT-2) 21-20a Tests XB-36. Consolated Prelim Results. 1943-1944.
(AT-2) 21-20a Tests XB Consolated Prelim Results. 1943-1944.
(AT-2) 21-25 Tests XP-54. Ducting System Mat. Div.
(AT-2) 21-25 Blueprints. 1942.
(AT-2) 21-25a Tests XP-54. Ducting System. Mat. Div. Prelim Results. 1944
(AT-2) 21-25a Tests XP-54. Preliminary Results.
(AT-2) 21-30 Tests. XP-54. Lockheed. 1944
(AT-2) 21-30a Tests. XP-38. Lockheed. Preliminary Results.
(AT-2) 21-30a Preliminary Data from 16 foot Wind-Tunnel Tests of the Lockheed P-38 Model. Albert D. Erickson. May 20, 1942.
(AT-2) 21-30a Preliminary Data from 16-foot Wind-Tunnel Tests of the Lockheed. -38 Model. Marley J. Hood. June 13, 1942.
(AT-2) 21-30a P-38 1/6 Scale High Speed Wind Tunnel Model Report #LA.L. 17 - Part II. December 16, 1941.
(AT-2) 21-30a Preliminary Data from 16 foot Wind Tunnel Tests of the Lockheed P-38 Model. Manley J. Hood. September 5, 1942.
(AT-2) 21-30a Preliminary Data from 16 ft. Wind Tunnel Tests of Lockheed P-38 Model. Manley J. Hood. June 29, 1942.
(AT-2) 21-30a Preliminary Data from 16 foot Wind Tunnel Tests of the Lockheed P-38 Model. Albert L. Erickson. 4, 1942.
(AT-2) 21-30a Preliminary Data from 16-foot Wind Tunnel Tests of the Lockheed P-38 Model. Albert L. Erickson. November, 13, 1942.
(AT-2) 21-30a Preliminary Data from 16-foot Wind Tunnel Tests of Lockheed P-38 Model. Albert L. Erickson. November 26, 1942.
(AT-2) 21-30a Preliminary Data 16 foot Wind Test of the Lockheed P-38 Model. Albert L. Erickson. December 3, 1943.
(AT-2) 21-40 Tests. XP-56. Northrop Aircraft. 1943.
(AT-2) 21-40a Tests. XP-56. Preliminary Results. 1942-1943.
(AT-2) 21-40a Preliminary Data on 16 foot Wind Tunnel Tests of Northrop XP-56 Model. Manley J. Hood. September 7, 1942.
(AT-2) 21-40a Preliminary Data - II 16 foot Wind Tunnel Tests of Northrop XP-56 Model. Edmund V. Laitone. December 1, 1942.
(AT-2) 21-40a Preliminary Data on the 16-foot Wind Tunnel Tests of Northrop XP-56 Model. Edmund V. Laitone. November 26, 1942.
(AT-2) 21-45 Tests. XB-29, Boing Aircraft.
(AT-2) 21-45 XB-29.
(AT-2) 21-45. XB-29.
(AT-2) 21-45 Stress Analysis of XB-29.
(AT-2) 21-45 Tests. XB-29. Boeing. 1943-1945.
(AT-2) 21-45a Preliminary Data - III 16 foot Wind Tunnel Tests of the Boeing XB-29 Airplane Model. Victor M. Ganzer. January 22, 1943.
(AT-2) 21-45a Preliminary Data - II 16 foot Wind Tunnel Tests of the Boeing XB-29 Airplane Model. Victor M. Ganzer. January 16, 1943.
(AT-2) 21-45a Preliminary Data I 16 foot Wind Tunnel Tests of the Boeing XN-29 Airplane Model. Victor M. Ganzer. January 7, 1943.
(AT-2) 21-45a Preliminary Data IV 16 foot Wind Tunnel Tests of Boeing XB-29 Airplane Model. Victor M. Ganzer. January 25, 1943.
(AT-2) 21-45a Preliminary Data - V 16 foot Wind Tunnel Tests of the Boeing XB-29 Airplane Model. Victor M. Ganzer. January 30, 1943.
(AT-2) 21-45a Preliminary Data VI 16 foot Wind Tunnel Tests of the Boeing XB-29 Airplane Model. Victor M. Ganzer, February 2, 1943.
(AT-2) 21-45a Preliminary Data - VIII 16 foot (etc XB-29) Victor M. Ganzer February 5, 1943.
(AT-2) 21-45a Preliminary Data XX (same title/aut) March 24, 1943.
as above. Prelim Data XIX, March 22, 1943 [same title/Aut]
(AT-2) 21-45a as above. Prelim Data XVIII March 19, 1943 [same title/Auth]
as above Prelim Data XVII. March 18, 1943. [same title/Auth]
as above Prelim Data XVI [same title] March 13, 1943
(AT-2) 21-45a as above Prelim Data XV [same title] March 11, 1943. [Lee J. Boddy]
(AT-2) 21-45a Prelim Data XIV. same title March 5, 1943. [Lee J. Boddy]
(AT-2) 21-45a Prelim Data XIII [same title] February 24, 1943 [Victor M. Ganzer.]
(AT-2) 21-45a Prelim Data XII [same title] February 22, 1943. [Ganzer.]
(AT-2) 21-45a Prelim Data XI [same title/auth] February 16, 1943.
(AT-2) 21-45a Prelim Data X [same title/author] February 15, 1943.
(AT-2) 21-45a Prelim Data IX [same title/author] February 13, 1943.
(AT-2) 21-45a Prelim Data VII. [same title/author] February 11, 1943.
(AT-2) 21-45a Prelim Data XXXIII. [same T/A] July 23, 43
(AT-2) 21-45a Prelim Data XXXII. [same T/A] July 23, 43
(AT-2) 21-45a Prelim Data XXI. [same T/A] July 22, 1943
(AT-2) 21-45a Prelim Data XXX. [same T/A] July 21, 1943
(AT-2) 21-45a Prelim Data XXIX. [same T/A] June 3, 1943. Robt. H. Barnes
(AT-2) 21-45a Prelim Data XXVII. [same T] June 1, 1943 Victor M. Ganzer
(AT-2) 21-45a Prelim Data XXVII. [same T/A] May 21, 1943
(AT-2) 21-45a Prelim Data XXVI. [same T/A] May 5, 1943
(AT-2) 21-45a Prelim Data XXV. [same T/A] April 23, 1943
(AT-2) 21-45c Prelim Data XXIV. [same T] April 12, 1943 Robt. H. Barnes
(AT-2) 21-45c P D XXIII. [same T] April 3, 1943 Victor M. Ganzer
(AT-2) 21-45c P D XXII. [same T/A] March 31, 1943
(AT-2) 21-45c P D XXI. [same T/A] March 27, 1943
(AT-2) 21-50 Tests XP-58 Lockheed. 1942-1944]
(AT-2) 21-50a Preliminary Results. 1943-1945
(AT-2) 21-50a P D, [same T/A] November 3, 1943
(AT-2) 21-50a P D Reports, July - October, 1942
(AT-2) 21-55 Tests C69. Lockheed.
(AT-2) 21-55a Tests C-69 Lockheed. Prelim, Results.
(AT-2) 21-60 Tests XF5U-1 Vought-Sikorsky. 1944-1945.
(AT-2) 21-60 [Loose blueprints, reports and drawings. 1944]
(AT-2) 21-60 [Loose drawings. 1944]
(AT-2) 21-60 [Loose Drawings and Blueprints. 1944]
(AT-2) 21-65 Tests P-51. North American. 1943-1944.
(AT-2) 21-65 [Loose Drawings. 1943.]
(AT-2) 21-65 [Loose Drawings. 1942-1943]
(AT-2) 21-65 [Loose Drawings. 1943.]
(AT-2) 21-65a P-51- Prelim. Results 1943-1945. [Include Preliminary Data Reports, 1944.
(AT-2) 21-65a Preliminary Data Reports, May 28, 1943 - September 21, 1944.
(AT-2) 21-65a Preliminary Data Reports, May 31, 1943 - May 31, 1943.
(AT-2) 21-70 Tests XC-97 Boeing. October 1943.
(AT-2) 21-70a Tests XC-97 Boeing. Preliminary Results [contains Prelim Data Report, April 14 1943]
(AT-2) 21-75 Tests in XP-51B Duct Rumble North American. 1943
(AT-2) 21-75 [Loose drawings]
(AT-2) 21-75a Tests XP-51B. North American. Prelim Results.
(AT-2) 21-75a Preliminary Data Reports, April 3, 1943 - May 19, 1943
(AT-2) 21-80 Tests. XTB2D-1. Douglas. 1943.
(AT-2) 21-80 [Loose Blueprints.]
(AT-2) 21-80 [Loose blueprints and drawings.]
(AT-2) 21-85 Tests P-47. Republic.
(AT-2) 21-85 [Loose blueprints and drawings.]
(AT-2) 21-85 [Loose blueprints and drawings.]
(AT-2) 21-85a Tests P47. Republic. Prelim Results. 1943-1946.
(AT-2) 21-85a Preliminary Data. November 1944.
(AT-2) 21-85a Preliminary Data. 1943-1945.
(AT-2) 21-85a Preliminary Data. 1943-1945.
(AT-2) 21-90 Tests XB-29, Aileron. Boeing. 1943-1945.
(AT-2) 21-90a Tests XB-29 Aileron. Boeing. Prelim Results. 1943-1944.
(AT-2) 21-90a Preliminary Data. August 1943.
(AT-2) 21-90a Preliminary Data. August 1943 - October 1943.
(AT-2) 21-95 Spoiler and Aileron Investigation. A-15. 1943-1944.
(AT-2) 21-100 Tests. XFD-1. McDonnell.
(AT-2) 21-100 [Loose blueprints and drawings]
(AT-2) 21-100 [Loose blueprints and drawings]
(AT-2) 21-100 [Loose blueprints and drawings]
(AT-2) 21-100 [Loose Blueprints and drawings]
(AT-2) 21-100 [Loose blueprints and drawings]
(AT-2) 21-100a Test XFD-1. McDonnell. Prelim. Result.
(AT-2) 21-100a Preliminary Data. July 19, 1944.
(AT-2) 21-100a Preliminary Data. July 19, 1944 - September 18, 1944
(AT-2) 21-100a Preliminary Data. 1944-1945.
(AT-2) 21-105 Tests. XB-42. Douglas. 1943-1944.
(AT-2) 21-105 [Loose blueprints]
(AT-2) 21-105. [Loose blueprints]
(AT-2) 21-105a Preliminary Data. February 28, 1944 - March 29, 1944.
(AT-2) 21-110 Tests XA-39. Fleetwings. 1943. Douglas.
(AT-2) 21-110 [Loose blueprints] Douglas.
(AT-2) 21-105a Tests SA-42 Prelim Results.
(AT-2) 21-105a Preliminary Data. February 1944.
(AT-2) 21-110a [Loose Blueprints] These are for XA-39
(AT-2) 21-110a Loose blueprints [seem to be XA-39]
(AT-2) 21-112 Tests XP-79. Avion Spoilers. October 1943 - Jan. 1944.
(AT-2) 21-112a Preliminary Results. contains Preliminary Data Reports. November 10, 1943 - December 13, 1943.
(AT-2) 21-112a A-74. Preliminary Data Reports I - III. (High Speed Tests of an Upper Surface Spoiler on Naca Tapered Wing.) April 29, 1944 - May 5, 1944.
(AT-2) 21-115 Tests XP-55. Curtiss-Wright. July 1943 - December, 1943.
(AT-2) 21-115a [Loose drawings and blueprints.]
(AT-2) 21-115a [Loose drawings and blueprints N.D.C. 1943]
(AT-2) 21-115a Preliminary Results. December 31, 1943.
(AT-2) 21-120a Tests XB-42. Full Scales Empennage. Douglas. May 23, 1944 - July 20, 1945.
(AT-2) 21-120a Preliminary data reports. May 19, 1944 - August 25, 1944
(AT-2) 21-122 Tests XP-81 Consolidated (A-96) May 1944 - May 1945.
(AT-2) 21-122 [Loose drawings] 1944
(AT-2) 21-122 Table I of XP-81 "Wing Coordinates of XP-81 Airplanes."
(AT-2) 21-122 [Loose Blueprints] 1944
(AT-2) 21-122 [Loose blueprints] 1944
(AT-2) 21-122 [Loose blueprints and drawings] 1944
(AT-2) 21-122a High Speed Wind-Tunnel Test of a Model of the Consolidated Vultee XP-81 Airplane - Power Off. by Henry Jessen and Jack K. Stephenson [N.D.]
(AT-2) 21-122a Tests. XP-81. Consolidated (A-96). January 1945 - July 1945.
(AT-2) 21-122a Preliminary Data Reports. Jossen and Stephenson, Jan. 5, 8, 11, 25 (2) 31, Feb. 5.
(AT-2) 21-122a Preliminary Data Reports.
(AT-2) 21-122a P D reports.
(AT-2) 21-125 Tests. XP-82.
(AT-2) 21-125 [Loose drawings]
(AT-2) 21-125 [Loose drawings]
(AT-2) 21-125 [Loose drawings]
(AT-2) 21-125a Preliminary Results (XP82). 1944-1945.
[(AT-2) 21-125a] Process Manual [issued to aerodynamics dept; designed by North American Aviation, re XP82]
(AT-2) 21-125a Preliminary Data. April 1946.
(AT-2) 21-125a Preliminary Data. December 1944-April 1946.
(AT-2) 21-125a Preliminary Data. May 1945 - June 1945.
(AT-2) 21-125a Preliminary Data. Feb. 45 - May 45
(AT-2) 21-125a Preliminary Results (contd).
(AT-2) 21-125a Preliminary Data. January 1945
(AT-2) 21-125a Preliminary Data. Feb. - June 1945.
(AT-2) 21-125a Preliminary Data. March 1945.
(AT-2) 21-125a Preliminary Data. March - April 1945.
(AT-2) 21-130 Tests P39N-1. Bell. 1944-1945
(AT-2) 21-135 Tests XF7F-1 1944-1945
(AT-2) 21-140 Tests YP-80a. Lockeed. 1944-1945
(AT-2) 21-140 Preliminary Results. February 10, 1945 - July 14, 1947
(AT-2) 21-140a Preliminary Data Reports. February 10, 1945 - Sept. 7, 1945.
(AT-2) 21-140a Preliminary Data Report. September 18, 1945
(AT-2) 21-142 Tests YP-80a. November 6, 1945 - February 13, 1946
(AT-2) 21-142a XP-80A Outer Wing Panel. Preliminary Results. 21 January 1946 - 28 March 1946.
(AT-2) 21-142a Preliminary Data Reports. January 16, 1946 - February 11, 1946.
(AT-2) 21-142a Preliminary Data Reports. 27 February 1946 - March 18, 1946.
(AT-2) 21-145 Tests and Preliminary Results [Wing and Fuselage Studies] 1945-1946.
(AT-2) 21-150 Tests BT2D-1. Douglas 1945-1947
(AT-2) 21-150a Preliminary Data. March - Dec 1946. for BT2D-1 and AD-1 model
(AT-2) 21-150a Preliminary Data. Dec. 45 - Jan. 46
(AT-2) 21-155a Tests XP-80, Consolidated. April 1, 1944, July 9, 1946.
(AT-2) 21-155a Preliminary Data. March - April 1944.
(AT-2) 21-155a Preliminary Data. April - May 1944.
(AT-2) 21-155a Preliminary Data. May 1944.
(AT-2) 21-160 Tests XB-43. DaDouglas. 1945
(AT-2) 21-160 [Loose blueprints. 1943-1944]
(AT-2) 21-160 [Loose blueprints and drawings. 1943-1944]
(AT-2) 21-160 [Loose blueprints 1944.]
(AT-2) 21-160a XB 43 Preliminary Results. September 1944 - October 1944.
(AT-2) 21-160a S21-25b. Preliminary Data. September 1944.
(AT-2) 21-160a S21-25b. Preliminary Data. September 1944 October 1944.
(AT-2) 21-160a S21-25b. Preliminary Data. November 1944.
(AT-2) 21-165 [Loose Drawings]
(AT-2) 21-165 [Loose drawings and blueprints]
(AT-2) 21-165 [Loose drawings and blueprints]
(AT-2) 21-165a Preliminary Data. May 1946 - November 1946.
(AT-2) 21-180 Tests CVAC "Lark:. Consolidated. 1945
(AT-2) 21-180 [Loose blueprints. 1945]
(AT-2) 21-180 [Loose blueprints. 1945]
(AT-2) 21-195 [Transmittal Forms, Blueprints and drawings pertaining to the XP-86. 1946-1947]
(AT-2) 21-180 Consolidated Voultee Aircraft Corporation Lark. 1945.
(AT-2) 21-180a CVAC Lark. Preliminary Results.
(AT-2) 21-180a Preliminary Data Reports. October - December, 1945.
(AT-2) 21-180a Preliminary Data Reports. December 1945 - January 1946.
(AT-2) 21-180a NACA Research Memorandum - A6K19 For the Bureau of Aeronautics, Navy Department. December 13, 1946. Lark Missile
(AT-2) 21-185. Tests P51 H. Stabi(lity) and Control. North Am, Avia. November 1945 - December 1945.
(AT-2) 21-185 [Loose drawings]
(AT-2) 21-185 [Loose drawings]
(AT-2) 21-195 Tests XP-8-8.
(AT-2) 21-195 [Drawings.]
(AT-2) 21-195 [Loose drawings]
(AT-2) 21-195 [Loose drawings]
(AT-2) 21-210 Test. C.74. Douglas 1946-1947
(AT-2) 21-210a Preliminary Results.
(AT-2) 21-210a Preliminary Data. September 6, 1946 - January 17, 1947.
(AT-2) 21-210a NACA Research Memorandum No A7028 for the Air Material Command, Arny Air Force. May 6, 1947.
(AT-2) 21-230 Tests. XF2H-1. McDonnell. 1947
(AT-2) 21-230 Tests. XF2D-1. McDonnell. 1946
(AT-2) 21-230 Stress Analysis 2/7 Scale High Speed Wind Tunnel Model XF2D-1. Report No. 340 Serial 4. November 1, 1945.
(AT-2) 21-230 [Loose drawings 1945]
(AT-2) 21-230 [Loose drawings 1945]
(AT-2) 21-230 Reprot No 340. Serial 5. November 1, 1945.[with attached drawings]
(AT-2) 21-235 Tests-Wing tip-mounted tuit (A-216). 1944-1947.
(AT-2) 21-240 Tests-Douglas XS-3. (A-218) 1948.
(AT-2) 21-245 High Speed Tests Fairchild. XSDM-2. (Lark) Pilotless Aircraft. (A223) 1949.
(AT-2) 21-250a MX-838. 16th. Preliminary Results. RA A-233. 1948
(AT-2) 21-265a Prelim Results. 1/6 Scale Bumblebee XPM Model (JOHNS HOPKINS UNIV). RA A271. (1949)
(AT-2) 21-275 HS WT Inv. of Arodynamic Char. of Boeing XB-52 `plane. (C) 16' AMC. (RAA-256). 1950/
(AT-2) 21-280. Tests. "HS WT Invest of Horizontal Tail of Northrop F-89 Plane". (RA-258) (C). 1950
(AT-3) 5-20 Equipment, General. 1944-1947.
(AT-3) 5-20a Equipment - Smoke Generating (1944-1947)
(AT-3) 16-30 Operations, General. 1944-1950.
(AT-3) 17-20 Research Programs. General 1944-1945
(AT-3) 19-15 Research Problems Suggested. 1944-1948
(AT-3) 21-5 Tests - General. 1943-1945.
(AT-3) 21-5b Tests - Progress Reports and Tunnel Schedules 1944-1946.
(AT-3) 21-10 Tests. BTD-1. Douglas. 1944-1945.
(AT-3) 21-10 [Loose blueprints and drawings] June 1945 - January 1946.
(AT-3) 21-10a Preliminary Data Reports. September 2, 1944 - November 28, 1944.
