Guide to the Presidio Trust Enviromental Remediation Collection

Processed by The Institute of Governmental Studies Library staff; machine-readable finding aid created by Gabriela A. Montoya
Institute of Governmental Studies Library
Institute of Governmental Studies Library
109 Moses Hall #2370
University of California, Berkeley
Berkeley, California, 94720-2370
Phone: (510) 642-1472
Fax: (510) 643-0866
Email: rheckart@library.berkeley.edu
URL: http://www.igs.berkeley.edu:8880/library/library.html
© 2000
The Regents of the University of California. All rights reserved.

Guide to the Presidio Trust Enviromental Remediation Collection

Collection number: A9964

Institute of Governmental Studies Library



University of California, Berkeley

Berkeley, California

Contact Information:

  • Institute of Governmental Studies Library
  • 109 Moses Hall #2370
  • University of California, Berkeley
  • Berkeley, California, 94720-2370
  • Phone: (510) 642-1472
  • Fax: (510) 643-0866
  • Email: rheckart@library.berkeley.edu
  • URL: http://www.igs.berkeley.edu:8880/library/library.html
Processed by:
The Institute of Governmental Studies Library staff
Encoded by:
Gabriela A. Montoya
© 2000 The Regents of the University of California. All rights reserved.

Descriptive Summary

Title: Presidio Trust Enviromental Remediation Collection
Collection number: A9964
Creator: Presidio Trust (U.S.)
Extent: Approximately 161 items
Repository: Institute of Governmental Studies. Library
Berkeley, California 94720-2370
Shelf location: Housed at the Northern Regional Library Facility (NRLF). NRLF location numbers for particualr items are listed in the catalog record for the collection in the Berkeley campus online catalog (Gladis/Pathfinder). Match the IGS Library call number in the Classified List of Items to the NRLF location number.
Language: English.

Administrative Information

Access

Collection is open for research.

Publication Rights

Copyright has not been assigned to the Institute of Governmental Studies Library. All requests for permission to publish or quote from manuscripts must be submitted in writing to the Head Librarian of the Institute of Governmental Studies Library. Permission for publication is given on behalf of the Institute of Governmental Studies Library as the owner of the physical items and is not intended to include or imply permission of the copyright holder, which must also be obtained by the reader.

Preferred Citation

[Identification of item], Presidio Trust Enviromental Remediation Collection, A9964, Institute of Governmental Studies Library, University of California, Berkeley.

Organizational History

In 1996 the Presidio Trust Act created the Presidio Trust, which is a wholly owned federal government corporation. The purposes of the Trust are to preserve and enhance the Presidio as a national park and to ensure that the Presidio becomes financially self-sufficient by 2013 (i.e., generate sufficient revenue without any federal appropriation to fund long-term operating and maintenance costs). The U.S. Army occupied the Presidio for 148 years before closing its post in 1994. As part of an environmental cleanup agreement the U.S. Army will supply the Trust with $100 million dollars to provide for fast-track restoration of areas impacted by the military's use of the site. In accordance with this agreement, in August 1999 the Base Realignment and Closure (BRAC) collection at East Fort Baker was transferred to the Trust and has been renamed the Presidio Trust Environmental Remediation Collection. This collection will continue to grow as remediation projects are completed.

Scope and Content

Contains environmental reports and studies, some focused on particular buildings and complexes, and some focused on particular hazards, such as lead-based paint and underground storage tanks. Most items are in large binders. The collection is not complete. Additional items may be added.
Classified List of Items:
  • 1. Asbestos Lead Base Paint Maintenance A/LBPM
  • 2. Base Closure BC
  • 3. Building 637 Area Bldg_637
  • 4. Environmental Sampling Analysis Program ESAP
  • 5. General Reference Gen_Ref
  • 6. Main Installation Restoration Program MIRP
  • 7. Outdoor Firing Ranges OFR
  • 8. Park Service Planning Documents PSP
  • 9. Public Health Service Hospital PHSH
  • 10. Underground Storage Tanks Fuel Distribution System UST/FDS
  • 11. Restoration Advisory Board RAB

 

1. Asbestos Lead Base Paint Maintenance

 

A9964, no. 1:1A/LBPM 101.2 RC 2A Residential Buildings to 200, January 1990. Report Category 2A.

 

A9964, no. 1:2A/LBPM 103 Final Asbestos Survey for the Supplemental Remedial Investigation, Modification to Phase II Environmental Study.

