Series I: Belmont Junior High School [BJHS], 1983-1999
Subseries A: Finance/State Allocation Board [SAB] Forms and Agendas, 1983-1997
Site Data (22/64733-11-23), All Documentation Has Been Received: Note [by R. Walton]
To Adjust the Project Budget for an Increase for Property Acquisition and to Apportion Funds: State Allocation Board (SAB) Exhibit (Application No. 77/64733-11-23)
LAUSD Building Committee Communication No. 6, Authorization to File Applications for State Aid, Application for Apportionment (SAB 506) (Application No. 22/24023), 1983 October 17, 24
LAUSD Building Committee Report No. 4, Emergency Communication No. 2, Application for Apportionment (Application No. 22/24023), 1985 March 13-18
Agreement to Lease (SAB 518) (Lease No. 22/24023), 1985 April 24, October 17
Area Office Clearance to Release Funds (SAB-237), Specific Authorization to Commit Funds and to Make Expenditures (SAB-[501]), 1986 January 7, December 15
Time Extension for Apportionment, New Junior High School #1-22/24023: Letter from E. Werner and B. Kimball (LAUSD) to B. Hancock (OLA), 1987 February 10
SAB Resolution M2 87-05, Resolution Revising Project Applications and Making Apportionments Therefore, To Present Districts' Requests for Time Extensions on Apportionments (Item No. M2-5): SAB Exhibit, Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD), 1987 May 27, 29
SAB Documents, 1988 April 27-May 2
SAB Resolution M2 88-04 Resolution Revising Project Applications and Making Apportionments Therefore
To Advise the Board of Applications That Have Received Phase I or Phase II Apportionments and Have Not Progressed to the Next Phase Within the Time Frames Prescribed by Board Policy (Items No. M2-50/MRC-50): SAB Exhibit
Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD)
Time Extensions on Applications: Letter from B. Breaks (OLA) to B. Kimball (LAUSD), 1988 May 2
SAB Documents, 1988 September 28-October 3
SAB Resolution M2 88-04 Resolution Revising Project Applications and Making Apportionments Therefore
To Advise the Board of Applications That Have Received Phase I or Phase II Apportionments and Have Not Progressed to the Next Phase Within the Time Frames Prescribed by Board Policy (Items No. M2-50/MRC-50): SAB Exhibit
Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD)
Reduction of Project to Costs Incurred: Letter from B. Breaks (OLA) to B. James (LAUSD), 1990 February 20
Amended Phase I Submittal: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1991 March 14
Phase S Worksheet (SAB 517S) (Application #22/64733-11-23), 1992 February 6, 1993 March 17-April 14
SAB-506B (Phase II) (22/24023) by Villanueva/Arnoni Architects, Cost Estimate Supplement, Summary of Estimated Costs, Estimated Project Cost Detail (SAB-506A), 1992 March 23-April 22
Phase II Application-Furniture and Equipment Computation: Letter from M. Scinto (LAUSD) to R. Walton (OLA), 1992 March 30
Belmont New JHS No. 1 (Project No. 22/64733-11-23), Request for Phase II Application Approval-New Construction: Letter from M. Scinto (LAUSD) to R. Walton (OLA), 1992 April 21
Application for an Apportionment (Project No. 22/64733-11-23), Supplemental Funding Calculation (SAB 502), 1992 April 22
Request for Site Apportionment: Letter from R. Walton (OLA) to C.D. Brown (LAUSD), 1992 April 27
To Present the District's Request that the Board Approve the Purchase of a Site for the Belmont New Jr. High School and Apportion Funds (Application #22/64733-11-23): Report of the SAB Executive Officer, 1992 August 26
Site Acquisition (22/64733-11-23): Letter from B. Niccum (LAUSD) to B. Van Gundy (OLA), 1992 September 24
Apportionment Priority (22/64733-11-23): Letter from L. Roberts (LAUSD) to W. Van Gundy (OLA), Fax Transmittal, 1992 October 1
District Reviews and Requests, 1992 September-November
District Review of Executive Officer Report with Suggested District Revisions: Fax from M. Scinto (LAUSD) to R. Walton (OLA)
Negotiated Purchases of School Sites Involving Remediation of Toxic/Hazardous Substances
To Amend the Prior Action of the SAB: SAB Exhibit
After Reviewing the Recent Discussion: Letter from R. Mason and D. Shambra (LAUSD) to B. Van Gundy (OLA)
Scheduling of Agenda Item: Letter from R. Mason and D. Shambra (LAUSD) to B. Van Gundy (OLA)
Site Acquisition: Letter from B. Niccum (LAUSD) to B. Van Gundy (OLA)
To Present the District's Request: Report of the SAB Executive Officer
To Present the District's Request: Report of the SAB Executive Officer
To Amend the Prior Action of the SAB Concerning the Apportionment of Funds for a Site Which was Believed to Have a Toxic/Hazardous Condition (Application #22/64733-11-23): Report of the SAB Executive Officer, 1992 November 18
To Present the District's Request for $31,000,000 to Fund the Site Acquisition Out of Order and Contrary to Current SAB Policy: Report of the SAB Executive Officer (Application #22/64733-11-23), 1993 January 27
Transfer of Air Conditioning Funds to Belmont New Middle School No. 1 for Site Acquisition (Project No. 22/64733-1123): Letter from D. Shambra (LAUSD) to P. Shearer (OLA), Air Conditioning Funds to be Transferred to Belmont New Middle School: List, 1993 February 16
Year-Round Schools Air-Conditioning/Insulation Applications and Lease-Purchase New Construction: Report of the SAB Executive Officer, 1993 March 10
Finance Reports and Agendas, 1992 April 22-1993 March 17
Response to Letter from February 8, 1993: Letter from B. Van Gundy (OLA) to J. Kirschenstein (Sage Institute)
Phase S Worksheet
To Present the District's Request That the Board Approve the Purchase of a Site…: Report of the SAB Executive Officer
Summary of Estimated Costs (506B)
Agenda Coordination/Authorization
Lease-Purchase Project Accounting System: Application Budget Summary (Application: 22-64733-11-23), 1993 March 17
Phase Site Apportionments, Fund 745-220, Fund 789-001 (Application #22/64733-11-23), 1993 April 14, September 22
Fund Release (M/WBE Participation) (SAB 521B), Fund Release Clearance (SAB 237), 1993 August 11, July 20
Finance Reports and Agendas, 1993 July 12-September 2
To Clarify Issues with Regard to the New Belmont Middle School Site (Application No. 22/64733-11-23): Letter from D. Fallis (OLA) to D. Shambra (LAUSD)
This Letter Supersedes: Letter from D. Fallis to D. Shambra
To Advise the LAUSD of the Status of: Letter from B. Van Gundy (OLA) to D. Shambra (LAUSD)
Drafts of Same Letters
Standard Fund Release (SAB 521), Fund Release Clearance (SAB 237), 1993 September 13, 27
Lease-Purchase Project Accounting System: Application Budget Summary (22-64733-11-23), 1993 November 16
Lease-Purchase Program Application No. 22/64733-16-01: Letter from V. Stice (OLA) to D. Shambra (LAUSD), 1994 January 25
School District Summary of Bids/Proposals (SAB 515) (Application No. 22/64733-11-23), 1994 April 22, July 17
M/W/DVBE Bid Approval Transmittal (SAB 260), 1994 July 15, August 30
Lease-Purchase Project Accounting System: Application Budget Summary (Application 22-64733-11-23), 1995 April 21, May 19
LAUSD Business and Facilities Committee Report No. 1, Designation of LAUSD District Authorized Representatives: Superintendent Communication No. 1, Authorized Signatory (SAB 508), 1995 June 5, June 19, August 3
Agreement (Under the Leroy F. Greene State School Building Lease-Purchase Law of 1976) (SAB 518) (Application No. 22/64733-11-23), 1995 November 7
SAB Report Minutes of 1/27/93: Fax from R. Hamm (LAUSD) to R. Gonzalez, 1996 January 2
Cross Reference (SAB 240) (22/64733-11-23 Reference -06-95), 1996 June 13
Lease-Purchase Accounting System, Application Budget Summary (Application: 22-64733-11-23), 1996 September 9, 18
To Present the District's Request to Convert the Current Belmont High School to Middle School Use: Report of the SAB Executive Officer (revision of "To Provide a Status Report…"), 1997 June 25
Subseries B: Agreements and Contracts, 1986-1995
LAUSD Building Committee Report No. 1, Superintendent Communication No. 8, Rescission of Architectural Agreement and Approval to Enter into Two New Architectural Agreements, 1986 June 2, May 19
Contract for Architectural Services for School Building Projects (Agreement #862124-Carmichael-Kemp, Architects), 1986 June 2
Contract for Architectural Services for School Building Projects (Agreement #862125-Fernando Juarez & Assoc.), 1986 June 2
Carmichael-Kemp and Fernando Juarez, a Joint Venture: Letter from B. Kimball (LAUSD) to B. Hancock (OLA), 1986 October 14
Architectural Agreements: Handwritten Memo from [Illegible] to B. Hancock, 1986 November 1
Executed Lease-Purchase Document and Architect Agreement: Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD), 1986 November 17
Interviews with Architectural Firms: Letters from S. Moore (LAUSD) to G. Villanueva (Villanueva/Arnoni Architects, S. Graham (Angelil/Graham Architecture), Gilbert Aja (Gilbert Aja Assoc.), O. Greer (Greer & Assoc.), Site Diagrams, 1989 August 25
LAUSD Superintendent Committee Expedited Communication No. 3, Construction of New Plant: Letter from B. Rachal (LAUSD) to Carmichael-Kemp, Architects, 1989 October 2, 24
LAUSD Building Committee Communication No. 4, Regarding Architectural Agreement, 1990 January 16
LAUSD Building Committee Report No. 2, Superintendent Communication No. 4, 1990 January 16, 22
