Stringfellow Hazardous Waste Site collection
1955: | James B. Stringfellow, owner of the Stringfellow Quarry Company, was contacted by California officials to discuss the creation of a 17-acre hazardous waste dump on his property. |
1956: | In August, Stringfellow began operating a class I hazardous waste disposal facility permitted by the Santa Ana Regional Water Quality Control Board (RWQCB). |
1969: | Excessive rainfall caused the disposal ponds at Stringfellow to overflow into Glen Avon. |
Parents of Jurupa, Inc., a non-profit corporation of Glen Avon residents, was established with the goal of closing down the Stringfellow HazardousWaste Site. | |
1972: | The Stringfellow Hazardous Waste Site ceased operation as a disposal facility in November, and closed permanently in December. |
1974: | The State of California gained control of the Stringfellow Hazardous Waste Site, with the RWQCB serving as the responsible party. |
1978: | Excessive rainfall caused the disposal ponds at Stringfellow to overflow into Glen Avon a second time. |
1980: | The United States Congress passed the Comprehensive Environmental Response, Compensation and Liability Act. Known as the "Superfund," the Act provided $1.6 billion for the emergency cleanup of chemical spills and hazardous waste dumps. |
1981: | Responsibility for the Stringfellow Hazardous Waste Site passed from the RWQCB to the California Department of Health Services (DOHS). |
1983: | The United States Environmental Protection Agency (US EPA) officially placed the Stringfellow Hazardous Waste Site on the national priority list for the federal Superfund. |
1984-Present: | Cleanup activities, jointly managed by the US EPA and DOHS Toxic Substances Control Division, began at the Stringfellow Hazardous Waste Site. Treatment is ongoing. |
1996: | The Department of Toxic Substances Control, a branch of the California Environmental Protection Agency, assumed operational control at Stringfellow, with the US EPA serving as an oversight agency. |
- Series 1. Media clippings, 1960-1987, undated.
- Series 2. Ruth Kirkby papers, 1951-2005, undated.
- Series 3. Technical reports, 1983-2009.
Series 1. Media clippings 1960-1987, undated
Clippings from The Register, The Press-Enterprise, The Record , Daily Titan, People's World, West Side News, Ad-Vantage, The Los Angeles Times , and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies) 1960-1987, undated
Clippings from The Press-Enterprise, Pacific Sun, Whole Life Times, the Los Angeles Times, Ad-Vantage, The Record, Time, articles and papers on toxic waste, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies). Cassette tape regarding tire fire in Winchester, Virginia 1965-1987, undated
Clippings from The Press-Enterprise, Ad-vantage, The Record, The Register, the Los Angeles Times , The Sun, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies) 1972-1987, undated
Clippings from The Record, The Press-Enterprise, The Columbus Dispatch, The American City County, and other publications regarding the Stringfellow Hazardous Waste Site (includes photocopies) 1972-1987, undated
Series 2. Ruth Kirkby papers 1951-2005, undated
Ephemera, writings, presentation copies, samples of work, and other material regarding engineering, environmental, and waste management firms and programs 1972-1987, undated
Field notes, reports, proposals, evaluations, and work plans submitted to, or prepared by, the Santa Ana Regional Water Quality Control Board, U.S. Environmental Protection Agency, California Department of Health Services, Santa Ana Watershed Project Authority, U.S. Army Corps of Engineers, and other agencies 1973-1986
Reports, plans, and proposals submitted to, or prepared by, the U.S. Environmental Protection Agency, Region IX, U.S. Army Corps of Engineers, Santa Ana Regional Water Quality Control Board, Santa Ana Watershed Project Authority, California Department of Health Services, and other agencies 1975-1987, undated
Reports, plans, proposals, evaluations, and documents submitted to, or prepared by, the State Water Resources Control Board, Santa Ana Regional Water Quality Control Board, Santa Ana Watershed Project Authority, California Department of Health Services, and other agencies 1973-1985
Correspondence regarding Riverside law firm Macomber and Eley (includes photocopies) 1972-1977
Correspondence, writings, presentation copies, samples of work, public records, and other material regarding engineering, environmental, and waste management firms and programs 1974-1985, undated
Correspondence, public records, reports, and other material regarding engineering, environmental, and waste management projects circa 1969-1987, undated
Reports and proposals submitted to, or prepared for, the Santa Ana Watershed Project Authority, California Department of Health Services, South Coast Air Quality Management District, and San Bernardino County Land Management Department, Environmental Public Works Agency 1976-1987
Technical reports, proposals, and publications prepared for the California Department of Health Services, Toxic Substances Control Division 1983-1987
Technical reports, proposals, and publications prepared for the California Department of Health Services, Toxic Substances Control Division, Santa Ana Regional Water Quality Control Board, and other entities 1974-1989
Public records regarding Stringfellow Quarry Company financial, legal, and business affairs in Riverside County (photocopies) 1972-1976, undated
Technical reports, proposals, and publications submitted to, or prepared for, the Stringfellow Technical Committee and the California Department of Health Services 1974-1985
Correspondence, documents, ephemera, and other material regarding the United States Environmental Protection Agency, Region IX (includes photocopies) 1985-1987, undated
Technical reports, correspondence, drafts, and other material regarding the United States Environmental Protection Agency, Region IX (includes photocopies) 1984-1985, undated
Correspondence, publications, public records, transcripts, and other material regarding Representative George E. Brown, Jr.'s involvement with the Stringfellow Hazardous Waste Site (includes photocopies) 1972-1986, undated
Correspondence, publications, clippings, and other material regarding the United States Environmental Protection Agency, Region IX, and the federal Superfund program 1973-1985, undated
Public records, correspondence, publications, and other material regarding various United States federal agencies (includes photocopies) 1962-1984
Correspondence, publications, drafts, and other material regarding the California Department of Health Services (includes photocopies) 1973-1988, undated
