Guide to the Fredric Raichlen Papers, 1932-2014
Immediate Source of Acquisition
Subjects and Indexing Terms
Series 1 Biographical Documents and Correspondence 1
Subseries 1 Correspondence 1
Correspondence, Alphabetical
Astill Convention 1998 August 7 - September 14
Briggs, Michael: Corps of Engineers 2007 May 31 - June 1
Brooks, Norman (Tyler Prize) 1999 July 7 - 2000 March 20
Carta, David (Letter) ca. 1990
Current Invoices 1987 July 6 - 2007 June 27
French, Jon 1965 February 25 - 1969 March 28
Goring, Derek 1973 December 5 - 1997 July 10
Hammack, Joe 1968 September 30 - 2002 February 25
Jarvis, John J. (Georgia Tech) 1994 August 15
John Hopkins University: Brody Letter 2003 December 2 - 4
Lawrence, Ron: Email including Judy's Azusa Tank Photos 2007 June 19
Lee, Jiin-Jen 1966 September 22 - 1981 November 3
Lepelletier, Thierry 1975 September 3 - 1982 November 17
Li, Ying 1995 September 8 - 2003 May 14
Lillevang, Omar J. (Fund) 1982 December 8 - 2005 November 2
Liu, Phil 2003 September 25 - October 15
Margulis, Steve undated
Naheer, Ehud 1971 March 22 - 1987 June 10
Ohio State University Research Supplement 2002 December 11 - 2003 May 9
Pacific Weather Analysis 1996 August 25
Petroff, Catherine 1986 September 26 - 1996 February 13
Poon, Ying (Everest International Consultants, Inc.: Port of Long Beach) 2000 April 4 - 6
Raichlen, Fredric: Bulletin Board 1966 January 7 - 1973
Ramsden, Jerald 1986 December 15 - 1997 January 31
Robie & Matthai, A Professional Corporation 2001 December 13 - 14
Skjelbreia, Jim 1979 December 15 - 1991 August 2
Skjelbreia, Jim 1982 April - 1985 October 10
Synolakis, Costas 1983 March 28 - 1986 June 2
Synolakis, Costas: Emails 2000 August 7 - 2006 June 27
Ting, Francis 1982 August 27 - 1998 September 1
Tsunami Bulletin Board, Folder 1 of 2 1992 December 15 - 2001 June 25
Tsunami Bulletin Board, Folder 2 of 2 1992 December 15 - 2001 June 25
Tsunami Workshop Information: Lake Arrowhead 1974 January 30 - October 16
Watts, Philip 1991 October 15 - 2002 July 22
Zelt, Jeff 1981 June 21 - 1993 August 24
Correspondence, Chronological
Correspondence: 1961 to 1962 1961 August 18 - December 29
Correspondence: 1962 to 1963 1962 January 12 - November 28
Correspondence: 1963 to 1964 1963 January 7 - December 12
Correspondence: 1964 to 1965 1964 January 27 - December 8
Correspondence: 1965 to 1966 1965 January 12 - December 30
Correspondence: 1966 to 1967 1966 January 4 - December 12
Correspondence: 1967 to 1968 1967 January 7 - August 24
Correspondence: 1968 to 1969 ca. 1968 - 1969
Correspondence: 1969 ca. 1969
Correspondence: 1969 to 1970 1969 February 12 - June 18
Correspondence: 1970 1970 January 23 - December 28
Correspondence: 1971 1970 November 4 - 1971 December 30
Correspondence: 1972 1972 January 29 - December 4
Correspondence: 1973 ca. 1973
Correspondence: 1974 1974 January 1 - December 26
Correspondence: 1975 1975 January 3 - December 19
Correspondence: 1976 1976 April 23 - 1977 January 7
Correspondence: 1977 1977 January 5 - 1978 January 7
Correspondence: 1978 1978 February 14 - December 20
Correspondence: 1978 to 1984 1978 January 10 - November 1
Correspondence: 1980 ca. 1980
Correspondence: 1981 1980 January 2 - 1981 November 6
Correspondence: 1982 1981 December 9 - 20
Subseries 2 Professional Organizations, Academies and Award Nominations 2
Civil Engineering Examination 1967 November
State of California Professional Engineer Registration 1967 December 12 - 2011 June 30
State of New Jersey Professional Engineer Registration 1972 February 15 - 2016 April 30
American Society of Civil Engineers (ASCE) Fellow Appointment 1983 October 20 - 1984 September 10
National Academy of Engineering (NAE) Annual Meeting and Election Correspondence 1991 September 21 - 1994 October 13
Chakrabati, Subrata: National Academy of Engineering (NAE) Nomination 1993 March 31 - 1995 March 22
John G. Moffatt-Frank E. Nichol Harbor and Coastal Engineering Award 1994 April 19 - 1995 January 3
National Academy of Engineering (NAE) Nominations and Correspondence 1994 July 14 - 2002 April 4
Network for Earthquake Engineering Simulation (NEES) 2000 January 13 - February 10
National Science Foundation (NSF) Network for Earthquake Engineering Simulation (NEES) Meeting 2000 February 3 - February 22
National Academy of Engineering (NAE) Section 4 Information 2001 February 1 - 2003 July 15
Professional Nominations 2001 February 22 - 2003 July 8
National Academy of Engineering (NAE) Peer Committee 2002 September 30 - 2003 February 11
Imberger, Jorg: National Academy of Engineering (NAE) Nomination 2003 February 26 - 2004 May 6
National Academy of Engineering (NAE) Peer Committee 2003 April 22 - 2004 May 21
National Academy of Engineering (NAE) Peer Committee 2003 May 8 - 23
National Academy of Engineering (NAE) Meeting 2003 August 16 - 2003 December 8
National Academy of Engineering (NAE) Peer Committee Nominations 2004 May 6 - 2006
Dalrymple, Tony: National Academy of Engineering (NAE) Nomination 2004 May 7 - 18
Chapman Award 2007 May 3 - 6
Subseries 3 Education 3
Massachusetts Institute of Technology (MIT) Lecture 1940 September 30 - 1949 February 24
Civil Engineering: Strength of Materials & Theory of Structures, Folder 1 of 2 1951 February 12 - 1952 January 28
Civil Engineering: Strength of Materials & Theory of Structures, Folder 2 of 2 1951 February 12 - 1952 January 28
Hydraulic Machinery 1951
Regulation of Hydro-Electric Plants: Hydraulic Transients 1952
Hydraulics 1952
Structural Design 1952 November 29
Structural Design 1952 - 1953
Sanitary Engineering 1953
Advanced Calculus for Engineering 1953 September 22 - 1954 January 29
Water Power Engineering 1954
Advanced Calculus for Engineers 1954
Rivers & Harbors 1955
Massachusetts Institute of Technology (MIT) Thesis: Some Studies of Turbulence in the Wake of a Cylinder 1955 May 23
Structures 1958 September 12 - 1959 January 12
Acoustics 1959
Problems 1959
Shear Strength & Slope Stability (Whitman, R.V.) 1959 August
Experimental Hydromechanics ca. 1959 - 1960
Methods of Applied Math ca. 1960
Massachusetts Institute of Technology (MIT) Thesis: Theoretical and Experimental Study of Wave Induced Oscillations in Harbors of Simple Planform 1962 January 15
Course AM 152 ca. 1964
Computation of Water Hammer Pressures undated
Design of a Penstock Anchorage undated
Design of a Low Pressure Intake undated