 

A9964, no. 1:3A/LBPM 114.3 Golden Gate Bridge Seismic Retrofit Project, Phase One, Lead Cleanup and Site Preparation, Final Remedial Action Plan, March.

 

A9964, no. 1:4A/LBPM 115 Fort Cronkhite Asbestos Survey for fort Cronkhite, Prepared Under Direction of: Army Corps of Engineers Sacramento District Project No. 381A.

 

A9964, no. 1:5A/LBPM 141 Work Plan/ Site Safety and Health Plan, Asbestos Abatement of Buildings 0001, 0034, 0050, 0087, 0312, 0516, 0723B, 0733B, 0767, 0813, 1040, 1051, 1152, 1216, 1217, 1218, 1230, 1268.

 

A9964, no. 1:6A/LBPM 143 Contractor Quality Control Plan, Lead and Asbestos Abatement of Buildings, Imminent Hazards - WAD 48, April 1996.

 

A9964, no. 1:7A/LBPM 144.08 Abatement Report Asbestos and Lead Hazard Removal Building 1801 and 1802, Presidio of San Francisco, April 1998.

 

A9964, no. 1:8A/LBPM 144.5 Draft Work Plans/ Safety and Health Plan, Asbestos and Lead Hazard Abatement, Buildings 1801 and 1802, May 1996.

 

A9964, no. 1:9A/LBPM 336 Summary of Asbestos Abatement Action, Buildings 34, 35, 46, 13 5, 228, 335B, 338B, 516, 537A, 548B, 551 A, 651, 654, 717B, 734B, 744B, 857B, 952, 954, 955, 958, 961, 1001A, 1004A, 1040, 1047, 1050, 1051, 1100, 1183, 1203, 1204, 1205, 1208, 1218.

 

2. Base Closure

 

A9964, no. 2:1BC 103 Base Closure Final Environmental Impact Statement. Appendix 1.

 

A9964, no. 2:2BC 108 Base Realignment and Closure (BRAC) Cleanup Plan. Version 1.

 

A9964, no. 2:3BC 108.05 Base Realignment and Closure (BRAC) Cleanup Plan. Version 2.

 

A9964, no. 2:4BC 108.1 Base Realignment and Closure (BRAC) Cleanup Plan. Draft Version 2.

 

A9964, no. 2:5BC 119 Community Environmental Response Facilitation Act (CERFA) Report, Presidio of San Francisco, CA. April 1994.

 

A9964, no. 2:6BC 123 Draft Environmental Impact Statement Base Closure, June 1990.

 

A9964, no. 2:7BC 124 Base Closure Draft Environmental Impact Statement, August 1990.

 

A9964, no. 2:8BC 126 Enhanced Preliminary Assessment Report: Presidio of San Francisco Military Reservation San Francisco, California, Argonne National Laboratory.

 

A9964, no. 2:9BC 136 Base Closure, Final, Environmental Impact Statement, May 1991.

 

A9964, no. 2:10BC 139.04 Basewide Groundwater Monitoring Plan, Presidio of San Francisco, July 1996.

 

A9964, no. 2:11BC 141.7 Master Plan Report, Presidio of San Francisco, California, July 1987.

 

A9964, no. 2:12BC 149 Base Closure Preliminary Final Environmental Impact Statement, March 1991.

 

A9964, no. 2:13BC 153 Final Public Involvement and Response Plan (Community Relations Plan), March 1992.

 

A9964, no. 2:14BC 153.4 Draft Community Relations Plan, October 30, 1995.

 

A9964, no. 2:15BC 153.5 Community Relations Plan, Draft Final, January 1996.

 

A9964, no. 2:16BC 317 Low Flow Sampling Study, Technical Memorandum, July 1998.

 

A9964, no. 2:17BC 320 Additional sites of Potential Environmental concern: In-depth Historical Research Results, February 17, 1999.

 

3. Building 637 Area

 

A9964, no. 3:1Bldg. 637 107.2 Bldg. 637, Site Characterization and Tank Removal Action, Final, Chemical Data Acquisition/ Field Sampling Plan, February 1992.

 

A9964, no. 3:2Bldg. 637 107.71 Building 637, Site Characterization and Tank Removal Action, Final, Site Safety and Health Plan, February 1992.

 

A9964, no. 3:3Bldg. 637 110 Building 637 Site Investigation, Draft, Additional Site Investigation, May 1994.