Correspondence, publications, and other material regarding California state legislators' involvement with the Stringfellow Hazardous Waste Site (includes photocopies). Legislators include Senator Robert Presley and Assemblyman Walter M. Ingalls 1971-1987, undated
Legal documents regarding cases held in the County of Riverside Superior Court (photocopies). Parties include the Jurupa Mountains Cultural Center, local and state public utility agencies, and classes of citizens 1972-1987, undated
Deposition of Ruth Kirkby from the legal case Penny Newman et al. vs. J.B. Stringfellow, Jr., et al. Case heard in the Superior Court of the State of California, County of Riverside 1987-1988
Correspondence, public records, and other material regarding the California Public Utilities Commission (includes photocopies) 1974-1977, undated
Correspondence, public records, transcripts, and other material regarding the Santa Ana Regional Water Quality Control Board and the State Water Resources Control Board (includes photocopies). Public records regarding Stringfellow Quarry Company financial, legal, and business affairs in Riverside County (photocopies) 1955-1985, undated
Correspondence, documents, reports, and other material regarding the Santa Ana Watershed Project Authority (includes photocopies) 1973-1985, undated
Correspondence, reports, and other material regarding various California state agencies (includes photocopies) 1972-1984, undated
Correspondence, public records, transcripts, and other material regarding the Riverside County Planning Commission (also called Department or Council; includes photocopies) 1955-1986, undated
Correspondence, public records, agendas, minutes, and other material regarding Riverside County government agencies and community organizations (includes photocopies) 1969-1987, undated
Drafts, minutes, documents, and other material regarding the Parents of Jurupa, Inc. (includes photocopies) 1972-1985, undated
Public records, correspondence, minutes, rosters, and other material maintained by, or regarding, the Riverside County Solid Waste Management Advisory Committee and Class I Task Force of the County Road Department (includes photocopies) 1956-1977, undated
Correspondence, public records, transcripts, maps, and other material regarding various Riverside County and City of Riverside government agencies (includes photocopies) 1955-1986, undated
Correspondence, minutes, maps, and other material maintained by, or regarding, the Jurupa General Plan Steering Committee (includes photocopies) 1962-1973, undated
Correspondence, notes, photographs, and other material sent from UCR geophysicist Donald J. Stierman, Ph.D., to Ruth Kirkby 1979-1987, undated
Ephemera, clippings, and other material regarding geological organizations and activities 1976-1987, undated
Agendas, minutes, correspondence, and other material regarding the Stringfellow Advisory Committee and Stringfellow EPA/DOHS Defendants' Technical Committee 1983-1987, undated
Correspondence, agendas, petitions, and other material regarding community groups and local public agencies of the Glen Avon, Jurupa, and Riverside areas (includes photocopies). Ephemera and clippings regarding pollution 1970-1987, undated
Correspondence, publications, and documents regarding California state and regional environmental regulatory agencies 1972-1987, undated
Transcript of an interview with Ruth Kirkby regarding the history of the Stringfellow Hazardous Waste Site and her political activism. Interview conducted by William Fuentes, Claims Adjuster for Liberty Mutual 1985
Correspondence, ephemera, writings, clippings, maps, and other material regarding engineering, environmental, and waste management firms and programs circa 1972-1987, undated
Deposition of Ruth Kirkby from the legal case Penny Newman et al. vs. J.B. Stringfellow, Jr., et al. Case heard in the Superior Court of the State of California, County of Riverside 1987-1988
Notes, fliers, and other material prepared or maintained by Ruth Kirkby, including typescripts, annotated typescripts, and photocopies 1971-1986, undated
Publications issued by the California Department of Natural Resources, Division of Mines and Geology, regarding the greater Southern California region 1951, 1973
Correspondence, notes, legal documents, and other material regarding the Jurupa Mountains Cultural Center (includes photocopies) circa 1970-1988, undated
Map (hand-drawn; unidentified) of the Stringfellow area undated
Fliers, publications, ephemera, and other material regarding air resources and pollution in California circa 1974-1983, undated
Correspondence and plans regarding Science Applications International Corporation (SAIC). Documentation pertaining to the Stringfellow Hazardous Waste Site (photocopies) 1973-1987, undated
Correspondence, ephemera, writings, clippings, maps, and other material regarding engineering, environmental, and waste management firms and programs, and geological organizations and activities 1982-1987, undated
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts and clippings (includes photocopies) circa 1970-1988, undated
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts (includes photocopies) circa 1970-1988, undated
Photographs (color; black and white) of the Stringfellow Hazardous Waste Site (source unknown) undated
Correspondence, notes, legal documents, and other material regarding the Jurupa Mountains Cultural Center (includes photocopies) 1964-1978, undated
Notes, documents, drafts, and other material prepared or maintained by Ruth Kirkby, including hand-written documents, typescripts, and annotated typescripts (includes photocopies) 1953-1974, undated
Correspondence, public records, notes, reports, and other material regarding waste management in Southern California and the political activism of Glen Avon residents (includes photocopies) 1972-1987, undated
Correspondence and documents sent from James A. Hammond, Ph.D., to Ruth Kirkby regarding the Stringfellow Hazardous Waste Site (includes photocopies) 1975-1983
Public records, correspondence, clippings, drafts, and other material regarding the Santa Ana Regional Water Quality Control Board, the Stringfellow Quarry Company, Parents of Jurupa, Inc., and other entities (photocopies) 1955-circa 1983, undated
Correspondence, notes, drafts, and fliers regarding waste management processes and solutions (includes photocopies) 1972-circa 1984, undated
Clippings from the Los Angeles Times and The Press-Enterprise regarding a $93 million insurance settlement for cleanup of the Stringfellow Acid Pits February 2, 2005
Series 3. Technical reports 1983-2009
- Sub-Series 3.1. California Department of Health Services. Toxic Substances Control Division, 1984-1993.