Dynamics Problems from Mechanical Vibrations by Thompson undated
Estimating Dimensions of Powerhouse Generator Floor and Substructure undated
Free Surface Flow undated
Hydraulic Structure: Restricted Orifice Surge Tank undated
Morning Glory Spillway Design undated
Power Routing Study undated
Special Problems undated
Statistical Study of Precipitation and Runoff Data for Determination of Dependable Power undated
Toebes, G.H. undated
Subseries 4 Biographical 4
Personal Photos and Correspondence: Fredric Raichlen 1980 - 1986 October
Fredric Raichlen: Curriculum Vitae 2002 September 16
Series 2 California Institute of Technology 2
Subseries 1 California Institute of Technology Campus and Administration 1
Hydrodynamics Laboratory (Operating Under United States Navy Contract N0RD 9612) 1940
The High Speed Water Tunnel at the California Institute of Technology (Office of Scientific Research and Development National Defense Research Committee: Division C, Section C- 4) 1942 June 29
Azusa Facility Site and Floor Plans; Inspection Correspondence 1949 April 21 - 1982 July 6
Flume Pump Research 1952 August 6 - 1963 October 17
Flume Maintenance and Hydraulic Power Supply 1959 August 11 - 1988 May 31
Flume Memos 1960 July 19 - 1962 November 6
Tilting Flume Proposal 1960 December 27 - 1963 December 12
Flume Instrumentation Information 1962 August 3 - 1964 June 16
Haskell Bed Profiler 1962 August 13 - 1978 February 3
Wind Tunnel 1962 August 22 - 1963 February 15
Pump Dimension Information 1963 March 11 - May 7
Flume Heating 1963 May 16 - June 11
Flume Report 1964 October 10 - 1965 January 4
Wave Staff 1965 June 23 - July 2
Tsunami Study Wave Tank Design Estimate Proposal 1966 December 20 - 1967 April 7
Tsunami Project Equipment Design 1968 June 27 - 1969 February 14
Tsunami Wave Generator Information 1968 October 25 - 1976 March 11
Data Acquisition Systems (DDS 1103 Series) 1969
A Data Acquisition System (DDA 1103 Model D) 1969
Digital Data Systems (Juilfs, Don) 1969 April 16 - 1972 May 11
Description and Operation of Analog To Digital Data Acquisition System 1969 November 5 - 1974 July
High Velocity Flow Flumes and Correspondence with Daly, Elton F. 1970 January 5 - April 20
Kerckhoff Marine Lab (Days 2 and 3: Mariner 6) 1970 July - 1976 February 27
Azusa Wave Tank Design 1972 June 27 - 1977 June 16
Caltech Computer Lab Historical Files 1979 June 22 - 1981 January 20
Azusa Property Save and Move, Keck Modifications, and Tank 1985 June 12 - 2000 May 5
Planning for Caltech's Division of Engineering and Applied Science 1985 June 20
Ditch Day 1992 May 13
Flume Caliber 1993 April - 1997 January
Superscope Data Acquisition System 1993 October 26 - 1994 January 7
New Mellon Proposed Budget 1994 July 1 - 1997 June 30
Glass Window (Flume 1999) 1995 October 4 - December 14
Budget Status 1996 March 14 - 2004 April 22
Bookstore I 1996 May 9 - June 17
Documents and Correspondence (re:Caltech Bookstore) 1996 May 26 - 1997 October 13
Bookstore II 1996 May 28 - June 13
Bookstore Business Plan, Bookstore Reports and Correspondence 1996 June 3 - 1997 April 22
Bookstore III 1996 June 20 - July 25
Bookstore IV 1996 June 20 - June 27
The Future of Civil Engineering at Caltech 2001 July 17
National Academy of Sciences Travel Expense Report (NRC Travel) 2002 July 30 - October 21
University of Southern California (USC) Contract Information 2004 July 20 - 2005 January 6
Job Environment (Computer Program) undated
Subseries 2 Teaching and Student Coursework 2
HY 113b Forces on Structures 1967 February 22 - 2003 February 19
Wave Diffraction Around Islands (Gartrell, Gregory, Jr.) 1974 May 31
A Theoretical Study on the Hydrodynamic Forces on a Large Dock Near Fixed Boundaries (Lepelletier, Thierry) 1977 May
A History of Beach Development in the Santa Monica and Venice Areas with Increased Shoreline Development 1977 May
Beach Experiments Figures 1977 September 20
Tsunami at Hilo, Hawaii (Tam, Clement) 1979 August
Tsunamis Records of Hilo Harbor: Data Processing Report 1979 August
Hilo Harbor Modeling and Tsunamis Energy Spectrum Analysis 1979 August 27
Wave Current Experiments (Brownlie, William) 1980 February 25 - 1984 Septmeber 18
The Delta Series: Computer Modeling of River Delta Growth (Izzo, Dominic) 1980 May
Advanced Hydraulics Laboratory: Beach Profile and Onshore / Offshore Sand Transport by Swell and Storm Waves (Ting, C.K.F.) 1987
Experiment (E-5) 1992 December 15 - 1993 February 3
Comments from Course ME10 2000 - 2001
Kinetic Jets Project: Structural Engineering undated
Naheer, Ehud: Thesis undated
One-Dimensional Response of Basins & Harbors of Variable Depth (Naheer, Ehud) undated
Translation (McNown, John Stevenson) undated
Series 3 Technical Papers, Research and Consultancy Work 3
Subseries 1 Consultancy Work 1
The Silting of Reservoirs and Scour Prevention 1935
Report on Development of a Centrifugal Type Sediment Separator, By Means of Models 1938 January 4
A Method of Measuring High Velocity Flow in Open Channels (Rouse, Hunter) 1939 February 15
The Glenn L. Martin Company Seaplane Model Report No. E.R. 4022 1940
Results of Research Concerning the Origin of Long Period Movements Observed in Seaports (Laurent, Jean) 1952 December 22
Laboratory Methods of Generating Irregular Waves, The Principal Statistical Criteria of Which Agrees with Those of Actual Waves (Laurent, Jean and Miche, Robert) 1953 January 19
River and Harbor Improvement Design Memorandum Number 1: General Design for Playa Del Rey Inlet and Harbor, Venice, California (United States Army Corps of Engineers) 1956 November
Water Hammer Tests: Long Beach Pumping Plant 1964 August 27
Wave Machines, Moffatt & Nichol (Ewa Marina) 1975 June 17 - 1991 April 22
The Gulf Oil Company Pipeline: Oil Slick Transport (Prepared by Raichlen,F. and Lee, Jiin-Jen for Daniel, Mann, Johnson & Mendenhall, Inc. and Allan Hancock Foundation) 1976 October
Anchor Co & K: Analysis and Experiments 1978 January 12 - March 20
Monterey Bay Outfall, Folder 1 of 2 1978 September - 1983 October 2
Monterey Bay Outfall, Folder 2 of 2 1978 September - 1983 October 2
Larkspur Ferry Protection Scheme (Prepared for Moffatt & Nichol Engineers) 1981 October
Dare City Outfall 1981 October 27
Wave Power Industries, Folder 1 of 2 1983 January 16 - 1984 April 6
Wave Power Industries, Folder 2 of 2 1983 January 16 - 1984 April 6
Wave Power Book 2 1984 February 12 - 1985 May 9