Contract for Architectural Services for New School Projects (Agreement #902056-Villanueva/Arnoni Architects), 1990 January 20
Agreement #902056: Letter from LAUSD to Villanueva/Arnoni Architects, 1990 January 26
Architectural Agreement (22/24023): Letter from C.D. Brown (LAUSD) to R. Walton (OLA), 1990 February 13
LAUSD Request to Provide Oil Well Abandonment Oversight Services for Belmont New Middle School: Letter from S. Wong (LAUSD) to Contractors, Oil Well Abandonment Oversight Scope of Services, Proposal to Provide Oil Well Abandonment Oversight Services: Letter from El Capitan Environmental Services to LAUSD, 1994 June 1, July 12
Eminent Domain Documents/Oilwell Abandonment Monitor: Letter from P. Hall (LAUSD) to S. McSherry (OLA), 1994 September 15
Oilwell Abandonment Monitor (Project No. 22/64733-11-23), Approval for Hiring Intera West: Letter from F. Harding (OPSC) to L. Roberts (LAUSD), 1995 April 4
Subseries C: Subject Files, 1985-1999
Construction – Demolition Estimate-Temple and Beaudry: Memo from M. Duran to G. Werner (LAUSD), 1991 March 13
Construction – Energy Review: Letter from D. Callander (OLA) to D. Mahone (ADM Associates, Inc.), 1991 August 29
Construction – Unconventional Energy: Letter from D. Callander (OLA) to B. Niccum (LAUSD), Unconventional Energy/Environmental Transmittal and Check List, 1991 October 18, 22
Construction – Energy Review: Letter from D. Callander (OLA) to E. Koester, Letters from E. Koester to D. Callander, Letters from D. Callander to C.D. Brown (LAUSD), 1992 May 22, 31, June 30, July 1, 14
EIR – Checklist for EIR Package to OLA (Project No. 22.24023)
EIR – Findings and Statement of Overriding Considerations
EIR – Draft Environmental Impact Report: Letter from J. Ohanian (OPRC) to Reviewing Agencies, Distribution List for SCH #86070212, Notice of Preparation of a Draft EIR, Environmental Concerns, Site Map, 1986 June 30-July 7
EIR – Negative Declaration: Letter from A. Kevorkian and D. Fallis (OLA) to B. Kimball (LAUSD), Checklist, 1987 June 10
EIR – Notice of Public Hearing, 1990 July 16
EIR – Unconventional Energy/Environmental Transmittal and Check List (SAB 74C), 1990 July 30, 1992 June 2
EIR – Checklist-CEQA Requirements, Routing Slip, SAB Agenda Coordination Sheet, 1990 July 30, August 17
EIR – Environmental Impact Report Draft: Letter from R. Walton (OLA) to B. James (LAUSD), 1990 August 29
EIR – SCH #90010277: Letter from D. Nunenkamp (Office of Planning and Research) to R. Niccum (LAUSD) Regarding EIR Review, 1990 September 4
EIR – LAUSD Board New Facilities Division (Real Estate Branch) Expedited No. 1: Memo from Superintendent Regarding Certification of Final EIR, Adoption of Findings, Adoption of Statement of Overriding Considerations, Adoption of Mitigation Monitoring Plan, and Approval of Project, Related Documents, 1990 October 1
EIR – LAUSD Board Committee of the Whole Report No. 6, New Facilities Division No. 1, Certifying Final EIR, Copy Certification, 1990 October 1, December 3
EIR – Notice of Determination: Form Sent from LAUSD to Office of Planning and Research, Note, 1990 November 21
EIR – Statement of Consultation and Comments, Appendix C, Persons and Organizations Consulted, 1990 November 26
EIR – Statement of Consultation with Office of Local Assistance, 1990 November 26
EIR – Environmental Documentation: Memo from D. Griffith to G. Werner (LAUSD), 1990 December 13
EIR – Final EIR: Letter from R. Walton (OLA) to B. James (LAUSD), 1990 December 14
EIR – EIR: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 December 21
EIR – Final EIR-Additional Documents: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1991 January 16
EIR – Checklist-CEQA Requirements (SAB 499), 1991 April 15
EIR – EIR Has Been Reviewed: Letters from R. Walton (OLA) to B. James (LAUSD), 1991 July 15, April 2
Oil Wells/Toxins – Please Co-Ord a Meeting: Handwritten Memo from Bruce [No Last Name] to F. Harding and D. [Fallis], April 13
Oil Wells/Toxins – Oil Field-Related Issues: Correspondence from California Department of Conservation, Division of Oil, Gas, and Geothermal Resources to Various Recipients, Fax Transmittal, 1990 June 29-1996 September 4, 1997 May 23
Oil Wells/Toxins – LAUSD Committee of the Whole Report No. 7, Facilities Services Expedited Communication No. 1, Board Resolution to Address Potential Environmental Mitigation for Belmont New Middle School No. 1 Site, 1993 September 7
Plans and Diagrams – SP-2A Diagram, Design Development Phase (22/24023), by Villanueva/Arnoni Architects, Diagram of Building Areas (SP-2A)
Plans and Diagrams – Diagram of Building Areas (SP-2A) (22/24023), 1992 February 10
Plans and Diagrams – Plan Review Transmittal and Check List (OLA) (22/64733-11-23), Plan Review Findings for Preliminary (SAB 74E), 1992 April 24-May 15
Plans and Diagrams – Preliminary Plan Review-New Construction: Letter from R. Walton (OLA) to C.D. Brown (LAUSD), 1992 May 21
Property Acquisition – Eminent Domain, Article 8, Chapter 9, Title 7 of Part 3, Code of Civil Procedure
Property Acquisition – SP1As for Existing Plasencia Site: Letter from B. Kimball (LAUSD) to D. Carmichael (Carmichael-Kemp), 1988 June 10
Property Acquisition – Conversion of Plasencia Elementary: Letter from B. Kimball (LAUSD) to W. Wedin (Wedin Enterprises), 1988 June 10
Property Acquisition – RE File 11901/Moret: Letter from M.W. Linnes (Appraiser) to J. Colbert (LAUSD), Appraisal Values, 1990 November 26
Property Acquisition – Relocation Documents: Transmittal Letter, Adjusted Market Value of Land Acquisition: Letter from E. Werner (LAUSD) to R. Walton (OLA), RE File No. 11901/Moret: Letter from M. Linnes (Appraiser) to J.W. Colbert (LAUSD), Note from R. Walton to [RLP] Regarding Appraisals, ca. 1990 October 17, 1990 November 26, 1991 January 16, April 10
Property Acquisition – Relocation Plan: Letter from R. Walton (OLA) to B. James (LAUSD), Review of Relocation Plan: Memo from D. Weathers (State and Consumer Services Agency) to L. Sykes (OLA), 1991 July 15, June 27
Property Acquisition – Certification of Ownership of Site on Which a Lease-Purchase Project is to be Planned or Constructed (SAB 509), Certification of School District's Compliance with Ed. Code Section 39002 (SAB 510), 1992 April 22
Property Acquisition, 1990 September-1992 September
Site Acquisition: letter from B. Niccum (LAUSD) to B. Van Gundy (OLA)
To Present the District's Request that the Board Approve the Purchase of a Site for the Belmont New Jr. High School and Apportion Funds: Report of the SAB Executive Officer
RE File No. 11901/Moret: Letter from M. Linnes (Appraiser) to J.W. Colbert (LAUSD)
From R. Walton to [RLP] Regarding Appraisals
Land and Oilwell Appraisals: Letter from E. Werner (LAUSD) to R. Walton (OLA)
Summary of Appraisals: Memo from D. Griffith to G. Werner (LAUSD)
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. I, 1992 December 1
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. II, 1992 December 1
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. II, 1992 December 1
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. III, 1992 December 1
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. III, 1992 December 1
Property Acquisition – Appraisal Report, Update Study Proposed Belmont Junior High School No. 1, by Laurain & Associates, Inc.: Vol. III, 1992 December 1
Property Acquisition – Buyer's Settlement Statement, Grant Deed for 11914 (Yee), 11913 (Belcher), 11912 (Tablada), 11911 (Boylston Development Co.), 11910 (Tang), 11909 (Tellini), & 11908 (Su), 1993 January 4-1994 June 1
Property Acquisition – New Land Appraisals: Letter from M. Scinto (LAUSD) to R. Walton (OLA), Phase S Worksheets, 1992 February 6-1993 March 17
Property Acquisition – Legal Description of Parcel: Letter from F. Bennett (LAUSD) to B. Hansen (CDE), 1993 March 19
Property Acquisition – Site Letters: Letters from H. Heydt & B. Hanson (SFPD) to LAUSD (Application # 22/64733-1123, 22/24023), Our New Phase S (Site Apportionment): Fax from R. Walton (OLA) to E. Werner (LAUSD), 1991 August 1, November 22, 1993 April 26
Property Acquisition – Eminent Domain Backup (Project No. 22/64733-11-23): Correspondence, Court Documents, 1993 June 16, 24-August 6
Property Acquisition – File No. 11926: 1121, 1121A, 1123, & 1123 ½ Colton St. (Balue): Correspondence, Escrow Instructions, Litigation Guarantee, 1993 September 8-20
Property Acquisition – Parcels No. 11911 (Boylston Development Co.), 11920 (Cabarteja), 11925 (Colton Street Partnership), 11927 (Roman Catholic Archbishop), and 11915 & 11926 (Balue): Correspondence, Litigation Guarantee, Other Supporting Documents, 1993 September 8-1994 January 12
Property Acquisition – Eminent Domain Documents (Project No. 22/64733-11-23): Letter from M. Scinto (LAUSD) to S. McSherry (OLA), Court Documents, 1993 September 10-13, November 9
Property Acquisition – Litigation Guarantee (File No. 11915): Letter from LAUSD to OLA, 1993 September 20
Property Acquisition – R/E File No. 11920: Letter from F. Bennett (LAUSD) to M.L. Marsh (Commonwealth Land Title Co.), 1993 October 5
Property Acquisition – Amendment to Complaint, LAUSD v. Ramona's Mexican Food Products, Inc., 1993 October 6
Property Acquisition – Settlement Agreement and Mutual Release Between LAUSD and Boylston Development Company, 1993 October 18
Property Acquisition – Relocation Assistance (22/24023-22/24023-11-23): Correspondence and Supporting Documents, 1993 December 8-1995 February 13