(AT-3) 21-25a Preliminary Data Northrop N9M-2 October 31, 1944 - February 26, 1945.
(AT-3) 21-10a Preliminary Results BTD-1 October 23, 1944 - June 29, 1945.
(AT-3) 21-25a Tests. N9M-2. No thrip November 2, 1944 - March 3, 1945.
(AT-3) 21-30 Grumman XFTF-1 1944-1945.
(AT-3) 21-30a XG7F-1. Preliminary Results.
(AT-3) 21-30a Preliminary Data Reports. October 2, 1944 - January 5, 1945.
(AT-3) 21-30a Preliminary Data Reports. January 19, 1945 - July 5, 1945
(AT-3) 21-35 Tests. XP-56. Northrop 1944-1945.
(AT-3) 21-40 Tests. P75. General Motors. 1944-1945.
(AT-3) 21-40 [Loose blueprints and drawings]
(AT-3) 21-40a Preliminary Results. [contains 6 P D Reports. January 6, 1945 - August 9, 1945. Also a copy of NACA Memorandum Report for Air Technical Services Command, USAAF. dated November 7, 1945.]
(AT-3) 21-55 Tests FR-1. Ryan. 1945.
(AT-3) 21-55 [Loose blueprints]
(AT-3) 21-55 [Loose blueprints and drawings]
(AT-3) 21-55a Tests FR-1 Ryan (A-153) Preliminary Results. [Contains P D Reports - March 30, 1945 - July 31, 1945
(AT-3) 21-60 Tests XBT 2D-1, Douglas. 1945.
(AT-3) 21-60 [Loose blueprints May 1945]
(AT-3) 21-60a XBT2D-1 Preliminary Results.
(AT-3) 21-60a Preliminary Data Reports. July 26, 1945 - December 17, 19
(AT-3) 21-60a Preliminary Data Reports. April 17, 1947 -October 10, 1945 October 18, 1945;
(AT-3) 21-65a Test A-26B. Douglas. May 21, 1945 - July 20, 1945.
(AT-3) 21-65a Preliminary Results. Contains P D Reports, 18 May 45-26 June 45.
(AT-3) 21-70 Tests FR-1 Engineering Division (A-168) 1946.
(AT-3) 21-70 [Loose blueprints]
(AT-3) 21-70 [Loose drawings and blueprints]
(AT-3) 21-70 [Loose drawings]
(AT-3) 21-70 [Loose drawings]
(AT-3) 21-70 [Loose drawings]
(AT-3) 21-70 [Loose drawings]
(AT-3) 21-70 [Loose drawings and blueprints]
(AT-3) 21-70 FR1. Preliminary Results. [Contains 4 PD Reports July 9, 1945 - August 11, 1945]
(AT-3) 21-75 Tests XB-36. Consolidated Vultee. 1945-1947.
(AT-3) 21-75 a Preliminary Results [Contains PD Reports Septmeber 26, 1945 - December 3, 1945
(AT-3) 21-80 Tests Parachute. 19 June 1945. [only contains one transmittal statement]
(AT-3) 21-85a FR-1 Preliminary Results [Contains 5 PD Reports.] January 9, 1946 - January 15, 1946
(AT-3) 21-110a Air Intake Ducks Preliminary Data Report November 7, 1946
(AT-3) 21-125 Tests XP-91, Republic May 14, 1947 - July 7, 1947
(AT-3) 21-125 [Loose blueprints, drawings. 1942-1948]
(AT-3) 21-125 [Loose drawings 1946-1947]
(AT-3) 21-125a Tests XP-91 Preliminary Results [Contains 9 PD Reports dtd May 9, 1947 - Oct. 22, 1947]
(AT-3) 21-125a [Loose blueprints 1945-1946.]
(AT-3) 21-125a [Loose blueprints, 1946-1947]
(AT-3) 21-125a [Loose blueprints, drawings 1946-1947]
(AT-3) 21-130 40 x 80. RAA-199/ (1946-1948).
(AT-3) 21-145 Tests - Invest. of Full Scale Charac. of Con. Vultee XP-92 (A-210). [1948]
(AT-3) 21-150 Test - 40-by 80 ft. Wind-Tunnel Inv. of McDonnell XP-85 Airplane. (A-211).
(AT-4) 1-10 Airfoils - General. 1948
(AT-4) 1-10 Airfoils - General. 1943-1946
(AT-4) 5-10 Equipment. General. 1945
(AT-4) 21-10a P.D. "Pressure-Distribution Measurements at High Speeds for Five Representative NACA Low-Drag and Conventional Airfoils." April 30, 1945.
(AT-5) 21-5b Tests. Progress Report. [1945-1949]
(AT-5) 21-15a Tests. Progress Report. [1945-1949]
(AT-5) 21-20 Tests-Aerody. Char. of Ducts and Duck Inlets. [1947]
(AT-5) 21-25 Supersonic Inv. Lockheed Ram Jet Test Vehicle. (RAA-226) (1948)
(AT-6) 5-10 Equipment - General. [1949]
(AT-6) 21-40a Prelim. Results. (A-236)
(AT-7) 5-10 Equipment - General. [1949]
(AT-10) 9-10 Investigations General. [1948-1950]
(AT-11) 3-20 Computations - General. [1949]
(AT-11) 9-5 Inquires. Commercial Sources. [1949]
(AT-11) 3-20a Computations - Reeves Electronic Analog Computers. (REAC). [1948-1949]
(AT)17 17-20 Propellers 1951. Drawings. Budget (General). 1941-1950. [1951]
B1-5 Allotments - General. [1945]
B1-5a Allotments - C&E Funds. [1945]
B1-5b Allotments - General Funds. [1945]
B1-10 Appropriations - Estimates of. [1945]
B1-12 Budget - Fiscal Year 1954.
B2-20 Budget - 1945 - General.
B2-20a Budget - 1945 - Supplemental Estimate
B2-21 Budget - 1946 - General
B2-21 Ames Aeronautical Laboratory Fiscal Year. 1946. August 7, 1944.
B2-21a Budget - 1946 - Supplemental Estimates.
B2-22a Budget - 1947 - Memos to Divisions and Sections.
B2-22b Budget. [Samples to be used in preparing project requests). [1947]
B2-22b Budget - 1947. Instructions for Wash. Office.
B2-22c. Budget - 1947 - Rough Draft.
B2-22d. Ames Aeronautical Laboratory. Fiscal Year 1947. Estimates. August 3, 1947.
B2-22d. Budget - 1947 - Final Budget.
B2-22e. Budget - 1947 - Supplemental Estimate
B2-22f. Construction Program thru Fiscal Year. 1952.
B2-22g. Ames Aeronautical Laboratory. Fiscal Year 1948. Estimates. August 12, 1946.
B2-22g. Budget - 1948.
B2-22h Budget - 1949.
B2-22i. 1950 Budget.
B2-22j. Budget. 1951.
B2-22k. Budget. 1952.
B2-22l. Budget. 1953.
B2-40. Bureau of Budget - Memos, etc. [1941-1951]
B2-45. Budget - Muroc. [1949]
B3-5. Cost Analysis. [1946-1948]
B16-10. Obligation Breakdown. [1945-1946]
B19-10. Reports. [1945-1946]
C-2-1. A2. McDonnell. F3H. 1953.
C-2-1. A2. Flight Investigation of Buffeting of High Speed Aircraft
C-2-1. A5. Flight Inv of Horizontal Tail Loads F-86A. Airplane and F-86D ' plane Lowered Horizontal Tail Position. (c). [1954]
C-2-1. A7. Division of Load Between Wing and Body at Transonic Speeds. [1952-1955]
C-2-2. A6. Investigation of Critical Maneuvers and Loads Resulting There from During Flight Test of a Swept-Wing Airplane. [1952-1955]
C-2-3. A3. Wind-Tunnel Investigation of the Mechanism of Buffeting at Subsonic Speeds. [1952-1955]
C-2-3 A8. Gust Responses of Elastic Wings at Supersonic Flight Velocities. [1953-1955]
C-3-2. A4. Determination of Flutter Derivatives at Transonic Speeds. [1955]
C-3-2. A7. Determination of Elastic and Geometric Characteristics for Flutter of Straight Wings at Transonic Speeds. [1952-1955]
C-3-3. A5. Investigation of the Cause of Failure of the Northrop F-89 Elevator. [1952]
C-3-3. A6. Investigation of Elevator Oscillation of Northrop F-89 Airplane. (C) [1951]
C-3-4. A10. Analysis of Existing Fluctuating Pressure Data on Two-Dimensional Airfoils. [1954-1955]
C-46. Summary of a Number of Reports on Thermal Ice Prevention. 1949.
E1-1 Agard - General. 1954. [Advisory Group for Aeronautical Research]
E1-1 Agard - Paris, France, November 1954.
E1-1 Agard - Netherlands, May 1954.
E1-1a. Accidents - Airplanes. 1949.
E1-5. Aeronautical Board. 1942-1947.
E1-10a. Aircraft - British. 1941-1946.
E1-10a. Aircraft - British. 1947-1948.
E1-10b. Aircraft - German. 1947-1948.
E1-12. Annual Inspection - Ames. 1946.
E1-12. Annual Inspection - Ames. Mar - June 1948
E1-12. Annual Inspection - Ames. July - 1948
E1-12 Annual Inspection - Ames. 1946.
E1-12b. Annual Inspection - Cleveland. 1947-1948
E1-12a Annual Inspection - Langley. 1947.
E1-12a Annual Inspection - Langley. 1949.
E1-12 Annual Inspection - Langley. 1950
E1-12a [Copies of Material Presented at the 1949 Biennial Inspection. Langley.
As Above
E1-15 Army Air Forces-Material Command Center. 1948.
E1-15. Army Air Force-Material Command Center [1943-1948]
E1-15. Aerojet Engineering Corp. 1952-1954.
E1-15. Air Force - General. 1949
E1-15. Air Force - General. 1950
E1-15a Air Force. Liasison Officer at Ames. 1947-1948.
E1-15a Army Air Force Reports. (General). [1943-1947]
E1-15b. Edwards Air Force Base. 1945-1948.
E1-15c. Army Air Forces - Research Authorizations. 1947-1948.
E1-18. Atomic Energy Commission. 1947-1948.
E1-20. Avion Inc.
E2-5 Bell Aircraft, Inc.
E2-10. Boeing. 1944. 1947
E1-20. Aerolab Development Co. 1951-1952.
E1-30. Aircraft Industries Assoc. 1950-1953
E1-30 Aircraft Industries Assoc. 1954.
E1-30 [Actually 31] Aircraft Industries Assoc. 1954.
E1-40. Air Force - General. 1953-1954.
E1-40. Air Force - General. 1950-1953.
E1-40. Air Force - General. 1945-1946
E1-40b Air Force. Report of Research. Projects at Ames. 1954.
[As above. 1953. 1952.
E1-40d Research Authorizations. Transmitted to AFDFR. 1954-1956
E1-40d. R.A.'s transmitted to AFDFR. 1949-1953
E1-40e. [Air Force - Availability of Air Force Aircraft] 1954-1955.
E1-40f. Air Force - WADC - Wright Air Development Center. 1954.
E1-40f WADC 1950 - 1953
E1-40g. ARDC. 1954
E1-40g. ARDC. 1952-1953.
E1-40h. Arnold Eng. [ineering] Dev. [elopment] Center. 1954.
E1-40h. AEDC Transonic Subcommittee Meetings
E1-40h. Arnold Eng. Dev. Center. 1950-1953.
E1-40h AEDC Transonic S/C Meetings. 1952-1953.
E1-55 Army - General. 1951-1954.
E1-55c. Balistic Research Lab. 1954.
E1-55c. Army Ballistics Res. Lab. Aberdeen. 1949-1953.
E1-60. Aro, Inc. 1954
E1-60. Aro, Inc. 1952
E1-65. AEC. 1949
E2-4 BAY AREA COUNCIL [1955]
E2-20. Bell Aircraft. 1949-1952
E2-20. Bell Aircraft. 1954.
E2-30. British Air Commission, Washington D.C. (1941-1948.
E2-35. British Visitors, General. (1941-1948.
E2-35a. British Air Ministry [1941-1946]
E2-35a British Air Ministry Rpts. (1946-1949).
E2-40. Boeing. 1954.
E2-40. Boeing. 1953.
E3-10. Chamberlain, E.H. [1940-1945]
E3-10. Cessna Aircraft. 1954.
E3-13 Chance Vought
E3-13 Chance Vought Aircraft Co. (1945 thru 1948)
E3-15 Civil Aeronautics Admin, Board
E3-15 Civil Aeronautics Admin, 1948
E3-15a Civil Aeronautics Admin, 1942]
E3-15a Civil Aeronautics Admin. 1948
E3-20 Chance-Vought. 1954
E3-20 Chance-Vought. 1949-1953
E3-20. Commission - Air Policy. 1947-1948.
E3-25. Civil Aero Admin. 1949-1953.
E3-25. Committees - AAL - General. 1942-1946.
E3-26. Committees, Langley (General). [1945-1947]
E3-26. Committees, - LAL - General. - 1948.
E3-26. Langley - Minutes of Comm. Meetings Held at Langley. (1949).
E3-26. Civil Aero. Board. 1952-1953.
E3-26a Committees - LAL - Stability Control. 1948.
E3-26a Committees, Stability and Control. [1941-1947]
E3-26b. Cowling and Cooling (Langley). [1941-1945]
E3-26c. aerodynamic. (General) Langley Committee. [1941-1947]
E3-26c Committees - LAL - Aerodynamic - General. 1948.
E3-26d. Committees - Instruments, LMAL. [1944-1945]
E3-32 Committee, High Speed Panel
E3-32 Committee and Sub Committee General. 1941-1948
E3-32 Committees - NACA Committees, Sub Committees and Sub Committee Panels. (1949)
E3-32a Committees - Induction System De-Icing. [1941-1946]
E3-32a-1. Research Airplane Panel. (1948)
E3-32a-2. S/C Aircraft Structure. (1948) 1949]
E3-32a-2 S/C Aircraft Structure. (1949)
E3-32a-2 Committee on Aircraft Construction. (1948)
E3-32a-2 As above. (1949)
4. Supersonic Facilities Panel (1948-1949)
5. Committee on power plants for aircraft (1948)
E3-32b Committees. Lighting Hazards to Aircraft. 1941-1946.
E3-32a-6 S/C on Fluid Mechanics (1949-1950)
E3-32b-1. S/C on Upper Atmosphere. (1948).
E3-32b-2 Subcommittee on Aircraft Fire Prevention (1948)
E3-32c. Committees - Subcommittee on Meteorlogical Problems (1949).
E3-32c S/C - Meterological Problems. 1941-1948.
E3-32c Conferences - NACA - Executive Conference. (1943-1950)
E3-32d S/C - De-Icing Problems. 1947-1948.
E3-32E. Committee - Heat Exvhangers. [1943-1947]
E3-32f. S/C on Propellers for Aircraft. (1948).
E3-32f. Committees - Subcommittees on Propellers for Aircraft (1949).
E3-32f. Committees - Propellers for Aircraft. [1944-1948]
E3-32g Committee - Aerodynamics [(1944-1946)]
E3-32g. [Loose Reports and Correspondence. NACA Mtgs. 1946-1947]
E3-32g Committees - Committee on Aerodynamics (1949)
As above. (1948)
E3-32h. S/C Vibrations and Flutter. (1948).
As above (1947)
As above (1949)
E3-32h. Special Comm on Surplus Aircraft Research. 1946.
E3-32i. Subcommittee on Helicopters (1949)
E3-32i. S/C on Helicopters (1943 and 1948)
E3-32j Committee on Operating Problems. (1949).
E3-32j. As above. (1948)
E3-32j. Committee Operating Problems. [December 7, 1942 - December 12, 1947]
E3-32k. Committee on Military Operational Data. (1945)
E3-321. S/C - Self propelled Guided Missiles. 1946.
E3-32m. Committee, Industry Consulting. Oct. 4, 1945 - Dec. 3, 1947.
E3-32n. Committees - Special Buffeting Panel (1949).
E3-32o. S/C Stability and Control. 1948
E3-32o. Committee, Stability and Control. Jan 19, `46 November 7, 1947.
E3-32o. Committee, Subcommittee on Stability and Control. (1949)
E3-32p. Committee, High Speed Aerodynamic. Jan 19, 1946 - Oct. 22, 1947.
[As above.] (1949)
E3-32p. S/C High-Speed Aerodynamics. 1948.
E3-32p S/C High Speed Aerodynamics. 1948
E3-32q. Committees, Seaplanes. March 19, 1946 - Oct 1, 1946.
E3-32q. Committees, on Aerodynamics, 1948.
E3-32q. Committees - Subcommittee on Seaplanes. (1949).
E3-32r. Aerodynamics & Structures Panel, Guided Missiles Committee. (1946)
E3-32s. Propulsion Systems. 1946-1949.
E3-32t. High Speed Panel. (1948).
E3-32t. Committess. Meeting of NACA High Speed Panel (1949)
E3-32u. S/C on Internal Flow. (1948).
E3-32u. Committees S/C on Internal Flow. (1949).
E3-32v. S/C on Aircraft Loads. (1948).
E3-32v. S/C on Aircraft Loads. (1949)
E3-32x. Special S/C Research Problems of Transonic Aircraft Design. 1948-1949.
E3-32y. S/C on Icing Problems. (1948).
E3-32y. S/C on Icing Problems. (1949)
E3-35. Classification. 1951.
E3-35. Classification. 1952.
E3-35. Classification. 1953.
E3-35. Classification. 1954.
E3-35. Classification. 1955.
E3-35. Conferences, General. (September 9, 1940 - Jan 8, 1948)
E3-35. Conferences - General. (1947-1948).
E3-35. Conferences - Upper Atomosphere. Rocket Research Panel. (1948).
E3-35a Conference, Propellers. July 10, 1941 -March 7, 1947.
E3-35b Conferences - Liquid Cooled Air Engine Instruments. dated 11 Sept 41]
E3-35c Conferences - Development of Research Instruments. August 2, 1944 - July 24, 1947.
E3-35d. Conferences - NACA. Administrative Conference (1944-1947).
E3-35f. Conferences - Lab. Conf. on Flight Techniques. (1944).
E3-35f. Conferences - Flight Techniques. (September 1, 1944- June 23, 1945.)
E3-35h. Personal Aircraft Conf. at Langley. (1946).
E3-35i. Stability Control. (Joint NACA. LAL. Ames - Nov 26 & 27th, 1945). (1945 - 1946)
E3-35j. Flutter & Vibration Conference at LAL - April, 1946. (1946-1947).
E3-35k. Supersonic Aerodynamics Conference at Ames. (1946)
E3-35k-1. Supersonic Aerodynamics Conference at Ames. (1947).
E3-351. Conference- Aviation Writers Assn. (1946-1947).
E3-35m. Ice Prevention Conference. (1947).
E3-35n. Conference - Boundary Layers (1947-1948).
E3-35o. Conferences - Aerodynamic Problems of Transonic Airplane Design. (1947-1948).
E3-35p. Conferences - Aircraft Loads - LAL - (1948). (1947-1948).
E3-35q. [Enclosures Detached from Memos for Director. October 24, 1947.]
E3-35r- Conferences - NACA. University Conf. on Aerodynamics. LAL - June 21, 22, 23. (1948).
E3-35s- Conferences - Aircraft Structure - LAL. (1948).
E3-35t. Conferences - NACA Conference on Supersonic Aerodynamics - (Ames - Feb. 28 and March 1, 1950.
E3-35t. Superior Conference. Ames. (1948)
E3-35u. Conferences - NACA Conference on Propellers for Aircraft (Langley - Sept 29, 1949).
E3-35v. Conference on Aerodynamic Problems of Transonic Airplane Design. (Langley - Sept 27-29, 1949).
E3-35w. Conferences. Navy Conference on Lateral Dynamic Stability Problems and Research (NACA Hdqtrs. - 10/5/49).