- Sub-Series 3.2. California Environmental Protection Agency. Department of Toxic Substances Control, 1996-2009.
- Sub-Series 3.3. Pyrite Canyon Group, Inc., 1991-circa 2000.
- Sub-Series 3.4. Santa Ana Watershed Project Authority, 1984.
- Sub-Series 3.5. United States Environmental Protection Agency, Region IX, and other federal agencies, 1983-2006.
Sub-Series 3.1. California Department of Health Services. Toxic Substances Control Division 1984-1993
- Sub-Series 3.1.1. Feasibility study draft final reports, 1988
- Sub-Series 3.1.2. Glen Avon community, 1985-1993
- Sub-Series 3.1.3. Groundwater monitoring project, 1986-1989
- Sub-Series 3.1.4. Remedial investigation draft final reports, 1987
- Sub-Series 3.1.5. Stringfellow facility remedial investigation/feasibility study reports, 1984-1989
- Sub-Series 3.1.6. Stringfellow facility remedial investigation/feasibility study work plans, 1984-1987
- Sub-Series 3.1.7. Stringfellow facility remedial investigation/feasibility study other documents, 1985-1987
Sub-Series 3.1.1. Feasibility study draft final reports 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Sections 1, 2, and 3 . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Sections 4 and 5 . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix A . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix B, C, D, E, and F . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix G, H, and I . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Draft Final Report: Stringfellow Hazardous Waste Site Feasibility Study: Appendix J and K . Prepared by Science Applications International Corporation for the California Department of Health Services, Toxic Substances Control Division June 30, 1988
Sub-Series 3.1.2. Glen Avon community 1985-1993
"Attachment 1: Discussion of Cleanup of Contaminated Groundwater in Glen Avon South of Highway 60." circa 1988
"DHS/EPA Proposed Plan for Contaminated Groundwater Cleanup South of Highway 60 in Glen Avon, California." Summary of joint agency recommendation by the California Department of Health Services, Toxic Substances Control Division, and the United States Environmental Protection Agency, Region IX June 30, 1988
Report on Radioactivity at the Stringfellow Site and in the Community of Glen Avon . Prepared by multiple agencies of the California Department of Health Services circa 1985
"Stringfellow Hazardous Waste Site Riverside County, California Community Relations Plan" (2 copies) March 16, 1993
Stringfellow Health Effects Study: An Epidemiologic Health Survey of Residents of Glen Avon and Rubidoux, California (two copies). Prepared by the School of Public Health, University of California, Los Angeles, for the Epidemiological Studies Section, California State Department of Health Services, and the Riverside County Department of Health February 1986
Sub-Series 3.1.3. Groundwater monitoring project 1987-1989
"California Dept. of Health Services Toxic Task III: Routine Groundwater Monitoring Report, November 1986" (Revised Tables) April 27, 1987
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: Lower Pyrite Canyon Wells, July, 1989 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc December 1989
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume I . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc October 1989
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume II . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc October 1989
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume III . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc October 1989
Final Summary Data Report: Stringfellow Groundwater Monitoring Project: May and June 1989: Volume IV . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Kleinfelder, Inc October 1989
Stringfellow Site Routine Groundwater Monitoring: Isotopic Sampling Report . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation July 6, 1989
Sub-Series 3.1.4. Remedial investigation draft final reports 1987
Stringfellow Hazardous Waste Site Remedial Investigation: Draft Final Report Sections 1, 2, 3 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation June 1, 1987
Stringfellow Hazardous Waste Site Remedial Investigation: Draft Final Report Sections 4, 5, 6, 7 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation June 1, 1987
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix A (Site Maps). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division June 1, 1987
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix B and C (Methodologies and Geologic Logs). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division June 1, 1987
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix D and E (Aquifer Test Data and Water Level Data). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division June 1, 1987
Stringfellow Hazardous Waste Site Remedial Investigation Draft Final Report: Appendix F, G, and H (Chemistry Data, Meteorological Data, and Groundwater Model). Prepared by Science Applications International Corporation for the California Department of Health Services Toxic Substances Control Division June 1, 1987
Sub-Series 3.1.5. Stringfellow facility remedial investigation/feasibility study reports 1984-1989
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: August, 1984 Groundwater Monitoring Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by JRB Associates, A Company of Science Applications International Corporation December 19, 1984
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: October, 1984 Groundwater Monitoring Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation January 18, 1985
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: September, 1984 Electrical Resistivity Survey . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation February 11, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, January, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) March 28, 1985
Final Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Task IV: Preliminary Remedial Technologies . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) April 4, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, February, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) May 22, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, March, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) May 22, 1985
Interim Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Soil Gas Sampling Survey, April 18-May 2, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) May 28, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Routine Groundwater Monitoring Survey, April, 1985 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) June 13, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, May, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) July 19, 1985
Stringfellow Facility Remedial Investigation/Feasibility Study: Draft Interim Report on Development and Screening of Remedial Technologies and Alternatives . Prepared as a Working Document for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) July 31, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, June, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) September 4, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, July, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) December 27, 1985
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, August, 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) December 27, 1985
Draft Report: Stringfellow Facility Remedial Investigation/Feasibility Study: Combined Tasks XI and XII: Development and Initial Screening of Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation May 30, 1986
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey Annual Report for 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, Site Cleanup and Emergency Response Section, by Science Applications International Corporation June 11, 1986
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, September, 1986 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation October 16, 1986