Property Acquisition – Relocation Assistance (22/24023-22/24023-11-23): Correspondence and Supporting Documents, 1993 December 8-1995 February 13
Property Acquisition – Relocation Assistance (22/24023-22/24023-11-23): Correspondence and Supporting Documents, 1993 December 8-1995 February 13
Property Acquisition, 1993 September 8-1994 February 1
Litigation Guarantee: Letter from J. Estrada-Melendez (LAUSD) to OLA (File No. 11909)
Request for Land Purchase Reimbursement: Letter from S. Scinto (LAUSD) to S. McSherry (OLA)
Purchase Agreement: Letter from F. Bennett (LAUSD) to Escrow Company
Title Insurance
Property Acquisition – Parcels No. 11916 (Hsu), 11912 (Tablada), & 11923 (Colton Street Partnership): Correspondence, Litigation Guarantee, Other Supporting Documents, 1993 September 15-1994 February 11
Property Acquisition – Parcels No. 11914 (Yee, Wong, Chang), 11913 (Blecher), & 11908 (Su): Correspondence, Litigation Guarantee, Other Supporting Documents, 1994 February 11-April 11
Property Acquisition – Real Estate Parcel No. 11928: Letter from M. Scinto (LAUSD) to S. McSherry (OLA), Letter from C. Allen (OPSC) to M. Scinto, Memo from C. Allen to R. Lessa (LAUSD), 1994 August 11, 1995 March 20
Property Acquisition – Real Estate Parcel Ownership Report, LAUSD (22/64733-11-23), 1995 September 22
Property Acquisition – District's Request for Relocation Assistance Claim Payments: Letter from N. Abd'Allah (DGS) to M. Chang (LAUSD), Relocation Assistance: Letters from M. Chang (LAUSD) to OLA, 1996 October 16-28, November 7
Site Review/Assessment – Certification of School District's Compliance with Ed. Code Section 39002 (SAB 510) (Application No. 22/24000), 1984 February 8
Site Review/Assessment, 1988 November 29-1989 May 31
Site Review Transmittal: Memo from B. Hanson (SFPD) to OLA
SFPD Site Reviews
Maps
Proposal from Metro Housing Associates Regarding Proposed Belmont Junior High School: Memo from B. James (LAUSD to LAUSD Building Committee
Concept for Plasencia School Site: Letter from J. King (John King Inc.) to J. Goldberg (LAUSD Board Member)
Site Review/Assessment, 1989 January 20-February 2
Progress Report-Belmont Junior High School #1, Application No. 22/24023, and Belmont Senior High School #1, Application No. 22/24031: Letter from B. James (LAUSD) to D. Fallis (OLA)
Proposed Implementation of Board-Adopted Site Selection Process: LAUSD Memo
Alternative Sites for Secondary Schools Within the Central/Northeast Areas of the District
Staff Response-Temple-Beaudry Hill New Community Proposal
Site Review/Assessment – Central City West Transportation/Land Use Specific Plan, Memorandum, Analysis of Alternative School Sites Prepared by Meyer & Allen Assoc. and David J. Mesa, Architect, 1989 June 1
Site Review/Assessment – LAUSD Building Committee Communication No. 1, Regarding Land Acquisition, 1989 August 7
Site Review/Assessment – Site Review Transmittal: Memo from B. Hanson (Cal Dept. of Education) to OLA, School Facilities Planning Division Site Reviews, 1990 March 8
Site Review/Assessment – SFPD Field Site Reviews (Temple-Beaudry, 2A), 1990 March 8
Site Review/Assessment, 1990 March 8, June 18
Site Review Transmittal: Memo from B. Hanson (Cal Dept. of Education) to OLA, School Facilities Planning Division Site Reviews (Railroad Yard, Carnation)
School Facilities Planning Division Site Reviews (Railroad Yard, Carnation)
Maps
Belmont/Marshall Senior High School Site Assessment: Memo from L. Britton (Superintendent) to Building Committee (L.A. City)
Site Review/Assessment, 1990 April 20, June 1
Evaluation of the Preferred Site for Belmont New JHS No. 1 (Bixel St./Beaudry Ave./First St./Colton St.): Memo from B. James to LAUSD Board Members and Building Committee
Site Diagrams
NOP of an EIR: Letter from R. E. Corbaley (Division of Oil and Gas) to R. Niccum (LAUSD)
Site Review/Assessment – LAUSD Site Selection Process, Prepared by the New Facilities Division, Real Estate Branch, July 1990
Site Review/Assessment – Notice of Completion, Belmont New Junior High School #1, SCH# 900101227, 1990 July 20-September 4
Site Review/Assessment – Land and Oilwell Appraisals: Letter from E. Werner (LAUSD) to R. Walton (OLA), Summary of Appraisals: Memo from D. Griffith to G. Werner (LAUSD), 1990 September 28-October 15
Site Review/Assessment – ABB Environmental Services (ABB) Phase II Site Investigation Report, Vol. I, November 1990
Site Review/Assessment –ABB Phase II Site Investigation Report, Vol. II, November 1990
Site Review/Assessment – ABB Environmental Services (ABB) Phase II Site Investigation Report, Vol. II, Including Technical Memorandum No. 1, Geophysical Survey Belmont Junior High, November 1990
Site Review/Assessment – ABB Phase II Site Investigation Report, Vol. III, November 1990
Site Review/Assessment – ABB Phase II Site Investigation Report, Vol. III, November 1990
Site Review/Assessment – ABB Phase II Site Investigation Report, Vol. III, November 1990
Site Review/Assessment – Cross Reference, for Site Mediation Monitoring Plan, Site Assessment, and Relocation Plan & Project Specification, 1992 August 13
Site Review/Assessment – Site Investigation Report-Executive Summary: Fax from F. Bennett (Realty Agent) to F. Harding (LAUSD), Executive Summary, 1992 October 7
Site Review/Assessment – BLC Documents: Letter from A. Maurad (El Capitan Environmental Services, Inc. (ECIS)), Report of Phase I Site Assessment Including Phase II Workplan for Belmont Junior High School (BJHS) No. 1, 1990 May 30, 1999 June 24
Subseries D: General Correspondence, 1985, 1990-1993
Memo to the File (22/24… [Illegible]), Construction Application Checklist (Application No. 22/64733-11-23), 1985 March 21, 1990 January 18-1993 March 17
Preliminary Approval by DOE of Plans: Letter from B. Hanson (DOE) to Villanueva/Arnoni Architects, 1993 January 6
Series II: Belmont High School, 1983-1995
Subseries A: Finance, 1983-1995
Summary of Estimated Costs (OLA) (22/64733-11-21)
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Summary of Estimated Costs (SAB 506B) (Application No. 22/24021)
Urban Adjustment/Security Allowance Justification
LAUSD Building Committee Report No. 4, 1983 October 24
Preliminary Land Acquisition Estimate: Memo from B. Willman to B. Kimball (LAUSD), 1983 November 30
LAUSD Building Committee Report No. 1, 1984 July 25
LAUSD Educational Development Committee Report No. 3 (Partial), Building Committee Report No. 3, Superintendent's Emergency Communication No. 1, 1985 February 12
LAUSD Building Committee Report No. 4, 1985 March 18
Application to SAB for Apportionment: Form, 1985 March 19
BHS, Third Addition, Preliminary Cost Estimate: Memo from R. Niccum to B. Kimball, 1985 March 20
Preliminary Cost Estimate: Relocation Plan and Appraisal-BHS: Memo from R. Niccum to P. Hall (LAUSD), Preliminary Cost Estimate: Relocation Plan and Appraisal-Belmont Area New JHS: Memo from R. Niccum to P. Hall (LAUSD), Note, 1985 March 22
Execution of Lease-Purchase Agreements Checklist: Site, Plans, Specifications and Construction (SAB 526), 1985 April 24
To Approve Feasibility Studies in Accordance with Board Regulation 1865.60(a) (2) (A) and (B): Exhibit No. 22/24023 to SAB Resolution C2 85-04 (Item No. C2-6), SAB Resolution Approving Project Applications and Making Apportionments Therefore (C2 85-04) (SAB 511), 1985 April 24
Agenda (22/24021): Letter, Resolution C2 85-04, Exhibit (C2-4), 1985 April 24-30
BHS, Third Addition-Application No. 22/24021, Phase I Amendment: Letter from E. Werner (LAUSD) to E. Collier (OLA), 1986 November 5
Belmont High School Addition: Transmittal for Two Appraisals-Three Books from OLA to Office of Real Estate and Design Services, 1986 November 18
Site Acquisition: Letter from A. Kevorkian and B. Hancock (OLA) to B. Kimball (LAUSD), 1987 February 6
Apportionment Time Extension: Letter from E. Werner and B. Kimball (LAUSD) to B. Hancock (LA), 1987 February 10
Agenda (22/24021-B): Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD), Resolution M2 87-07, Exhibits (M2-1, C2-5), 1987 February 24-August 10
SAB Agenda: Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD) Regarding Project Approvals (22/24031-A), Resolution M2 87-02, 1987 March 3
Cost Estimate-Supplement (SAB 506B) (Application No. 22/24021), 1987 March 13
BHS, Third Addition-Application No. 22/24021, Appraisals: Letter from R. Restivo (LAUSD) to E. Collier (OLA), 1987 April 7
Statement of Consultation with Office of Local Assistance: Statement by R. Niccum (LAUSD), 1987 April 13
Cost Estimate-Supplement (SAB 506B) (Application No. 22/24021), 1987 April 15
Machinist Union Property: Memo from R. Restivo to G. Werner (LAUSD), 1987 April 16
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Detail of Estimated Costs (SAB 506B) (Application No. 22/24021), 1987 April 17
Application for an Apportionment (SAB 506) (22/24021), ca. 1987 April 17
Worksheet-Furniture and Equipment Computation, Senior High Schools (Application No. 22/24021), 1987 April 17-1990 May 8
Lease-Purchase and Architectural Agreements for Belmont (SH) 22/24021: Letter from B. Kimball (LAUSD) to E. Collier (OLA), Agreement to Lease (22/24021), Architectural Agreement, 1987 April 30