 

A9964, no. 3:4Bldg. 637 110.2 Building 637 Site Investigation, Final, Additional Site Investigation, March 1995.

 

A9964, no. 3:5Bldg. 637 113.5 Draft Building 637 Site Investigation, Draft, Aquifer Test Report, November 1994.

 

A9964, no. 3:6Bldg. 637 113.5 Final Building 637 Site Investigation, Draft, Aquifer Test Report, December 1994.

 

A9964, no. 3:7Bldg. 637 113.8 Bldg. 637 Site Investigation, Draft, CAP, December 1994.

 

A9964, no. 3:8Bldg. 637 116 Building 637, Quarterly Groundwater Monitoring Report, March - May 1994, October 1994.

 

A9964, no. 3:9Bldg. 637 117 Building 637, Area, June - August 1994, Quarterly Groundwater Monitoring Report, November 1994.

 

A9964, no. 3:10Bldg. 637 117.15 Building 637 Area Groundwater Monitoring Program, Annual Summary Report, January 1997 - October 1997 Quarterly Monitoring Period.

 

A9964, no. 3:11Bldg. 637 117.3 Bldg. 637 Area, April 1995, Quarterly Groundwater Monitoring Report.

 

A9964, no. 3:12Bldg. 637 125 Sep 1994 Building 637 Area - Source Reduction Measure, Groundwater Treatment System, Monthly Monitoring Report for September 1994, November 1994.

 

A9964, no. 3:13Bldg. 637 125 Oct 1994 Bldg. 637 Site Investigation, October 1994 - Source Reduction Measure Report, December 1994.

 

A9964, no. 3:14Bldg. 637 125 Jan 1995 Bldg. 637 Site Investigation, January 1995 - Source Reduction Measure Report, March 1995.

 

A9964, no. 3:15Bldg. 637 125 Feb 1995 Bldg. 637 Site Investigation, February 1995 - Source Reduction Measure Report, April 1995.

 

A9964, no. 3:16Bldg. 637 125 April 1995 Bldg. 637 Site Investigation, April 1994 - Source Reduction Measure Report, June 1995.

 

A9964, no. 3:17Bldg. 637 130 Bldg. 637 Area, Final, Biosparging Treatability Study Work Plan, May 1995.

 

A9964, no. 3:18Bldg. 637 131 Bldg. 637 Corrective Action, 60 Percent, Design Analysis/ Health And Safety Design Analysis, June 1995.

 

A9964, no. 3:19Bldg. 637 134.01 Risk-Based Assessment of Appropriate Fuel Hydrocarbon Cleanup Strategies for Presidio at San Francisco, Building 637 Area, April 1998.

 

4. Environmental Sampling Analysis Program

Note

[No documents available]
 

5. General Reference

Note

[No documents available]
 

6. Main Installation Restoration Program

 

A9964, no. 6:1MIRP 104.06 Final RCRA Closure Plan For Building 950, February 1997 (with response comments) Appendices missing.

 

A9964, no. 6:2MIRP 111.07 Building 231 and 937 Areas, Quarterly Groundwater Monitoring Report, April 1995, November 1995.

 

A9964, no. 6:3MIRP 121.3 Draft Final, Feasibility Study Report, Presidio Main Installation, January 1996.

 

A9964, no. 6:4MIRP 121.4 Final, Feasibility Study Report, Presidio Main Installation May 1997.

 

A9964, no.6:5MIRP 123 Quality Assurance Plan, Phase II, Final Supplement.

 

A9964, no. 6:6MIRP 125 Industrial Radiation Consultation no. 27-43-E26P-93, Sixth U.S. Army and Presidio of San Francisco, 27 September-4 November 1993.

 

A9964, no. 6:7MIRP 148, v. 1 Remedial Investigation Report. Presidio Main Installation, Presidio of San Francisco, Vol. 1, Text, March 1993.

 

A9964, no. 6:8MIRP 148, v. 2A Remedial Investigation Report, Presidio Main Installation, Presidio of San Francisco, Vol. IIA, Tables, March 1993.

 

A9964, no. 6:9MIRP 148, v. 2B Remedial Investigation Report, Presidio Main Installation Volume IIB, Figures, March 1993, Revised Draft Final.

 

A9964, no. 6:10MIRP 148, v. 3A Remedial Investigation Report, Presidio Main Installation, Volume IIIA, Baseline Risk Assessment, March 1993, Revised Draft Final.