Encina Outfall: May to June 1985, Folder 1 of 2 1984 May 15 - 1985 June 17
Encina Outfall: May to June 1985, Folder 2 of 2 1984 May 15 - 1985 June 17
Encina Outfall Model (June 1985) 1985 April 24 - June 27
San Elijo Ocean Outfall Inspection Report (Encina Outfall Project) 1992 January 22
Pump Intake: Coldwater Creek, Folder 1 of 2 1985 February 14 - June 27
Pump Intake: Coldwater Creek, Folder 2 of 2 1985 February 14 - June 27
Adamo-Rupp Review 1986 June 12 - July 24
Breakwater: Hammond, Indiana 1988 September 2 - November 5
Buffalo Harbor: B35C-C35B, Folder 1 of 2 1986 May 6 - 1988 October 14
Buffalo Harbor: B35C-C35B, Folder 2 of 2 1986 May 6 - 1988 October 14
Buffalo Harbor: A35A-B35B, Folder 1 of 2 1988 September 29 - October 11
Buffalo Harbor: A35A-B35B, Folder 2 of 2 1988 September 29 - October 11
Los Angeles Harbor Outfall 1988 December 14
Menlo Park 1989 September 27 - November 7
Tijuana Outfall 1990 January 30 - February 20
Miscellaneous Consultancy Documents 1990 February 11 - 16
Conti 1990 December 20 - 1991 January 25
Batam Island Project 1991 November 26 - December 21
Encina Re-Rocking 1992 January 8 - August 4
Hyperion Outfall 1992 February 26 - 2007 June 12
Oceanside Outfall, Folder 1 of 2 1992 August 21 - September 7
Oceanside Outfall, Folder 2 of 2 1992 August 21 - September 7
South Bay Tunnel Outfall Model Tests 1992 March 3 - August 16
South Bay Ocean Outfall (SBOO) 1994 March 8 - October 24
Refraction: South Bay Ocean Outfall (SBOO), Folder 1 of 3 1994 March 11 - 14
Refraction: South Bay Ocean Outfall (SBOO), Folder 2 of 3 1994 March 11 - 14
Refraction: South Bay Ocean Outfall (SBOO), Folder 3 of 3 1994 March 11 - 14
Refraction: South Bay Ocean Outfall (SBOO) II 1994 March 14
Wave Protection Aspects of the International Boundary and Water Commission's South Bay Tunnel Outfall 1994 May
Gary, Indiana 1995 October 24 - December 19
St. Thomas 1996 January 22 - 1998 March 27
A-Jacks Armor Unit 1997 June 2 - 1999 February 7
Guam Seawall 1997 December 5 - 1998 January 19
Titanic 1997 December 8 - 23
San Clemente 1998 May 15 - June 9
Palos Verdes 1998 November 11 - 1999 February 10
City of Rancho Palos Verde 1998 November 23 - 1999 June 29
Monterey Bay Outfall Stability Assessment: Final Report 1998 July
Geotechnical Report, Storm Drain Outfall Shaft and Outlet Structure: Rancho Palos Verdes, California 1999 April 2
Monterey Outfall Review 1999 June 24 - July 18
A-Jacks Transmission 1999 October 3 - October 25
Tuxpan, Mexico Outfall (Luciano) 2000 August
Samoa Review 2003 April 21 - 2009 August 27
CH2M HILL Industrial Design & Construction, Inc.: Mexico Port 2004 August 5 - 2005 June 21
Samoa Township 2006 January 23 - 2007 January 26
Consulting Agreement with the RETEC Group 2007 February 1
Experimental Beach Profiles undated
Howard's Solution undated
Some Historical Tsunami Data undated
Consultancy Work, Avalon Seawater
Avalon Seawater, Folder 1 of 2 1993 December 17 - 1994 February 25
Avalon Seawater, Folder 2 of 2 1993 December 17 - 1994 February 25
Model Study of the Avalon Seawall at Avalon, California (Prepared for Moffatt & Nichol Engineers) 1994 March
Consultancy Work, Basin Electric Power Cooperative
Model Tests for the Cooling Water Forebay of the Antelope Valley Station Unit 1 of the Basin Electric Cooperative (Prepared for Byron Jackson Pump Division, Borg-Warner Corporation) 1979 January
Model Tests of Raw Water Pump Well for the Basin Electric Power Cooperative (Prepared for Byron Jackson Pump Division, Borg-Warner Corporation) 1979 September
Additional Model Tests of Raw Water Pump Well for the Basin Electric Power Cooperative (Prepared for Byron Jackson Pump Division) 1980 February
Consultancy Work, Diablo Canyon
Pacific Weather Analysis Diablo Hindcasts, Folder 1 of 2 1940 January 23 - 1982 March 27
Pacific Weather Analysis Diablo Hindcasts, Folder 2 of 2 1940 January 23 - 1982 March 27
A Model Study of the Breakwater for the Diablo Canyon Site of the Pacific Gas and Electric Company Nuclear Power Plant 1969 August 18
General Model Considerations: Refractions, Folder 1 of 3 1975 February 13 - 1981 November 2
General Model Considerations: Refractions, Folder 2 of 3 1975 February 13 - 1981 November 2
General Model Considerations: Refractions, Folder 3 of 3 1975 February 13 - 1981 November 2
Diablo Canyon Wave Information Changes, Folder 1 of 2 1977 October - 1986 October 10
Diablo Canyon Wave Information Changes, Folder 2 of 2 1977 October - 1986 October 10
Diablo Canyon 1981 Shoal Model: Intake Model 1981 March 23 - June 24
Diablo Canyon Wave Information 1981: Laboratory, Folder 1 of 2 1981 June 15 - 1982 March 24
Diablo Canyon Wave Information 1981: Laboratory, Folder 2 of 2 1981 June 15 - 1982 March 24
Diablo Canyon Data Phase I, Folder 1 of 2 1981 October 3 - 13
Diablo Canyon Data Phase I, Folder 2 of 2 1981 October 3 - 13
Diablo Canyon 3D Model Information: Data Phase II, Folder 1 of 2 1981 October 6 - 1982 June 11
Diablo Canyon 3D Model Information: Data Phase II, Folder 2 of 2 1981 October 6 - 1982 June 11
Pacific Weather Analysis Diablo Hindcasts: Book II, Folder 1 of 3 1982 February 3
Pacific Weather Analysis Diablo Hindcasts: Book II, Folder 2 of 3 1982 February 3
Pacific Weather Analysis Diablo Hindcasts: Book II, Folder 3 of 3 1982 February 3
Diablo Canyon: Bechtel, Folder 1 of 2 1982 May 24 - July 1
Diablo Canyon: Bechtel, Folder 2 of 2 1982 May 24 - July 1
Report on Wave Climatology for Diablo Canyon, California 1982 June
Diablo Canyon Bechtel Data 1982 September 14 - 25
Extremal Analysis of the Wave Hindcasts for the Diablo Canyon Area, California (Dr. Resio, Don) 1982 December
The Investigation of Wave-Structure Interaction for the Cooling Water Intake Structure of the Diablo Canyon Nuclear Power Plant (Prepared for Pacific Gas and Electric Company) 1982 December
Hydraulic Model Study of Diablo Canyon Intake Structure Test Results: Ingestion Studies 1983 January
Diablo Reflection Coefficient 1983 January 19 - 1988 April 27
Pacific Gas & Electric Company Reports 1983 January 19
Winter at Diablo Canyon Site 1983 July 1
Ponding 1984 May
Diablo Canyon Rib Study 1985 April 29 - 1986 April 15
Ponding Analysis 1986 April 1 - August 12
Diablo Canyon Pressures, Folder 1 of 2 1996 February 29 - 1997 April 1
Diablo Canyon Pressures, Folder 2 of 2 1996 February 29 - 1997 April 1