Second Draft: Assessment of an Extraction Well Barrier in the Lower Canyon, A Proposed Early Implementation Action at the Stringfellow Hazardous Waste Site: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation December 16, 1986
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, October, 1986 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation December 18, 1986
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey Annual Report for 1985 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, Site Cleanup and Emergency Response Section, by Science Applications International Corporation December 24, 1986
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, November, 1986 . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation January 30, 1987
Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3 Draft Report: An Assessment of Drainage Improvements at the North End of the Canyon, a Proposed Early Implementation Action . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation February 3, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, February, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation April 20, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, January, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation May 18, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, March, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation June 12, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, April, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation June 19, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, May, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation July 2, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Survey, June, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation August 3, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys, July-September, 1987 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation December 9, 1987
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: November-December, 1987; January 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation January 26, 1989
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: March-May, 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation January 27, 1989
Draft Data Report: Stringfellow Facility Remedial Investigation/Feasibility Study Routine Groundwater Monitoring Surveys: July-September, 1988 . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation June 12, 1989
Sub-Series 3.1.6. Stringfellow facility remedial investigation/feasibility study work plans 1984-1987
Draft: Stringfellow Facility Remedial Investigation/Feasibility Study Work Plan Task III: Stringfellow Routine Groundwater Monitoring Program . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by JRB Associates, A Company of Science Applications International Corporation December 18, 1984
Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Stringfellow Routine Groundwater Monitoring Program . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) January 18, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Quality Assessment . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) February 11, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Pyrite Canyon Field Investigation . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) March 4, 1985
Final Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Quality Assessment . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) April 1, 1985
Final Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Pyrite Canyon Field Investigation . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) April 19, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Combined Tasks XI and XII: Development and Initial Screening of Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) April 30, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Air Stripping of Volatile Organic Carbon Contaminants: A Treatability Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) July 19, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Leachate Treatment by Activated Carbon: A Treatment Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) July 19, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Treatment by Soil Washing Techniques: A Treatment Study Under Task XIII . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) July 19, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Evaluation of Remedial Alternatives and Selection of the Cost Effective Alternative . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) November 26, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: Groundwater Modeling . Prepared for the State of California Department of Health Services, Division of Toxic Substances Control, by Science Applications International Corporation (JRB Associates) December 3, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Workplan for Drill Cuttings Disposal, Disturbed Site Emissions Measurement and Bulk Sampling . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) December 10, 1985
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Additional Community Monitoring Wells . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates) January 8, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.2: Maintenance and Revegetation of the Stringfellow Hazardous Waste Site . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates) January 8, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task V: Remedial Investigation Report . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates) January 8, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Routine Groundwater Monitoring Survey (Continuation from January to June, 1986) . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation (JRB Associates) January 8, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: A Treatability Study Reverse Osmosis and Ultrafiltration Treatment of Contaminated Groundwater . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates) January 9, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Technical Support to DTC Summer 1986 Pyrite Canyon Investigations . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation June 19, 1986
Revision No. 3 of Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.3: Early Implementation Actions (Formerly Called Operable Unit Development) . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, by Science Applications International Corporation July 16, 1986
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Detailed Evaluation of Remedial Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation July 24, 1986
Revision No. 2 Draft Workplan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: A Treatability Study Reverse Osmosis Treatment of Contaminated Groundwater: Phase 2 . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation (JRB Associates) December 29, 1986
Addendum No. 1 to Revision No. 2 of Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task III: Incineration Treatability Study . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation February 11, 1987
Draft Work Plan Addendum: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: Phase III Incineration Treatability Study: Soil Excavation, Preparation, Containerization and Testing . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation May 29, 1987
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study Task III: Routine Groundwater Monitoring Survey Phase III: July, 1987 to September 1988 . Prepared for the State of California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation July 15, 1987
Draft Work Plan Addendum No. 2: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIII: Phase III Incineration Treatability Study: Soil Excavation, Preparation, Containerization and Testing . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation July 15, 1987
Draft Work Plan Revision No. 2 (Second Version): Stringfellow Facility Remedial Investigation/Feasibility Study: Task XIV: Detailed Evaluation of Remedial Alternatives . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Project, by Science Applications International Corporation November 6, 1987