 

A9964, no. 6:11MIRP 148, v. 3B Remedial Investigation Report, Presidio Main Installation, Volume IIIB, Baseline Risk Assessment, Attachments, March 1993.

 

A9964, no.6:12MIRP 148, v. 4 Remedial Investigation Report, Volume IV, Supplemental Study Areas, March 1993, Revised Draft Final.

 

A9964, no. 6:13MIRP 148, v. 5 Remedial Investigation Report, Presidio Main Installation, Volume V, Appendices A-D, March 1993, Revised Draft Final.

 

A9964, no. 6:14MIRP 160 Response to Notice of Noncompliance from the Environmental Protection Agency Region IX: Polychlorinated Biphenyls (PCB).

 

A9964, no. 6:15MIRP 166.5 Buildings 680 and 1153 Sites Pre-design Work Plan, Chemical Data Acquisition Plan Addendum, Site-Specific Health and Safety Plan.

 

A9964, no. 6:16MIRP 167 Chemical Data Acquisition Plan Addendum, Building 680 and 1153, Draft, June 1995.

 

A9964, no. 6:17MIRP 168 Site-specific Health and Safety Plan Addendum, Buildings 680 and 1153, June 1995.

 

A9964, no. 6:18MIRP 170 Approach for Closure of Inorganic Groundwater Sites and Recommendation for Closure of Investigation at Presidio.

 

A9964, no. 6:19MIRP 172.00 Fort Point U.S. Coast Guard Station, Groundwater Monitoring Program, July 1995 and October 1995, Quarterly Report, April 1996.

 

A9964, no. 6:20MIRP 172.04 Fort Point U.S. Coast Guard Station Groundwater Monitoring Program, October 1996, Quarterly Report, December 1996.

 

A9964, no. 6:21MIRP 201, v. 1 Remedial Investigation Report, Presidio Main Installation, Volume 1, Text, November 1995, Second Revised Draft Final.

 

A9964, no. 6:22MIRP 201, v. 2 Remedial Investigation Report, Presidio Main Installation, Volume 2, Tables, November 1995, Second Revised Draft Final.

 

A9964, no.6:23MIRP 201, v. 4 Remedial Investigation Report, Presidio Main Installation, Volume IV, Appendices A-F, November 1995, Second Revised Draft Final.

 

A9964, no. 6:24MIRP 201, v. 5 Remedial Investigation Report, Presidio Main Installation, Volume V, Appendices G-Q, November 1995, Second Revised Draft Final.

 

A9964, no. 6:25MIRP 201, v. 6 Remedial Investigation Report, Presidio Main Installation, Volume VI, Appendices R-U, November 1995, Second Revised Draft Final.

 

A9964, no. 6:26MIRP 202 Building 651 Area Groundwater Monitoring Program: July 1995 and October 1995 Quarterly, May 1996.

 

A9964, no. 6:27MIRP 205 Building 937 Area, Groundwater Monitoring Program: October 1995 Quarterly, May 1996.

 

A9964, no. 6:28MIRP 208 Buildings 231 and 937 Areas, Site-specific Sampling Plan, May 1996.

 

A9964, no. 6:29MIRP 209 Fill Site 1 and Landfill 2, Groundwater Monitoring Program, July 1995 and October 1995 Quarterly, June 1996.

 

A9964, no. 6:30MIRP 210 Fill Site 7, Groundwater Monitoring Program, July 1995 and October 1995 Quarterly, June 1996.

 

A9964, no. 6:31MIRP 221, v. 2 Final Remedial Investigation Report, Presidio Main Installation.

 

A9964, no. 6:32MIRP 221, v. 3 Final Remedial Investigation Report, Presidio Main Installation.

 

A9964, no. 6:33MIRP 221, v. 4 Final Remedial Investigation Report, Presidio Main Installation.

 

A9964, no. 6:34MIRP 221.01 Final Remedial Investigation Report, Presidio Main Installation, Errata.

 

A9964, no. 6:35MIRP 224.05 Remediation Work Plan, Directorate of Engineering and Housing Area, Revision C, September 1997.

 

A9964, no. 6:36MIRP 226 Draft Remedial Action Plan Crissy Field Area, October 3, 1997.

 

A9964, no. 6:37MIRP 226.01 Final Remedial Action Plan Crissy Field Area, Presidio of San Francisco, April, 1998.