Diablo Pressures: Bechtel 1996 September 25 - 1997 March 19
Diablo Pressures Calculations and Reports 1997 February 11 - March 3
Diablo Canyon Ponding, Folder 1 of 3 undated
Diablo Canyon Ponding, Folder 2 of 3 undated
Diablo Canyon Ponding, Folder 3 of 3 undated
Consultancy Work, Disney
S.W.O.O.P. 1979 August 30 - 1980 January 21
Disney, Wind: Honey, I Shrunk the Kids, Folder 1 of 2 1987 October 7 - 1989 December 28
Disney, Wind: Honey, I Shrunk the Kids, Folder 2 of 2 1987 October 7 - 1989 December 28
Disney Wave Generator, Folder 1 of 2 1987 November 4 - 1988 April 6
Disney Wave Generator, Folder 2 of 2 1987 November 4 - 1988 April 6
Walt Disney Imagineering: Tests of WaveTek Wave Generator 1988 January 24
Walt Disney Imagineering: Parsons (Moffatt Nichol Review) 1989 January 9 - May 9
Disney Honey I Shrunk, etc., Folder 1 of 2 1990 January
Disney Honey I Shrunk, etc. (2), Folder 2 of 2 1990 January
Disney Honey I Shrunk the Kids (Forces on the Grass Plants for the Honey I Shrunk the Kids Playground) 1990 January
Disney Water Effect 1992 November 24 - 1993 August 13
Disney Water Display: Stationary Breaking Waves 1993 September
Disney (1995) 1995 May 24
Disney Water Park Wind Tunnel Tests 1996 February 20 - April 17
Disney Raft Ride 1996 August 26 - September 9
Disney Oblique Wave (September 1996) 1996 September 3 - 1997 July 16
Walt Disney Imagineering Oblique Plate, Folder 1 of 2 1996 November 20 - 1997 May 9
Walt Disney Imagineering Oblique Plate, Folder 2 of 2 1996 November 20 - 1997 May 9
Disney Tapes: Reference Notes 1997 April 11
Consultancy Work, Federal Emergency Management Agency
Post, Buckley, Schuh & Jernigan, Inc.: Center for Coastal Studies Solicitation 2001 January 26
Post, Buckley, Schuh & Jernigan, Inc. and Federal Emergency Management Agency (FEMA) Contract 2008 July 3
CDM Federal Programs Corporation and Federal Emergency Management Agency (FEMA) 2009 March 13 - 23
Consultancy Work, Foster City Levees
Bob Born Data (August 1987) 1987 June - August
Foster City Levees, Folder 1 of 2 1987 July 15 - 1988 March 22
Foster City Levees, Folder 2 of 2 1987 July 15 - 1988 March 22
Preliminary Report on Analysis of Foster City Levees 1987 October 2
Preliminary Report on Analysis of Foster City Levees 1987 October 8
Report on Analysis of Foster City Levees 1987 December 15
Report on Analysis of Foster City Levees 1988 June 15
Finding of Federal Emergency Management Agency 1988 October 26
Comments on Findings of FEMA of October 8, 1988 (re: Foster City Levees) 1988 November 3
Foster City: Additional (December 1988) 1988 December 7 - 10
Born Information: Fallbrook 1990 July 27 - 1991 November 6
Born Valve Tests 1991 June 27 - 1992 January 16
Born Field Tests, Folder 1 of 2 1991 July 12 - 1992 April 3
Born Field Tests, Folder 2 of 2 1991 July 12 - 1992 April 3
Born Exhibits 1992 February 4 - March 8
Consultancy Work, Island Esther
Island Esther Model Study 1966 June 17 - August 7
Standard Oil Study: Island Esther 1966 August 6
Laboratory Study of Wave Run-Up on Island Esther 1966 August 11
Consultancy Work, Mendocino
Mendocino Breakwater: General 1972 May 30 - 1973 March 18
Construction Notes: 3-D Model Mendocino Power Plant 1972 - 1973
Surveying Information and Contours as Built 1972 September 18 - 1973 January 15
Consultancy Work, Metal Bellows Corporation
Metal Bellows 1972 January - 1977 September 15
Pulsation Damping for the Chemical and Volume Control System of the Catawba Nuclear System (Prepared for Metal Bellows Corporation) 1977 October
Model Construction Report: Rough Draft undated
Consultancy Work, Metropolitan Water District (MWD)
Metropolitan Water District (MWD) Study, A50 Series, Folder 1 of 2 1964 April 14 - 1966 April 15
Metropolitan Water District (MWD) Study, A50 Series, Folder 2 of 2 1964 April 14 - 1966 April 15
Harbor Boat no. 3: Marina Del Rey 1965 October 21 - 1968 June 3
Metropolitan Water District (MWD) Bolsa Island Study Preliminary and Estimates 1965 December 7 - 1966 February 2
Experimental Data: Metropolitan Water District (MWD) Island, Folder 1 of 2 1966 March 1 - April 5
Experimental Data: Metropolitan Water District (MWD) Island, Folder 2 of 2 1966 March 1 - April 5
Metropolitan Water District Island Study: Summary Information 1966 June 3 - 29
Bolsa Island Nuclear Power & Desalting Plant 1968 December 20
Association of Metropolitan Water Agencies Refraction 1994 April 9
Association of Metropolitan Water Agencies 1994 April 24 - May 2
Metropolitan Water District Floating Breakwater 2003 June 26 - 2004 January 12
Metropolitan Water District Marina Problem 2003 November 5 - 2004 March 23
Consultancy Work, Naval Civil Engineering Laboratory (NCEL) and Naval Construction Battalion Center
Office of Naval Research (ONR): Breaking Waves, Folder 1 of 2 1959 December 31 - 1996 August 20
Office of Naval Research (ONR): Breaking Waves, Folder 2 of 2 1959 December 31 - 1996 August 20
Design Information for Wave Machine and Basin 1963 June 30 - 1965 June 15
Naval Civil Engineering Laboratory (NCEL) Review 1973 March 14 - 1976 April 22
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Folder 1 of 2 1976 September 17 - 1977 February 3
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Folder 2 of 2 1976 September 17 - 1977 February 3
Hydrodynamic Analysis of the Tethered Float Breakwater (Prepared for the Civil Engineering Laboratory, Naval Construction Battalion Center) 1976 December
Hydrodynamic Analysis of the Tethered Float Breakwater (Prepared for the Civil Engineering Laboratory, Naval Construction Battalion Center: Not For Public Release) 1976 December
The Behavior of an Inclined Pontoon Breakwater in Water Waves 1978 May
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Book 2, Folder 1 of 2 1978 June 23 - September 25
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Book 2, Folder 2 of 2 1978 June 23 - September 25
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Book 3, Folder 1 of 2 1978 December 27 - 1979 October 15
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Book 3, Folder 2 of 2 1978 December 27 - 1979 October 15
Naval Civil Engineering Laboratory (NCEL) Floating Breakwater, Book 4 1980 April 14 - June 28
Some Experiments Dealing with the Interaction of Currents and Waves (By Raichlen, Fredric and Lee, Jiin-Jen for Naval Construction Battalion Center) 1982 October