E3-35x. Conferences - NACA Conference on Some Problems of American Operation. (Lewis - October 9-10, 1950)
E3-35y. Conferences - USAF - RDB Symposium on the Aerodynamics of Ram Jet Supersonic Inlets. (WADC - Oct. 3-4, 1950).
E3-35y-1. Conferences - Computing. (1947-1948).
E3-35y-1. Conferences - Computing. (1949)
E3-35z. Conferences - Bu Aer - Sperry - SPARROW Conference. (Bu Aer, Wash. - Oct. 17-18, 1950).
E3-40. Consolidated Vultee Aircraft Corp. (1948).
As above. (1949).
E3-40. As above. October 27, 1941 - December 9, 1947.
Scope and Content Note
E3-40a. Meeting Scheduled. 1950-1953.
E3-40a. Meeting Scheduled. 1954
E3-41. Committee on Aircraft, Missile, & Spacecraft on Aerodynamics. 1954.
E3-41. Committee on Aerodynamics. 1953 1951-52
E3-41. Committee on Aerodynamics. 1950.
E3-41a. Subcommittee on Fluid Mechanics. 1954.
E3-41b. S/C on Hi Sp. Aero. Gen Cases. 1950.
E3-41b. Committees - S/C on High Speed Aerodynamics. 1950
E3-41b. S/C on Hi-Sp Aero. Minutes of Meeting. 1951.
E3-41b. S/C on Hi-Sp Aero. Minutes of Meeting. 1952.
E3-41b. S/C on Hi-Sp Aero. Minutes of Meeting. 1953.
E3-41b. S/C on High-Speed Aerodynamics. 1954.
E3-41b-1. High Speed Panel. S/C on High Speed Aerodynamics. 1950-1954.
E3-41b-2. Subcommittee on High Speed Aerodynamics. Panel on Laminar - Flow Boundary - Layer Control. 1954.
E3-41c. Subcommittee on Aerodynamic Stability and Control. 1954.
E3-41e. S/C on Internal Flow. 1949.
E3-41e. Committees. Subcommittee on Internal Flow. 1954
E3-41e. S/C on Internal Flow. Gen Corres. 1950-1953.
E3-41e. S/C on Internal Flow. Minutes of Meeting. 1950
E3-41e. S/C on Internal Flow. Minutes of Meeting. 1951
E3-41e. S/C on Internal Flow. Minutes of Meeting. 1953
E3-41e. S/C on Internal Flow. Minutes of Meeting.
E3-41e. Special West Coast Panel on Air Inlets. 1951.
E3-41f. Committees - S/C on Propellers for Aircraft 1954-2955, 1953
E3-41f. Committees - S/C on Propellers for Aircraft. 1952.
[As above. 1951]
[As above. 1950]
E3-41f. S/C on Propellers for Aircraft. 1954
E3-41f-1. Panel on Vibration. 1954.
E3-41g. S/C on Seaplanes. 1950-1953.
E3-41h. S/C on Helicopters. 1950-1953.
E3-41h. Subcommittee on Helicopters. 1954
E3-41i. Committees. Speacial S/C on the Upper Atomosphere (1950-1951).
E3-41j. S/C on Stability and Control. Gen. Corres. 1952-1953.
[As above. 1950-1951.]
E3-41j. S/C on Stability and Control - Minutes of Meetings. 1951.
[As above. 1952.]
[As above. 1953.]
[As above. 1954.]
E3-41j. S/C on Stability & Control. 1951.
E3-41j. S/C on Stability & Control. 1950
E3-42. Comm on Power Plants for Aircraft. 1954.
E3-42. Committee on Power Plants for Aircrafts. 1950-1953.
E3-42a. Committees - S/C on Aircraft Fuels. (1950-1953.
E3-42b. Committees. Subcommittees on Combustion (1953-1954)
E3-42b. Subcommittee on Combustion. 1954.
E3-42e. Subcommittee on Engine Performance and Operation. 1954.
E3-42e. S/C on Engine Performance. 1951-1953.
E3-42f. Subcommittee on Power Plant Controls. 1954.
E3-42h. Subcommittee on Rocket Engines. 1954.
E3-42h. S/C on Rocket Engines. 1953.
E3-43. Committee on Aircraft Missile and Space-Craft Construction. 1954.
E3-43. Committee on Aircraft Construction. 1950-1953.
E3-43a. Subcommittee on Aircraft Structure. 1954.
E3-43a. S/C on Aircraft Structures. 1950-1952
E3-43b. Subcommittee on Loads. 1954
E3-43b. Committees - S/C on Aircraft Loads. (1953).
E3-43b S/C on Loads. 1953
[As above. (1952).]
[As above. (1951).]
[As above. (1950).]
E3-43c. Committees - S.C on Vibration and Flutter (1953).
E3-43c. Subcommittee on Vibration and Flutter. 1954.
[As above. (1952).]
[As above. (1951).]
[As above. (1950).]
E3-43d. S/C on Aircraft Structural Material. (1950)
E3-44. Committee on Operating Problems. (1950-1953).
E3-44 Minutes of the Meeting. Committee on Aircraft & Operating Problems. 1954.
E3-44a. Committees - S/C on Meterological Problems. (1950-1953).
E3-44b. S/C on Icing Problem. 1954
E3-446. S/C on Icing Problem. on Icing Problems. (1950-1953).
E3-44d. S/C on Aircraft Noise. 1952-1953.
E3-44d. Subcommittee on Aircraft Noise. 1954.
E3-44e. Panel on Aircraft Accident Survival. 1952-1953.
E3-44e. Panel on Aircraft Accident Survival. 1954.
E3-44f. S/C on Aircraft Fire Prevention. 1949-1953.
E3-44f. Subcommittee on Aircraft Fire Prevention. 1954.
E3-50. Coordinator of Research Memos. [1940-1947]
E3-60. Curtis - Wright Corp & Cornell Aero Lab [1940-1947]
E3-60 Curtis - Wright (Cornell Aero Lab) 1948. [1940-1947]
E3-60 Conferences, General. 1950-1953
E3-60. Conferences - General. 1954.
E3-60. Conferences. 1950-1951
E3-60a-1. Conferences - Aircraft Loads and Structures. (Langley - March 5-7, 1951).
E3-60a-2. Conferences - Turbine Materials & Cooling (Lewis 15, Mar. 1951)
E3-60a Conferences - Aerodynamic Design Problems of Supersonic Guided Missiles (Ames, Oct. 2,3, '51).
E3-60c-4. Conferences - Aerodynamics of High Speed Aircraft (Ames - July 8-10, 1953)
E3-60a-4. Conferences. High Speed Airplane Aerodynamics. (Langley - Dec. 4-5, 1951).
EG-60b-1 Conferences - Supersonic Missile Propulsion. (Lewis - March 13, 1952).
EG-60c-1. Conferences - Transonic Wind Tunnel. (Hdqts. - Nov. 2, 1953)
E3-60c-2 Conferences - Turbo jet Engines for Supersonic Propulsion. (Lewis - Oct. 8-9, 1953).
E3-60c-3. Conferences - Aircraft Loads, Flutter and Structures. (Langley - March 2-4, 1953).
E3-60d-1. Conferences - NACA, BUAER, WADC, Airplane Flight Control Systems. (March 22-23, 1954).
E3-60d Conferences - Helicopters. (Langley; May 12-13, 1954)
E3-60d-3. Conferences - Aerodynamics, Structures, and Propulsion (Lewis - Oct. 20-22, 1954).
E3-60d-4 Conferences - Some Problems of Aircraft Operations (Lewis - Nov. 17-18, 1954)
E3-60e-3. Conferences - Aerodynamics of Powerplant Installations for H.S. Aircraft (Lewis Proposed) 1954.
E3-65. Consolidated Vultee Corporation (Convair). 1954.
E3-65. Consolidated Vultee Corporation (Convair). 1950-1953
E3-65 Convair. (1953).
E3-70. Curtiss-Wright Corp. 1942-1949.
E3-90. Curtiss-Wright Corp. 1954.
E3-90. Curtiss-Wright Corp. 1950-1953
E3-90. Curtiss-Wright Corp. 1953
E4-5. Department of Defense. 1949-1953.
E4-5. Department of Defense. 1954
E4-20. Douglas Aircraft Company, Inc. 1954.
E4-20. Douglas Aircraft Company, Inc. (1950-1953)
As above. 1953. Box 537. As Above. Flight Reports. 1948-1950
E4-40. Douglas Aircraft Co, Inc. (1948)
E4-40. Douglas Aircraft Co, Inc. (1944-1949)
E4-40. Douglas Aircraft Co, Inc. 1941-1947
E4-45. Dryden, Hugh L. (1948).
E5-5. East Coast Aircraft War Production Council. (1944)
E5-10. Educational Institutions - General. 1947-1948.
E5-10. [As above. 1941-1947.]
E5-10a. Educational Institutions - (Stanford University) 1947-1948.
E5-10b. Educational Institutions. (Univ of Calif). (1948).
E5-10c. Educational Institutions. (Calif. Inst. of Tech.) 1947-1948.
E5-10c Seminar re Fluid Mechanics by Prof. K. Stewartson. (CIT) (Univ. of Bristol) at Ames, Dec. 14 & 15, 1953
E5-10c. Visit to Jet Propulsion Lab, & Calif Inst of Tech, IAS, & Douglas by Mr. John Spreiter. 2/27 - 29/52.
E5-12. Educational Programs - Class Assignments. 1943.
E5-12. Educational Programs General. 1941-1947.
E5-15. Edwards - General. (1946-1947).
E5-20 Engine Res. Lab. (Lewis). 1948.
As above. Engine Research Lab Cleveland. General. 1944.
E5-30. Propellers. (General). [1949]
E5-50. Exhibits. (1944-1948).
As above. Exhibits. - General. [1941-1947]
E6-20. NACN. - Motion Picture - General. (1940-1948)
E6-30. Films - General. 1953.
E6-30. Films - General. 1954
E6-30. Films 1949-1959. [Includes U of Cal. Rpt. on Dist of Ames Film.]
E6-50 Foreign Countries - General. 1954.
E6-50 Foreign Countries - General. 1953.
E6-50 Foreign Countries. 1942-1953.
E6-50 Foreign Countries. England and Canada. (1949-1953).
E6-50b. France.
E6-50b. Foreign Countries - France. 1946-1953.
E7-10. Gruman Aircraft Corporation 1944-1947
E8-30 Harmond Aircraft Corporation. General. 1943-1944.
E7-20. General Electric. 1954.
E7-20. General Electric. 1942-1953.
E7-20a. G.E. - Upper Atomosphere Rocket Research Panel. 1954.
E7-20a General Electric. Upper Atmosphere Rocket Res. Panel. 1950-1953.
E7-25. General Motors Corp. 1951-1953.
E7-50. Grumman Aircraft. 1954
E7-50. Grumman Aircraft Corp. 1949-1953.
E8-30. Hi. Sp. Flt Station. Gen. 1954.
E8-30 Photographic Prints. Also Blueprint Wing Structure D-558 II. 1954.
E8-30a Hi High Sp Speed Flt Flight Station. RA Research Authorization 1954
E8-30b. Hi Sp Flt Station - Comments. 1954
E8-30b. Hi Sp Flt Station - Memos. 1949-1953
E8-30d. HSFS. Memos. 1954.
E8-30d. HSFS. 1949-1953
E8-30d. HSFS. Memos. 1950.
E8-40. Hiller. 1954.
E8-40 and E8-40a Correspondence.
E8-50. Hughes. 1954.
E8-50. Hughes Aircraft Company. (1948).
E8-50. Hughes Aircraft Company. General. 1942-1947.
E8-60. Hughes Aircraft. 1951.
E8-60. Hughes Aircraft. 1950-53.
E9-15. Information - General. 1940-1947
E9-20. Inquiries Refered to NACA.
E9-15. Information - General. (1945-1948).
E9-20. Inquiries Refered to NACA. (1948).
Inquiries forwarded to NACA. (1949)
E9-30. Roll Stabilization of Free Fall & Rocket Models 1947.
E9-40. Helicopters. (1941-1947).
E9-30. Instruments - General. 1942-1948.
E9-40 Instruments - General. 1940-1947.
E9-50. Inquires - General. 1954.
E9-50. Repts for Gen. Lab. Info. 1949-1953.
E9-56. Inquires Ref to NACA. 1952
E9-56. Inquires Ref to NACA. 1950-1953.
E9-70a. Inspection - Lewis. 1954.
E9-70b. Inspection - Lewis. May 5, 7, 13, 1953.
E10-5. Joint Research & Development Board (1946-1948).
E11-1. Langley - General 1954. (1949 & 1951)
E11-1. Langley - Gen. 1953.
Langley - Gen. 1953.
E11-1. Langley. 1952.
Langley. General. 1954.
E11-1. Langley. 1951.
E11-1. Langley. 1948.
E11-1 Langley - General. 1952.
E11-1. Langley - General. 1950-1951.
E11-1a. Langley - Comments. (1953).
E11-1a. Langley - Comments. (1954)
E11-1a. Langley - Comments. (1952)
E11-1b. Langley Research Authorizations. 1954.
E11-1b. Langley RA's. 1951-1953.
E11-1c. Langley Memos. 1954.
E11-1c. Langley Memos. 1950-1953.
E11-1c. Langley Memos. 1949.
E11-1d. Langley Paper "Airscoop". 1952-1953.
E11-1d. "Airscoop". 1954
E11-1c. Weekly Activity Report of the AFDFR at Langley. 1953.
E11-1e. Langley-Weekly Activity Report of the AFDFR at Langley.
E11-1f. Langley - Aircraft Status Reports. 1949-1953.
E11-20. Lectures by Ames Staff. 1949-1953.
E11-20. Lectures by Ames Staff.
E11-21. Lectures by other than Ames. 1949-1954.
E11-22. Lewis. (gen). 1950.
E11-22 Lewis. (gen). 1954.
E11-22. Lewis. (gen). 1951.
E11-22. Lewis. (gen). 1952.
E11-22. Lewis (Gen). 1949.
E11-22. Lewis (gen). 1953.
E11-22a. Lewis - Comments. 1953.
E11-22a. Lewis - Comments.
E11-22a. Lewis - Comments. 1952.
E11-22b. Lewis RA's. 1951-1953.
E11-22b. Lewis RAs. 1954.
E11-22c. Lewis Memos. 1944-1953.
E11-22d. Lewis "Orbit" (Formerly Wing Tips) 1954.
E11-22d. Lewis Paper:Wing Tips. 1952-1953.
E11-30. Library - General. 1940-1953.
E11-30. Library - General. 1954.
E11-40. Lockheed. 1954.
E11-40. Lockheed. 1949-1953
E12-1. McDonnell. 1946-1953.
E12-1. McDonnell a/c Corp. 1952.
E12-1. McDonnell Aircraft Corp. 1954.
E12-5. Langley Memorial Aeronautical Lab. (1948).
E12-5. Langley Aeronautical - Lab. 1940-1947
E12-5. Langley. (Gen). 1940-1949
E12-10. Lectures by Staff Members. (1940-1947).
E12-10. Lectures by Ames Staff Members. 1949.
E12-10a. Lectures. Speeches etc. by Ames Stall. General. 1944-1949
E12-15. Lesley, Evertt P. (1943-1945).
E12-15. Marquaedt. 1954.
E12-15. Marquaedt. Aircraft Company. 1948-1949
E12-17. Lewis. General. 1943-1949.
E12-20. Martin. 1954.
E12-20. Martin. 1954.
E12-20. Glenn L. Martin Co. 1949-1953.
E12-30. Lockheed Aircraft Corp. (1948)
E12-30. Lockheed [and E13-5. McDonnell A/C] 1942-1947.
E13-20. National Bureau of Standards. 1949-1953
E13-40. Navy - General. 1940-1953
E13-40. Navy. 1954.
E13-40b. Navy - Pt Mugu. 1949-1953.
E13-40b. Navy - Point Mugu. 1954.
E13-40c. Navy-Naval Ordinance Test Station. 1949-1953
E13-40c. Navy - Naval Ordinance Test Installation.
E13-40d. Navy-Naval Ord. Lab. 1949-1953.
E13-40d. [Same title as above.]
E13-40e. Navy-Bureau of Economics. 1944-1953.
E13-40e. Navy Bu [reau] of Aero [nautics]. 1954
E13-40f. Navy NADC. 1954. [NAVY AIR DEVELOPMENT CENTER]
E13-40h. Navy NATC [NAVY AIR TEST CENTER]. 1954
E13-95. North American. 1944-1953.
E13-95. North American. [1954]
E13-100. Northrop Aircraft. 1944-1953.
E13-100. Northrop 1954
E14-3. Medicine (Aviation)
E14-10a. Panels - Res search Airplane Panel 1953-1954
E14-10b. Panels-Automatic Control Group. (Goett, Kauffman, and Smith, G.A.) 1953
E14-10c. Panels-Computing Machine Panels. 1948-1951
As above. 1954
E14-10e. Technical Adv isory Panel on Aeronautics. 1954
E14-20. Missiles and Rockets. 1949
E14-20. Visits to West Coast Guided Missile Contracters, week of 10/5/53, by Niewald of NACA, Goett, Frick, Matthews and Stewart of Ames.
E14-40. Photographs 1949-1955
E15-7. Bureau of Standards. 1944-1947
E15-7. Bureau of Standards. (1948)
E15-8. National Defence Research Council. 1944-1947
E15-10. Navy Department-Gen. 1948.
E15-10. Navy Dept. 1942-1947 Poss Confid.
E15-10a. David Taylor Model Basin. (1948)
E15-10a. David Taylor Model Basin. (USN) 1944-47.
E15-10b. Navy Dept. - Pilotless Aircraft Unit. (Point Mugu). (1946-1948).
E15-10c. Navy Dept. - Naval Ord Test Station - Inyokes. (1945-1948).
E15-20. Natl. Research Council of Canada. 1950
E15-25c. National Science Foundation. (1947)
E15-30. National Supersonic Center. Sverdrup and Parcel. 1946-1948
E15-40. North American Aviation, Inc. 1944-47
E15-40. North American Aviation, Inc. 1948
E15-42. North American Aviation, Inc. 1948
E16-30. Rand Corp. 1954.
E16-30. Rand Corp. 1949-1953.
E16-50a. Reports in Preparation.
E16-50a. Reports - Reports in Preparation. (1950-1953).
E16-50d. Reports - Requests for in Numbers. 1953-1956.
E16-60. Republic. 1948-1953
E16-60. Republic. 1954.
E16-75. Research Programs General. 1940-1954.
E16-75. Research Programs. General 1951-1954
E16-75. Convertiplane and Engine Proposal. (R. Scheerer) 1949-1952.
Research - (Ames) Area Rule. 1954-1955.
E16-75. [documents labeled E19-23] Research on External Stores. 592
E16-75. Bullpup Tests in 6x6 1954-1955. 592
E16-75. Review of NACA Static Lateral-Directional Stability Studies. 1953. 592
E16-75. Research-Programs-Reversed Pitch Propeller Problem. 592
E16-75. Jet-Exit Problems Corres. (Visit by E.A. Mossman) 1950-1954. 592
E16-75. NACA Program on Supersonic and Transonic Controls (Ames and Langby). 1951-52. 593
E16-75. Ribner Triangular Transonic Propeller 593
E16-75. Jet Engine Research by Ames. (1949-1954) 594
E16-75. Ryan. 1948-1954. Contains Privilege 595
E16-75a. Fire Control. 1952-1955.
E17-3b. Panels-Upper Atomsphere Rocket Research Panel (General Electric). (1949).
E17-10. Photographs (General). 1941-1947
E17-10. Photographs - General. (1948).
E17-10a. Photographs. AAL Construction Program.
E17-11. Propellers (General). 1949.
E17-11. Part & Whitney. 1945-1950
E17-30. Schools and Universities. 1954.
E17-30. Schools & Universities. 1949-1953
E17-30a. Stanford. 1954.