 

A9964, no. 6:38MIRP 234 Draft Remedial Action Work Plan, Crissy Field Area.

 

A9964, no. 6:39MIRP235 Responsiveness summary, Draft Crissy Field Area, Remedial Action Plan, Prepared by Department of the Army.

 

A9964, no. 6:40MIRP 236 Contractor Quality Control Plan for Crissy Field Remedial Action, Presidio of San Francisco, April 1998.

 

A9964, no. 6:41MIRP 239 Pre-remediation Sampling Data Summary, Crissy Field, Volume 1, May 1998.

 

A9964, no. 6:42MIRP 240 Results of Chronic Bioassays Performed with Ceriodaphnia Dubia, Pimephales Promelas, and Selenastrum Capricornutum for Cal Test.

 

A9964, no. 6:43MIRP 241 Contingency Action Plan, Crissy Field Area, Restoration, Draft.

 

A9964, no. 6:44MIRP 241.01 Contingency Action Plan, Crissy Field Area, Restoration, Final.

 

A9964, no. 6:45MIRP 242 Coastal Fortification Explosives, Survey, November 1996.

 

A9964, no. 6:46MIRP 245 Correction Action Plan, Building 1065, Revision C, September 1998.

 

A9964, no. 6:47MIRP 245.01 Corrective Action Plan, Building 1065, March 1999.

 

A9964, no. 6:48MIRP 246.01 Final Safety and Health Plan for Quarterly Groundwater Sampling Program.

 

A9964, no. 6:49MIRP VF 1226 Feasibility Study Report Presidio Main Installation Public Comments Package.

 

7. Outdoor Firing Ranges

 

A9964, no. 7:1OFR 001 Draft Site-Specific Work Plan for Environment Soil Investigation of the Small Arms Firing Ranges, October 1995.

 

A9964, no. 7:2OFR 003 Site Investigation Report for the Small Arms Firing Ranges, Draft.

 

8. Park Service Planning Documents

Note

[No documents available]
 

9. Public Health Service Hospital

 

A9964, no. 9:1PHSH 102 Feasibility Study for the Former U.S. Public Health Services Hospital, Presidio of San Francisco, November 1993, Final.

 

A9964, no. 9:2PHSH 104 Final Feasibility Study for the Former Public Health Services Hospital.

 

A9964, no. 9:3PHSH 113 Draft Remedial Action Plan for the Former U.S. Public Health Services Hospital, May 1994.

 

A9964, no. 9:4PHSH 114, v. 1 Draft final Remedial Investigation Report for the Public health Services Hospital, Volume 1 - Text, August 1991.

 

A9964, no. 9:5PHSH 114, v. 2 Draft final Remedial Investigation Report for the Public health Services Hospital, Volume 2 - Appendices A through F, August 1991.

 

A9964, no. 9:6PHSH 114, v. 3 Draft final Remedial Investigation Report for the Public health Services Hospital, Volume 3 - Appendix G/ Analytical Data, August 1991.

 

A9964, no. 9:7PHSH 115, v. 1 Remedial Investigation Report for the Former U.S. Public Health Services Hospital, Vol. 1, Text, January 1992, Revised Draft Final.

 

A9964, no. 9:8PHSH 115, v. 2 Remedial Investigation Report for the Former U.S. Public Health Services Hospital, Vol. 2, Appendices A-F, January 1992, Revised Draft Final.

 

A9964, no. 9:9PHSH 115, v. 3 Remedial Investigation Report for the Former U.S. Public Health Services Hospital, Vol. 3, Appendix, January 1992, Revised Draft Final.

 

A9964, no. 9:10PHSH 116, v. 1 Remedial Investigation Report for the Former U.S. Public health Services Hospital: Final, Volume 1 of 3, Text, December 1992.

 

A9964, no. 9:11PHSH 116, v. 2 Remedial Investigation Report for the Former U.S. Public health Services Hospital: Final, Volume 2 of 3, Tables and Figures, December 1992.

 

A9964, no. 9:12PHSH 116, v. 3 Remedial Investigation Report for the Former U.S. Public health Services Hospital: Final, Volume 3 of 3, Appendices A-G, December 1992.

 

A9964, no. 9:13PHSH 127 Feasibility Study for the Former U.S. Public Health Services Hospital, Revised Draft Final, February 1993.

 

A9964, no. 9:14PHSH 128 Landfill 8 Pre-Design Investigation Report, Draft, December 1994.