The Interaction of Solitary Waves with Currents (By Raichlen, Fredric and Lee, Jiin-Jen for Naval Construction Battalion Center) 1983 March
PMB-Naval Civil Engineering Laboratory (NCEL) Report 1989 July
Naval Civil Engineering Laboratory (NCEL) Study, Folder 1 of 2 1990 January 21 - February 6
Naval Civil Engineering Laboratory (NCEL) Study, Folder 2 of 2 1990 January 21 - February 6
Naval Civil Engineering Laboratory (NCEL) Study, Book #2, Folder 1 of 2 1990 February 15 - April 16
Naval Civil Engineering Laboratory (NCEL) Study, Book #2, Folder 2 of 2 1990 February 15 - April 16
Naval Civil Engineering Laboratory (NCEL), Book #3 1990 March 12 - June 25
Valve Tests 1991 February 21 - 22
Naval Civil Engineering Laboratory (NCEL) Rising Box 1992 January 31 - March 24
Office of Naval Research (ONR): Breaking Waves II 1995 January 26 - March 13
The Inclined Floating Breakwater: A Progress Report undated
Consultancy Work, Orange County
Outfall Design: General, Folder 1 of 2 1967 November 4 - 2000 July 5
Outfall Design: General, Folder 2 of 2 1967 November 4 - 2000 July 5
Specifications and Plans: Orange County Ocean Outfall No. 2 1968
Appendix D (Prepared for John Carollo Engineers) 1968 April 30
Profiles of Municipal Breakwater 1983 April 14
Breakwater Report 1983 May 31
Summary Report of Contract 2.1: Ocean Outfall Design of Enhanced Armor Rock 1983 December
A Detailed Model Study of Damage to a Large Breakwater and Model Verification of Concepts for Repair and Upgraded Strength 1984
Basis of Design Report: Outfall Armor Rock 1992 November
Re-Ballasting: Orange County Outfall 1995 December 5 - 1997 January 6
The Re-Rocking of the Orange County Outfall 1996
County Sanitation District of Orange County (CSDOC) Investigation and Repair of Ocean Outfall: Carollo Engineering J-39 Contract Revisions 1996 February 27 - June 6
Project: Proposed Carollo Schedule 1996 May 21
Orange County Outfall Model 1996 December - 1999 September
Over Head Report Presentation: Orange County 1997 April 15
Physical Model Tests of the Proposed Armor Protection for the Orange County Outfall: Prepared for Carollo Engineers 1999 September
Orange County Outfall Model Tests I and II 1999 September
Orange County Model Tests II 1999 September 5 - 2000 February 3
Physical Model Tests of the Proposed Armor Protection for the Orange County Outfall Model Tests II 2000 January
Orange County Re-Rock 2000 June 29 - 2001 July 30
Sanitation District Outfall 2006 January 26 - 2008 November 25
Consultancy Work, Pier J
Navy Basin II 1951 May - 1998 December 11
Pier J Review Committee 1995 January 30 - 1998 November 30
Port of Long Beach (POLB): Navy Basin 1995 February 26 - 1998 May 19
Pier J Surge Barrier Technical Review Committee Materials 1995 March 14
Long Beach Pier J, Folder 1 of 2 1995 March 21 - June 20
Long Beach Pier J, Folder 2 of 2 1995 March 21 - June 20
Port of Long Beach: Navy Basin, Folder 1 of 2 1995 April 5 - 2000 March 22
Port of Long Beach: Navy Basin, Folder 2 of 2 1995 April 5 - 2000 March 22
HB Pier J Coastal Engineering Research Committee (CERC) Data, Folder 1 of 2 1995 July 6 - 28
HB Pier J Coastal Engineering Research Committee (CERC) Data, Folder 2 of 2 1995 July 6 - 28
Pier J Design Report 1995 December 6 - 27
Port of Long Beach Navy Basin Phase I Study 1996 January 24
Port of Long Beach Pier J Additional Numerical Study Summary Report (Moffatt & Nichol Engineers) 1996 January 26
Moffat & Nichol Navy Basin Review of March 2000 Report 1996 February 6 - 2000 March 2
Port of Long Beach, Port of Los Alamitos Numerical Model 1997 June 14 - October 1
Main Operating Base (M.O.B.) Navy 1998 April 2 - 27
Review of Numerical Model: Port of Long Beach, Port of Los Alamitos 1999 December 15 - 2000 May 2
Navy Basin 2000 March 22 - 27
Moffat & Nichol: Port of Long Beach 2005 July 22 - 2007 January 26
Tsunami Hazard Assessment for the Ports of Long Beach and Los Angeles: Final Report, Moffat & Nichol 2007 April
Consultancy Work, Point Loma, San Diego
Black & Veatch, San Diego, Folder 1 of 2 1983 November - 1990 May 10
Black & Veatch, San Diego, Folder 2 of 2 1983 November - 1990 May 10
Point Loma: Current Data 1990 January 31 - September
Black & Veatch, Book #2 (Velocity & Pressures) 1990 April 12 - 1991 January 31
Point Loma Extension (General) 1991 May 28 - 1992 May 26
Point Loma Outfall Failure 1992 January 23 - March 10
Point Loma Re-Rocking 1992 March 3 - 1997 September 12
Contract Documents for Ocean Outfall Reballast and Corrosion Control Project 1992 May 21
Point Loma Sewer Outfall Stability Tests 1994 August 17
Rosarito Intake 1995 December 4 - 2003 November 17
Rosarita Intake (Engineering Science) 1996 January 10 - 2000 April 24
Re-Ballasting Point Loma Outfall (Re-Ballasting of a Section of the Point Loma Ocean Outfall, Prepared for Parson's Engineering Science, Inc.) 1996 March
Loma Report and Figures 1996 March
Rosarito Report: Rock Protection and Forces (The Rosarito Power Plant Cooling Water Intake Pipeline, Prepared for Parsons Engineering Science) 2000 February
Peru Outfall 2000 November 13 - 2001 February 21
Peru Outfall Report: Review of Report on the Chimbote Submarine Outfall (Prepared for Parsons Engineering Science, Inc.) 2001 January
Consultancy Work, Redondo Beach Pier, King Harbor
Redondo Beach Pier 1988 September 7 - 1992 July 1
Redondo Beach King Harbor 1989 November 30 - 1990 January 6
General Design Memorandum Number 3, Folder 1 of 2 1989 November - 1990 June
General Design Memorandum Number 3, Folder 2 of 2 1989 November - 1990 June
Redondo Beach 1996 November 4 - 1997 August 30
Consultancy Work, Sammi Superstars Oil Spill
Oil Slick Study 1976 August 29 - October 6
Champion Oil Spill 1978 January 3 - 1982 March 8
Sammi Superstars Oil Spill, Folder 1 of 2 1991 January 8 - 1993 March 30
Sammi Superstars Oil Spill, Folder 2 of 2 1991 January 8 - 1993 March 30
Oil Spill: Los Angeles Harbor 1993 February 12 - June 2
Sammi Superstars Oil Spill Book 2 1993 March 5 - 1994 January 28
Coastal Conservancy 1993 March 12 - April 23
Consultancy Work, Santa Cruz
Santa Cruz Design & Model Tests, Folder 1 of 2 1983 March - 1985 November 7
Santa Cruz Design & Model Tests, Folder 2 of 2 1983 March - 1985 November 7
Santa Cruz Outfall Model Results Data 1985 October 14 - 17
Design of the Rock Protection for the Santa Cruz Outfall (By Raichlen, Fredric for Brown and Caldwell Consulting Engineers) 1985 December