E17-30a. Schools & Universities. Stanford. 1948-1953
E17-30b. Schools & Universities. Univ. of California. 1948-1953.
E17-30b. University of California. 1954.
E17-30d. Calif. Inst of Tech. 1954.
E17-30d. Schools & Univ. - DIT. 1945-1953.
E17-30e. Mass. Inst. of Tech. 1954.
E17-30e. Schools & Univ. - MDT. 1949-1953.
E17-30h. Schools & Univ. Cornell Univ. 1949-1953.
E17-31. Comments on University Reports. (1952-1954).
E17-60. Societies - General. (1954)
E17-60. International Cong. of Mathematicians in Amsterdam, 9/2-9, Attended by W.A. Mersman.
E17-60. Societies - General. (1951-1953).
E17-60. Instrument Society of America Conf. Cleveland - 9/8-12. 1952 attended by Taft Wrathall "Miniature Pressure Cells" paper presented.
E17-60. Briefing on Analysis of Combat Film by Institute of Air Weapons Research at Univ. of Chicago on 5/19/54 (Attended by G.A. Rathert.)
E17-60. American Mathematical Society Meeting - Los Angeles, Nov. 27, 1954
E17-60. Photographic Society of America Meeting - Chicago - Week of October 4, 1954 (Attended by John F. Darson).
E17-60a. Societies - S.A.E. 1949-1954.
E17-60b. Societies - ASME. 1949-1953.
E17-60b. Societies - ASME American Society of Machanical Engineers. 1954.
E17-60b. Paper by G.A. Smith and W.C. Triplett, "Experimental Flt. Methods for Evaluating Frequency - Response Characteristics of Aircraft" for ASME Meeting in Pittsburg, June 20-24, 1954.
E17-60c. Societies - DAS. Institute of Aeronautical Science. 1941-1948.
E17-60c. Societies - IAS. Institute of Aeronautical Science. 1949-1952.
As above. 1954.
E17-60c. IAS Meeting - Wright Bros Lecture by Dr. Dryden. 1949-1951.
E17-60c. Societies - IAS. Inst. of Aeronautical Sciences. 1953.
E17-60f. Societies - International Congress of Applied Mechanic. 1950-1953.
E17-60g. Societies - US National Congress of Applied Mechanic. 1950-1953.
E17-60h. Societies - Heat Transfer and Fhird Mechanics Institute.
E17-70. Sperry Gyroscope Co. 1953-1954.
E17-75. Stanford Research Institute. 1949-1954.
E19-13. Republic Aviation Corp. 1942-1947.
E19-15. Reports. War Time Reports. (Tests of reports copiled and released by NACA on Tech issues). 1946-1949.
E19-15. (Classif) Reports - Classification Forms. (1947-1950)
E19-15 Reports (General) Reproduction. 1947-1948
E19-15a Reports in Preparation 1951-52
E 19-15a Loose Transmittals of Lists of Reports on Tesh. papers in preparation at Ames Lab. 1950-1951
E19-15a Loose (Some Material as last entry 1946-1950)
E19-15a Loose (as above 1944-46)
E19-15b Reports - Annual Report 1950
E19-15b Reports - Annual Reports 1949
E19-15b Reports - Annual Reports 1946 (as w/327)
E19-15b/ Reports - Annual Reports 1948
E19-15b. Reports - Annual Reports 1947.
E19-15b Reports - Annual Reports. 1940-1945
E19-15b-1 Annual Bound Bolume Report 1947-1948 Correspondence concerning the above additions, deletions etc
E19-15b-1 Annual Bound Volume (Jan. - August. 1949) as above
E19-15b-1 Annual Bound Bolume (Septs. 1949 - Dec 1950.) as above
E19-15d;c Loose, as above. 1944-47
E19 15d;e;f. Monthly Lists of Preliminary Data, Reports issued by NACA for internal use, and Reports prepared by NACA for AAF. 1943-1947.
E19-15g;h. Monthly Reports of Aircraft Assigned and Operating at Ames A L. 1946-1949.
E19-23. "Application of thin Airfoil Theory to the Study of Cascades." RA proposed by Theo. Aero. Disapproved. 1951.
E19-23 Bu Aer Air to Surface Guided Missile Weapon System. 1954. Closed
E19-23. Navy Day Fighter Competition. 1952-1953. Closed
E19-23 Interceptor - (MX-1554). General - - (Incl Visit by C W Trick to So. Calif Aircraft Companies). 1950-1952 Closed
E19-23. (Corres. re visit by Crone and Frick to So. Calif. Industry Plants re Control Surface Problems for Transonic and Supersonic Aircraft. 1950.
E19-23. Long Range Interceptor Competition. 1954. Closed
E19-23. Summary Reports on Experimental Reaearch on Triangular Wings. 1950.
E19-23a. Research - General (Study Groups). (1946-1950).
E19-23 Research, General. 1942-1947
E19-23a Summary of Reports on Triangular Wings. 1950
E19-24 Request for Authorization on Wind Mills in Transonic Speed Range
E19-24 Research (NACA Investigations
E19-25 Research Program AAL (Test Schedules) AMC Air Material Command Test Schedules. 1943-1947
E19-25 Research Program. Ames. General 1942-1947
E19-25 AAL Test Schedules. 1942-1950
E19-25(a) Research Programs. Ames Progress Reports. 1946-1949.
E19-25a Loose. As above
E19-25a. Research Program (Progess Reports) 1948-1950.
E19-15a Loose. As above
E19-30 Research Reports Comments (LMAL) Tech. Reprots returned from NACA with comments March 26, 1942 - December 31, 1947
E19-30 Memorandums. General 1941. 26 May thru 1947 December 29, rewvisits, equipment failures, performences
E19-30 Loose Memorandums & Research Authorizations Jan. 27, 1943-December 11, 1946
E19-30 Research Authorizations. March 28, 1921 - January 11, 1943
E19-30 Preliminary Data - Langley.
E19-30 As above. 1945-47. Tests of D-558. Douglas 1945 -
E19-30 PD's Guided Missiles - JB-2 Flying Bomb; V-1 Flying Bomb; Aeronca Glide Bomb; Interceptor Aircraft. September 22, 1944 - April 11, 1949.
EE19-30 (Bell) XS-2 (Army Project 743). 1946.
E19-30 P/D Operating Characteristics and Thrust-loading of 2 Six-Blade Dual - Rotating 10 foot Diameter Propellers as Detemined by Wind Tunnel Tests. LMAL. Oct. 8, 1945.
E19-30 Memorandums - P-47 B- Republic Aviation. 1942-1943.
E19-30 P-47B-3 Aileron Study. June 11, 1942.
E19-30 P-47D-30 Flying Qualities. 1945.
E19-30 P-47C- Flight Tests. March 22, 1944.
E19-30 P-47D- Propellers. January 27, 1944
E19-30 Memorandums - Bell Co. P-63, P-59 etc. 1943-1944.
E19-30 KAQ-1 Ranger/Lark Model Tests Conducted in the Langley Propeller Research Tunnel. June 4, 1946-July 24, 1946.
E19-30 Navy "Lark" - High Speed Tunnel. June 4, 1946 - July 24, 1946.
E19-30 P-51B General Flight Tests Sept. 29, 1943 - August 19, 1944.
E19-30 XP-51 - Flight Tests - Compressibility Studies, October 22, 1942 - June 20, 1944
E19-30 XP-51F - 19 foot Pressure Tunnel. November 1943.
E19-30 XP-51F - Aerodynamic Data - Air - Flow. Research Division. Sept 14, 1943 - October 29, 1943.
E19-30 XA-26 - 19-foot Pressure Tunnel. January 4, 1944.
E19-30 P-51 - Tests in Full Scale Tunnel. October 27, 1943 - November 5, 1943
E19-30 F6F-3 - Flight Tests. March 27, 1944 - August 17, 1944
E19-30 XC-82 Horizontal Tail Surface 7 x 10.
E19-30 Supersonic Wind-Tunnel Tests and Analysis of a Proposed Supersonic Airplane. 20 Jan 1945.
E19-30 Effect on Prop. Performance of Tip Modification De Icing Air Flow. July 12, 1944 - August 15, 1944
E19-30 XF8B-1- Aerodynamic Data. December 7, 1943 - October 6, 1944.
E19-30 P5Y-1 Airplane - Free Flight Tunnel Tests. Janyary 6, 1944.
E19-30 A-26B - Flying Qualities. June 6, 1944. September 7, 1944.
E19-30 XTB3D-1 (A-26) - Design Information Carburetor Ram Investigation. Wing and Fuselage Combination. August 26, 1943 - Feb 2, 1944
E19-30 Power Plant Installation. 1944-1945
E19-30 XP-77 - Full-Scale Tunnel Tests. January 22, 1944
E19-30 P-63 Airplane - Full-Scale Tunnel. November 5, 1943.
E19-30 XP-63 - Aileron Effectiveness. April 13, 1942.
E19-30 P-63A-1-BE - Flight Tests. 1943-1945
E19-30 P-38 Airplane - Preliminary Data. March 15, 1942 - March 23, 1943.
E19-30 YP-59A - Full Scale Tunnel Tests. 1944.
E19-30 "Compressibility Effects MX397 Project. February 15, 1944 - March 20, 1944.
E19-30 XBTC-2- Atomospheric Wind Tnnel Tests. 1944.
E19-30 As above. 1943-1944.
E19-30 Japanese Zero-2 Airplane - Flight Tests. May 27, 1943
E19-30 Randome Model - Pressure Distribution. May 10, 1944
E19-30 Horizontal Tail Loads Resulting from Landing Impacts. March 15, 1944.
E19-30 XP-75 Aileron Development - TDT. September 14, 1944 - October 26, 1943.
E19-30 XP-75 Aileron Development - Flight Tests. May 15, 1944 - July 15, 1944.
E19-30 Constriction Effects in High Speed Wind Tunnels. January 31, 1944.
E19-30 NACA 7-11-12, 8-H-12, 9-H-12 and 10-H-12 Airfoils Sections - Aerodynamic Data, February 29, 1944
E19-30 RA-30 Airplane - Flight Investigation of Sideslip Characteristics. January 26, 1944
E19-30 Aileron Control - NACA Studies. June 28, 1943.
E19-30 XF2M-1 - General Motors Model, November 17, 1943.
E19-30 YR-4A Helicopter - Aerodynamic Data. March 29, 1944
E19-30 XBTM-1 - Aerodynamic Data
E19-30 XBTM-1 - Free-Spinning Tunnel Tests of 1/20 - Scale Model. August 10, 1945.
E19-30 XB-36 Nacelle. February 9, 1944 - April 30, 1945.
E19-30 B-36 Powered Model - 19 foot Model. 1944-1945.
E19-30 XF-12 Direct Coupled Gyroscope - Langley Roll Stabilization System. 1944-1948.
E19-30 XF-12. 1945-1946
E19-30 NACA 23015 and NACA 16-212 Airfoils. XB-35 Elevon Model at High Speeds. December 16, 1942 - January 26, 1945.
E19-30 XB-35-Elevon Development. Drag Data. Propeller Characterstics
E19-30 XB-42 - Tail Propeller Interference Tests. G-17 Airfoil Duct Model. MX-392. February 18, 1944 - September 12, 1944.
E19-30 PD - "LMAL Full Scale Tests of the Grumman XF8F-1 Airplane - - Part 1 - Drag Tests." January 13, 1945 - December 20, 1946
E19-30 XP-67 - Wing Inlet and Duct Designs. October 14, 1943.
E19-30 XP-72 Model - Atmospheric Wind Tunnel. August 5, 1944-Septermber 4, 1944.
E19-30 XB-39 - Full Scale Tunnel. Engine Nacelle. June 17, 1944.
E19-30 XP-69 - Compressibility Effects. Feb. 22, 1943
E19-30 Performance Selection of 3000 HP Pursuits Airplanes. February 26, 1944.
E19-30 B-33 - Balacned Ailerons. Frise Aileron. Feb 27, 1942 - April 13, 1942.
E19-30 B-32-19 Foot Tunnel. Low Turbulence Section. May 10, 1944 - July 27, 1944
E19-30 P-40 K. Tail Loads Investigation. July 28, 1943 - February 21, 1944.
E19-30. P-40 K. Tail Loads Investigation. April 5, 1944 - November 8, 1944
E19-30 F4F-3- Flap Tests on Semispan Model. April 18, 1944.
E19-30 SB2D-1- Tests in LMAL 16 - foot Tunnel. August 22, 1944.
E19-30 XP-60- Preliminary Data from 19-Foot Pressur Tunnel. May 9, 1941.
E19-30 JRM-1 Model - Wind Tunnel. September 4, 1944.
E19-30 Douglas C-74 - Aerodynamic Data. November 7, 1944 - December 13, 1944.
E19-30 NACA 66, 2-216 and NACA 66 (215) - 216 Airfoils - Aerodymanic Data. November 5, 1943 - January 19, 1944.
E19-30 JRM-1 Model - Wind Tunnel. September 4, 1944.
E19-30 Douglas C-74 - Aerodynamic Data. November 7, 1944 - December 13, 1944.
E19-30 NACA 66, 2-216 and NACA 66 (215) - 216 Airfoils - Aerodynamic Data. November 5, 1943 - January 19, 1944.
E19-30 CNAC 1/35 - Scale Tailless Airplane, Free-flight Tunnel Tests. August 15, 1944.
E19-30 65, 3-018 Wing Section - TDT. Sept. 29, 1942.
E19-30 XP-84 - Inv. of Aerodynamic Characteristics of Lefthand Horizontal Tail Surface in 16 T. Part II
E19-30 MX-578 Republic. Investigation in 16 of Lefthand Horizontal Tail Surface. Parts I - III. May 28, 1945 - June 5, 1945
E19-30 P-80A (MX-596) - Free-Flight Tunnel Tail Tests. June 15, 1945.
E19-30 XF5U-1 - Tests 1/3 - Scale Model in Full Scale Tunnel. June 8 - Aug 4, 1945
E19-30 XF6U-1 - Aerodynamic Data. May 19 - August 6, 1945.
E19-30 XB-43 (MX-475) Aerodynamic Data. July 3-5, 1945.
E19-30 XTB3F-1. P/D - Tests of 1/8 Scale Model. October 5, 1945 - February 27, 1946.
E19-30 P/D Wind Tunnel Tests of the 1/4.5 Scale Model of the Bell L-39-1 Airplane. June 4, 1946 - Sept. 19, 1946.
E19-30 Tests of JB-2 Air Logs in Langley 16-foot High - Speed Tunnel. July 30, 1945.
E19-30 Tests of Seven Types of Impellers for the JB-2 Air Logs in the Langley 16 foot High Speed Tunnel. Sept. 4, 1945.
E19-30 P/D Investigation of Icing Characteristics of a PBM-3D Cooling - Fan Installation AERL, Cleveland Co. April 23, 1946.
E19-30 Langley P/D "Wind Tunnel Tests of Army Project MX-578 XXII - Pressur Distribution Over Fuselage Nose, Original Canopy, and V-Front Canopy." October 11, 1945
E19-30 Langley P.D "Free-Spinning Tunnel Tests of a 1/20 - Scale Model of the Curtiss-Wright XF15C-1 Airplane II - Spin Recover Parachute Requirements TED No. NACA 2366. October 4 - November 27, 1945
E19-30 Langley Paper: "Multichannel Pressure Transmitter for Measuring Pressures on a Rotating Propeller," by Arthur A. Reiger. November 20, 1945.
E19-30 P/D Development of Tip Nozzles for Heated - Air Anti-Icing Propellers. Part I - Description of Equipment. July 6, 1945
E19-30 P/D Basic Thickness Forms for the NACA 651-006, 651-009, 651-010, 661-006 and 661-009 Airfoil Sections. December 18, 1944.
E19-30 Allison V-3420-11 Engine - - Ground Tests at the Full-Scale Tunnel. August 16, 1944
E19-30 P.D. "Ordinates ofr the NACA-1408, 1410, 1412, 641-110, and 641-112. Airfoil Sections. November 3, 1944.
E19-30 PD-"Wing-Tunnel Tests of a Swept-Back Wing, Chordwise Pressure Distribution and Spanwise Normal - Force Loading" January 23 - January 29, 1945.
E19-30 Tailess Pusher Airplane - Free - Flight Tunnel Tests. September 18, 1943 - December 8, 1944.
E19-30 P/D 1/7 Scale Model of the Kaiser Tailess Airplane Part I - Lift and Drag Measurements. May 9, 1945.
E19-30 XF-15C-1 Aerodynamic Data for Airfoil Section Equipped With Double-Slotted Flap for Curtiss-Wright XF-15C-1 Airplane II Lift and Pitching-Moment Data; etc. July 7, 1944.
E19-30 Guided Missiles - Free Flight Tunnel. May 22 - August 6, 1945.
E19-30 PD High Speed WT Tests of an Experimental AS-27 Antenna Model No. 1 with 45° Sweepback. Aug. 4, 1945.
E19-30 P/D Negative - Thrust Tests of Single - and Dual - Rotating Tractor Props. August 31, 1943.
E19-30 Memo For Files: "A Preliminary Trial of a Pressure Belt," by Blake Corson. Aug. 12, 1942.
E19-30 Memo for Files "Tests Made in a One Inch Nozzle to Compare Aerody Data Obtained in an Atomosphere of FREON 12 with that obtained in Air." by Von Doenhoeff and Braslon. April 4, 1947
E19-30 CMR "Propeller and Cooling - Air - Flow char. of Twin Engine Airplane Model..." by McHug and Pepper
E19-30 P/D Two Dimensional Wind - Tunnel Investigation at High Reynolds nos. of two Symetrical Circular - Arc Airfoil Sections with High Lift Devices LMAL July 3, 1944.
E19-30 Langley Paper: "Multichannel Pressure Transmitter for Measuring Pressures on a Rotating Propeller," by Arthur A. Reiger, 11/20/45.
E19-30 LMAL "Low-Speed Tests of 5 NACA 66-Series Airfoils Hairing Mean Lines Designed to Give High Critical Mach Numbers," by von Doenhoff, Stivers Je., O'Conner. April 11, 1946
E19-30 (Comments). (1947-48).
E19-30 LMAL Memo - "Measurements of the Motions of Shock Waves" by J.W. Benson. (1947).
E19-30 (Memos.) (1948).
E19-30 Research Program. Aircraft Loads Division. Apr. - Aug. 1950 Apr. - Aug. 1950
E19-30. Comments. 1951.
E19-30 Comments. 1950.
E19-30. Comments. 1949
E19-30. Comments. 1949-1951.
E19-30 Langley (Research. General) 1940-1949.
E19-30. (Memos) Langley Memo. 1949.
E19-30. Langley-Progress of Papers. 1951-1952
E19-30. Langley-Progress of Papers. 1950-1951
E19-30. Research Program - Aircraft Loads Division. 1950-1951
E19-30. General 1951.
E19-30. Research Program. Aircraft Loads Division. Jan. - Apr. 1950.
E19-30 MR "The Problem of Noise Reduction With Reference to Light Airplanes" by T. Theodorsen and Arthur A. Regier.
E19-30 Langley Rpt. "Effect of Shark Design on Propeller Performance at High Speeds," by J.B. Delan and M.M. Carmel - 12/29/45
E19-30 Memo for Files - "A Pressure Transfer Device for Measure Simultaneously 24 Pressures on Rotating Airfoils" by Miller and Habel dated May 28, 1946.
E19-30 P/D. I. 4/14/45 Autom. Pilot Charac.
P/D. II. 4/14/45 Lat. Char. of Orig. Design
P/D. III. 4/25/45 Lat. Char. with inc. tail Gargoyle LBD-1 area
E19-33 General. Drawings Flight 12-13X4#2
E19-35 Research Program (AERL) Lewis Flight Propulsion Lab. 1943-1947.
E19-35 Research Reports Comments (Cleveland) Lewis Flight Propulsion Lab. June 7, 1945 - December 2, 1947.
E19-35 Lewis - Research Authorizations. 1943-1950
E19-35 Preliminary Data - General. March 23, 1945.