Preliminary Work Plan Revision to Task III Routine Groundwater Monitoring, Phase III Work Plan: Detailed Chemical Characterization of Selected Monitoring Wells . Prepared by the California Department of Health Services, Toxic Substances Control Division 1987
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.I: Workplan for Custodial Services . Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates) 1986
Sub-Series 3.1.7. Stringfellow facility remedial investigation/feasibility study other documents 1985-1987
Waste Discharge Review Interim Treatment and Disposal Program . Prepared by the State of California Health and Welfare Agency, Department of Health Services January 1985
Remedial Investigation/Feasibility Study Community Relations Support: Educational Package . Prepared for the California Department of Health Services, Toxic Substances Control Division, by Science Applications International Corporation circa 1987
Stringfellow Facility Remedial Investigation/Feasibility Study: Packer Sampling of Selected Bedrock Wells . Prepared for the California Department of Health Services, Toxic Substances Control Division, Stringfellow Site Management Team, by Science Applications International Corporation November 19, 1987
Sub-Series 3.2. California Environmental Protection Agency. Department of Toxic Substances Control 1996-2009
- Sub-Series 3.2.1. Annual reports, 1998-2008
- Sub-Series 3.2.2. Bench-scale testing, 2004-2005
- Sub-Series 3.2.3. Groundwater monitoring, 1997-2009
- Sub-Series 3.2.4. Pre-treatment plan effluent pipeline project, 1997
- Sub-Series 3.2.5. Stormwater sampling, 2009
- Sub-Series 3.2.6. Supplemental feasibility study, 2000-2007
- Sub-Series 3.2.7. Surface water monitoring, 2006-2008
- Sub-Series 3.2.8. Well/piezometer installation, 1998-2001
- Sub-Series 3.2.9. Zone 3, 1999-2000
- Sub-Series 3.2.10. Zone 4, 1996-2009
- Sub-Series 3.2.11. Other documents, 2000-2009
Sub-Series 3.2.1. Annual reports 1998-2008
Draft Background Review Report: Stringfellow Hazardous Waste Site . Prepared by ENVIRON Corporation for the Department of Toxic Substances Control March 20, 1998
Final Semi-Annual Report: Stringfellow Hazardous Waste Site: From Period May 1, 1999 to December 31, 1999 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control January 2001
Final Annual Report: Stringfellow Hazardous Waste Site: From Period January 1, 2000 to December 31, 2000 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control November 2001
Stringfellow 2001 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch December 2004
Stringfellow 2002 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch December 2004
Stringfellow 2003 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch March 2006
"Stringfellow 2003 Annual Report" (CD). Prepared by Tetra Tech, Inc March 2006
Stringfellow 2004 Annual Report: Draft. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch February 2008
Stringfellow 2005 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch December 2008
Sub-Series 3.2.2. Bench-scale testing 2004-2005
Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater (Volume 1 of 2). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control December 2004
Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater (Volume 2 of 2). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch December 2004
"Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater" (Volume 1 and 2, CD). Prepared by Shaw Environmental, Inc December 2004
Final Bench-Scale Testing Summary Report for Advanced Oxidation Processes . Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control January 2005
"Final Bench-Scale Testing Summary Report for Advanced Oxidation Processes" (CD). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control January 2005
Final Bench-Scale Testing Summary Report for Ion-Exchange Technology . Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch February 2005
"Final Bench-Scale Testing Summary Report for Ion-Exchange Technology" (CD). Prepared by Shaw Environmental, Inc February 2005
Final Bench-Scale Testing Summary Report for Ultraviolet Treatment Technology . Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch March 2005
"Final Bench-Scale Testing Summary Report for Ultraviolet Treatment Technology" (CD). Prepared by Shaw Environmental, Inc March 2005
Sub-Series 3.2.3. Groundwater monitoring 1997-2009
Final Site Safety and Health Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program (two copies). Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control March 1997
Final Quality Assurance Project Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program March 1997
Final Work Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program March 1997
Final Groundwater Monitoring Report: Spring 1997 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control August 1997
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control December 1997
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation December 1997
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 3 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation December 1997
Final Groundwater Monitoring Report: Fall 1997 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control January 1998
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1998
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1998
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 3 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1998
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 4 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1998
Report of the June 1998 Non-Routine Groundwater Monitoring Event . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 1998
Final Groundwater Monitoring Report: Spring 1998: Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program August 1998
Final Groundwater Monitoring Report: Spring 1998: Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program August 1998
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program December 1998
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program December 1998
Final Groundwater Monitoring Report: Fall 1998: Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program March 1999
Final Groundwater Monitoring Report: Fall 1998: Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program March 1999
Final Groundwater Monitoring Report: Fall 1998: Appendix Volume 3 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program March 1999
Final Groundwater Monitoring Report: Spring 1999: Appendix Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1999
Final Groundwater Monitoring Report: Spring 1999: Appendix Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program June 1999
Final Groundwater Monitoring Report: Spring 1999: Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 1999
Final Groundwater Monitoring Report: Spring 1999: Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 1999
Final Groundwater Monitoring Report: Fall 1999: Appendix Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program December 1999
Final Groundwater Monitoring Report: Fall 1999: Appendix Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program December 1999
Final Groundwater Monitoring Report: Fall 1999 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program February 2000
Final Groundwater Monitoring Report: Spring 2000 Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 2000
Final Groundwater Monitoring Report: Spring 2000 Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 2000
Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 1 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 2000
Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 2 . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program July 2000
Non-Routine Groundwater Monitoring Report: August 2001 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch January 2002