New Shop/Classroom Building – Phase III Submittal: Letter from E. Werner (LAUSD) to E. Collier (OLA), Phase II Submittal: Letter from E. Werner (LAUSD) to E. Collier (OLA), 1987 April 16, May 1
Cost Estimate-Supplement (SAB 506B) (Application No. 22/24021), 1987 May 1
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Detail of Estimated Costs (SAB 506B) (Application No. 22/24021), 1987 May 1
Lease Agreements, 1985 April 24-1987 June 22
Lease-Purchase and Architectural Agreement for Belmont New H.S. No. 1, 22/24031: Letter from B. Kimball (LAUSD) to E. Collier (OLA)
Executed Lease/Purchase Document for Belmont: Letter from A. Kevorkian and D. Fallis (OLA) to B. Kimball (LAUSD)
Agreement to Lease (SAB 518)
Source of Funds: Memo to File from N. Strang, 1987 June 23
New Shop/Classroom Building (22/24021) Appraisals: Letter from E. Wagner (LAUSD) to J. Holmes (OLA), Estimated Project Cost Detail (SAB-506A), Detail of Estimated Costs, 1987 July 10, 13
Specific Authorization to Commit Funds and to Make Expenditures as Agent of the SAB (SAB 521) (Application No. 22/24031), Area Office Clearance to Release Funds (SAB 237), Site Map, 1987 June 24, July 15
Source of Funding for Site Acquisition: Letter from B. Kimball (LAUSD) to D. Fallis (OLA), 1987 July 20
SAB Agenda, Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD) Regarding Project Approvals (22/24031-B), Exhibit (Item No. C2-3), 1987 April 10, July 29
Site Acquisition and Building Demolition: Fund Release (SAB 521) and Other Related Documents, 1988-1991
To Advise the Board of Applications That Have Received Phase I or Phase II Apportionments and Have not Progressed to the Next Phase within the Time Frames Prescribed: Exhibit (Item No. M2-50/MRC-50), 1988 July 27
Memo of Understanding: Letter from D. Fallis (OLA) to B. Kimball (LAUSD), 1988 August 5
Lease-Purchase Program-Application 22/24000: Letter from B. Kimball (LAUSD) to D. Fallis (OLA), 1988 September 7
Report of Project Expenditures, Forms SAB 184 & 184-A: Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD), 1988 October 5
Agenda (22/64733-11-21C): Letter from A. Kevorkian (OLA) to B. Kimball (LAUSD), Resolution M2 88-11, Exhibit (M2-1), 1988 November 2-7
Activity Log: Memo to File, January 1989-January 1992
Cost Estimate-Supplement (SAB 506B) (Application No. 22/24021), 1989 January 23
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Summary of Estimated Costs (SAB 506B) (Application No. 22/24021), 1989 February 8
Agency Services Certification (SAB 412), 1989 February 27
OLA Plan Review Construction Allowance (Superseded), 1989 February 28, April 24, May 16, 1990 May 30
Cost Estimate-Supplement (SAB 506B) (Application No. 22/24021), 1989 April 6
Estimated Project Construction-Cost Breakdown (Bid Packages I–IV, Re-Bid), Revised, 1989 April 6, 1990 May 4
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Summary of Estimated Costs (SAB 506B) (Application No. 22/24021), 1989 April 12
Cost Allowance on Electrical Vault: Memo to File, 1989 May 5
Transmittal and Worksheet for Preparation of Construction/Reconstruction Apportionment, State School Building Program, 1989 May 18-June 7
Agenda (22/64733-11-21D): Letter from A. Kevorkian (OLA) to B. James (LAUSD), Resolution M2 89-06, Exhibits, 1989 June 7-8
Agenda (22/64733-11-21E): Letter from A. Kevorkian (OLA) to B. James (LAUSD), Resolution M2 89-06, Exhibits, 1989 June 14-15
To Increase the Estimated Cost and to Apportion Funds Therefor: Exhibit No. 22/64733-11-21E/F to SAB Resolution M2 89-06 (Item M2-12 and Revision), Resolution M2 89-06, Correspondence, 1989 June 14-August 2
Exterior Building Walls: Letter from B. Cochran (& Assoc.) to G. Werner (LAUSD), 1989 August 2
Adjustments to OLA Allowance, 1989 August 8
Certification of County Superintendent of Schools to SAB Regarding the Deposit of District Funds (SAB 185), 1989 September 12
Administrative Journal (22/64733-11-21G), Notes, 1989 September 15
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Detail of Estimated Costs (SAB 506B) (Application No. 22/24021), 1989 October 6
Cost Computation Comparison: Spreadsheets, 1989 July 23, August 8, October 6
SAB Forms 522, 504-A, 504-B: Letter from E. Werner (LAUSD) to R. Walton (OLA), SAB Forms, 1989 October 9
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), 1989 October 11
Meeting 10-6-89: Fax Cover Sheet from R. Walton to G. Werner (LAUSD), Memo to File from D. Tolbert, 1989 October 6, 11
To Reduce the Application to Costs Incurred by Administrative Journal: Exhibit (Item No. M2-7), SAB Agenda: Letter from D.B. Korff (OLA) to B. James (LAUSD), Exhibits Per Resolution M2-90-02, 1990 February 7, 8
Certification of Type 'B' Building Construction, Class 'B' Application/Permit, 1990 March 26
Rescission of Project (22.24031): Letter from B. James (LAUSD) to D. Fallis (OLA), Attachments, Reinstatement of Project (22.24031): Letter from E. Werner (LAUSD) to B. Breaks (OLA), 1990 March 29, April 17
Loss of Construction Funding Apportionment: Letter from D.B. Korff (OLA) to B. James (LAUSD), 1990 April 10
To Reinstate Three Project Applications That Were to be Reduced to Costs Incurred by Administrative Journal (Application #22/64733-11-31F): Exhibit (Item No. M2-4), SAB Resolution M2 90-04, SAB Agenda: Letter from D.B. Korff (OLA) to B. James (LAUSD), 1990 April 25, 26
Estimated Project Cost Detail (SAB 506A) (Application No. 22/24021), Summary of Estimated Costs (SAB 506B) (Application No. 22/24021), 1990 May 4
General Site Allowance Computation (SAB 74GS), 1990 May 21
Administrative Approval of Construction Items (SAB 219) Bid Part I, 1990 July 25
Request for Budget Augmentation (22/64733-11-21, New Addition): Letter from E. Werner (LAUSD) to R. Walton (OLA), Plan Review Transmittal, 1990 August 30-September 24
Administrative Approval of Construction Items (SAB219), 1991 April 25
Reimbursement of Legal Fees for Various Schools: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1991 August 30
Moran Construction Payment Documents, 1991 June 11-1992 October 5
Plan Review Class B Cost Computation, 1991 September 12
Plan Review Transmittal and Check List: as Built and Contract #2 Revisions, Addenda #s 4 & 5 & Bid Package for Review, 1991 September 12, October 21
The SAB Has Recently Expressed a Strong Interest...: Background Note, 1992 February 6
Administrative Journal (AJ #92-13), 1992 July 8
Notice of State Allocation Board Action: Letter from D.B. Korff (OLA) to W. Anton (LAUSD), Exhibit, 1992 July 13
Lease-Purchase Project Accounting System: Application Budget Summary, Application Transaction Detail, Application/Fund Budget (22/64733-11-21), 1992 August 17
To Rescind the Bid Approval Dated January 8, 1992, to Approve the Rebid and Apportion Funds: Exhibit, Notes, SAB Approval: Letter from D.B. Korff (OLA) to D. Koch (LAUSD), 1992 August 26, September 2
Standard Fund Release (SAB 521), Fund Release Clearance (SAB 237), 1992 August 26-1993 March 17
Notice to School District of Low Bid Approval (SAB 513A) (Gentosi Bros.), 1992 September 3
Certification of District Funds (Application #22/64733-11-21): Letter from O. Woodfin (LAUSD) to R. Walton, (OLA), 1992 September 8
Lease-Purchase Project Accounting System: Application/Fund Budget (22/64733-11-21), 1992 December 8
Standard Fund Release (Moran Construction) (SAB 521), (M/WBE) Participation Fund Release (Moran Construction) (SAB 521B), 1992 December 29, 1993 September 21
To Rescind and Transfer Apportionments for Certain Air-Conditioning Applications Pursuant to Board Action on January 27, 1993: Report of the SAB Executive Officer, 1993 March 10
Notice of State Allocation Board Action: Letter from D.B. Korff (OLA) to K. Koch (LAUSD), Exhibit, 1993 July 28, August 5
To Present the District's Request to Transfer the Apportionment for Site Acquisition for the New L.A. Sr. H.S. to the new Belmont Sr. H.S. for Site Acquisition for that Project (Application #22/64733-11-31 and -81): Report of the SAB Executive Officer, 1993 September 22
Statement of Consultation with Office of Local Assistance, 1993 October 8
Phase S Worksheet (Application # 22/64733-11-31), 1994 February 4
Lease-Purchase Project Accounting System: Application Budget Summary, Application Transaction Detail, Application/Fund Budget (22-64733-11-31), 1994 February 9
Furniture and Equipment List: Letter from L. Sykes (OLA) to R. Heyman (LAUSD), Memo from S. Walters to S. Moore (LUASD), Lists, 1987 December 23, 1994 February 25
Belmont Attendance Area-Various New Schools Legal Fees Backup: Letter from M. Scinto (LAUSD) to S. McSherry (OLA), 1994 March 3
SAB Approval (22/64733-11-31): Letter from A. Bradley (OLA) to D. Shambra (LAUSD), Site Apportionment: Exhibit, 1994 February 23, March 3
Standard Fund Release (SAB 521), Fund Release Clearance (SAB 237), Legal Description, 1994 February 23-March 7, 9
SAB Approval (22/64733-11-31): Letter from A. Bradley (OLA) to D. Shambra (LAUSD), To Present the Priority 1 and Priority 2 New Construction and Modernization Projects for the Apportionment: Report of the SAB Executive Officer, Fund 708-001 Phase Site Apportionments, 1994 March 9, 14
Reimbursement of Legal Fees (Project 22/67433-00-00): Letter from M. Scinto (LAUSD) to S. McSherry (OLA), 1994 August 4
Lease-Purchase Project Accounting System: Application Transaction Detail (22/64733-11-21), 1994 August 18
Phase III Construction Fund Release Checklist Transmittal, 1994 August 31