E19-35 "Velocity Distributions on Arbitrary Airfoils in Closed Tunnels by Conformal Mapping.
E19-35 P-80 Transcontinental Speed Record Report and Analysis of Fuel Consumptions made by Cleveland Lab Staff. 1946.
E19-35 Pro. (posed) Adv. (anced) Restr. (ricted) Report "A Method of Matching the Performance of Compressor Systems With that of Aircraft Power Sections." Keetch & Moses - October, 1945 - February 7, 1946.
E19-35 CR "Relaxation Calculations of the Effects of Compressibility on the Two-Dimensional Wind Tunnel Constriction Correction for Subsonic Flows: Epstein, Brinich, Albers, December 1945
E19-35 AERL RPT. "A Constant - Gain Crystal Knock Pickup Amplifier" by Richard P. Krebs and Thomas Dallas (AERL-November 1945) (R.A. E-19)
E19-35 Pro [posed] Adv. [anced] Restr. [icted] Report" Experimental Investigation of the Jet-Boundary Constriction Correction for a Model Spanning a Closed Cir cular Tunnel. November 1945.
E19-35 (General). (1948)
E19-35 (Comments). (1948)
E19-35 ACR "The Jet-Boundry Constriction Correction for Summetrical Airfoils in a Closed Tunnel, etc. W. Perl and H.E. Moses, dated 11/45.
E19-35 ACR "The Jet - Boundary Constriction Correction for Symmetrical Airfoils in a Closed Tunnel, etc. W. Perl and H.E. Moses, 11/45.
E19-35 YP-59A - Power-Plant Installation 1944.
E19-35 P/D Altitude - Wind-Tunnel Tests of Westinghouse 19B and 19XB Engines. 1944-1945
E19-35 Prosp. ACR "The Minimum Pressure Attainable on an Airfoil in Mixed Supersonic Flow, by W. Perl (AERL - March, 1946)
E19-35 Paper: An Optical Method of Angular Demagnification with Application to a Recording Inclinometer. February 23, 1945.
E19-35 P/D "Icing Char. of Bendix-Stromberg PT-13G-1 Carburetor Mounted on Pratt Whitney R-2800-51 Accessory Housing Assembly. July 7, 1945.
E19-35 P/D "Flame Damping of Turbosuper - charger Installation by Mears of Exhaust-Gas Heat Exchanger: April 15, 1944
E19-35 P/Analysis "Comparison of the Performance Charac. of the Westinghouse Sup-Stage Axial-Flow Compressors Models 19-B and 9. 5a dated July 11, 1945.
E19-35 B-26B- Temperature Distribution on a R-2800-5 engine. Oct. 5, 1943 - March 22, 1944.
E19-35 P/D "Perf. Tests of G.E. I-16 J-P Unit Equipped with Ryan XFR-1 Cowling. Ducting and Tailpipe. October 1944.
E19-35 Alcohl De-Icing Tests of the C-46 Induction System Part II, Altitude Air-Box Tests of Four Alcohol, De-Icing Systems conducted at Cleveland. June 1, 1945 Part II
E19-35 Memo "Spiral Shielded Thermocouple for Measuring Exhaust - Gas Temperatures" Harmon May 18, 1944.
E19-35 P/D "Performance Tests of G.E. Type I-A Supercharger, Unit 10". February 22, 1944.
E19-35 P/D "Icing Char. of Special Aircraft Antennas." December 14, 1944.
E19-35 Report "Electronic Indicator for Angular Velocity and Acceleration." by Krebs. May - June 1944.
E19-35 P/ARR "Two-Dimensional Incompressible Potential Flow Over Corrugated and Distorted Surfaces." by Mutterperl and Green. June - July 1944.
E19-35 P/D "Performance Tests of G.E. Type I-A Supercharger, Unit 10". February 22, 1944.
E19-35 P/D "Icing Char. of Special Aircraft Antennas." December 14, 1944.
E19-35 Report "Electronic Indicator for Angular Velocity and Acceleration." by Drebs. May - June 1944
E19-35 P/ARR "Two-Dimensional Incompressible Potential Flow Over Corrugated and Distorted Surfaces." by Mutterperl and Green. June - July 1944.
E19-35 CMR "Flame Visibility Tests with Individual Exhaust Stack" by Turner and Humble March 19, 1943.
E19-35 ARR - "Engine Tests of Pressurized Shunt Type Cooling Systems for a Liquid-Cooled Engine. January 1944
E19-35 P/D "Altitude-Wind Tunnel Tests of the Locheed YP-80a Power-Plant Installation - Part I," dated April 30, 1945.
E19-35 As above. Loose March - August 1945.
E19-35 P/D "Two NACA Fuel-Injection Modifications that Prevent Serious Refrigeration Icing in the Induction System of Allison V-1710-89. April 17, 1945.
E19-35 Calculation of Thrust of a Compressor Combustion - Turbine Jet Propulsion Engine. AERL. July 11, 1944.
E19-35 "A Method for Remote Indication of Propeller-Pitch Angle" and "Ratio-Meter Type of Propeller-Pitch Indicator" by Warshaw. May 15, 1945.
E19-35 P/D Development of Protected Carburetor - air scoop for Induction System of C-46 airplane dated May 19, 1945.
E19-35 RMR "A Multiple Bridge for Elimination of Contract-Resistance Errors in Resistance Strain-Gage Measurements, Warshwasky. June, 1945.
E19-35 "Meteorlogical Summary of Conditions Observed During NACA Icing Tests at Cleveland, Ohio. During Winter of 1946-1947" by Dwight B. Kline.
E19-36 (Comments). (1948).
E19-36 Research, General. Contracts w/Schools. 1943-1947
E19-36 (General). (1940-1948).
E19-36 (Copies of Research Contracts with Schools). (1943-48).
E19-36 Comments. 1949-1951. Stanford Univ. - Contract W535 - ac - 18162 dtd. Feb. 10, 1941. "Report on Flutter." (AAF).
Stanford Univ. - NA w-5322 -
Stanford Univ. - NA w-2946.
Stanford Univ. - NA w-5469.
Univ. of California. - NA w-5459.
E19-40. United Aircraft. 1950-1954.
E-45 Ryan Aeronautical General Correspondence 1943-1946
E19-60 Scientific Research Board (Presidents). (1946-1947).
E20-20 Socities-General.
E20-11 Stack, John. 1946
E20-20. Heat Trans and Fluid Mech Inst. (1949).
E20-20. Societies - General. (1948).
E20-20a. Societies - SAE. (1940-1948).
E20-20b. Societies - ASME. (1946-1948).
E20-20c. As above.
E20-20e. Societies - Aircraft Industries Assoc. ARYC on Flutter Research, 1948-1949
E20-20e. Prelim. Corres. re Wright Bros Lecture by Dr. Dryden under S,A,S, (1949).
Closed
E20-25q. Visits - Reports by Ames Staff. 1940-1954
E21-10. Tests - Weekly Schedules of Tests. 1943-1947.
E21-10. Westinghouse. 1952-1954
E21-30. Enclosures to Langley. 3-1-50. 1950
E22-20. United Arilines - General. (1944-1948).
E23-3. Vega Aircraft. 1942-1943
E23-10. All Corres. re MX-1179. (1950-1952).
E23-10a. Reports of Visits to Ames. 1940-1949.
E23-106. British - Visit to England by Fred Mattheson - September, 1953.
E23-20b. Visit of Dr. A.C. Charters to Navy Ord Lab, Harvard College Observatory and Ballistic Research Lab, Aberdeen Pro. Gr, Oct. 26 - Nov. 4., 1953.
E23-20b. Visits by Charles W. Frick to England and France (9/29/52 - 11/27/52)
E23-10b. Visit to Various Aircraft Companies in L.A. to Discuss Fiberglass Reinforced Plastic Techniques (Betts - Elam and Pahle). Nov., 1953.
E24-5- Status of Investigations for the AAF at Ames Lab. 1952.
E24-5- Progress Reports of AAF Projects Investigated at Ames. 1950-1951.
E24-5. War Dept - Arny Liaison Office. 1943
E24-5. War Dept - Army Liaison Office 1942-1946.
E24-5. War Dept - Liaison Info. 1943-1945.
E24-20. Warner, Dr. Edward P. (1942-1944).
Equipment EMC Equipment Branch. 1950-1954
G3-20. Chambers of Commerce. 1939-1948.
G3-25a. Quart Reports of Franked Mail. Admin. Div. 1940-1946
G3-25d. Mail - Delays, etc. Adm. Services. (1940-1949).
G3-30. Construction Projects - General. 1940 thru 1947.
G7-40. Drawings from Mare Island Naval Shipyard re Torpedo Tube Firing Mechanism. March 14, 1948.
G7-40c. N.A.S. Moffett Field.
G5-30. Equipment (Microsyn). (1949).
G5-30a. OPA Mileage Report.
G5-30b. Annual Motor Vehicles Rpts. 1943-1948
G5-34. Property. July 1942 - Aug. 1948.
G12-5k. Laboratory - Visits to (Group Tours, Open house, etc.) 1945-1949
G12-6. Labor - General.
G12-6b. Labor - Wage Rate Determination
G12-6c. Labor - Wages.
G15-10- National Defense - General.
G15-10a. National Defense - Blackout Regulations.
G15-10b. National Defense - Camouflage.
G15-10c National Defense - National Defense Sec Against Sabotage
G20-3. Safety Commitee. 1951-1954.
G21-18. Tire Rationing.
G21-18 Monthly Report of Papers for Office of War Information.
Miscellaneous Correspondence from R.A.'s. 1946-1949
R.A. A-41 XFR-1 Airplane. Ryan. 1945.
R.A. A-45 Investigation of "Rumbling" of North American XP-51B Airplan. 1948.
R.A. A-58 Investigation of Dougle-Hinged Control for the Horizontal Tail of an Airplane 1954
R.A. A-160 High-Speed Wind Tunnel Invest. of NACA66 (215)-210 Airfoil with Modified Mean Comber Line. 1946
R.A. A-161 Study of Bodies Suitable for Supersonic Flight. 1946-1951.
R.A. A-166 Lockheed P-80 Project MX409 (1945)
R.A. A-173. Investigation to Determine Optimum Configurations for Jet and Turbine Driven Airplanes 1946-1948
R.A. A-174. "High Speed Wind Tunnel Investigation of Consolidated Vultee Lark". 1945-1948
R.A. A-175. Investigation of Flying Qualities of Chance-Vought F4U-4 Airplane. 1947
R.A. A-178. Determination of Wing Structure Temperatures During High-Speed Flight Maneuvers. 1950
R.A. A-181. Study of Dynamic Stability and Control of Airplanes. (Flt. Res.) 1945-1954.
R.A. A-183. Investigation of the Flying Qualities of a Lockheed P-80A. 1945-1951.
R.A. A-186 Full-Scale Research on Boundary Layer Control for Swept Wings. 1950
R.A. A-192. Inv. of Fluctuating Pressures on Wings at Transonic Speeds. 1946-1947
R.A. A193. Investigation of Characteristics of Wings at High Reynolds Num. and High Subsonic Mach Numbers. 1946-1947.
R.A. A194 Wind Tunnel Tests of Project MX-656 1948-1950
R.A. A-194 Investigation of Aero. Characteristics of Ducts and Ducts and Duct Inlets Suitable for Supersonic Flight. 1948-1949
R.A. A-196. Investigation of Aerodynamic Characteristics of Ryan XF22-2 Airplane. 1947
R.A. A-197 Investigation of Stat. and Control Character of Full-Scale Model of Republic XP-91 Airplane. 1948-1949
R.A. A-199. Full-Scale Invest. of Effects of Airplane Density on Oscillatory Divergence of Airplane with Sweptback Wing. 1946-1951.
RA A-199 F86 Drawings. 1951 (also check 1028-1029)
RA. A-208. Investigations of Full-Scale Empennage of Boeing XB-47. Airplane in 40 X 80 W/T. AAF. 1946-1947
R.A. A-208 Drawings. B.T2D-1 Aircraft. 1948
R.A. A-210. Investigation of Full-Scale Characteristics of Consolidate Vultee XP-92 in 40 x 80. 1946-1951.
R.A. A-211. 40 x 80 Foot Wind Tunnel Inv. of McDonnell XP-85 Airplane. AAF (R). 1947-1948.
R.A. A-213. Hi-Speed W.T. Inv of Compressibility Problems of Typical Twin Inlet Turbo - Jet Fighter Aircraft. (BuAer). (C). 1945-1950.
R.A. A-214. Fundamental Study of Leading Edge Air Inlets on Swept Wings. (Subcomm. on Inter Flow.) (C.).
R.A. A215. Inv of High-Frequency Undamped Oscillations of High-Speed Airplanes. (C) (Subcomm. on Stab. and Cont.). 1945-1948.
R.A. A217 7 x 10 W.T. Inv. of Rep. XP-91 Airplane to Compare Conventional and Vee-Tail Arrangements. (C). 1947-1950.
R.A. A218.- Wing Tunnel Invest. on XS-3 Research Airplane. (C) 16 (AAF) (MX656). 1947-1955
R.A. 219 Surface Temp. and Heat Transfer to Bodies at Supersonic Speeds. 1947-1948.
R.A. 218. (Drawings). 1956
RA 218 - Wind Tunnel Tests of Project MX656. 1948-1950
R.A. A-220 Fundamental Inv of Boundary - Layer Phenomena in Compressible Flow, Effs. Heat Trans. 1947-1950.
R.A. A-221. Inv of Boundary Layer Control to Obtain Reductions in Drag at Sub and Super Speeds. 1947-1948.
R.A. A-222 Inv of Downwash and Wake of Wings at Supersonic Speeds. 1948.
R.A. A-223. High-Speed Wind-Tunnel Tests of Fairchild Model XSAM-2 (Lark) Pilotless Aircraft. 1947-1952.
R.A. A-224. Invest of Effects of Sweep, Low Aspect Ratio, and Thin Wing Sec on Stalling char. of Airplanes. 1947-1951.
R.A. A-220. Fundamental Inv of Boundary - Layer Phenomena in Compressible Flow. Effs. Heat Trans. 1947-1950.
R.A. A-221. Inv of Boundary Layer Control to Obtain Reductions in Drag at Sub and Super Speeds. 1947-1948.
R.A. A-222. Inv of Downwash and Wake of Wings at Supersonic Speeds. 1948.
R.A. A-223. High-Speed Wind-Tunnel Tests of Fairchild Model XSAM-2 (Lark) Pilotless Aircraft. 1947-1952.
R.A. A-224. Invest of Effects of Sweep, Low Aspect Ratio, and Thin Wing Sec on Stalling har. of Airplanes. 1947-1951.
RA A-225 Investigation of Aerodynamic Maneuvering Brakes for High Speed Aircraft. 1947.
R.A. A-226 Supersonic Wind - Tunnel Inv. of Lockheed Ram-Jet Test Vehicle. 1947-1954
R.A. A-227 Invest of Effects of Wing Inter. and Closeness of Resonce upon First-order Vibration Stresses of Prop. Blades. 1948-1950
R.A. A-228 High Speed Studies of Prop. Spinner - Cooling Configuration. (S.C Propellers for Aircraft). 1948-1949.
R.A. A-230 Theoretical Research on Stability Derivatives for Transonic and Supersonic Flight. 1948.
R.A. A-231. Invest. of Mutual Interf. Between Intersecting Airfoils and Between Arifoils and Bodies. 1948.
R.A. A-232. Aerodynamic Effects of Jets and Jet Exits. 1947-1949.
R.A. A-233. Invest of High Speed Aerody. Characteristics of Martin XB-51 Bomber. 1947-1948.
R.A. A-235 W/T Invest. of Horizontal-Vertical Tail Surface Interaction on McDonnell XF2H-1 Airplane. 1948-1949.
R.A. A-236 Exper. Invest. of Stability Derivatives of H/S Aircraft and Component Parts. Confidential. S/C Stability and Control.
R.A. A-236 March and April. 1950.
R.A. A-237 Invest. of Characteristics of Control Surfaces at Transonic and Supersonic Speeds. Confid. 1948-1950.
R.A. A-238 Invest. of Atability and Control Character of Grumman XSSM-6 Pilotless Aircraft. Confid. Buero. 1949-1951.
R.A. A-240 Invest, of Radio Cont. for Obt. Aero Data on Full-Scle in Flight at High Mach Number. 1947-1951.
R.A. A-241. Tests of a Cross-Wind Landing Gear. 1948.
R.A. A242. Drawings Only. 1946
R.A. A-242. Tests to Determine Loads on F-84 Wing Due to Tip Tanks and Aero-Elastic Effects. 1948-1950
R.A. A-244 Inv. Bon-Wave Detachment from Airfoil Sections at Low Supersonic Spds. Confed. 1950-1951.
R.A. A-246 "Study of Aeroelastic Effects on Aircraft Suitable for High Speed Flight." (C). 1947-1950.
R.A. A-247 "Inv. of Aero. Charact. of 1/16 - Scale Model of Bumblebee Prototype Test Vehicle. 16." (C). 1949.
R.A. A-250. "Wind Tunnel Invest. of Aeroelastic Eff. on Stab. of Northrop MX-775 Missile. AAF. C. 1950.
R.A. A-251. Supersonic Wind-Tunnel Invest. of Aerodynamic Characteristics of Douglas XF4D-1 Airplane. 1949-1951.
R.A. A-252 Supersonic Wind Tunnel Investigation of Boeing GAPA Model 601. (MX-606). 1945-1950
R.A. A-253 Inv. of Airplane Shaking at Stall and at Supercritical Mach Numbers. (c) FR-16 - 1x3½ - 40x80. S/C Hi - Sp. 1949-1950
493 - R.A. A254 Drawings 1950
R.A. A-254. "W/T Inv. of Aerodynamic Char. of x-3 Research Airplane At Supersonic Speeds." 1950.
1123 - R.A. A254. Wind Tunnel Tests of ProjectMX 656 1948-1950
R.A. A-255. Flt. Invest. of Control Motion and Manuevering Tail Loads on Large Air-Planes. Flt. Rea. S/C Aircraft Loads (R). R60-1 (Constituation). 1949-1952.
R.A. A-256. High Spd. WT Invest. of Aerodynamic Char of Boeing XB-52 (MX-839) Airplane (C) 16. AMC.
1130. R.A. A-256. (MX-839). XB-52. (1949)
S21-75. (R.A. A-256). XB-52. MX-839 Preliminary Correspondence. Boeing 1950
493. RA257. Drawings. 1949
R.A. A-257. Supersonic Wind-Tunnel Tests of the Sperry XAAM-N-2. (Sparrow) Pilotless Aircraft. (C). 1948-1951.
494. RA261 Drawings 1950
R.A. A-258. "High Speed Wind-Tunnel Investi of Horizontal Tail of Northrop F-89 Airplane. (C). 1950-1951
R.A. A-259. Wind-Tunnel Test of Air Sampling Devices. (C). (Chemical Corps. Dept. of Army). 1950.
R.A. A-260. Investigation of Wing-Tails Interference of MX-904 Guided Missile. (C). 1951
R.A. A-261. Supersonic Wind-Tunnel Investigation of MX-775A. (C). 1950-1951
R.A. A-262. "Inv. Effects Non Linearities on the Dynamic Response of Aircraft (Unclass) S/C Stab. and Con. 1950
Records of the Ames Unitary Plan Design Group, 1950-1953
Lewis. C-NAW-6002 to 6220. 1952-1954.
Lewis. NA3-1831 to 2449. 1952-1954.
L - and NA1 - Contracts. 1953-1956
Langley - Requisitions and Contracts.
Ames - Requisitions and Contracts. 1950-1954
Lewis Orders. C - Bids.
Lewis - Condition of Appropriation. 1953-1954.
Lewis - Cost Estimate, Fiscal Programming.
Langley - Condition of Appropriation, Monthly Fiscal Reports. 1951-1955.
Lewis - Requisitions and Contracts. 1952-1956.