Non-Routine Groundwater Monitoring Report: September 2001 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch January 2002
Non-Routine Groundwater Monitoring Report: January 2002 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2002
Groundwater Monitoring Report: Fall 2001: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2002
Groundwater Monitoring Report: Fall 2001: Volume 2 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2002
Non-Routine Groundwater Monitoring Report: April 2002 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch July 2002
Non-Routine Groundwater Monitoring Report: June 2002 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch August 2002
Non-Routine Groundwater Monitoring Report: October 2002 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch December 2002
Groundwater Monitoring Report: Spring 2006: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch September 2006
Groundwater Monitoring Report: Fall 2006: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch January 2007
Groundwater Monitoring Report: Spring 2007: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch August 2007
"Groundwater Monitoring Report: Spring 2007" (CD). Prepared by Geo-Logic Associates August 2007
Groundwater Monitoring Report: Fall 2007: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2008
"Groundwater Monitoring Report: Fall 2007" (CD). Prepared by Geo-Logic Associates March 2008
Groundwater Monitoring Report: Spring 2008: Volume 1 . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2009
"Groundwater Monitoring Report: Spring 2008" (CD). Prepared by Geo-Logic Associates March 2009
Sub-Series 3.2.4. Pre-treatment plant effluent pipeline project 1997
"Air Quality Analysis: Stringfellow Site: PTP Effluent Pipeline Project." Prepared by JHA Environmental Consultants, LLC for the Department of Toxic Substances Control October 28, 1997
"Response to Comments: Proposed Negative Declaration and Initial Study for Stringfellow PTP Effluent Pipeline Project." Prepared by the Department of Toxic Substances Control December 22, 1997
Sub-Series 3.2.5. Stormwater sampling 2009
Stormwater Sampling Results Letter Report (December 2008). Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Legacy Landfills Branch February 25, 2009
February 2009 Stormwater Sampling Results Letter Report . Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Legacy Landfills Branch March 3, 2009
Sub-Series 3.2.6. Supplemental feasibility study 2000-2007
Draft Supplemental Feasibility Study: Volume 1: Report . Prepared by ENVIRON Corporation for the Department of Toxic Substances Control April 21, 2000
Draft Supplemental Feasibility Study: Volume 2: Appendices . Prepared by ENVIRON Corporation for the Department of Toxic Substances Control April 21, 2000
Draft Supplemental Feasibility Study: Volume 3: Appendices . Prepared by ENVIRON Corporation for the Department of Toxic Substances Control April 21, 2000
Final Draft Supplemental Feasibility Study: Volume 1: Report . Prepared by ENVIRON International Corporation for the Department of Toxic Substances Control December 21, 2007
Final Draft Supplemental Feasibility Study: Volume 2: Appendices . Prepared by ENVIRON International Corporation for the California Department of Toxic Substances Control December 21, 2007
Final Draft Supplemental Feasibility Study: Volume 3: Appendices . Prepared by ENVIRON International Corporation for the California Department of Toxic Substances Control December 21, 2007
"Final Draft Supplemental Feasibility Study: Volumes 1 through 3" (CD). Prepared by ENVIRON International Corporation December 21, 2007
Sub-Series 3.2.7. Surface water monitoring 2006-2008
Winter 2006 Surface Water Monitoring Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the Department of Toxic Substances Control, Stringfellow Branch June 2006
"Winter 2006 Surface Water Monitoring Report" (CD). Prepared by GeoLogic Associates June 2006
Winter 2008 Surface Water Monitoring Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the Department of Toxic Substances Control, Stringfellow Branch June 2008
Sub-Series 3.2.8. Well/piezometer installation 1998-2001
Stringfellow - Zone 1: Extraction Well and Piezometer Installation and Testing, Riverside, California . Prepared by URS Greiner, Inc. - California for the Department of Toxic Substances Control March 1998
Cone Penetrometer Testing and Well/Piezometer Installation Work Plan . Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch September 2001
Sub-Series 3.2.9. Zone 3 1999-2000
Zone 3 Deep Soil Gas Survey Report. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control June 7, 1999
Step-Drawdown and Long-Term Pumping Tests: Zone 3 Monitoring Wells . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control March 2000
Sub-Series 3.2.10. Zone 4 1996-2009
Phase I Report: Community Extraction System Design Data Collection and Private Well Sampling: Stringfellow - Zone 4 . Prepared by URS Consultants, Inc. for the Department of Toxic Substances Control August 1996
Zone 4 Subsurface Investigation. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch February 2003
Stringfellow Perchlorate Plume Definition in Zone 4: Appendix H . Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Legacy Landfill and RCRA Corrective Actions Program May 2008
Groundwater Modeling Work Plan: Stringfellow Superfund Site Zone 4 . Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch January 28, 2009
In-Situ Bioremediation Pilot Test Work Plan: Stringfellow Superfund Site Zone 4 . Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch January 29, 2009
Draft: Zone 4 Remedial Investigation Report. Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Legacy Landfill and Corrective Action Office March 17, 2009
"Zone 4 Remedial Investigation Report" (CD). Prepared by Kleinfelder West, Inc March 17, 2009
In-Situ Bioremediation Pilot Study Work Plan: Stringfellow Superfund Site Zone 4 . Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch April 27, 2009
Groundwater Modeling Work Plan: Stringfellow Superfund Site Zone 4 . Prepared by Kleinfelder West, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch May 18, 2009
Sub-Series 3.2.11. Other documents 2000-2009
Final Clay Barrier Testing - Pumping Test Work Plan . Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control May 3, 2000
UXO Avoidance and Debris Removal Report. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch June 2003
Zone 1 Monitoring Well OW-15D Conversion Construction Summary Report . Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2007
Monitoring Wells FC-161A, FC-162A, and FC-163A Decommissioning Report . Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch March 2008
Passive Sampling Pilot Study Report. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control February 2009
Sub-Series 3.3. Pyrite Canyon Group 1991-circa 2000
- Sub-Series 3.3.1. AOC-10 and CD Scope of Work Quarterly Reports, 1992-1994
- Sub-Series 3.3.2. Community extraction system, 1992-1999
- Sub-Series 3.3.3. Community well test program, 1991-1993
- Sub-Series 3.3.4. Routine groundwater monitoring, 1992-1997
- Sub-Series 3.3.5. Routine site maintenance operations, 1992
- Sub-Series 3.3.6. Soil vapor extraction field test, 1993-1994
- Sub-Series 3.3.7. Work plans, 1992-1997
- Sub-Series 3.3.8. Zone 1 dewatering system, 1993-1999
- Sub-Series 3.3.9. Zone 3 field investigation, 1993
- Sub-Series 3.3.10. Other documents, 1993-2000
Sub-Series 3.3.1. AOC-10 and CD Scope of Work Quarterly Reports 1992-1994
Stringfellow Project AOC-10 and CD Scope of Work Quarterly Report No. 1 . Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group November 9, 1992
Stringfellow Project AOC-10 and CD Scope of Work Quarterly Report No. 7 . Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group May 10, 1994
Sub-Series 3.3.2. Community extraction system 1992-1999
Community Extraction System Final Interim Operation Plan (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group November 1992