Submittal of Amended Applications for Belmont New High School No. 1 – 22/64733-11-31, Belmont New Elementary School No. 2 – 22/64733-11-27: Letter from J. Glymph (LAUSD) to M. Williams (OPSC), Application for Apportionment, Belmont New Senior High School No. 1 (22/64733-11-31), 1995 January 31
Response to Correspondence (OPSC No. 22/64733-11-31): Letter from C. Allen (OPSC) to M. Scinto (LAUSD), 1995 March 21
Lease-Purchase Project Accounting System Application Budget Summary (App #22-64733-11-21, -23, -27, -31), 1995 April 21
Gentosi Bros. (Contract #921215) Payment Documents, 1995 May 3-August 24
Lease-Purchase Project Accounting System: Application Budget Summary, Application Transaction Detail (22/64733-11-21), 1995 May 9
State Allocation Board Approval: Letter from A. Bradley (OPSC) to D. Shambra (LAUSD), SAB Exhibit, 1995 June 14, 20
Masters Construction Payment Documents, 1995 July 28-August 23
Agreement (Under the Leroy F. Greene State School Building Lease-Purchase Law of 1976-SAB 518) (App. No. 22/64733-11-21), 1995 November 7
Subseries B: Agreements and Contracts, 1986-1994
Disabled Veterans Business Enterprise Contracting Goals: Letters from OPSC, Minority, Women, and Disabled Veterans Business Enterprises Contracting Goals: Letters from OPSC
Bid Form, Deductive Alternates to be Incorporated in the Bid, for Belmont Senior High New Shop & Classroom Building (22/24021): Blank Form
LAUSD Contract for Architectural Service for School Building Projects (Escudero-Fribourg Assoc. and KDG Architecture and Planning, Joint Venture), 1986 December 15
LAUSD Committee of the Whole Report No. 6, 1987 February 9
LAUSD Building Committee Report No. 1 (22/24021), 1987 April 20
[Contractor Agreement], 1988 May 25
Authorization to Bid: Letter Regarding Submission of Documents, from E. Werner (LAUSD) To R. Walton (OLA), 1989 February 6
Authorization to Advertise for Construction Bids, 1989 May 22
Bids: Bid Estimates, Bid Breakdown, 1989 June 28-29
Bid Form for Belmont Senior High New Shop & Classroom Building (22/24021): Blank Form, Form for John Hundley, Notice to Bidders, 1989 June 29
New Shop and Classroom Building Bids: Letter from E. Werner (LAUSD) to R. Walton (OLA), Supporting Documents, 1989 July 20
Belmont Sr. High School Bid Rejection: Letter from R. Walton and D. Fallis (OLA) to B. James (LAUSD), 1989 August 30
Cost Estimate-Inspection, 1989 October 5
Revised Submittal Package, Shop and Classroom Building Addition: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1989 October 6
Executive Summary-Shop and Classroom Building Addition (22/24021), 1989 October 6
Estimate Comparison, 1989 October 6
Authorization to Re-Bid: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 May 4
1990 May 8-22
Addendum #2 – Bid Opening Extension: Letter from E. Werner (LAUSD) to R. Walton (OLA), Addendum #2 to the BSHS Shop/Classroom Building Bid Package #1 Contract #1, 22-24021, 1990 June 15
Authorization to Advertise for Construction Bids, Parts 1 thru 4: Letter from R. Porter [Unknown Organization] to [SAB Lease Purchase Program], 1990 June 28
Sending Bid Form: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 July 5
Submission of Construction Bid Results-Bid Package 1-Service Site Work (Re-Bid): Letter from E. Werner (LAUSD) to R. Walton (OLA), Supporting Documents, 1990 July 13
Appointment of Consultant to Perform Services: Memo from Superintendent to LAUSD Board, New Facilities Division (Real Estate Branch) Expedited No. 1 to the Committee of the Whole, 1990 October 1
Bid Form, Part II-Building (22/24021): Notice of Deadline, 1991 January 8
Addendum #4 (to Contract #2), 1991 August 12
Notification of Rebid-Part II (Building): Letter from E. Werner (LAUSD) to R. Walton (OLA), SAB 506A & B, 1991 August 14-26
Addendum #5 (to Contract #2), 1991 August 22
Bid Form, Completed Bid Form, Part II – Shop/Classroom Addition at BHS – Montgomery, Ross, Fisher, Completed Bid Form-Bernards Bros., 1991 September 24-October 9
Project Manual, October 1992
Project Manual, October 1992
Plan Review Transmittal and Check List-Part II, Shop Building, Submission of Construction Bid Results: Letter from LAUSD to OLA, Supporting Documents, 1991 October 21, December 3
To Approve the Bid and to Apportion Funds: Exhibit (22/64733-11-21H), Supporting Documents, 1991 December 10-1992 January 8
Authorization to Bid, BHS, Part II: Letter from D. Fallis (OLA) to C. D. Brown (LAUSD), 1992 March 23
Addition – Request for Authorization to Rebid-Addendum #9: Letter, Addendum, Supporting Documents, 1992 May 15
Addition – Part II Building Rebid-Addendum #10: Letter, Addendum, 1992 May 21
Submission of Construction Bid Results-New Addition: Letter from M. Scinto (LAUSD) to R. Walton (OLA), Summary of Bids, Bid Form, 1992 May 27, June 24, 25
Award of Contracts (22/24021: Letter from C.D. Brown (LAUSD) to R. Walton (OLA), Committee of the Whole Report, Memo from W. Anton (LAUSD) to Board, 1992 July 20, August 3, 21
Bid Approval: Letter from R. Walton (OLA) to C.D. Brown (LAUSD), Documents Regarding Original Bids, Bid Rescission, Re-Bidding for Part II, 1991 December 31-1992 September 3
Submission of Construction Bid Results-General Site Development, Part IV, Supporting Documents, 1994 May 25-June 1
Approval of M/W/DVBE Construction Contracts (SAB 513C) (Lindmark Engineering Masters Contracting Corp.), 1994 August 12, 17, 30
General Site Development (Case-by-Case)-Part IV: Letter from M. Duran (LAUSD) to S. McSherry (OLA) Regarding Status (22/67433-11-21), 1994 July 18
Contracts: Masters Contracting Corp., Gentosi Brothers, Moran Construction Co., 1990 July 25, 1992 June 26, 1994 August 31
Award of Contract for BHS Site Case-by-Case Part IV: Letter from C.D. Brown (LAUSD) to F. Alexander (OLA), Execution of Contract for Advertised Work, Lease-Purchase Project LP Memo No. 116: Memo from C.D. Brown to T. Rothman (LAUSD), Board Report, Supporting Documents, 1994 August 31-October 12
Subseries C: Subject Files, 1984-1995
Construction – Heating /AC Brochures
Construction – Lighting Brochures
Construction – Rearranging Overhead Facilities: letter from K. Noyes (DWP) to A. Juan (LAUSD), 1988 January 8
Construction – Electrical Vault: Letters from DWP to LAUSD, 1988 September 28, 1989 March 9, April 27
Construction – Removal of Aerial Cable by Pacific Bell (Job. No. G278890): Correspondence Between S. Moore (LAUSD) and R. Marano (Pacific Bell), Special Billing, 1989 February 24-March 2
Construction – Schedule of Construction Requirements and of Materials to be Furnished by the Customer (for Electrical Vault) (IS 2662), 1989 March 16
Construction – Electrical Vault: Note, Plan Review Transmittal, 1989 April 17, 24, May 16
Construction – Undergrounding of Overhead Power Lines to Accommodate Pedestrian Bridge: Letter from R. Agopian (DWP), J. McGrath (Vanir/3DI), 1989 July 3
Construction – Unconventional Energy: Correspondence Between LAUSD and OLA, Correspondence Between Building Systems Management and Hellmuth, Obata & Kassabaum, 1989 July 15-1990 August 2
Construction – Construction of Three-Story Shop/Classroom Building: Letter from Office of the State Architect to LAUSD Board (File No. 19-H16, 48801), 1989 July 28
Construction – Energy Analysis: Letter from Building Systems Management to Hellmuth, Obata & Kassabaum, 15-Year Life-Cycle Cost Analysis, Report, 1989 September 16, 18
Construction – Street Vacation #E-1400065, Second Street and Loma Drive (Map No. 134-207): Letter from R.B. Wicksell (DWP) to J. McGrath (LAUSD), 1989 September 29
Construction – Retaining Wall: Fax Cover Sheet, Letter, 1989 August 30, October 6
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Change Orders, Supporting Documents, 1990-1993
Construction – Energy Review: Letter from D. Callander (OLA) to E. Koester, Exhibit A, List, 1990 May 21-22
EIR – Soils Report: Note
EIR – Negative Declaration, Mitigation Monitoring Plan for Belmont New Senior H.S. No. 1
EIR – Negative Declaration: Correspondence, Declaration, 1985 July 3-1987 April 29
EIR – Preliminary Geologic and Soils Engineering Exploration: Report by Kovacs-Byer & Assoc. (KB 10497-S), 1987 April 21
1987 March 4, 17, 19
EIR – Soils Report/Retaining Wall: Fax, Diagrams, 1989 October 6
EIR – Deadline for Environmental Consultant: Memo from D. Griffith to G. Werner (LAUSD), 1990 February 26
EIR – [CEQA] Checklist (Partial), Attachment B: Statement of Overriding Considerations, 1990 March 15, November 26
EIR – Environmental Analysis Checklist, New Senior High School/Belmont Complex, 1990 April 2
EIR – Notice of Preparation of a Draft Environmental Impact Report, Environmental Analysis Checklist, 1990 April 2, May 8
EIR – Draft Environmental Impact Report Belmont New Senior High School Alternative Site Assessment, October 1990
EIR – Draft EIR Belmont New Senior High School Alternative Site Assessment, October 1990
EIR – Draft EIR, Belmont Senior H.S. No. 1: Letter from R. Walton (OLA) to B. James (LAUSD), 1991 January 3
EIR – Initial Study, Negative Declaration and Mitigation Monitoring Plan, Related Documents, September 1993
EIR – Public Notice of Availability, 1993 September 8
EIR – Declaration of Posting, Notice, 1993 September 16
EIR – State Clearinghouse Review of SCH #93091044: Letter from C. Kinne (Governor's Office of Planning and Research) to F. Bennett (LAUSD), Notice of Completion, 1993 October 13