Ames - Project and Modifications Approval. 1950-53.
Loose Papers. Fiscal Budget 1955-56.
Langley - Cost Estimate, Fiscal Programming. 1950-1954.
Supersonic Facility Unit. Organization and Personnel. 1948-1949.
Unitary Plan - Ames. 1953-54.
Lewis - Project and Modification Approvals. 1950-1956.
Langley - Project and Modification Approvals. 1950-1956.
Langley - Miscellaneous Correspondence. 1950-1955.
Unitary Plan Progress Reports - 1954. also 1955-56
Lewis - Miscellaneous Correspondence. 1950-1954.
Unitary Plan - Budget Submittals. 1950-1953.
Unitary Plan - Memos for Files - 1950.
Unitary Plan - Memos for Files - 1951 -1954
Unitary Plan - Progress Reports. 1950-1954.
As above. 1950-54
Ames - Miscellaneous Correspondence.
Loose Paper. Unitary Plan. 1950-1954.
Instrumentation Unitary Plan. 1949-1954.
Unitary. - Langley Drawings.
Specifications. #'s C-3418 to C-3485. Unitary Plan
Specifications. #'s C-3489 - C3975 Unitary Plan.
Specifications 1948-1955
Lewis. Specifications C-361 - C-3416. Lewis -
Specifications C-4048 - C-4495. Lewis -
Specifications. Lewis Standard General Building Specs. C-4093 - C-4940.
Specifications. C-4423 - C-4439.
Specifications. C-4444 - C-5019.
Specifications. C-5026 - C-5513.
Specifications. L-4556 - L-5978.
Specifications. L-6957 - L-7768
Specifications. L-5928 - L-7507
C D 109900. - C D 109970. Blueprints. Unitary Plan 1952.
C D 109970 - C D 110041. Blueprints. Unitary Plan 1952.
C D - 111 ---; C D S -: C E - 108 ---; Blueprints; Unitary Plan
CE - 111200; CES-: CR; Misc; Blueprints 1952.
Specifications. C-4433. Blueprint 1952 Unitary Plan
CAS - 100 --. Blueprint. 1952
C B - Blueprint. 1952
C D - 106 - Blueprint. 1952
C D - 107650 Blueprint. 1952
C D - 107700 Blueprint. 1952
C D - 107750 Blueprint. 1952
C D - 108 Blueprint. 1952
C D 108399 - C D 108462. Blueprint. 1952.
C D 110165 - Blueprints & Drawings. 54.
EE - 16890 - EE - 16896 Blueprints 52.
EE 17566 - EE - 17873 Blueprints
CE - 109462 - CE - 109424. 1952.
C D - 106911 - C D 110292. 1952.
CE - 109301 - CD109469. Blueprints. 52.
Loose. CE - 109317 - CE1093833 Blueprints. 52.
Loose. CE - 109384 - 109424 Blueprints. 52.
CL - 6020R - CD5 - 1413 Drawings. 1951.
Loose Blueprints. 1945-46. Axial Flow Compressor.
Loose Blueprints Axial Flow Compressor 1947.
Cleveland.
Loose Drawings and Blueprints Compressor. 48.
Loose Blueprints and Drawings. 1948-1950.
16 foot Wind. 1953.
EE - 17902 - EE - 17912. Blueprints. 1946-1947.
J2769. Drawings. Unitary Wind Tunnel.
CE - 111114 to CE 109383. Loose Drawings. 1952.
ED - 17570 - ED - 17850. Blueprints. 1946-47.
8 - Foot Transonic Wind Tunnel. Drawings. 1946.
J2769. Loose Drawings. 1947-1948.
Misc Langley Drawings - Props and Spinners; Survey Equip; Cowlings. Photostats of Turbine Specs. 1944-1947.
EEP12369-G LFPL 16" and 24" Explosion Relief Valves. Drawings. 1942-43.
CE81718 LFPL 8 Differential Manometer Board. Drawing 1950.
ERL Wind Tunnel. 1941. [work papers]
As above. 1941 [Workpapers]
As above. 1941-42. [Workpapers]
As above. 1942. [Workpapers]
As above. 1941-42. [Workpapers]
LE - 46850. Blueprints 1951. Unitary Plots.
ES - 5812. Blueprints 1951 Unitary Plan
LD - 42301 Blueprints 1951 Unitary Plan
LD - 46848 Blueprints 1951 Unitary Plan
LD - 46851. Blueprints. Unitary Plan. 1951.
LD - 46861. Blueprints. Unitary Plan. 1951.
LD - 46866. Blueprints. Unitary Plan. 1952.
LD - 46860. Blueprints. Unitary Plan. 1951.
LD - 46866. Blueprints. Unitary Plan. 1952
LD - 46870. Blueprints. Unitary Plan. 1952
LD - 46874 Blueprints. Unitary Plan. 1952
LD - 46875 Blueprints. Unitary Plan. 1952
LD - 46876 Blueprints. Unitary Plan. 1952
218870 - Blueprints. Unitary Plan. 1952.
L - 6564 Blueprints. Unitary Plan. 1953.
Spec. L - 6639. Strain Gage Indicators. Blueprints. Unitary Plan. 1953.
LD - 46877 Blueprints. 1953.
LD - 46877. Blueprints. 1952. Unitary Plan.
LD - 46878. Blueprints. 1952. Unitary Plan.
LD - 46878. Blueprints. 1952. Unitary Plan.
LD - 46879. Blueprints. 1952. Unitary Plan.
LX - 46890. Blueprints. 1952. Unitary.
LX - 46890. Blueprints. Unitary Plan. 1951-52.
LE - 46891. Blueprints. Unitary Plan. 1951-52.
LD - 46892. Blueprints. Unitary Plan. 1951-52.
LD - 46893. Blueprints. Unitary Plan. 1951.
LD - 46894. Blueprints. Unitary Plan. 1952.
LD - 46895. Blueprints. Unitary Plan. 1952.
LD - 72081. Blueprints. Unitary Plan. 1951.
LD - 72081. Blueprints. Unitary Plan. 1951.
LD - 76041. Blueprints. Unitary Plan. 1951-52.
LD - 76043. Blueprints. Unitary Plan. 1951.
21 - 9001E - 21 - 9072. Blueprints. Unitary Plan. 1951-52.
Unitary - General Corres. 1954.
U - 2. Unitary - Corres re Brochure. 1954.
U1 - 10. Authorization of Unitary Plan and Hearing Statements before the Comm on Armed Service (House of Rep. 1949).
U3 5. Classification (Unitary Plan). 1952.
U4 - 5. Unitary Design - General. 1948 - 1955.
[Loose Drawings] Unitary Plan Wind Tunnel 1946-1954.
As above.
As above.
As above.
Records of the Research Instrumentation Division, 1941-1956
Instrument Development - General. 1950-1954
Instrument - General. 1948-1954.
Inst. Dev. - Accelerometer Units. 1948-1956.
Inst. Dev. - Altimeters. 1947-1953.
Inst. Dev. - Cathetometers. 1949-1953.
Inst. Dev. - Dew Point Meters. 1945-1952.
Inst. Dev. - Diaphrams. 1949-1950.
Inst. Dev. - Film Drums. 1947-1951.
Inst. Dev. - Film Reader - (Telereader). 1946-1952.
Inst. Dev. - Galvanometers. 1949-1953.
Inst. Dev. - Gyroscopes. 1954.
Inst. Dev. - Indicator, Angle of Attack. 1949-1954.
Inst. Dev. - Indicator, Mixture. 1947-1952.
Inst. Dev. - Manometers (General). 1948-1955.
Inst. Dev. - Manometers (micromanometers). 1940-1954.
Inst. Dev. - Pressure Gages. 1949-1954
Inst. Dev. - Potentiometers. 1950-1953.
Inst. Dev. - Radar Beacons. 1950.
Inst. Dev. - Recorder. Rainbow (Cloud-Meter). 1950-1951.
Inst. Dev. - Recorders - VG. 1943-1955.
Inst. Dev. - Recorder - Stick Force. 1942.
Inst. Dev. - Recorder. Miniature Sequence. 1951.
Inst. Dev. - Recorders - Flight. 1947-1954.
Instrument Dev. - Recorder, Magnetic Tape Data. 1954-1955.
Instrument Dev. - Recorders - 1954-1955. Miniature Temperature.
Inst. Dev. Splined Couplings. 1941
Inst. Dev. Selector Switches 1942
Inst. Dev. - Thermometer. Electrical Resistance 1946-1948
Inst. Dev. - Thermometer, Calibration of 1946-1948
Inst. Dev. - Timers - Tuning Fork. 1949-1956.
Inst. Dev. - Turnometers. 1945-1946.
Inst. Dev. - Vibration Testing Table (Oscellating). 1949-1953.
Inst. Dev. - Wake Survey Machine. 1941.
Report Unit Files, 1947-1954
TN-1391 by William Lewis. 1947-1950
TN-1791 by Holdaway. 1948-1949.
RM A9C09. by Jones and Lewis. 1948-1949.
TN-1904 by Lew & Hoecker. 1949.
TN 1855 by Jones and Lewis. 1948-1950.
TN 2212 by Neel and Bright. 1950-1951.
"A Probability Analysis of the Meteorlogical Factors Conductive to Aircraft Icing" by W. Lewis. 1950-1951. No Number
RM A51H15. by White and Look. 1951
TN 2476 by Bergun. 1951
TN 2615 by Neel and Steinmetz. 1951-1952.
TN 2738 by Lewis and Bergrun. 1951-1953
Spreiter. AL-47. Theo Aero. RM A51L17. Original Text. Positives. 1951
MN Mead. AG-38. GRM A51K05. O.T.P. 1951
S. Sherman Edwards. AG-29. CRM A51J19 OTP etc.
Frank A. Pfyl. AG-36. CRM A51I18. OTP etc
John C Heitmeyer. AG-39. CRM A51H22. O.T.P. etc
John C Heitmeyer. AG-37. CRM A51H10. O.T.P. etc
John C Heitmeyer. AG-35. CRM A51H02. O.T.P. etc
AG-30. CRM A51F12. O.T.P. 1951
Hall and Heitmeyer. AG-32. CRM A51E01. O.T.P. etc
RM A51 H20 (A-3-1 A4) and CRM A51 B14. Selna
Ray Phelps and Frank Lazzeroni. RM A51E28. AG-31. OTPND
John C. Heitmeyer. CRM A51D30. AG-33. OTPN.D
John C. Heitmeyer. and Romald Hightower. AG-34. CRM A51F21. OTPND
John W. Boyd. AG-20. CRM A51C13. O.T.P.N.D.
Benton E. Wetzel and Frank AG_@@. CRM A51B20. O.T.P.N.D.
Wyss and Sorenson. AB-34. CRM A51J10. O.T.P.N.D.
J. F. Strond. AE-57. CRM A51K14. O.T.P.N.D.
RM A52F27. By John Selna, L.G. Bright. B.A. Schlaff.
Ben Johnson and Harry Shibarta, AF-24. CRM A51D27. O.T.P.N.D.
Elliot Katzen and Geo. Kaatari. AE-45. CRM A51C27. O.T.P.N.D.
Spahr and Robinson. RM A51C08. AE-37. O.T.P.N.D.
Scherrer and Dennis. AE-38. CRM A51A03. O.T.P.N.D.
John Stroud and Warren Anderson. AE-49. CRM A51A09. OTPND
Leonard M. Rose. AA-52. CRM A51D25. OTPND
Earl C. Watson. CRM A51F15. OTPND
Edward Hopkins and Hurbert C. Cerel. AA-51. CRM A51G24. O.T.P.N.D.
Matthews and McNeill. Flt. Res. AN-55. OTPND
Grahm and Koenig. AD-44. RM A51L013. OTPND
Cook and Kelly. AD-45. RM A51J24. OTPND
Howard Matthews and Edward Stuart. Flt. Res. AN-31. CRM A51F18. OTPND
Smith, Shibata, and Selon. AF-32. CRM A51K28. O.T.P.N.D.
Boddy, Lee. F. And Emerson, Horace. F. O.F.N.D. RM A9J20.
Smith and Reed. 12 foot. AF-29. CRM A51L21 O.T.P.N.D.
Robert H. Barnes. AB-41. RM A51I25. O.T.P.N.D.
Stephanson and Selon. 12-foot. AF-28. CRM A51Io7. O.T.P.N.D.
Reynolds and Sammonds. AF-19. RM A51E03. O.T.P.N.D.
Kolbe and Baudettine. AF-21. RM A51D02. OTPND
Kolbe and Baltz. 12 foot. AF-27. RM A51G31. O.T.P.N.D.
Burnett L. Gadeburg. Flt Res. AN-51. TN 2525. O.T.P.N.D.
Marvin Shinbrat. Flt Res. AH-26. TN 2341. O.T.P.N.D.
Harvey H. Brown. AA-37. TN 2490. O.T.P.N.D.
Liddell, Creer and Van Dyck. Flt Res. AH-39. RM A51E16. OTPND
Seth B. Anderson. Flt Res. AH-25. CRM A51E14. OTPND
Anderson, Ernst and Van Dyck. Flt Res. AH-38. CRM A51B28. O.T.P.N.D.
Neel and Sternmetz. Flt Engr. AK-22. TN 2615. OTPND
Stalder and Zurick. Flt Engr. AK-19. TN 2423. OTPND
Bergrun. TN 2416. Flt Eng. AK-15. OTPND
Triplett and Smith. Flt Res. AH-41. CRM A51G27. OTPND
White and Look. Flt Eng. AK-24. CRM A51H15. OTPND
Selna and Schlaff. Flt Eng. AK-26. RM A51H20. OTPND
Morris W. Rubesin. Flt Eng. AK-20. TN 2345. O.T.P.N.D.
Higgins and Pappas. Flt Eng. AK-18. TN 2351. O.T.P.N.D.
James Selna. Flt Eng. AK-17. CRM A51B14. O.T.P.N.D.
Muroc. Sadoff, Ankenbruck, and O'Hare. CRM A51H09. AM-2. O.T.P.N.D.
Grahm and Koenig. AD-46. RM A51H10A. O.T.P.N.D.
Grahm and Koenig. RM A51B21. AA-43. O.T.P.N.D.
James Drew. RM A51D18. OTPND
Paul Yaggy. AD-47. TN 2528. OTPND
Rogallo, Roberts & Oldaker. AD-37. TN 2308. OTPND
Ralph L. Maki. AD-42. RM A51E15 OTPND
Smaus, Gore, Waugh. Inst. Dev. AM-6. TN 2578. OTPND
Smaus and Stewart. Inst. Dev. AM-7. Tn 2373. OTPND
McDevitt. AB-45. RM A51L17b. OTPND
Robert A. Taylor. AB-42. RM A51L03a. OTPND
Cleary & Stevens. AB-43. CRM A51J11. OTPND
Frank and Taylor. AB-38. CRM A51H20a. OTPND
Stalder, Goodwin and Creager. Flt. Eng. AK-21. Proposed TN 2428. OTPND
Vernon J Rossow. SSFF. AO-4. Proposed TN 2399. OTPFND
Edwin C. Allen. 16. CRM A51F12a. AB-39. OTPFND
Sacks. AL-40. Theo. Aero. TN 2605. OTPND
Fuller and Briggs. Theo Aero. AL-37. Tn 2335. OTPFND
Lomax & Byrd. AL-33. TN 2554 OTPND
Lomax & Heaslet. Theo Aero. AL-36. TN 2497. OTPND
Sacks and Spreiter. Theo Aero. AL-26. TN 2323. OTPND
Altman and Hayter. AA-49. TN-2500 OTPFND
Mc Cullough and Gault. AA-50. TN 2502. OTPFND
Holzhauser. AA-54. CRM A51J19A. OTPFND
Kelly and Hayter. AA-53. CRM A51H23. OTPFND
Morris D. Friedman. Theo Aero AL-38. RM A51I20. OTPFND
Lomax, Neaslet, and Studer. Theo Aero. TN 2403. AL-34. OTPFND
Lomax, Neaslet, and Studer. Theo Aero. TN 2387. AL-22. OTPFND
Blackaby. AA-45. TN 2379. OTPND
Dannenberg. AA-41. RM A51E29 OTPFND
Holzhouser. AA-48. CRM A51E24. OTPND
Delany and Hayter. AA-39. RM A51A16. OTPND
Perkins, Gowen and Jergensen. AE-40. CRM 51G13. OTPFND
Vincenti and Waggoner. AE-51. TN 2588. OTPND
Chapman, Wimbrow and Kester. AE-59. TN 2611. OTPND
Spahr and Dickey. AE-46. Proposed TN 2360. OTPFND
Milton Van Dyke. TN 2670. AC 27. O.T.N.D.
As above
Laurence, Schmedt and Loaschen. AC-26. TN 2509. OTPND
Walker, Stivers and Beard. AC-25. CRM A51B16. OTPFND
High Speed Research. AG-59. TN 2919. OTPFND
Hamaker, Niece and Evans. TN 2443. AN-3. OTPFND
Hamaker and Wong. AN-4. TN 2631. OTPFND
Eggers and Smith. AN-6. TN 2579. OTPFND
Edward Hopkins. AA-46. CRM A51C14. OTPFND
TN 3347. AF-65.
TN 3348. AG-75.
TN 3224. AG-64.
TN 3386. AG-72.
TN 3130. AK 35. Flt Engr.
Edwards, Tinling and Ackerman. RM A52F18.
Bruce E. Tinling. RM A52119.
NACA RM A52K20. AF-40.
RM A52I19a. AF-38.
CRM A52D01a.
CRM A52G07.
CRM A52G02. AF-35.
RM SA52E06. AF-39.
RRM A52D22.
CRM A52D01.
CRM A52B20.
RM A52130.
RM A52D29.
A52H28.
RM A52D17.
AD-68. CRM A52C20.
CRM A52F17.
CRM A52B06. AE-66.
NACA RM A52E27. SSFR. AH-57
RM A52I23. AH-61.
RM A52J06. AH-60. Flt. Res.
RM A52A31. AH-47. Flt. Res.
Flt. Res. RM A52A14.
984. RM 52F16.
RM A52A04.
CRM SA52L31. AH-68. Flt. Res.
RM A52L16a.
RM A52J22. Flt Res.
AF-31. CRM A52B20. O.T. 1952
Accession 57A254 1952 AF-68. RM A52E06. O.T.P. 1952
AF-34. RM A52D01. O.T. 1952
AF-35. RM A52G02. O.T.P. 1952
AF-36. CRM A52F18. O.T.P. 1952
AF-42. CRM A52I19. O.T.P. 1952
AF-41. CRM A52G07. O.T.P. 1952
AF-30. RRM A52D22. O.T.P. 1952
AB-52. RM A52D11. O.T.P. 1952
SSFF. AO-1. Conf. RM A52A24. O.T.P. 1952
SSFF. AO-2. RRM A52A14B. O.T.P. 1952
SSFF. AO-5. RM A52C24. O.T.P. 1952
SSFF. AO-9. TN 2764. O.T. 1952
Theo Aero. AL-21. TN 2825, O.T.P. 1952
Theo. Aero. AL-46. TN 2744. O.T.P. 1952
Theo. Aero. AL-41. TN 2707. O.T.P. 1952
12 Foot. AF-40. RM A52K20. O.T. 1952
Flt Research. RM A52LI6a. O.T.P. 1952
AD-62. RM A52LI6. O.T.P. 1952
16. RM A52J17. O.T.P. 1952
16. AB-51. RM A52J21. O.T.P. 1952
Flt Res. AH-58. RMAA52I17. O.T.P. 1952
Flt Res. AH-42. TN 2820. O.T.P. 1952
Flt Res. AH-62. TN 2877 O.T.P. 1952
Flt Res. AH-56. CRM A52AO4. O.T.P. 1952
Flt. Res. AN-65. RM A52K12. O.T.P. 1952
Flt. Res. AN-35. TN 2622. O.T.P. 1952
AN-14. TN 2811. O.T.P. 1952
AN-14. TN 2646. O.T.P. 1952
AN-10. TN 2729. O.T.P. 1952
AN-18. TN 2922. O.T.P. 1952
AN-17. TN 2690. O.T.P. 1952
AE-62. TN 2664. O.T.P. 1952
AE-68. TN 2960. O.T.P. 1952
AE-67. RM A52F17. O.T.P. 1952
AM-4. TN 2845. O.T.P. 1952
AD-50. RM A52JO8. O.T.P. 1952
AD-49. RM A52BO5. O.T.P. 1952
AD-53. RM A52B19 O.T.P. 1952
AD-63. TN 2894. O.T.P.N.D.