 

A9964, no. 9:15PHSH 129 Remedial Action Plan for the Former U.S. Public Health Services Hospital, October 1994, Revised Draft.

 

A9964, no. 9:16PHSH 134 Landfill 8 Quarterly Groundwater Monitoring Report, September-November 1994.

 

A9964, no. 9:17PHSH 135 Landfill 8, Quarterly Groundwater Monitoring Report, December 1994 - February 1995.

 

A9964, no. 9:18PHSH 135.2 Landfill 8 Quarterly Groundwater Monitoring Report for June 1995.

 

A9964, no. 9:19PHSH 136 Landfill 10 Area, December 1994 - February 1995, Quarterly Groundwater Monitoring Report, April 1995.

 

A9964, no. 9:20PHSH 136.03 Landfill 10 Area, Goundwater Monitoring Program, July 1995 and October 1995 Quarterly Summary Report - March 1998.

 

A9964, no. 9:21PHSH 136.2 Landfill 10, Quarterly Groundwater Monitoring Report, June 1995.

 

10. Underground Storage Tanks Fuel Distribution System

 

A9964, no. 10:1UST/FDS 102.02 Building 1349 Site Investigation Report, Presidio of San Francisco, San Francisco, California, Final, January 1995.

 

A9964, no. 10:2UST/FDS 103 Building 1340 Site Investigation, Draft, Site Investigation Report, June 1994.

 

A9964, no. 10:3UST/FDS 105 Building 1349 Site Investigation Final Site-Specific Work Plan, August 1993.

 

A9964, no. 10:4UST/FDS 106 Health and Safety Plan for Additional Site Investigation of Previous Underground Storage Tank Locations, Final, June 1994.

 

A9964, no. 10:5UST/FDS 107 Health and Safety Plan for the Fuel Distribution System, June1994.

 

A9964, no. 10:6UST/FDS 108, v. 3 Investigation at Various Storage Tank Sites and a Fuel Distribution System Draft Work Plan, Volume III, Site Specific Work Plan, December 1992.

 

A9964, no. 10:7UST/FDS 108, v. 4 Investigation at Various Storage Tank Sites and a Fuel Distribution System Draft Work Plan, Volume IV, Site Specific Work Plan, December 1992.

 

A9964, no. 10:8UST/FDS 113 Safety and Health Plan for Cleaning, Tasting, and Installation of Leak Detection Monitoring Systems for Active Underground and Aboveground Storage Tanks, Draft, Safety and Health Plan, June 1994, Draft.

 

A9964, no. 10:9UST/FDS 119 Final, Technical Memorandum/ Work Plan for Additional Site Investigations of Previous Underground Storage Tank Locations, June 1994.

 

A9964, no. 10:10UST/FDS120 Underground Storage Tank management, Draft, Site Safety and Health Plan, November 1991.

 

A9964, no. 10:11UST/FDS122, v. 1 Final Underground Storage Tank Management Plan, Volume 1.

 

A9964, no. 10:12UST/FDS 150 Building 332 Bioventing Treatability Study - Draft - Work Plan, November 1994.

 

A9964, no. 10:13UST/FDS 160 Investigation for Removal of Storage Tanks Inside Historical Buildings, Final, Investigation Report, March 1995.

 

A9964, no. 10:14UST/FDS 167 Site-specific Sampling Plan and Health and Safety Plan for the Fuel Distribution System, Final, September 1994.

 

A9964, no. 10:15UST/FDS 169.3 Tank Removal Inside Historical Buildings, Final, Work Plans for Building 342 Underground Storage Tank Removal: Work Plan, Site-specific Sampling Plan, Site-specific Safety and Health Plan, January 1995.

 

A9964, no. 10:16UST/FDS 175 Underground Storage Tank Removal, Health and Safety Design Analysis, May 1992.

 

A9964, no. 10:17UST/FDS 184 Fuel Product Action Level Development Report (FPALDR), May 1992, Draft.

 

A9964, no. 10:18UST/FDS 184.1 Fuel Product Action Level Development Report (FPALDR), Final, May 1995.

 

A9964, no. 10:19UST/FDS 185 On-Site Soil Treatability Study Using Low Temperature Thermal Description, Draft, Work Plan, May 1995.

 

A9964, no. 10:20UST/FDS 187, v. 1 Removal/ Abandonment of Fuel Oil Pipeline, Specifications, 60% Design, June 1995.