Santa Cruz Rock Size 1987 April 20 - 1988 February 18
Consultancy Work, Skagway
Skagway, Folder 1 of 2 1966 October 29 - 1998 December 23
Skagway, Folder 2 of 2 1966 October 29 - 1998 December 23
Skagway Barge Dynamics 1995 August 7 - 1996 September 30
Skagway II 1997 March 13 - 1998 November 21
Skagway: Photographs and Film Roll 1997 September 7
Skagway: Photographs and Film Roll 1997 September 7
Juneau and Skagway: Photographs and Film Roll 1997 September 7
Skagway Book 2 1999 January 13 - February 27
Consultancy Work, United States Army
Army Floating Breakwater, Folder 1 of 2 1980 July 17 - 1981 March 16
Army Floating Breakwater, Folder 2 of 2 1980 July 17 - 1981 March 16
Experiments with a Sloping Float Breakwater in Water Waves, Phase I (Prepared for Department of the Army Wilmington District, Corps of Engineers) 1981 April
Shore Protection Manual (SPM) Review 1989 July 2 - September
United States Army Corps of Engineers Dredging Research Technical Notes (Folder 1) 1992 July 21
Waves on an Adverse Current: A Data Report (Prepared for the Coastal Engineering Research Center, The Waterways Experiment Station, United States Army Corps of Engineers) 1994 August
United States Army Corps of Engineers Wave Generator 2007 May 30 - October 11
Subseries 2 Depositions and Cases 2
California Steel, Folder 1 of 2 1978 May 19 - 1990 January 9
California Steel, Folder 2 of 2 1978 May 19 - 1990 January 9
California Steel Information (Fogel & Roths) 1985 June 11 - 1990 December 10
Las Tunas Beach 1986 November 3
Simon Book II 1986 January 22 - 1987 April 22
Refraction Program 1991 February 28 - 1992 March 9
Brody Villa Blue Lagoon 1995 January 1 - 1998 August 14
Brody: File # 2 1995 February 22 - 1998 May 5
Skagway, Alaska Deposition 4: Raichlen, Fredric 1995 April 25 - 1999 May 1
Brody: Blue Lagoon 1997 October 3 - 1998 April 15
Malibu Landslide and Damage 1998 March 31 - 2002 November 12
Skagway, Alaska Deposition: Raichlen, Fredric 1998 December 17
Skagway, Alaska Deposition Exhibit 2: Raichlen, Fredric 1998 December 17
Deposition of McGill, Michael, P.E., Folder 1 of 2 2000 April 25
Deposition of McGill, Michael, P.E., Folder 2 of 2 2000 April 25
Graven, Joseph 2002 January 2 - 2003 April 11
Applied Fluids Engineering, Inc. (Copy of Case Number BC262348) 2002 June 26
Loomis: Albion River 2002 December 18 - 2003 February 28
CECON Group 2003 October 20 - November 4
CECON Group 2005 June 8 - December 8
Subseries 3 Technical Papers and Research 3
Three Dimensional Study 1960 April 19 - 1973 February 5
Tidal Estuaries 1963 April 26 - June 3
The Harmonius Analysis of Alluvial Beds 1963 August 22
Moored Body Theory 1963 December 30 - 1964 May 8
Wind Tunnel Experiments 1964 February 15 - March 8
Oscillations in an Arbitrary Shaped Basin 1964 April 9 - 16
Experiment Results: Moored Body, Folder 1 of 2 1964 August 1 - 1965 January 21
Experiment Results: Moored Body, Folder 2 of 2 1964 August 1 - 1965 January 21
Dune Growth 1965 March 11 - May 26
Turbulence Measurement 1965 May 31
Analytical Prototype Moored Boats 1967 June 7 - September 20
Prototype Mooring Systems and Response CRVs 1967 September 18 - 1968 March 12
Non-Linear and Linear Unsymmetric Mooring Systems 1967 September 26 - October 31
Summary and Runs 1 to 5 1967 December 21 - 26
Movement of Material by Breaking Waves 1968 January 28 - 1971 July 16
Movement of Material Under Waves 1968 January 28 - 1975 January 11
Tsunamis Harmonic Analysis 1968 December 27 - 1969 January 6
Locations Common to 1960 and 1964 Tsunamis 1969 September 11
Two Dimensional Study 1972 July 27 - 1973 January 19
Reflections from Breakwaters of Rock and of Dolosse 1972 December 18 - 1973 January 9
Preliminary 3-Dimensional Experiments 1973 February 8 - 1993 February 19
Excitation of Fluids in Containers, Folder 1 of 2 1973 March 9 - June 6
Excitation of Fluids in Containers, Folder 2 of 2 1973 March 9 - June 6
Run-Up Gage Circuit Diagram 1973 July 24
Run-Up Experiments 1973 August 13 - 1974 May 23
Untitled, Folder 1 of 2 1974
Untitled, Folder 2 of 2 1974
Incipient Motion of a Sphere Resting on a Bed of Spheres Theoretical and Experimental Results 1974 December 5 - 6
Wave Generation and Calibration of Waves 1974 December 16 - 1975 July 24
Tethered Buoyant Sphere 1975 November 5 - 1976 August 4
Harbor Resonance Variable Depth 1975 December 29 - 1976 June 14
The Tethered Float Breakwater Ocean Experiment 1976 June 28
Experiments, Folder 1 of 2 1977 June 13 - 1978 November 2
Experiments, Folder 2 of 2 1977 June 13 - 1978 November 2
Notes Regarding Potential Research Topics 1978 October 12 - 1982 April 14
Hilo Harbor Study 1980 December 11 - 1981 March 24
Untitled 1981 July 8 - September 20
Damage to West Breakwater 1982 January 11 - 1983 January 29
Summary of Research 1982 April - December 27
Breaking Wave Study, Folder 1 of 2 1986 December 28 - 1987 February 6
Breaking Wave Study, Folder 2 of 2 1986 December 28 - 1987 February 6
Breaking Waves Experiments 1987 September 25 - 1988 May 11
Bottom Pressures and Solitary Curves, Folder 1 of 2 1989 April 5 - December 21
Bottom Pressures and Solitary Curves, Folder 2 of 2 1989 April 5 - December 21
Bottom Pressures Book #2 1990 April 18 - September 7
Inlet Experiments 1991 December 2 - 1994 April 6
Forces on a Horizontal Cylinder: Raw Data 1992 April 7 - 1993 August 5
Forces on Cylinder off the Bottom, Folder 1 of 2 1992 June 6 - 1997 February 7
Forces on Cylinder off the Bottom, Folder 2 of 2 1992 June 6 - 1997 February 7
Multiple Wave Run-Up 1993 June 27 - 1996 June 5
Forces on a Horizontal Cylinder: Summer 1992 Final Data 1993 August 16 - 1997 February 16
Vertical Breakwater Project (Closed) 1995 March
Run-Up Scale Effects 1997 November 21 - 1998 January 13
Run-Up Scaling 2001 August 18 - 2002 January 10
Box Experiments 2002 April 4 - 2004 November 15
Rock Size Exploration 2008 February 5 - 20
Miscellaneous Figures and Maps undated
Miscellaneous Fortran Programs undated
Run-Up of Plunging Breaking Solitary Waves undated
Technical Papers and Research, International Conference on Coastal Engineering/ Coastal Engineering Research Center
International Conference on Coastal Engineering (ICCE) Paper (15th: Honolulu, HI) 1976
Draft Proceedings of the 52nd Meeting of the Coastal Engineering Research Board 1990 March 30
International Conference on Coastal Engineering (ICCE) (23rd: Venice, Italy) 1992 September - October