EIR – Final Mitigated Negative Declaration and Initial Study (SCH #93091044), November 1993
EIR – Final Mitigated Negative Declaration and Initial Study (SCH #93091044), November 1993
EIR – Traffic Effects: Descriptions and Spreadsheet, November 1993
EIR – Approval of Mitigated Negative Declaration and Approval of Project-Belmont New Senior H.S. No. 1 (Facilities Services No. 3, Committee of the Whole), 1993 November 1
EIR – Notice of Determination, Submission of Environmental Documents: Memo from C. Kinne (Governor's Office of Planning and Research) to F. Bennett (LAUSD), 1993 October 13, November 16
EIR – Notice of Determination: Form Sent from LAUSD to L.A. County Clerk, 1993 November 16
EIR – School Site Certification (SFPD) Form 4.03, Notice of Determination, 1993 November 16, ca. December 16
EIR – Justification Document for New Construction & Modernization/Reconstruction (SAB 600 & 600-1), 1994 January 18
EIR – Statement of Consultation and Comments, 1994 January 20
EIR – Exhibit A: Report of Subsurface Investigation Pacific Rim Plaza Prepared by ENV America Inc., March 1994
EIR – Disagreement with Proposal for Belmont High #1: Letter from Concerned Property Owners of Temple Beaudry to SAB, 1994 March 8
EIR – Fast-Track Phase 2 Report for Shimizu Property: Note, Memo, 1994 March 24
EIR – Justification Document for New Construction & Modernization/Reconstruction (SAB 600), Classroom Loading Summary (SAB 600S), 1994 July 7
Plans and Diagrams – Site Drawing
Plans and Diagrams – Diagram of Building Areas, 1987 March 31
Plans and Diagrams – Diagrams of Building Areas (SP-3A, SAB 506-B), 1987 April 24, 1988 November 22, 1989 October 3
Plans and Diagrams – Building Area Computation Sheets (SAB 74D), 1987 June 11
Plans and Diagrams – Plan Review Cost Computation (SAB 74), Plan Review Findings and Action Taken (SAB 74C), Plan Review Summary (SAB 74E), 1987 June 12-22
Plans and Diagrams – Preliminary and Final Plan Review – Construction: Letter from D. Fallis (OLA) to B. Kimball (LAUSD), Checklist, 1987 July 15-16
Plans and Diagrams – State School Building Aid Certification of Architect to Changes in Final Plans and Specifications for Project, 1988 November 15, 1991 August 1
Plans and Diagrams – OSA Approved Plans and Specifications: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1989 January 25
Plans and Diagrams – Plan Review Transmittal and Check List, 1989 February 16
Plans and Diagrams – Plan Review Findings (SAB 74), Plan Review Class B Cost Computation (SAB 74F), Plan Review Service Site Development-Handicapped Access Allowance (SAB 74HCA), 1989 February 28, March 3
Plans and Diagrams – Plan Review Comments Prior to Bid Authorization: Correspondence Between OLA and LAUSD, 1989 March 6, April 7
Plans and Diagrams – Addendum #1, Shop/Classroom Building, BSHS, Bid Package #1 (Contract #1, 22-24021), Fax Transmittal from J. Lin (for Werner, LAUSD) to R. Walton (OLA), Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 June 7, 8
Plans and Diagrams – Addendum No. 1 to the Drawings and Specifications for the Addition of the Shop/Classroom Building at the BSHS, Prepared by Hellmuth, Obata & Kassabaum (22/24021), New Shop and Classroom Building, Addendum #1: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1989 June 22, 26
Plans and Diagrams – Plan Review Transmittal and Check List, Addenda #1 & 2, 1990 June 26
Plans and Diagrams – Plan Review Transmittal and Check List, Addendum #3, Addendum #3, Shop/Classroom Building, BSHS, Bid Package #1 (Contract #1, 22-24021), Submittal of Addendum #3: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 June 27, July 2
Plans and Diagrams – Addendum #4 to the BSHS Shop/Classroom Building Bid Package #1 (Contract #1, 22-24021), Letter from E. Werner (LAUSD) to R. Walton (OLA), 1990 July 5
Plans and Diagrams – Addendum #6, Shop/Classroom Building, BSHS, Prepared by Hellmuth, Obata & Kassabaum (Contract No. 2, 22/24021), Rebid Part II, Submittal of Addendum No. 6: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1991 September 5, 10
Plans and Diagrams – Plan Review Findings-Addendum #6, 1991 September 12
Plans and Diagrams – Addendum 7, Shop/Classroom Building, BSHS, Prepared by Hellmuth, Obata & Kassabaum (Contract No. 2, 22/24021), Part II – Construction of New Addition, Addendum 7: Letter from E. Werner (LAUSD) to R. Walton (OLA), 1991 September 25, 26
Plans and Diagrams – Addendum 8, Shop/Classroom Building, BSHS, Prepared by Hellmuth, Obata & Kassabaum (Contract No. 2, 22/24021), 1991 September 27
Plans and Diagrams – Plan Review Transmittal and Check List, Addenda 7 & 8 (22/64733-11-21), 1991 October 21
Plans and Diagrams – Photos (22/64733-11-21) (Photocopies), 1991 November 7
Plans and Diagrams – Plan Review Transmittal and Check List-Addendums [sic] #11, 12, &13, Addenda #11, 12, & 13, and Supporting Documents, 1992 May 26-June 26
Plans and Diagrams – Plan Review Transmittal and Check List (Bid Update), M/WBE Route Slip, 1992 June 30, July 7
Plans and Diagrams – Specifications for the Construction of the Excess General Site Work – Part 4, Belmont High School Shop/Classroom Addition, Prepared by Hellmuth, Obata & Kassabaum (Bid No. 944021), February 1994
Plans and Diagrams – Addendum No. 1 to the Drawings and Specifications for the Construction of the Shop/Classroom Addition, BSHS, Prepared by Hellmuth, Obata & Kassabaum (Contract No. 4, 22/24021), 1994 April 27
Plans and Diagrams – Addendum No. 2 to the Drawings and Specifications for the Construction of the Shop/Classroom Addition, BSHS, Prepared by Hellmuth, Obata & Kassabaum (Contract No. 4, 22/24021), 1994 May 12
Property Acquisition – Certification of Ownership of Site on Which a Lease-Purchase Project is to Be Planned or Constructed (SAB 509) (22/24000), 1984 February 8
Property Acquisition – Appraisal of Real Property Involved in BHS, Third Addition, Prepared by Western Cities Appraisal Co., Inc., 1984 December 27
Property Acquisition – Cross-Reference File No. 22/24021, 1984 December 27
Property Acquisition – Third Addition, Acquisition of Property from International Association of Machinists: Correspondence, Litigation Guarantee, 1985 March 5-26
Property Acquisition – Appraisal Report for LAUSD BHS Third Addition Site, Prepared by Edward P. Reilly, 1985 December 15
Property Acquisition – Appraisal Report for LAUSD BHS Third Addition Site, Prepared by Edward P. Reilly, 1985 December 15
Property Acquisition – Appraisal Report, BHS Expansion, by Charles Dunn Co., Transmittal Letter, 1986 January 20, February 6
Property Acquisition – Appraisal Report, BHS Expansion, by Charles Dunn Co., 1986 January 20
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Aguilar – Barrios), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Battistoni – Cainglet), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Campos – Garcia), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Giron – Lee), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Lee – Mejia), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Nakata – Rosales), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Ruiz – Villasenor), 1987-1989
Property Acquisition – Relocation Claim Transmittals, Supporting Documents (Yamamoto – Zepeda), 1987-1989
Property Acquisition – Appraisal Review: Letter from R.D. Meier (DGS) to A. Kevorkian OLA, 1987 January 12
Property Acquisition – Land Acquisition, 1987 January 13-August 11
170 & 174 Union Pl.-RE File 9819, 1621 W. 2 nd St. -RE File 9821, 143, 149, & 151 S. Loma Dr. -RE Files 9827, 9826, 9825, 176 S. Union Pl. -RE File 9831, 1605 Crown Hill Ave. -RE File 9852 (Lei, Nakata, Escorpiso, Corpuz): Correspondence
Title Documents
Litigation Guarantees
Property Acquisition – Condemnation of Parcels at Belmont High School Third Addition: Memo from R. Niccum to B. Kimball (LAUSD), Map, 1985 May 16, 1987 March 6
Property Acquisition – Belmont H.S. Site (E) 11.0 (N) 3.27 Acres: Letter Approving Acquisition, from D. Brooks and H. Heydt (CDE) to LAUSD Board, 1987 March 9
Property Acquisition – Land Acquisition – 155, 159, & 169 S. Loma Dr. -RE Files 9824, 9823, 9822, 1609 Crown Hill Ave. -RE File 9851 (Honradez-Jarabelo, Cabarloc, Escorpiso): Correspondence, Title Documents, Litigation Guarantees, 1987 March 16-1988 April 11
Property Acquisition – Third Addition, Land Acquisition – 173 & 177-181 S. Loma Dr.-RE File 9830 (Escorpiso & Cainglet): Correspondence, Title Insurance Litigation Guarantee, 1987 March 16-1988 June 3
Property Acquisition – BHS Third Addition, Request to be Heard, Resolution of Necessity Hearing Notice, 1987 March 3, April 6
Property Acquisition – BHS, Third Addition-Application No. 22/24021: Letter from E. Werner (LAUSD) to E. Collier (OLA), 1987 April 8
Property Acquisition – BHS, Third Addition and Commonwealth Avenue, Second Addition: Memo from R. Restivo to G. Werner (LAUSD), 1987 April 13
Property Acquisition – Certification of Ownership of Site on Which a Lease-Purchase Project is to Be Planned or Constructed (SAB 509) (22/24021), 1987 April 17
Property Acquisition – BHS Addition-Application No. 22/24021: Letter from E. Werner (LAUSD) to E. Collier (OLA), Site Description, 1987 April 21
Property Acquisition – Site Addition-22/24021, Relocation Claims: Correspondence and Supporting Documents (Carlos, Bautista, Sawai, Aguilar, Toda, Bigornia), 1987 May 4-1988 May 26