I.D. AD-48. TN 3008 O.T.P.N.D.
AD-57. TN 2795. O.T.P.N.D.
AD-61. RM A52L15. O.T.P. 1952
AD-55. RM A52K13. O.T.P. 1952
AP-1. TN 2686. O.T.P.N.D.
7x10. AA-56. RM A52A17. O.T.P. 1952
7x10. AA-60. RM A52DO16. O.T.P. 1952
Flt Eng. AK-23. TN 2738. O.T.P. N.D.
7x10. AA-55. A52C14. O.T.P. 1952
Flt Eng. AK-28. RM A52F16. O.T.P. 1952
Flt. Eng. AK-29. RN 2852. O.T.P. N.D.
Flt. Res. AH-68. CRM SA52L31. O.T.P. 1952
AA-58. RM A52F13. O.T.P. 1952
AD-59. SA52HO4. O.T.P. 1952
LD and HT. AP-2. TN 2740. O.T.P.N.D.
AD-58. CRM SA52D25. O.T.P. 1952
AD-3. TN. HEAT TRANSFER O.T.P. 1952
AD-52. RM A52A14A. O.T.P. 1952
AG-57. RM A52LO4. O.T.P. 1952
AG-56. CRM A52K14. O.T.P. 1952
AG-55. RM A52LO2. O.T.P. 1952
AG-50. CRM A52L15a. O.T.P. 1952
Flt Res. AH-48. CRM A52A14. O.T.P. 1952
Flt Res. AH-57. CRM A52E27. O.T.P. 1952
Flt Res. AH-61. CRM A52I23. O.T.P. 1952
Flt Res. AH-60. CRM A52JO6. O.T.P. 1952
Flt Res. AH-59. CRM A52J22. O.T.P. 1952
AE-76. CRM A52I30. O.T.P. 1952
AA-57 TN 2847. O.T.P. 1952
AG-41. CRM A52DO1c. O.T.P. 1952
AG-44. CRM A52C04. O.T.P. 1952
AG-40. CRM A52B08. O.T.P. 1952
AG-46. CRM A52C10a. O.T.P. 1952
AG-45. CRM A52D23. O.T.P. 1952
AG-42. CRM A52E01. O.T.P. 1952
AG-51. CRM A52J 31. O.T.P. 1952
AG-48. CRM A52J30. O.T.P. 1952
AG-52. CRM A52 G29. O.T.P. 1952
AG-47. SA52E07. O.T.P. 1952
AN-13. CRM A52K07. O.T.P. 1952
AB-49. CRM A52D21. O.T.P. 1952
AB-44. CRM A52C07. O.T.P. 1952
TR1088 (formerly TN 2270.) O.T.P. N.D.
AG-54. CRM A52L04a. O.T.P. 1952
TECH. REPORT 1188. TOBAK. Original Figures Only. A-8.
RM A52G17 (Now TR1276). 1952.
RM A52A18. AM-5. O.T.P. 1952
TN 3223. AQ-1. Unitary
RM A52K 12. Flt Res.
TN ____. AH-62. Flt Res.
TN 2845. AM-4. 10x14 and Inst. Dev.
A-2-2 A28-3. TN. 1952
CRM A52G17. AD-56.
RM SA52J15. 40x80 and Inst Dev. J.O. 2949.
RM SA52H04. Hunlon, Griffin and James.
Restricted RM A52B19.
RM SA52D25.
David G. Koenig. RM A52L15.
RRM A52B05. Maki. AD-49
NACA RM A52K13.
NACA RM 52A14a.
RM A52A10. AD-48.
Franks. RM A52L16.
Nelson and Krunm. AB-52. A52D11.
Martin and Reed. RM A52E05.
RM A52J21. AB-51.
RM A52J17. Martin and Reed.
Emerson and Gale. NACA Conf. RM A52C07.
RM A52D21. AB-49.
John C Hertmeyer. RM A52L15a.
Willard G. Smith. AG-48.
RM A52L04a. AG-54.
RM A52629. AG-52
RM A52E23.
RM A52E07.
NACA RM A52D23.
RM A52D01c. AC-41.
RM A52C10a.
RM A52C04.
NACA RM A52B08. SSWT.
RM A52L04. AG-57.
AG-55. RM A52L02.
NACA RM A52K14.
RM A52F27. AK-30
NACA RM A52F16. A9-5.
A52C24. SSFF. AD-5.
RM A52B13. SSFF.
RM A52A14B. SSFF.
CRM SA52C10. SSFF.
SSFF. RRM A52A24.
RM A52A24. AN-11.
RM A5E20.
RM A52E22.
RM A52K07. AN-13.
CRM A52F13.
A52A17. AA-56.
RM A52D01B.
RM A52A18. AM-5. Instrument Development.
AH-64. CRM A53G10. Flt Res.
RM A53H12. Flt Res.
CRM A53H10. AH-74. Flight Res.
CRM A53G22. AH-73. Flt Res.
TN 3285. AA-67.
TN 3220. AA-68.
3170. AA-66.
RM 53A514.
TN 3007. AA-63.
TN 3138.
TN 3093. AA-64.
Unclass TN. J02479-R-1.
AA-65. TN 3094.
TN 2847. J.0. 2649R.
TN 3226. AE-103.
TN. 1486R1.
TN 2832. AE-73.
J.0. 1892R2. Unclassified TN.
AE-91. TN 3097.
AE-69. RM A53E01.
TN 3225. AE-92.
TN 3499. AE-107.
J.0. 2823.R. TN ____. SSFF
TN 3391. AO-17. SSFF
TN 3284. AO-15. SSFF
TN 3125. AO-14. SSFF
TN 3095. AD-22.
A.J. Eggers Jr. AN-14. TN 2811.
TN 2694. AN-15.
TN 2927. Syvertson and Savin.
John A. Axelson. CRM A53123.
CRM A53129.
TN 3036.
TN 3129. AB-54.
AC-35. TN 3127.
AC-30. TN 2998.
AC-31. TN 3162
A-7-1 A47-1. AC-33.
TN 3087. AC-34
RM A53E29. AC-28.
AP-4. TN 3222. LDHT.
AP-2. 2740. J02583-R.
TN, Unclass. J0 2700R. Heat Transfer.
Rogallo and McCloud. AD-65.
Lynn W. Hunton and Harry A. Jones. AD-67. TN 3840.
TN by Vernon L Rogallo. AD-57.
TN 2894. Vernon L. Rogallo and John L. McCloud. AD-63.
Lynn W. Hunton. AD-48. TN 3008.
Wick, Bradford H. TN 3221. AD-74 CRM A53I01. Hi-Speed-Unitary.
CRM A53F23. Flt Res.
RM A53E21. Flt Res.
RM A53A15. Flt. Res.
AH-67. Flt Res. CRM A53B11.
RM A53A06. Flt Res.
AK -33. RM A53H17. Flt Eng.
Conf. RM 53816 - Flt Eng.
TN 2852. Flt Eng. 1918 -R.
TN 3025. Flt Eng.
TN 2985. AK-31. Flt. Engr.
CRM A53E06. AD-64.
AD-66. A53D21.
RM A53D14.
AD-69. CRM A53J26.
AA-59. RM A53H03.
CRM A53G31.
CRM A53C19.
CRM A53L17. AB-65.
CRM A53L03. AB-63.
RM A53K24. AB-59.
CRM A53121.
CRM A53J14.
AG-62. RM A53J14a.
AG-66. CRM A53K20.
RM A53A30.
AG-67. CRM A53L22.
CRM A53L21. AG-69.
CRM A53D27.
CRM A53H18.
RM A53D10.
RM A53A13.
RM A53A09.
AE-81. A53D29.
AE-83. RM A53G08.
RM A53F12. AE-80.
CRM A53E28.
RM A5317.
A53F22.
Seth B. Anderson. Flt. Research. AH-73. CRM A53G22. Original Text [hereafter refered to as O.T.]
Carlton S. James and Robert J. Carros. A0-7. SSFF. CRM A53D02. O.T.
Loris H. Ball. AG-66. CRM A53K20. O.T.
Sherman Edwards and Katsumi Hideko. AG-58. CRM A53H18 O.T.
Carl D. Kolbe and Frederick W. Boltz. AF-52. CRM A53L29. O.T.
Frank A. Lazzeroni. AG-69. CRM A53L21. O.T.
Carl D. Kolbe and Frederick W. Boltz. AF-52. CRM A53L29 O.T.
Walter E. McNeill, Fred J. Drinkwater III and Rudolph D. Van Dyck, Jr. Flt. Res. AH-74. RM A53H10. O.T.
Earl C. Watson. AA-59. RM A53H03. O.T.
George Holdaway. Flt Eng. AK-25. CRM A53B16. O.T.
David E. Reese, Jr. AG-60. CRM A53D27. O.T.
Bandettine and Selan. RM A53J07. AF-49. O.T.
Fred A Demele. and William R. Otey. AF-43. RM A53F16. O.T.
William C. Drake. AE-79. RM A53F22. O.T.
Leland Jorgensen. AE-80. CRM A53F12. O.T.
Matthews and Schmidt. AH-67. CRM A53B11. O.T.
A.J. Molk and R. M. Reunolds. AF-54. 12-foot CRM A53L29a. O.T.
Rathert, Gadeberg and Fiff. AH-70. Flt Res. RM A53H12. O.T.
Robert M. Reynolds. AF-56. RM A53J02. O.T.
Ralph Selan and Angelo. Bondettini. AF-48. CRM A53 E12. O.T.
Scherrer, Stroud and Swift. CRM A53A13. AE-78. O.T.
Ralph Selon and Angelo Bondettini. AF-48. CRM A53E12. O.T.
Donald W. Smith and Verlin D. Reed. CRM A53C20. 12-foot. AF-45. O.T.
J. Richard Spahr and Robert R. Dickey. AE-64. CRM A53D10. O.T.
Edwin C. Allen. 16-foot. CRM A53C19. AB-55. O.T.
M. Abromovitz, S.Schmidt, R. Van Dyck, Jr. AH-69. RM A53E21. O.T.
John A. Axelson. AB-60. 16 Wind Tunnel. CRM A53I23. O.T.
Richard S. Bray. Flt Res. AH-71. RM A53F23. O.T.
Joseph W. Cleary and Lee E. Boddy. AB-56. CRM AF3I21.
Charles F. Coe and Jack A. Mellenthin. AB-59. RM A53K24. O.T.
Horace F. Emerson. AB-63. RM A53L03. O.T.
McFadden, McCloud and James. Flt Res. AH-66. CRM A53A15. O.T.
Jack A. Mellenthin. AB-40. TN 3036. O.T.
Warren H. Nelson. AB-65. RM A5317. O.T.
Verlin Reed and Donald W. Smith. AF-46.
L. Stewart Rolls. Flt. Res. AH-54. CRM A53A06. O.T.
Melvin Sadoff. Flt. Res. I.D. AH-64. RM A53G10. O.T.
Bruce E. Tinling and Armando Lopez. AF-47.
N.K. Delany and N.E. Sorensen. AA62. TN 3038. O.T.
David Graham. AD-54. CRM A53D14. O.T.
Albert D. Hemenhover. RM A53G09. O.T.
Albert D. Hemenhover. I.D. No AC 30. TN 2998. O.T.
Hopkins and Carel. AA61. O.T.
Lynn W. Hunton and Harry A. James. AD-67. TN 3040. O.T.
Earl D. Knechtel. AC-34. TN 3087. O.T.
David G. Koenig. Ad-66. RM A53D21. O.T.
Robert B. Petersen. AG-65. CRM A53J14. O.T.
Vernon L. Rogallo and John L. McCloud III. AD-65. TN 2957. O.T.
Rough Draft. RM SA53C17. AG-61. Willard G. Smith O.T.
Stivers, Louis Jr. RM A53K06. AC-31. O.T.
Benton E. Wetzel and Frank A. Pfyl. AG-62. RM A53J14a.
Norman R. Bergrun and Paul A. Nickel. Flt Engr. AK-31. TN 2985.
G.B. Brajnikoff and J.F. Stroud. AE-87. CRM A53E28. O.T.
Benjamin R. Briggs and Arthur L. Jones. AL-53. Theo Aero. TN 2977. O.T.
Doris Cohen and Morris D. Friedman. Theo Aero. AL-52. TN 2959. O.T.
R.E. Dannenberg and J.A. Weiberg. AA-64. TN 3093. O.T.
Alson C. Frazer and Warren E. Anderson. AE-81. RM A53D29. O.T.
Forrest E. Gowen. AE-74. Conf RM A53A09. O.T.
Forrest E. Gowen. AE-84. RM A53117. O.T.
George Holdaway. AK-33. Flt Engr. RM A53H17. O.T.
John A. Kelly and Nora Lee F. Hayter. AA-63 TN 3007. O.T.
Harvard Lomax. Theo. Aero. AL-50. TN 2925. O.T.
Carr B. Neel, Jr. AK-32. Flt Engr. TN 3025. O.T.
Stanford E. Neice. AN-15. TN 2694. O.T.
Spiegel, Hoffstetter and Kuehn. High Speed Res. and Unitary. AE-89. RM A53I01. O.T.
Syvertson and Gloria. AN-16. A53B02. O.T.
TN 2982. Milton D. Van Dyck. Theo. Aero. AL-54. O.T.
CRM A54J07. AL-55. Theo Aero. 1954
TN 3390. AL-60. Theo. Aero. 1954
AL-60. TN 3283. Theo. Aero. 1954
TN 3286. AL-58. Theo Aero. 1954
TN 3343. AL-63. Theo Aero. 1954
TN 3345. AL-64. Theo Aero. 1954
TN 3389. AL-67. Theo Aero. 1954
* RM A54J19. AC-36. 1954
* RM A54H23. AE-99. 1954
TN 3227. AE-82. 1954
AE-90. TN 3128. 1954
TN 3344. AE-98. 1954
AO-12. SSFF. RM A53L18 1954
TN 2900. Theo. Aero. AL-48. 1953
Theo Aero. TN 2727. 1953
TN 2925. Theo Aero. AL-50 1953
TN 2744. Theo Aero. 1953
Theo Aero. TN 2982. AL-54. 1953
TN 3173. AL-49. Theo Aero. 1953
TN 2977. AL-53. 1953
RM A53D02. SSFF. 1953
TN2919. H. Julien Allarn 1953
RM A53802. AN-16. 1953
RM A53D28. 1953
AF-49. CRM A53J07.1953
RM A53J02. 1953
CRM A53L29a. 1953
CRM A53I28. 1953
AF-47. CRM A53D06. 1953
CRM A53F16. 12-Fppt. 1953
CRM A53A30a. AF-44. 1953
AF-55. RM A53L15. 1953
AF-51. CRM A53J23. 1953
RM A53L29. AF-52. 1953
CRM A53C20 and RM A53H17 1953
CRM A53C20. AF-45. 12. 1953
CRM A53F03. 12. 1953
RM A53E12. 1953
NACA RM A53B06. 1953
Alfred G. Boissevain. SSFF. AO-11. RM A54B15a. O.T.
Thomas B. Carniny. AO-10. RM A54H23a. SSFF. O.T.
John C. Heitmeyer. RM A54B16. AG-71. O.T.
Willard G. Smith. CRM A54D05. AG-70. O.T.
Benton E. Wetzel. Ag 73. RM A54H26b. O.T.
Stanford E. Neice. AN 25. CRM A54C04. O.T.
David H Dennis and Bernard E. Cunningham. CRM A54E03. AN_24. O.T.
A.J. Eggers, Jr., and Clarence A. Syvertson. AN-26. RM A54J13. O.T.
A.J. Eggers, Jr., and C.A. Hermach. RM A54L13. AN-28. O.T.
Herrera and Barnes. AB-62. CRM A54A29. O.T.
John A. Wyss and James C. Monfort. AB.57. O.T.
Mossman and Anderson. RM A54B08. AE-93. Test.
George E. Kaaltari. RM A54D19. AE-101. O.T.
Spahr, L. Richard. AE-52. RM 54H27. O.T.
Kaaltari, George E. AE-105. CRM A54J12. O.T.
Gadeberg and Rathbert. Flight Research. AH-85. RM A54K16. O.T.
Abromovitz, Marivn; Van Dyke, Jr., Rudolph D. AH-86. CRM A54128. Flt Res. O.T.
Howard L. Turner, William C. Triplett, John S. White. Flt Res. AH-83 RM A54J14. O.T.
AH-79. Flt Res. RM A54A05. O.T. L.Stewart Rolls and C. Dewey Havill.
Graham, David. AD-82. RM SA54I29.
Canning and Denardo. RM SA54C10. A0-8. SSFF.
Ralph W. Franks. RM A54H26. AD-76. O.T.
Ralph W. Franks. RM A54H26a. AD-77. O.T.
Ralph L. Maki and Ursel R. Embry. CRM A54E10. AD-68. O.T.
David G. Koenig. AD-70. CRM A54B09. O.T.
Mark W. Kelly and William H Tolhurst, Jr. AD-71. CRM A54A25. O.T.
AA-65. TN 3094. O.T. Dannenberg. Weiberg and Gambucci.
James R. Blackaby and Earl C. Watson. AA-66. TN3170. Test
John A. Kelly and George B. Mc Cullough. AA-68. TN3220. Positive
Weiberg, James A. and Robert E. Dannenberg. AA-67. TN 3285. O.T.
Robert E. Dannenber, James A. Weiberg and Bruno J. Gambucci. AA-73. TN 3388. O.T.
Fred A. Demele and William R. Otey. AF-61.
Jack D. Stephenson, Angelo Bandettini, and Ralph Selan. AF-62. RM A54K09. O.T.
Sutton and Dickson. AF-63. CRM A54F18. O.T.
Sammonds, Robert I and Reynolds, Robert H. AF-60. RM A54G14. O.T.
George C. Kenyon and Robert M. Reynolds. AF-57. 12 CRM A54B18a. O.T.
Norman M. Mc Fadden and Donovan R. Heink. AH-82. ANCA RM A54F21. O.T.
Melvin Sadoff, Frederick H. Mattheson and Rudolph D. Van Dyke, Jr. AH-80. CRM A54C31. Flt Res. O.T.
Matheson and Van Dyke Jr.,. AH-77. NACA RM A54B26. Flt Res. O.T.
AB-54. TN 3129. O.T.
Joseph W. Cleary. RM A54B18. AB-64. O.T.
Jack A. Mellenthin. AB-67. RM A54L22. O.T.
Wyss, John A. and Herrera, Raymond. AB-68. RM A54H12 O.T.
Nelson, Warren H. and Frank, Joseph L. AB-66. RM A54H12a. O.T.
Monfort, James C. and Wyss, John A. AB-69. RM A54122. O.T.
Marvin Shinbrot. TN 3288. AH-76. Flt Res. O.T.
Stanley F. Schmidt and William Triplett. Flt. Res. AH-78. TN 3387. O.T.
Bradford H. Wick. AD-74. TN 3221. O.T.
John DeYoung and W.H. Barbing. AD-51. TN 3346. O.T.
Rogallo, McCloud III, and Yaggy. AD-79. CRM A54C30. O.T.
Cook, Woodrow L., Griffen, Roy N, Jr. and Hickey David H. AD-72. RM A54I21. O.T.
Constantine C. Pappas. AP-4. LDHT. TN 3222. O.T.
Stalder and Nielsen. AP-6. TN 3287. Heat Transfer. O.T.