Coastal Engineering Research Center (CERC) Seminar 1992 September 2 - 1993 January 13
Coastal Engineering Research Center (CERC) Inlet Data, Folder 1 of 2 1994 June 7 - August 9
Coastal Engineering Research Center (CERC) Inlet Data, Folder 2 of 2 1994 June 7 - August 9
Coastal Engineering Research Center (CERC) Figures 1994 July 11
International Conference on Coastal Engineering: Skagway Overhead (25th: Orlando, Florida) 1996
Coastal Engineering Research Committee (CERC) and Ohio State University (OSU) Prints and Overheads for Liu, S.C. 1997 January 14 - 1998 February 10
Technical Papers and Research, Ohio State University (OSU) Experiments
Goleta Outfall 1960 January - 1990 June 22
Goleta Sanitary District Plans 1964 July 6
Spectra 1983 January 19 - September 5
Goleta Refraction, Folder 1 of 2 1990 June
Goleta Refraction, Folder 2 of 2 1990 June
Goleta: General 1990 June 16 - October 29
Armored Protection for the Goleta Outfall 1990 July
Review of Ohio State University (OSU) Model Scale: Goleta 1991 September 4
Wave Experiments: Ohio State University (OSU) 2000 December 27 - 2002 April 2
Spectra for Wave Group Frequency 2000 December 28 - 2003 May 7
Ohio State University (OSU) Hemisphere (Raichlen, Fred) 2002 April 2 - 5
Ohio State University (OSU) Experiments (Wedge: Summary Plots) 2002 April 2 - 2003 May 13
Ohio State University (OSU) Hemisphere Experiments 2002 April 4 - 2003 March 31
Ohio State University (OSU) Experiments Summary 2003 June 10 - November 18
Subseries 4 Publications and Talks 4
Water Waves Generated by Arbitrary Bed Deformations 1975 October 20 - November 24
Journal of Fluid Mechanics (JFM) Paper Velocities 1981 January 27
American Society of Civil Engineers (ASCE) Wave Measurement Paper 1981 June 12 - 1983 April 27
Waves 1992 September 30 - 1993 September 8
Harbor Resonance Ship Operation Talk 1993 December 16
Horizontal Ridge Forces: Paper 1 1994 December 28 - 1995 February 15
Solitary Waves (EJL) 1996 February 26 - March 1
Jet Propulsion Laboratory (JPL) Talk 2005 March 11
Inlets Papers undated
Subseries 5 Research Proposals 5
Scour Proposal 1981 August - 1982 March 9
National Science Foundation (NSF) Letter: Historical 1984 October 31
Burns Harbor Waves 1985 - 2000 September 1
Proposals, Folder 1 of 2 1989 March 28 - December 3
Proposals, Folder 2 of 2 1989 March 28 - December 3
Seismo (Tsunamis) + Hydro (National Science Foundation) Workshop 1996 October 23 - November 1
National Science Foundation (NSF) MRE Proposal, Folder 1 of 2 1996 October 30 - 2000 January 19
National Science Foundation (NSF) MRE Proposal, Folder 2 of 2 1996 October 30 - 2000 January 19
Progress Report 1997 April 15
Breaking Wave Gas (ENTR. Proposal) 1997 April 15 - September 1
The National Tsunami Laboratory Facility: University of Southern California (USC) and National Science Foundation (NSF) Fastlane Proposal and Approval 2000 May 10
Burns Harbor (Cox) 2000 August 31 - November 14
Burns Harbor 2000 September 18 - October 24
Hong Kong Review Proposal 2000 October 19 - 2001 March 13
Run-Up Proposal (Liu, et al) 2002 September 30 - 2003 January 10
Proposal for Review undated
Series 4 Photographs and Slides, Film Reels and Videos, Zip Disks 4
Subseries 1 Photographs and Slides 1
Photographs
Photographs of Azusa Laboratory 1940 July 16 - 1972 August 9
Environmental Engineering Photos A to Z, Folder 1 of 3 1964 September - 1996 January
Environmental Engineering Photos A to Z, Folder 2 of 3 1964 September - 1996 January
Environmental Engineering Photos A to Z, Folder 3 of 3 1964 September - 1996 January
Photographs and Negatives: Azusa Laboratory 1972 July 18 - 1973 January 29
Aerial Photographs: Brewster Pacific Corporation 1972 November 24 - 1983 November 19
Photographs and Photograph Log of Mendocino Wave Study 1973 January 10 - 15
Miscellaneous Photographs 1973 July 17 - 2001 March 29
Miscellaneous Environmental Engineering Division Photographs 1974 December - 1997 January 31
Photographs: Diablo Canyon Model 1981 January - 1982 April
San Elijo: Encina Photos at Ohio State University (OSU) 1985 June
Santa Cruz: Photos at Ohio State University (OSU) 1985 October
Tsunami Negatives for Slides 1987 April 24
Prints of Solitary Wave and Surge from Wave from High Speed Movie 1987 July 9
Photographs: Experiments on Waves Breaking 1987 - 1988
Photographs: Copies of Various Frames 1988 May 6
Photo Album: Mechanical Engineering, Course ME19 Field Trip 1990 February 21
Slides
Slides from Box Labeled California Institute of Technology Hydraulic Structures Laboratory, Azusa 1973 April - 1980 February
Slides from Raichlen, Fred's Collection, Folder 1 of 6 1976-1978
Slides from Raichlen, Fred's Collection, Folder 2 of 6 1976-1978
Slides from Raichlen, Fred's Collection, Folder 3 of 6 1976-1978
Slides from Raichlen, Fred's Collection, Folder 4 of 6 1976-1978
Slides from Raichlen, Fred's Collection, Folder 5 of 6 1976-1978
Slides from Raichlen, Fred's Collection, Folder 6 of 6 1976-1978
Slides and Documents from Tsunami Film 1977 June 6
Slides from Environmental Engineering Film 1983 September
Overheads 1996 May 7
Subseries 2 Film Reels and Videos 2
Film Reel and Video Documentation
Notes to Accompany the 16mm Motion Picture, Experiments on Turbidity Currents, Middleton, Gerald V. (related to FR_4_1_1) 1965 July
Notes on Reel Content for Film for Watson Lecture 1977 March 17 - April 27
Documents from Middleton: Experiments on Turbidity Currents (related to FR_4_2_28) 1981 May 6
Documents from Storm and Coastal Damage (related to FR_4_3_19) 1988 March 16
Documents from Hydraulic Jump Above a Matrix of Vertical Cylinders in a Small Flume (related to FR_4_3_26) 1992
National Science Foundation (NSF) Wedge Video Log, Folder 1 of 2 2002 April 10 - 11
National Science Foundation (NSF) Wedge Video Log, Folder 2 of 2 2002 April 10 - 11
Documents from Video: Landslide Experiments, Exploratory (related to FR_4_5_78) undated
Film Reels
Videos
Bore Propagation and Tsunami 1968
Inclined Breakwater 1981 February 18
Diablo Canyon Breakwater Experiment 1981 March 26 - 27
Diablo Canyon Breakwater 1981 April 3 - 6
Preliminary Experiments on Intake Structures and Hood Models: Diablo Canyon 1981 April 19
Storm Waves: Seal Beach Pier, Santa Monica Pier, Crystal Pier and Malibu 1983 February 27
Akita Tsunami 1983 May 26
Akita Tsunami: Japanese TV News 1983 May 26