Property Acquisition – Belmont New Senior High #1, 23.2 Acres: Letter from D. Brooks and H. Heydt (CDE) to LAUSD Board, 1987 July 6
Property Acquisition – Relocation Claims: Letters from E. Werner (LAUSD) to R. Walton (OLA), July 1988-August 1989
Property Acquisition – Relocation Allowance Claims: Letter from A. Kevorkian and D. Fallis (OLA) to B. Kimball (LAUSD), 1988 December 2
Property Acquisition – Concern Regarding the Land Acquisition for the Belmont/Marshall New S.H.S. No. 1: Letter from B. Hanson (SFPD) to LAUSD Superintendent, 1989 June 16
Property Acquisition – LAUSD Board Building Committee Communication No. 2, Approval of Land Acquisition Program, 1989 June 19-26
Property Acquisition – Relocation Claims: Letter from D. Fallis (OLA) to B. James (LAUSD), 1989 September 21
1990 May 8-August 17
Property Acquisition – Relocation Plan for Belmont Area New Senior H.S. #1 (by Pacific Relocation Consultants) (22/64733-09-31), Correspondence Between R. Walton (OLA) to B. James (LAUSD), November 1990, 1991 May 1
Property Acquisition – Submittal of Appraisal Report (Project No. 22/64733-09-31): Transmittal Letter, Letter from E. Werner (LAUSD) to R. Walton (OLA), Appraisal Review, 1991 March 14, 27, April 22
Property Acquisition – Cross-Reference File No. 22/64733-09-21, 1992 March 20
Property Acquisition – Parcel Summary-Valuations (R.P. Laurain & Assoc.), 1992 December 1
Property Acquisition – Quitclaim Approval: Letter from F. Alexander (OLA) to C.D. Brown (LAUSD), 1992 December 24
Property Acquisition – Buyer's Settlement Statement (11902, 11900, 11907, 11923, 11927, 11926, 11925, 11924, 11923, 11920, 11915), Grant Deed (Lucky Land, Torres, Weiner, Colton Street Partnership, Roman Catholic Archbishop, Balue, Merlo, Cabarteja, Hsu), 1993 November 8-1995 July 7
Property Acquisition – Appraisal Reports, 1993 December 1
Property Acquisition – Acquisition Appraisal Report Belmont New Senior High School No. 1 by Losson Appraisal Co., 1993 December 7
Property Acquisition – Appraisal Report LAUSD Proposed Belmont New Senior High School No. 1 by Laurain Associates, Inc., 1993 December 7
Property Acquisition – Appraisal Report LAUSD Proposed Belmont New Senior High School No. 1 by Laurain Associates, Inc., 1993 December 7
Property Acquisition – Los Angeles City Plan Case No. 93-0392 PWA, Council District 1: Letter from Planning Commission to F. Bennett (LAUSD), 1993 December 9
Property Acquisition – Review of Preliminary Title Report: Letter from D. Cartwright, Map, 1993 December 16
Property Acquisition – Purchase and Sale Agreement and Joint Escrow Instructions Pacific Rim: Instructions, Fax Cover Sheet, 1993 December 16, 1994 March 3
Property Acquisition – Site Acquisition Documents (Project No. 22/64733-09-31): Letter from M. Scinto (LAUSD) to D. Fallis (OLA), Purchase and Sale Agreement and Joint Escrow Instructions, Pacific Rim, 1993 December 16, 1994 March 4
Property Acquisition – Pacific Rim: Letter from Tuttle & Taylor to R. Niccum (LAUSD), Purchase and Sale Agreement and Joint Escrow Instructions, Pacific Rim, 1993 December 16, 1994 February 11
Property Acquisition – Interlocutory Judgments (Case No. BC 088 92, LAUSD vs. Lucky Land Ltd.) (Parcel 11904, 11905), Letters from G. Phillips (O'Melveny) to F. Bennett (LAUSD), Warrant #26479218, 26193413, -414, & -412, 1994 July 18-November 22
Property Acquisition – Buyer's Settlement Statement, Grant Deed (F. and R. Joe), Real Estate Parcel No. 11928: Letter from M. Scinto (LAUSD) to S. McSherry (OLA), 1994 August 5, 11
Site Review and Assessment – Alternative Sites and Site Selection: Notes on Ambassador – Belmont #1 (22/24031), Projected Enrollment Diagrams, Memo from W. Denton to R. Niccum (LAUSD), 1984 September 17, 1985 March 19-1990 April 25, 1992
Site Review and Assessment – Status of LAUSD Site Reviews: Memo from H. Heydt (CDE) to B. Hancock (OLA), 1986 July 18
Site Review and Assessment – Certification of School District's Compliance with Ed. Code Section 39002 (SAB 510) (22/24021), 1987 April 17
Site Review and Assessment – School Construction Options, Los Angeles-Belmont-Northeast Area High School Attendance Areas: Report, ca. 1988
Site Review and Assessment – Alternative Sites for Secondary Schools within the Central/Northeast Areas of the District: Memo from B. James to LAUSD Board Members and Building Committee, Supporting Documents, 1989 January 23
Site Review and Assessment – LAUSD Augmented Building Committee, Alternative Sites for Central/Northeast Areas Site Tour: Maps, 1989 March 30
Site Review and Assessment – Franciscan Ceramics: Advantages, Disadvantages, 1989 April 10
Site Review and Assessment – "DA Enters into Franciscan Saga": News Article by D. Bailey, Los Angeles Independent, 1989 April 13
Site Review and Assessment – Belmont Complex: Junior and Senior High School Site Alternatives: Memo from B. James to LAUSD Board Members and Building Committee, Analysis Spreadsheet, 1989 April 28
Site Review and Assessment – School Facilities Planning Division Site Review (Franciscan Site), Maps, 1989 May 3
Site Review and Assessment – Site Review Transmittal: Memo from B. Hanson (SFPD) to OLA, 1989 May 31
Site Review and Assessment – Franciscan Site Assessment: Memo from B. James to LAUSD Board Members and Building Committee, Maps, 1989 October 17
Site Review and Assessment – Carnation Site: Memo from B. James to LAUSD Board Members and Building Committee, 1989 November 3
Site Review and Assessment – Summary of Augmented Building Committee Meeting of October 19, 1989: Memo from B. James to W. Anton (LAUSD), 1989 November 13
Site Review and Assessment – Site Assessment-Belmont Senior High School No. 1: Memo from D. Griffith to S. Wong (LAUSD), 1990 February 16
Site Review and Assessment – Attachment C: Belmont New Senior High School #1 – 22/24031, Sequence of Events in Reverse Chronological Order, 1990 March 8
Site Review and Assessment – Spreadsheet: [Student Counts], 1990 May 18
Site Review and Assessment – Belmont/Marshall Senior High School Site Assessment: LAUSD Board Memo, 1990 June 18
Site Review and Assessment – Revised Notice of Completion: Form from California Office of Planning and Research, 1990 October 29-November 27
Site Review and Assessment – Site Review, Belmont New Senior H.S.: Letter from R. Walton (OLA) to C.D. Brown (LAUSD), 1993 March 9
Site Review and Assessment – Preliminary Site Assessment and Senate Bill 2262 Screening, August 1993
Site Review and Assessment – Site Review Transmittal: Memo from Department of Education, Review Form, 1993 November 11, 23
Series III: Belmont Learning Complex, 1978-2002
Subseries A: Finance, 1988-1999
Demolition Costs for BLC, Project No. 22.24031
Summary of Estimated Costs (SAB 506B)
Summary of Estimated Costs (SAB 506B)
BLC (SAB) – To Change Application Status and Amend Phase P: Exhibit
SAB – Resolution Approving Project Applications and Making Apportionments Thereof: SAB Resolution C2 88-03, 1988 March 23
Kern Union H.S. District: SAB Documents, 1990
Funding Documents, 1992 August 26-1997 May 27
Documents Regarding BLC Funding: Report of the SAB Executive Officer (SAB)
Letter from E. Mersey (Kajima) to S. Soboroff (Soboroff Partners)
Letter from W. Wedin to E. Mersey
BLC, A Reality Check as of May 27, 1997
Review of Belmont Project: Memo from D. Koff to BB Oversight Committee Members
Local Bond Estimates of Need: Table
Table 1: Summary of School Facilities Needs by Cluster
SAB Minutes, 1993 September 22
Phase S Apportionment: Note
Question #7, State School Building Lease-Purchase (SAB 506) (Application No. 22/64733-11-31), 1994-1995
SAB Resolution 94-03-01, 1994
Project Eligibility Justification (22/64733-70-00), Draft Enrollment Projections Based on 1993/94 School Year Enrollment Data (SAB 411), 1994 January 7, 18
Department of Education Approval of Purchase of BLC Property: Letter from H. Heydt and B. Hanson, SFPD, to LAUSD Board, 1994 January 18
Request for Phase S Apportionment: Letter from M. Scinto (LAUSD) to S. McSherry (OLA), Request for Phase S Apportionment: Letter from LAUSD to OLA, CEQA Requirements (SAB 499), 1994 January 18, February 2
Belmont/Hollywood Attendance Area, Application No. 22/64733-70-00, SAB Form 411B: Letter from M. Scinto (LAUSD) to S. McSherry (OLA), Enrollment Certification (SAB 411B), Maps, 1990, 1994 January 25
Appraisal Reviews: Memo from D. Fallis to F. Harding, 1994 February 1
Lease-Purchase Project Accounting System, Application Budget Summary (22/64733-11-31), 1994 February 4
Site Apportionment: Application, 1994 February 23
Transfer of Cash for 1988 June Bonds: Memo, 1994 March 9
Phase Site Apportionments: Fund 708-001, 1994 March 9
School District Appeal Request (SAB 189), September 1994
Request for Action Proposal, State Allocation Board, September 1994
LAUSD Growth and Modernization Projects Without Phase III Apportionment, 1995 January 19
Amendment to Five-Year Facility Plan: Letter from L. Roberts (LAUSD) to H. Heydt (CDE SFPD), To Add 77/64733-0530 to Attached List: Letter from H. Heydt to OLA, 1995 February 14, April 4
Business and Facilities Committee Report No. 1, Section (1), 1995 June 19
SAB Approval: Letter from A. Bradley (OPSC) to D. Shambra (LAUSD), SAB Agenda Immediate Action Authorization, Agenda, 1995 July 12-28
Permanent Phase P Worksheet (SAB 517), 1995 July 13