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 1 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group June 1993
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 2 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1993
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 3 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group June 1994
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 4 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1994
Achievement of Performance Standard Community Extraction System Element of Work . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group January 1995
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 5 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group September 1995
Achievement of Performance Standard Community Extraction System Element of Work . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group February 1996
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 6 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group February 1996
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 7 (Project No. 22020-003). Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group September 1996
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 8 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group July 1997
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 9 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group November 1997
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 10 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group July 1998
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 11 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1998
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 13 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group April 1999
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 12 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group March 1999
Sub-Series 3.3.3. Community well test program 1991-1993
Pyrite Canyon Group Community Well Test Program Phase I . Prepared by Bechtel National, Inc. for Pyrite Canyon Group May 1991
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 1 - Report . Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group June 1991
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 2 - Appendices A-E . Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group June 1991
Community Well Test Program Phase 1: Final Health and Safety Plan for the Permanent Facilities Installation . Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group March 1991
Community Well Test Program Phase I: Final Quality Assurance/Quality Control Plan for the Permanent Facilities Installation . Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group March 1991
Pyrite Canyon Group Community Well Test Program Phase 1: Technical Specifications . Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group Stringfellow Project May 1991
Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 3 - Appendices F G . Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group June 1991
Community Well Test Program Phase 1: Final Long-Term Test Plan . Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for Pyrite Canyon Group December 1991
Community Well Test Program: Final Health and Safety Plan (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1992
Community Well Test Program Phase I: Monthly Report No. 27 (three copies). Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group November 10, 1992
Community Well Test Program Phase 1 Final Report: Volume 1 - Report . Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group March 1993
Community Well Test Program Phase 1 Final Report: Volume 2 Appendices . Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group March 1993
Sub-Series 3.3.4. Routine groundwater monitoring 1992-1997
Final Routine Groundwater Monitoring Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1992
Routine Groundwater Monitoring: Final Supplement to the Project Health and Safety Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group; two copies November 1992
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group June 1993
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group June 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 1 Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1993
Routine Groundwater Monitoring Biennial Report - Spring 1994: Volume 1 - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group June 1994
Routine Groundwater Monitoring Semi-Annual Report - Fall 1994: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1994
Routine Groundwater Monitoring Semi-Annual Report - Fall 1994: Volume 1 - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1994
Routine Groundwater Monitoring Annual Report - Spring 1995: Volume I - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group September 1995
Routine Groundwater Monitoring Semi-Annual Report - Fall 1995: Volume 1 Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group March 1996
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume I - Report . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume II - Appendices A and B . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume III - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume IV - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume V - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VI - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VII - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume VIII - Appendix B (continued) . Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc March 1997
Routine Groundwater Monitoring Semi-Annual Report: Fall 1996: Volume I Report, Appendix A . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group September 1997
Routine Groundwater Monitoring Semi-Annual Report: Fall 1996: Volume II Appendix B . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group September 1997
Sub-Series 3.3.5. Routine site maintenance operations 1992
Final Routine Site Maintenance Operations Plan . Prepared by Pyrite Canyon Group December 1992
Routine Site Maintenance Operations: Final Supplement to the Project Health and Safety Plan . Prepared by Pyrite Canyon Group December 1992
Sub-Series 3.3.6. Soil vapor extraction field test 1993-1994
Final Soil Vapor Extraction Field Test Design Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group February 1993
Final Soil Vapor Extraction Field Test Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group February 1993
Soil Vapor Extraction Field Test: Final Supplement to the Project Health and Safety Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. (two copies) May 1993
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 1 Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 2 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 3 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 4 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1994
Sub-Series 3.3.7. Work plans 1992-1997
Zone 1 Soil Gas Survey: Final Health and Safety Plan . Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group May 1992
Final Work Plan: Community Relations Support Activities by Settling Defendants for the Interim Rod Implementation at Stringfellow Superfund Site . Prepared for Settling Defendant by Pyrite Canyon Group, Inc November 5, 1992
Final Project Health and Safety Plan (Project No. 22020). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group May 1993
Work Plan for Further Work in Zone 4. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1997
Sub-Series 3.3.8. Zone 1 dewatering system 1993-1999
Final Zone 1 Dewatering System Plan (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group January 1993
Zone 1 Dewatering System: Final Supplement to the Project Health and Safety Plan (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group January 1993
Final Zone 1 Dewatering System Design Report (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group September 1993