 

A9964, no. 10:21UST/FDS 187, v. 2, 3 Removal/ Abandonment of Fuel Oil Pipeline - Design Analysis/ Health & Safety Design Analysis 60% Design - June 1995.

 

A9964, no. 10:22UST/FDS 189, v. 1 UST/AST Removal, Specifications 60% Design, June 1995.

 

A9964, no. 10:23UST/FDS 189, v. 2 UST/AST Removal, Design Analysis/Health and Safety Design Analysis, 60% Design, June 1995.

 

A9964, no. 10:24UST/FDS 197 Basewide Corrective Action Plan, Draft, August 1995.

 

A9964, no. 10:25UST/FDS 198 Assessment of the Presence of Unsubstantiated Storage Tanks, Final, October 1995.

 

A9964, no. 10:26UST/FDS 200 Work Plan, Removal/ Abandonment of Fuel Distribution System and Buildings 970/971, February 1996, Draft.

 

A9964, no. 10:27UST/FDS 200 Tank 530 Building 637 Tank Closure Report, Tank #530, Aboveground Tank Removal/Underground Storage Tank Removal, August 26, 1993.

 

A9964, no. 10:28UST/FDS 200 Tank 756.1 and 2 Tank Closure Report 756.1 and 756.2. September 20, 1993.

 

A9964, no. 10:29UST/FDS 200.01 Draft Contractor Quality Control/Sampling and Analysis Plan Removal/Abandonment of Fuel Distribution System and Building 970/971, February 1996.

 

A9964, no. 10:30UST/FDS 200.06 Contractor Quality Control/ Sampling and Analysis Plan. Removal/ Abandonment of Fuel Distribution System and Building 970/971, May 1996.

 

A9964, no. 10:31UST/FDS 202.6 Draft Additional UST (AUSTI) Investigation Tank Site Investigation Reports for the following AUSTI Sites 12, 534A, 722A, 724B, 728B, 757A, 758A, 760A and 1399.

 

A9964, no. 10:32UST/FDS 202.7 Draft Additional UST (AUSTI) Investigation Tank Site Investigation Reports for the following AUSTI Sites 724A, 728A, 753B, 757B, 759A, 759B, 976.

 

A9964, no. 10:33UST/FDS 207 Draft, Contractor Quality Control/ Sampling and Analysis Plan and Work Plan, Aboveground/ Underground, May 1996.

 

A9964, no. 10:34UST/FDS 214 Petroleum Sites Cleanup Program, Outdoor Underground Storage Tank Sites, (Round 1, Group Tasks) Draft, Mini-Corrective Action, March 1997.

 

A9964, no. 10:35UST/FDS 215.02 Site Investigation Work Plan, Building 1065, Revision 0, January 1998.

 

A9964, no. 10:36UST/FDS 220 Investigation of Underground Storage Tanks Adjacent to the Fuel Distribution System: Site Specific Work Plan, April 1998.

 

A9964, no. 10:37UST/FDS 221.01 Petroleum Sites, Remediation Work Plan, Revision D, July 1998.

 

A9964, no. 10:38UST/FDS 222 Petroleum Sites Cleanup Program Indoor Underground Storage Tank Sites (Round 2, Group 1 Tanks), August 1998.

 

A9964, no. 10:39UST/FDS 223 Hydraulic Fluid Removal Work Plan, Nike Missile Facility, Revision C, July 1998.

 

A9964, no. 10:40UST/FDS 224 Tank Removal Documentation Reports, July 1998.

 

A9964, no. 10:41UST/FDS 227, vol. 1 Petroleum Tank Closure and Recommended Site Action Report, Presidio Fuel Tank Removal Program, Presidio of San Francisco, November 1998.

 

A9964, no. 10:42UST/FDS 232 Hydraulic Fluid Removal Report, Nike Missile Facility, Presidio of San Francisco, California, April 1999.

 

A9964, no. 10:43UST/FDS 234 Petroleum Sites Cleanup Program Outdoor Underground Storage Tank Sites (Round 1, Group 2 Sites) Draft Mini-Corrective Action Plans, May 1999.

 

A9964, no. 10:44UST/FDS 236 Investigation of Underground Storage Tanks Adjacent to the Fuel Distribution System: Final Report, Presidio of San Francisco, May 1999.

 

11. Restoration Advisory Board

Note

[No documents available]