Morris W. Rubesin. AP-5. TN 3341. HT. O.T.
Lessing, Fryer and Mead. AG-75. TN 3348. O.T.
Eugene Migotsky. AG-72. TN 3386. O.T.
Duane W. Dugan and Katsumi Hikido. AG-64. TN 3224. O.T.
Wetzel, Benton E. AG-76. CRM A54J20. O.T.
John C Heitmeyer. AG-68. O.T.
Louis S. Stivers, Jr. AC-35. TN 3127. Positives. Text.
Robert E. Berggren and Donald J. Graham. AC-15. TN 3172. (formerly RM A50D04). O.T.
Barrett S. Baldwin. Jr., John B. Turner and Earl D. Knechtel. AC-28. O.T.
Hemenover & Graham. AC-23. TN 3174. O.T.
Summers, James L., Treon, Stuart L., and Grahm, Lawrence A. AC-37. RM A54L20. O.T.
Barrett S. Baldwin and Robert R. Dickey. AC-36. RM A54J19. O.T.
Milton D. Van Dyke. TN 3173. Theo Aero. AL-49. O.T.
Alvin H. Sacks. TN 3283. AL 60. Theo Aero. O. Figures
J.M. Spiegel and Philips J. Tunnel. AW-1. Unitary. TN 3223. O.T.
Philips J. Tunnel. AW-2. RM A54K16a. Unitary. O.T.
Simon C. Sommer and Barbara J. Short. SSFF. AO-17. TN 3391. O.T.
A.C. Charters. SSFF. AO-16. TN 3350. O.T.
James R. Jedlicka, Max E. Wilkins, and Alvin Seiff. SSFF. TN 3342. AO-12. O.T.
Seiff, Alvin. SSFF. AO-13. TN 3284. O.T.
Robert J. Carros and Carlton S. James. AO-13. SSFF. Tn 3171. O.T.N.D.
Thomas N. Canning. AO-14. SSFF. TN 3125. O.T.N.D.
Carr B Carr BltNeel. Flt Eng. AK-36. RM A54I23. O.T.N.D.
Carr B. Neel. Flt Eng. AK-35. TN 3130. O.T.N.D.
George H. Holdaway. RM A54I17. AK-38. Flt Eng. O.T.N.D.
George H. Holdaway. Flt Eng. RM A54F22. R-9-T. O.T.N.D.
Bright, Loren G. Flt. Eng. AK-39. RM A54L27. O.T.N.D.
Maurice D. White. Flt Eng. AK-34. RM A54E12. O.T.N.D.
H.G. Stine and Kent Wanlass. AE-98. TN 3344. O.T.N.D.
William R. Wimbrow. RM A54A07. AE-96. O.T.N.D.
Arthur Wm Rogers. AE-82. TN 3227. O.T.N.D.
Vincenti, Dugan and Phelps. TN 3225. AE-92. O.T.N.D.
D. Chapman and R. Kester. AE-91. TN 3097. O.T.N.D.
Warren E. Anderson and Richard Scheerer. AE-102. RM A54E06. O.T.N.D.
Meyer M. Resnikoff. RM A54B15. AN-23. O.T.N.D.
Eggers and Nothwang. AN-22. TN 3095. O.T.N.D.
CRM A54E06; CRM A54B15a.
RM A54F21. AH-82. Flt Res. 1954
CRM A54B26. Flt Res. AH-77. 1954
CRM A54C31. AH-80. Flt Res. 1954
CRM A54H09. AH-84. Flt Res. 1954
RM A54J14. AH-83. Flt Res. 1954
RM A54K16. AH-85. Flt Res. 1954
CRM A54I28. AH-86. Flt Res. 1954
CRM A54E12. AK-34. Flt Res. 1954
RM A54F22. AK-37. Flt Eng. 1954
RM A54L27. AK-39. Flt Eng. 1954
RM A54I23. AK-36. Flt Eng. 1954
RM A54I17. AK-38. Flt Eng. 1954
RM A54B18. AB-64. Flt Eng. 1954
CRM A54A22. AB-50. 16-Foot. 1954
AB-62. CRM A54A29. 1953
CRM A54C24. AB-57. 1953
CRM A54H12. AB-68. 1953
RM A54H12a. AB-66. 16-Foot. 1953
RM A54L22. AB-67. 16-Foot. 1953
RM A54I22. AB-69. 16-Foot. 1953
AO-10. RM A54H23a. SSFF. 1953
CRM A54E03. AN-24. 1953
AN-23. RM A54B15. 1953
CRM A54C04. AN-25. 1953
RM A54J13. AN-26. 1953
CRM A54L10. AN-27. 1953
RM A54L13. AN-28. 1953
CRM A54K16a. AQ-2. Unitary 1953
RM A54L20. AC-37. 1953
CRM A54D19. AE-101 1953
CRM A54B08. AE-93.
CRM A54B08a. AE-94.
RM A54A07. AE-96.
RM A54H27. AE-52.
CRM A54J12. AE-101.
CRM A54C30. AD-79.
RM A54E10. AD-68.
CRM A54A25. AD-71.
RM A54B09. AD-70
RM SA54109. AK-38.
RM 54N26. AD-76.
RM A54N26a. AD-77.
RM A54I21. AD-72.
RM A54I29. AD-82.
RM SA54B16. AG-71.
RM A54D05. AG-70.
CRM A54A04. AG-68.
CRM A54J20. AG-76.
RM SA54H26b. AG-73.
CRM A54D22. AF-61.
CRM A54F14. AF-50.
CRM A54B18a. AF-57. 12.
RM A54F18. AF-63. 12.
AF-58. RM A54G13. 12.
RM A54G14. AF-60.
RM A54J22. AF-59. 12.
RM A54K09. AF-62.
RM A54L07. AF-71.
RM A54L08. AF-64.
RM A54F28. Theo Aero.
TN 3171. AO-13. SSFF.
TN 3388. AA-73.
RM A54A05. AH-79. Flt Res.
TN 3387. AH-78. Flt Res.
TN 3288. AH-76. Flt. Res.
TN 3346. AD-51.
TN 3287. AP-6. Heat Transfer.
RM A54L27 by Bright.
RM A54F22. by Holsaway. 1954.
TN 3130. "The Design of Air-Heated Ice Prevention Systems" by Carr B. Neel. 1953-1954.
RM A54I17. by Holdaway. 1954.
RM A54I23. By Carr Neel.
RM A54E12. By Maurice D. White.
CRM A55F21. By Maurice D White. 1955.
CRM A55F06. By George H. Holiday. 1955.
CRM A55D18. By Maurice D. White. 1955.
TN 3670. AL-74. Theo. Aero. Alberta Y. Alksne.
RM A56F15. AN-48. HSR. H. Julian Allen. N.D.
RM A56G30. AH-109. Flt Res. Seth B. Anderson, Hervey C. Quigley and Robert C. Innis. N.D.
RM A56110. AH-113. Flt. Res. Robert M. Barnett, William M. Kaufman and Elmer C. Fulcher. N.D.
RM A56G17. AF-87. Frederick W. Boltz, George C. Kenyon, Clyde Q. Allen. N.D.
TN 3874. AH-112. Flt Res. Brown, Stuart C., and Holleman, Euclid C. N.D.
RM A56104. AF-77. Donald A. Buell, Verlin D. Reed, and Armando E. Lopez N.D.
RM A56H06. AF-85. Donald A. Buell, and Bruce R. Tinling. N.D.
TN 3718. AL-72. Theo. Aero. Paul F. Byrd. N.D.
RM A56B15. AO-21. SSFF. By Robert J. Carros. N.D.
TN 3792. AE-127. Dean R. Chapman. N.D.
RM A56H30. AH-111. Flt. Res. Creer, Brent Y. N.D.
TN 3669. AA-82. Dannenberg, Gambucci, and Weinberg. N.D.
RM A56C06. AE-116. Wallace F. Davis and Forrest E. Gowen. N.D.
RM A56E23. AC-46. Robert E. Dickey N.D.
RM A56C01. AA-81. Jules B. Dods, Jr., and Earl C. Watson. N.D.
RM A56D06. AF-80. George G. Edwards and Howard F. Savage. N.D.
TN 3789. AF-82. Feorge G. Edwards, Jerald K. Dickson, Fred B. Sutton and Fred A. Demele. 1954.
TN 3790. AF-83. Feorge G. Edwards, Donald A. Buell, Fred A. Demele, and Fred B. Sutton. (Supercedes RMs A53J23 and A 54F14). 1954.
RM A56B17. AD-89. William T. Evans N.D.
CRM A56G24. AH-106. Flt Res. Jos. G. Dowillier, Jr. J.V. Foster, and F.J. Drinkwater III. N.D.
TN 3797. AA-87. Bruno J. Gambucci. N.D.
TN 3964. AB-83. McDevitt, John B.
TN 4231. AF-90. Donald E. Gault
TN 3963. AF-88. Smith Donald W, and Walker, John H.
NACA TN 144. AO-27. SSFF. Steve P. Heins.
TN 4230. AO-29. SSFF. Steve P. Heins.
TN 3962. AN 47. C. Frederick Hansen.
TR 1328. (Supercedes NACA TN 3527). AN-56. Clarence A. Syvertson and David H. Dennis.
TN 4229. AN-62. Eggers, A.J., Jr., Hansen, C. Frederick, and Cunningham, Bernard E.
TN 4046. AN-29. Alfred J. Eggers, Jr., H. Julian Allen, Stanford E. Neice.
TN 3290. AG-103. Murray Tobak.
TN 3290. AE-120. Darren Winovich and Howard A. Stine.
TN 4146. AE-133. Spahr, J. Richard.
TN 3869. AE-119. Dean R. Chapman, Donald M. Kuehn, and Howard K. Larson.
RM A56H27. AN-49. Hermilo R. Gloria. N.D.
RM A56B27. AD-81. Griffen and Hickey N.D.
TN 3714. AH 108. Flt Res. C. Dewey Havill and L. Stewart Rolls. N.D.
TN 3868. AL-78. Theo Areo. Max. A. Heaslet and Franklin B. Fuller. N.D.
Max. A. Heaslet and John R. Spreiter. TN 3717. AL 73. Theo Aero N.D.
RM A56L05. AN-52. C.A. Hermach, Samual Kraus, and John O. Reller, Jr. N.D.
RM A56118. AE-128. Daniel P. Hickey. N.D.
RM A56C12. AE-118. William A. Hill, Jr., and George E. Kaatari. N.D.
RM A56K26. AB-82. 14. Holdaway, George H., and Hatfield, Elaine W. N.D.
RM A56F01. AD-88. Curt A. Holzhauser, Robert K. Martin, and V. Robert Page. N.D.
TN 3793. AD-98. Holtzhauser, Curt A., and Hall, Leo. P. N.D.
TN 1270. AD-90. By Curt A. Holzhauser and Richard S. Bray. (Supercedes RM's A52G17 and A55C07). N.D.
RM A56G16. AE-126. Leland H Jorgensen and Elliot D. Katzen. N.D.
RM A56712. AD-91. Kelley, Mark W.
RM A56G19. AD-96. Mark W. Kelly and Jeffry H. Tucker.
RM A56H31. AC-45. Earl D. Kuechtel and Arvid N. Andrea.
RM A56D23. AD-93. David M. Koeing.
RM A56H08. AD-94. Koenig, David G., and Aoyagi, Kiyoshi.
Technical Report (Supercedes RM A55B16). AL-80. Theo. Aero. Howard Lomax and Max. A. Heaslet.
TN 3871. AD-84. Maki, Ralph L, and Hunton, Lynn W.
RM A56F07. AH-107. Flt. Res. Howard F. Matthews and Robert B. Merrick.
TR 1295. AD-97. Vernon L. Rogallo, Paul F. Yaggy, and John L. McCloud III.
RM A56C08. AH-103. Flt. Res. McNeill, Walter E., and Creer, Brent Y.
RM A56G06. AG-99. Emmet A. Mossman and Frank A. Pfyl.
TN 3722. AE-106. Jack N. Nielsen and William C. Pitts. (Formerly RM A55B07).
TN 3873. AE-130. Jack N. Nielson.
TN 3721. AN-46. George J. Nothwag.
TN 3872. AC-48. William A. Page
RM A56107. AG-94. Robert B. Peterson.
RM A56L18. AG-102. Peterson, Victor L., and Boyd, John W.
RM G56AB03. AG-89. E. Ray Phelps.
TR 1307. AE-135. William C. Pitts, Jack N. Nielson, and George E. Kaatlari.
Alvin H. Sacks. TN 3725. AL-75. Theo Areo.
AL-83. Sacks. Theo Aero. TN 3796.
RM A56D02. AF075. Robert S. Sammond and Robert F. Reynolds.
TN 3668. AE-114. Scherrer, Richard and Anderson, Warren E.
RM A56K07. AH-110. Flt Res. Schmidt, Stanley F., Bergun, Norman F., Merrick, Robert B., and Matthews, Howard F.
RM A56I05. A0-24. SSFF. Alvin Seiff, Simon C. Sommer, and Thomas N. Canning.
TN 3791. AH-105. Flight Research. Marvin Shinbrot.
TN 3720. AA-74. Norman E. Sorensen and Edward J. Hopkins.
John R. Spreiter, and Alvin H. Sacks. TN 3528. AL-44. Theo. Aero.
RM A56B27a. AP-9. LDNT. Jackson R. Stalder and Mamoru Iouye.
RM A56B21. AE-112. Howard A. Stine and Warren Winovich.
RM A56E22. AC-42. Summers, Treon and Graham.
RM A56J08. AF-81. Fred B. Sutton and J. Walter Lautenberger.
RM A56111. AN-50. Clarence A. Syvertson. Thomas J. Wong, and Hermilo R. Gloria.
RM A56D05. AP-12. Heat Transfer. By Thorval Tendeland and Arthur F. Okuno.
TN 3788. AG-98. Murray Tobak and William R. Wekrend.
RM A56E24. AD-92. William H. Tolhurst, Jr., and Mark W. Kelly.
RM A56K19. AH-114. Flt Res. William C. Triplett, John D. McLean, John S. White.
TR 1274. AL-77. Theo. Aero. By Milton D. Van Dyke. (Supercedes TN's 3390 and 3343).
TN 3875. AL-79. Theo Aero. Milton D. Van Dyke.
TN 3723. AE-113. Walter G. Vinventi, Cleo B. Wagoner, and Norman H. Fisher, Jr.
RM A56A06. AN-44. By Thomas J. Wong and Hermilo R. Gloria.
NACA TN 4045. AE-141. Leland H. Jorgensen
TN 3967. ID.No. AE-134. Frank J. Centolanzi.
TN 4149. AP-18. LDHT. Morris W. Rubesin and Constantine C. Pappas.
TN 4142. AP-16. LDHT. Marcus O. Creager.
TN 3969. AP-13. LDHT. Morris W. Rubesin and Mamoru Inouye.
TN 4141. AP-15. LDHT. Jackson R. Stalder.
TR 1330. AN-134. Flt Res. (Supercedes NACA RM A54H09 and TN 3874) Henry A. Cole Jr., Stuart C. Brown, and Euclid C. Holleman.
RM A57G10. AHO120. Flt. Res. Seth B. Anderson, Alan E. Faye, Jr., and Robert C. Innis.
TN 4147. AH-128. Flt Res. Cole, Henty A., Jr., and Holleman, Euclid C.
TN 4145. AH-135. Flt Res. Shinbrot, Marvin and Carpenter, Grace C. N.D.
TN 3968. AH-123. Flt Res. Brian F. Doolin N.D.
TN 4148. AL-94. Theo. Aero. By John R. Spreiter, Alberta Y. Alksne, and B. Jeanne Hyett. N.D.
RM A57H21. AD-101. David G. Koenig and Kiyoshi Aoyagi. N.D.
RM A57K01. AD-106. Curt A. Holzhauser.
TN 4227. AL-95. Theo. Aero. Max A. Heaselet and Franklin B. Fuller.
TN 3289. AL-93. Theo Aero. Max A. Heaselet
TN 4232. AL-91. Theo Aero. Harvard Lomax and Loma Sluder.
TN 4038. AA-86. Robert E. Dannenberg, James A. Weiberg, and Bruno J. Gambucci.
RM A57J16. AB-877. By John A. Axelson.
RM 57N19a. AB-86. George H. Holdaway, Minor R. Wallace, Jr., and Elain W. Hatfield
RM A57G01. AB-84. By Joseph W. Cleary, Joseph L. Frank, and Forbes Dewey.
RM A57E23. AB-85. By George H. Holdaway and Minor R. Wallace Jr.
RM A57A02. AB-80. 14. McDevitt, John B., Taylor, Robert A.
RM A57F03. AD-104. David H. Hickey.
RM A57D11. AD-100. James, Harry A. and Maki, Ralph L.
RM A57B11. AD-99. William T. Evans.
RM A57A24. AD-95. Ralph L. Maki and Harry A. James.
RM A57F06a. AF-89. 12. Sutton, Fred B., and Lautenberger, J.Walter Jr.
RM A57E02. AF-84. Donald A. Buell and Carl D. Kolbe.
RM A57H19. AF-99. Demele, Fred A.
RM A57K05. AF-100. Bruce E. Tinling.
RM A57130. AN-59. David H. Dennis.
RM A57126. AN-55. By Neice, Carson, and Cunningham.
RM A57F03a. AN-54. John O. Reller, Jr.
RM A57K20. AT-9. A. Vernon Gros. and Richard L. Kurkowski.
RM SA57F06. AT-1. Hofstetter, William R.
RM A57126a. AT-2. Norman D. Wong.
RM A57C25. AO-26. SSFF. Thomas N. Canning. and Simon C. Sommers.
RM A57I09. AC-52. By George Leland James L. Summers.
RM A57F06b. AC-50. Earl D. Knechtel and George Lee.
RM A57I10. AC-43. Stivers, Louis S., Jr., and Lippman, Garth W.
RM A57A25. ID AC-51. Stuart L. Treon and Earl D. Knechtel.
RM A57L23. AE-146. Nielsen, Jack N.
RM A57I17. AE-131. By William A. Hill, Jr.
RM A57E21. AE-140. Spahr. J. Richard and Polhamus, Edward C.
RM A57K21. AP-17. LDHT. Neel, Carr B.
RM A57K21. AP-14. LDHT. Helmer V. Nielsen.
RM A57K21. AH-113. Flt Res. William C. Triplett
RM A57K21. AH-127. Flt Res. Maurice D. White, Bernard A. Schlaff, and Fred J. Drinkwater III.
RM A57L10. AH-129. Flt Res. McFadden, Pauli, and Heinle.
RM A57K07. AH-131. Flt Res. Sadoff and Stewart.
RM A57J01. AH-121. Flt Res. Howard L. Turner, George A. Rathert, Jr. and Donovan R. Heinle
RM A57D30. AH-119. Flt Res. Maurice D. White and Fred J. Drinkwater
RM A57D09. AH-125. Flt Res. William C. Triplett and Francis W.K. Hom.
RM A57D04. AH-118. Flt Res. Melvin Sadoff, John D. Stewart and George E. Cooper.
RM A57C19. AH-117. Flt. Res. Foster, Fulcher, and Heinle.
RM A57B14. AH-115. Flt. Res. Hervey C. Quigley, Francis W.K. Hom, and Robert C. Innis.
RM A57L18. AG-111. Victor L. Peterson and Gene P. Meness.
RM A57K27. AG-114. Victor L. Peterson and John W. Boyd.
RM A57K26. AG-113. Victor L. Peterson and Meness, Gene P.
RM A57K14. AG-112. Victor L. Peterson and John W. Boyd.
RM A57J22. AG-105. David E. Reese, Jr.
RM A57J15. AG-108. Vicotr L. Peterson and John W. Boyd.
RM A57E22. AG-97. Willard G. Smith and Peter F. Intrieri.
RM A57A10. AG-101. E. Ray Phelps and John W. Boyd.
RM A57E15. AG-95. Migotsky, Eugene and Adams, Gaynor J.