Japan Tsunami: Hwang, Li-san 1983 May 26
Akita Tsunami 1983
NHK Documentary: Tsunamis of 1983 Japan Sea Earthquake 1983
Initial Experiment: Random Waves Circular Harbor 1985 March 6
Wave-Wall Interactions; 1: Solitary, 2: Surge 1987 April 29
Breaking Waves: P2 and SP2 1987 June 8
Guam Original: Runs 1380 A-H Guam, C80 A-C Rock E + S, D80 A-C, E80 A-C 1988 January 15
Video of Impact Against Wall for QE Seminar: Explanation in Notes 1988 November 22
Avalon North East Waves: Santa Ana Damage 1988
Siting Guidelines: Test #9, #10, #11, Scour Patterns 1989 January 19
Warzyn Floating Breakwater Tests 1989 February 11
Wave Generation by Released Volume: Forman, Selena and McCaffree, Leslie 1989 June 9
Experiments: Slope1 to Slope 11 1989 August 11
Experiments: Step 1 to Step 27 1989 October 10 - 1989 October 11
Run-Up: Single and Multiple Solitary Waves; Overland Flow and Wall Impact 1990 December 28
Overland Flow Experiment: Hayen, J.C. 1991 December
Wave Run-Up and Overland Flow 1991 December 3
Hydraulic Jump above a Matrix of Vertical Cylinders in a Small Flume 1992
Sea of Japan Tsunami and Hokkaido Tsunami undated
Tsunami Inundation in Hilo Bay: 1960 Chilean Tsunami 1993 September
Video of H41: 2/6/94 H41-A, H41-B, H41-C, 2/7/94 H41-D, 2/8/94 H41-E,F,G, 2/9/94 H41-A 1994 February 6 - 1994 February 9
Run-Up: Two Waves 1996 May
Keck Lab: Run-Up of 1 foot Water Heights 1996 October 7
Tsunami Upper Slope Past Beam 1996 October
Tsunami Waves 1996 October
Diablo Canyon Breakwater: Prototype and Model for International Conference on Coastal Engineering (ICCE) Short Course 1996
High Speed Video Recording : H/h=0.35 1997 January 31
High Speed Video Recording Solitary Wave Breaking: H/h = 0.30 1997 February 1
High Speed Video: Plunging Breaking Solitary Wave On Slope 1997 July
Compare between HVC and Wave Gage (1) , Maximum Run-Up time for Panel 3 (2) 1997 July 1
Multiple Wave Run-Up Measurement: H/h = 0.40, h = 30.48 1997 September 17
Advance Pump Company: Akita Tsunami 1997 December 8
Nonbreaking Multiple Wave Run-Up: H/h = 0.025, h=1 foot 1997 December 28
Shape: h 30.48-0.3 1998 February 10
Overtop 1998 February 28
San Clemente Experiments: Original 1998 May - June
Normal Speed Landslide Original: Skagway 1999 January 5
Landslide Composite: Skagway 1999 January 5
High Speed Landslide Original: Skagway 1999 January 5
Wave Tank Modeling: Orange County Sanitation District (OCSD) 1999 July - August
Breaking Wave Workshop: Cornell 1999 October
Breaking Waves, Underwater View: Orange County Outfall Studies undated
Examples of Tsunami Research; 1: Overland Flow, 2: Breaking Wave Run-Up, 3: Surge-Wall Impact, 4: Landslides undated
P2, SP2 Breaking Waves undated
From High Speed Movies Breaking Waves; 12 min 25 sec: Solitary Waves P2, SP2, Cnoidal Waves CAN-4, 6-1, 7-1 undated
National Science Foundation (NSF) Wedge, Oblique View: Run Numbers 123-130 undated
National Science Foundation (NSF) Wedge Surface undated
National Science Foundation (NSF) Wedge, Long View: Run Numbers 123-130 undated
National Science Foundation (NSF) Wedge: Underwater undated
Preliminary Runs: A41-A, B, C undated
Sloped Cliff Face: Runs B1-B7, C1 undated
Video of Run M41-0, N41-0, O41-0, A1-A5, P41 A1-A5, Q41 A1-A6, Q41 B, Q41C, Q41E, Q41F undated
Alternate #1: K41 - A, B, C, D, F, G, H, L undated
Testing for LDV Velocity Recording: h = 0.20, h = 1 foot undated
Vicksberg Run-Up (h = 1 foot) undated
LDV Vicksberg: (1) h = 1 foot (2) h = 2.5 foot (3) h = 1 foot undated
Ship Surging: Print of Johnson, J. Film undated
SP2 Solitary undated
P2 Solitary undated
A-CN-4 Cnoidal undated
ACN6-1 Cnoidal undated
ACN7-1 Cnoidal undated
Colorado River Rapids: Kieffer undated
Landslide Experiments: Exploratory undated
High Speed Video: h= 30.48 cm, H/h = 0.43 undated
Comparison of Two High-Speed Video Cameras undated
Simultaneous Recordings undated
Recording From Top undated
Mechanical Engineering Seminar undated
Skjelbriea, Synolakis, Zelt: Equipment undated
Coldwater Creek Pump Intake undated
Laboratory Simulation of A Bow Wave: Waneiwski, Tricia undated
Excerpt of Run-Up Two Waves undated
Malibu: Graven undated
Redondo Beach Portofino undated
SBLO 3 undated
ESI: Movie 2354, 3091 undated
ESI: Movie 2354, 3092 undated
ESI: Movie 2354, 3093 undated
Storm & Coastal Damage: January 17-20, 1988 1988 March 17
Storm & Coastal Damage: January 17-24, 1988 1988 March 17
Videos, Walt Disney Imagineering
Walt Disney Imagineering: Typhoon Lagoon Wave Machine Sample Reel 1989 May 11
Walt Disney Imagineering: T.L.: 4/26/89 13:00-13:01F Series, 4/27/89 9:15:47-11:53:24 D.R.S. 1990 March 14
Walt Disney Imagineering: T.L.: 4/27/89 12:58:15-13:21:04 D.R.S. Channel Pan 1990 March 14
Walt Disney Imagineering: T.L.: 4/25/89 3:28:18-6:17:07 High Lift 1990 March 14
Walt Disney Imagineering: T.L.: 4/27/89 D.R.S. Wave #1 to #10 Channel Pan 1990 March 14
Walt Disney Imagineering: T.L.: 4/27/89 High Lift 10:06:05 to 13:21:11 1990 March 14
Walt Disney Imagineering: High Lift, Over the Fall (T.L. 4/27/89 10:52:57-15:01:00) 1990 March 14
Walt Disney Imagineering: Gate Vortex (T.L. 4/25/89 6:18:00-6:38:31) 1990 March 14
Walt Disney Imagineering: Gate Vortex (T.L. 4/26/89 11:57:37-12:50:27 ) 1990 March 14
Walt Disney Imagineering: Typhoon Lagoon (Wild Time Code) 1990 March 14
Walt Disney Imagineering: Typhoon Lagoon (Fixed Channel) 1990 February 13
Walt Disney Imagineering Hydronautics Wave Generator Forward Viewpoint 1997 April 23
Walt Disney Imagineering Hydronautics Wave Generator Upper Viewpoint 1997 April 23
Disney Test undated
Videos, ABC / Dateline
ABC Caltech Tsunami: Submaster (Audio Chapter 1) 1997 April 14
ABC Caltech Tsunami (Revised Edited Master) 1997 May 13
ABC Interview of Raichlen, Fred 1997 June 5
Dateline (Tsunami) 1997 December 9
Subseries 3 Zip Disks 3
Original Data 2002 March 12 - April 3
Transport 3 2002 April 4 - 5
Landslide Data: Forces and Runs (Ohio State University Wave Research Lab) 2002 April 15
International Conference on Coastal Engineering (Raichlen, Fred and Synolakis, Costas) 2002
Untitled 2003 January 20
Ohio State University Landslide Data (2002 Wedge and 2003 Hemisphere) 2003 February 19
Hemisphere Experiment 2003
Landslide 2004 2004
Landslide 2004 Videos, Video 1 of 4 2004
Landslide 2004 Videos, Video 2 of 4 2004
Landslide 2004 Videos, Video 3 of 4 2004
Landslide 2004 Videos, Video 4 of 4 2004