Construction Completion and Construction As-Built Report for All Zone 1 Dewatering System Components: Volume 1 Report, Appendices A-G (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group June 1994
Construction Completion and Construction As-Built Report for All Zone 1 Dewatering System Components: Volume II - Appendices H, I (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group June 1994
Zone 1 Dewatering System Six-Month Evaluation Report No. 1 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group November 1994
Measurement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group January 1995
Measurement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group January 1995
Zone 1 Dewatering System Six-Month Evaluation Report No. 2 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group September 1995
Measurement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1995
Measurement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1995
Zone 1 Dewatering System Six-Month Evaluation Report No. 3 (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group May 1996
Zone 1 Dewatering System Six-Month Evaluation Report No. 4 . Prepared by Pyrite Canyon Group January 1997
Achievement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group July 1997
Achievement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group July 1997
Zone 1 Dewatering System Six-Month Evaluation Report No. 5 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group January 1998
Zone 1 Dewatering System Six-Month Evaluation Report No. 6 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group March 1998
Zone 1 Dewatering System Six-Month Evaluation Report No. 7 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1998
Zone 1 Dewatering System Six-Month Evaluation Report No. 10 . Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group May 1999
Zone 1 Dewatering System Six-Month Evaluation Report No. 10 (Further Work in Zone 4): Volume II: Appendix D . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group April 1999
Zone 1 Dewatering System Six-Month Evaluation Report No. 8 . Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group December 1998
Zone 1 Dewatering System Six-Month Evaluation Report No. 9 . Prepared by S.S. Papadopulos and Associates, Inc. and Pyrite Canyon Group March 1999
Sub-Series 3.3.9. Zone 3 field investigation 1993
Final Zone 3 Field Investigation Plan (Project No. 22020-002). Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for Pyrite Canyon Group September 1993
Zone 3 Field Investigation: Final Supplement to the Project Health and Safety Plan (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group September 1993
Sub-Series 3.3.10. Other documents 1993-2000
Final Interim Report of Feasibility of Re-Injection and Screening of Water Management Options (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1993
Final Water Management Report (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group August 1994
3D Seismic Reflection Imaging Interpretation at the Stringfellow Hazardous Waste Site - Zones 2 3, Riverside County, California: Addendum 4 (Draft Final). Submitted by Resolution Resources, Inc. to URS Greiner Woodward-Clyde. Prepared for the Department of Toxic Substances Control November 1999
Maps, charts, and graphs containing data about Stringfellow Hazardous Waste Site zones. Material is from an unidentified report circa 2000
Sub-Series 3.4. Santa Ana Watershed Project Authority 1984
Final Draft Predesign Report for Interim Treatment Facilities . Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority September 1984
Proposed Stringfellow Interim Treatment Facility (a geotechnical reconnaissance). Prepared by Geotechnical Consultants, Inc. for the Santa Ana Watershed Project Authority, Riverside, California September 1984
Specifications for Furnishing Equipment for Interim Treatment Facilities (procurement documents). Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services) September 1984
Construction of Interim Treatment Facilities for the Stringfellow Hazardous Waste Site: Specifications and Reduced Drawings . Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for owner: State of California Department of Health Services) October 1984
Draft Operation and Maintenance Manual for Interim Treatment Facilities . Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services) October 1984
Sub-Series 3.5. United States Environmental Protection Agency, Region IX, and other federal agencies 1983-2006
- Sub-Series 3.5.1. United States Environmental Protection Agency. Region IX, 1983-2006
- Sub-Series 3.5.2. United States Congress, 1984
- Sub-Series 3.5.3. U.S. Geological Survey, 1999
Sub-Series 3.5.1. United States Environmental Protection Agency. Region IX 1983-2006
"Electromagnetic Conductivity Survey." Prepared by Ecology and Environment, Inc. for the United States Environmental Protection Agency Region IX August 26, 1983
Final Fast-Track Remedial Investigation Feasibility Study . Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX April 9, 1984
Final Fast-Track Remedial Investigation Feasibility Study . Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX May 18, 1984
Final Stringfellow Summary Report. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX July 13, 1984
Draft Report: Pilot Testing of Mid-Canyon Interceptor Well Field (two copies). Prepared by Ecology and Environment, Inc. (CH2M Hill) for the United States Environmental Protection Agency August 10, 1984
Draft Report: Treatability Testing Program. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX August 10, 1984
Performance of Remedial Response Activities at Uncontrolled Hazardous Waste Sites (REM II): Work Plan for Operations and Maintenance of the Pretreatment Plant . Prepared by the United States Environmental Protection Agency Region IX August 29, 1985
Interim Health and Safety Plan for Pretreatment Plant Operations and Maintenance . Prepared by the United States Environmental Protection Agency Region IX September 6, 1985
Pretreatment Plant Sampling and Analysis Plan . Prepared by the United States Environmental Protection Agency Region IX September 6, 1985
Pretreatment Plant Operations and Maintenance Plan . Prepared by the United States Environmental Protection Agency Region IX September 9, 1985
"Toxicity Testing of Chlorobenzene Sulfonic Acid." Study by the United States Environmental Protection Agency 1986
Community Relations Plan. Prepared by Ecology and Environment, Inc. (CH2M Hill) for the United States Environmental Protection Agency Hazardous Site Control Division. Part of the program Remedial Planning Activities at Selected Uncontrolled Hazardous Waste Sites - Zone II November 1986
Stringfellow Acid Pits Superfund Site September 1990 Rercord of Decision: Administrative Record Index . Prepared by the United States Environmental Protection Agency Region IX September 1990
Stringfellow Superfund Site: Final ROD Administrative Record Index . Prepared by the United States Environmental Protection Agency Region IX October 8, 1996
5-Year Review Report for Stringfellow Hazardous Waste Site . Prepared by CH2M Hill, Inc. for the U.S. Environmental Protection Agency, Region IX September 2001
Third Five-Year Review Report for Stringfellow Superfund Site . Prepared by CH2M Hill, Inc., URS Group, Inc., and E2 Consulting Engineers, Inc. for the U.S. Environmental Protection Agency, Region IX (two copies) September 2006
"3rd-5-Year Review Report: Stringfellow Superfund Site" (CD) September 2006
Sub-Series 3.5.2. United States Congress 1984
"Engineering Case Study of the Stringfellow Superfund Site." Prepared by G.J. Trezek, Department of Mechanical Engineering, University of California, Berkeley, for Office of Technology Assessment, Congress of the United States August 1984
Sub-Series 3.5.3. U.S. Geological Survey circa 1999
"Characterization of Dissolved Organic Solutes in Wastewaters and Groundwaters at the Stringfellow Hazardous Waste Disposal Site: Final Report." By Jerry A. Leenheer, U.S. Geological Survey circa 1999