Amended Application (22/64733-11-31): Letter from M. Scinto (LAUSD) to R. Lessa (OPSC), 1995 July 25
Growth/Amended Phase P: Application, Application Budget Summary, 1995 July 13, 26
Modernization/Phase P: SAB Exhibit, 1995 July 26
Public Records Act Request: Correspondence Between R. Martland (Atty.) and O. Wright (SAB), Requested Documents, 1995 August 29-October 30
Lease-Purchase Project Accounting System: Application Budget Summary (22-64733-11-29), 1995 September 19
Application for Apportionment for Modernization/Reconstruction (SAB 706), 1995 September 21
Funding Documents and Correspondence, 1995 January 26-1996 February 28
Potential Funding for LAUSD Projects: Letter from O. Wright (OPSC) to M. Slavkin (LAUSD)
Follow-Up to Questions Concerning Response to Public Records Act Request: Letter from O. Wright (OPSC) to R. Martland (Nielsen, Merksamer, Parrinello, Mueller & Naylor)
Response to Public Records Act Request: Letter from O. Wright (OPSC) to R. Martland (Nielsen)
Application Budget Summary
SAB Exhibit, Growth/Amended Phase P
OPSC Projects Funds Breakdown
Division of State Architect Fees: Request for Payment, 1996 April 8-1998 May 18
Requesting Approval of an Alternative Design/Construction Format, as a Pilot Project, for Two of its New Construction Applications: Report of the SAB Executive Officer, 1996 May 1
SAB Approval: Letter from D. Boydstun (OPSC) to B. Louargand (LAUSD), Report of the SAB Executive Officer, 1996 May 29, June 3
Fund Release Certificates: Note, Correspondence and Checklists from OPSC to LAUSD, Documents and Action Needed, Project Description, Phase C Worksheet, Phase P Worksheet, 1996 June 11-1997 September 25
Checklist of Planning Phase Fund Release Documents: Letter from S. Mulligan (OPSC) to R. Hamm (LAUSD), 1996 June 12
Cross Reference (SAB 240): Project Changed from Funding Priority 6 to Priority 2 (22/64733-11-31 and 22/64733-06-95), 1996 August 13
AB 481 (Joint Venture) Project: Letter from P. Risse (OPSC) to R. Rodriguez (LAUSD), 1996 August 15
Enrollment Projection (SAB 411), 1996 August 29
Lease-Purchase Accounting System, Application Budget Summary, 1996 September 9, 18
Draft Copy of the Status Report: Letter from T. Dutton (SAB) to B. Leonard (State Senator), Report of the SAB Executive Officer, 1996 September 18, 25
Report of the SAB Executive Officer to SAB (SAB 22/6473-11-31 & -23): Letter from D. Shambra (LAUSD) to T. Dutton (OPSC), 1996 September 26
To Follow Up on Our Application for Funding: Letter from R. Rodriguez (LAUSD) to P. Risse (OPSC), 1996 September 24
Standard Fund Release (SAB 521), Fund Release Clearance, Application Budget Summary (Application No. 22/64733-11-21), 1996 October 1-1997 June 30
To Provide a Status Report of the LAUSD's BLC: Memos, Report of the SAB Executive Officer, Submittal of Application for BLC, Fax, Report of the SAB Executive Officer, 1996 August 13, November 6
Checklist of Planning Phase Fund Release Documents: Letter from C. DeLong (OPSC) to R. Hamm (LAUSD), 1996 October 30
General Invoice (Kajima Int'l.), Check (Folio Number F 215943), 1996 December 3, 12
Application No. 22-64733-11-31 and 22-64733-11-23, Project Description and Status
Student Numbers: Spreadsheet, ca. 1997
Funding for BLC: News Articles, 1997-1999
Reimbursement of Legal Fees Associated with Condemnation Proceedings (Application #22/64733-11-21): Correspondence Between OLA and LAUSD, Budget Summary and Details, 1996 February 6-1998 March 31
Phase C Worksheet, Lease-Purchase Project Accounting System Application Transaction Detail, Application Budget Summary, 1997 February 7
Lease-Purchase Project Accounting System: Application Transaction Detail (22-64733-11-31), Application Budget Summary (22-64733-11-31), 1997 February 10
Work Sheet-Furniture and Equipment Computation, Senior High Schools (22/64733-11-31) (SAB 522B), March 1997
SAB 189 and SAB 600: Letter from D. Shambra (LAUSD) to T. Dutton (OPSC), School District Appeal Request (SAB 189), 1997 March 24
Phase Cs for May 21, 1997: List of Projects and Districts, 1997 April 23
Site Preparation Contract: Allowance Adjustment Sheet, Sample, 1997 April 24
Proposition BB and Funding for BLC: News Articles, 1997 May 6-1999 October 8
Lease-Purchase Project Accounting System: Application Budget Summary, Application Transaction Detail (22/64733-11-21), 1997 May 8
Cost Comparisons of High School Projects, 1997 May 20
Executive Officer's Statement, SAB, 1997 May 21
SAB Approval: Letter from D. Boydstun (OPSC) to B. Louargand (LAUSD), SAB Exhibit, 1997 May 21, 23
Amended Application: Fax from R. Rodriguez (LAUSD) to N. Abdallah (OPSC), Letter from D. Shambra (LAUSD) to T. Dutton (OPSC), Appeal Request, 1997 March 24, June 2
Estimated Project Cost Detail (Turner/Kajima) (Draft), 1997 June 3
Two Items-Belmont Complex: Notes, L.A. Unified Belmont Learning Complex: Notes, ca. 1997 June 3, June 4
Project Descriptions (Application Number 22-64733-11-31 and -23), Cost Estimates, 1997 June 10
Justification Document for New Construction & Modernization/Reconstruction (SAB 600), Classroom Loading Summary (SAB 600S), 1997 June 13
I Write to Express My Concerns About the BLC: Letter from T. Hayden to Members of SAB, 1997 June 20
The District is Requesting the Following: 1. Approval to Consolidate Applications No. 22/64733-11-23 and 22/64733-11-31, 2, Approval of the Transfer of Apportionments in the Amount of $32137268…: Report of the SAB Executive Officer, 1997 June 25, October 22
SAB Meeting: Letter from T. Dutton (OPSC) to D. Shambra (LAUSD), 1997 June 25, 27
Special Appeal Request: Letter from S. Mulligan (OPSC) to B. Hamm (LAUSD), 1997 June 27
Phase P (Planning) Fund Release (77/64733-11-17): Letter from M. Covington (OPSC) to B. Louargand (LAUSD), 1997 August 13
The LAUSD'S Belmont Learning Complex: Update on a JLAC Inquiry: Report from JLAC, 1997 September 4
Issue Paper (Current Application Numbers 22/64733-11-31, 22/64733-11-23, 77/64733-11-17), 1997 September 25
Lease-Purchase Project Accounting System: Application Transaction Detail (22-64733-11-31 and -23, and 77-64733-11-17), Application Budget Summary (22-64733-11-31 and -23), 1997 September 25
Regarding Your Question: Fax from K. Rosenlieb (OPSC) to R. Friermuth (LAUSD), 1997 September 25
Summary of Estimated Costs, Cost Estimate Supplement (C-6, Demolition), Turner/Kajima Increment 1 Submittal (Attachment to SAB 506A), 1997 October 9
Construction Allowance Transmittal and Check List (SAB 74T) (22/64733-11-31), 1997 October 15
Requesting to Amend This Application and to Convert a Portion of the Existing Belmont High School to a Middle School with Modernization Funds: Report of the SAB Executive Officer, Letter from S. Mulligan (OPSC) to B. Hamm (LAUSD), 1997 June 27, October 22, December 3
Executive Officer's Statement, 1997 December 3
I Have Some Concerns About This Politically Sensitive Project…: Memo from K. Rosenlieb (OPSC) to R. Gonzalez, 1997 December 10
Increments for BLC: Fax from K. Rosenlieb (OPSC) to R. Rodriguez and R. Friermuth (LAUSD), 1997 December 10
Lease-Purchase Project Accounting System, Application Transaction Detail (77-64733-11-17), Application Budget Summary, 1997 December 10
Thank You for Following Up with Michael Gould: Fax from K. Rosenlieb (OPSC) to R. Rodriguez and R. Friermuth (LAUSD), Michael Gould: E-mail from J. Hamiel to K. Rosenlieb, Fax from K. Rosenlieb (OPSC) to LAUSD, 1997 December 15
SAB Apportionment of Funds for BLC: Letter from Orrick, Herrington & Sutcliffe, LLP, to G. Ness (DGS Office of Legal Service), 1998 January 16
New Conflict of Interest: Handwritten Note, Proposition BB: Letter from R. Riordan (L.A. Mayor) to R. Dezember (SAB), Belmont Heating Up: Memo from T. Hayden to Connie [Brown], BLC Application: Letter from T. Hayden from T. Dutton (SAB), 1998 March 9-June 17
Copy of the Last Page of the Approved October 22, 1997 Board Item: Fax from K. Rosenlieb (OPSC) to R. Rodriguez and B. Louargand (LAUSD), 1998 March 20
Looking for Direction on Project 22/64733-11-31: Memo to file from K. Rosenlieb (OPSC), 1998 March 20
BHS Attendance Are, 1995 March 24-1998 March 17
#64733-70, SAB 600 and Related Documents for 1997/98: Letter from R. Friermuth (LAUSD) to K. Rosenlieb (OPSC)
Projected Average Daily Attendance (SAB 411)
Justification Document - New Construction & Modernization/Reconstruction (SAB 600)
Classroom Loading Summary (SAB 600S)
Architect Agreement Certification (SAB 533A)
Responses to the "Outstanding Issues": Fax from K. Rosenlieb (OPSC) to R. Rodriguez (LAUSD), Executive Officer's Statement (SAB), 1998 January 28, March 24
Cost Estimate, SAB 506B and Related Documents: Correspondence Between LAUSD and OPSC, SAB Forms 506B and 506A, 1998 February 4, March 25, April 6
Weekly Update: Memo from K. Rosenlieb (OPSC) (Draft), Documents Related to Questions Asked by SAB, 1997 December 3-1998 April 27
To Respond to Previous SAB Questions Relating to the Project … : Report of the SAB Executive Officer, Comments to SAB Requested Responses: Memo from R. Gonzalez to LAUSD and DGS, 1998 April 8, 22, July 7, 22
Request for Hold Harmless Clause: Fax from K. Rosenlieb (OPSC) to G. Ness, Documents Regarding DDA and Hold Harmless Clause, 1997 February 10-1998 April 7, 15
Construction Justification Documents, 1998 May 14-20
Justification Document for New Construction & Modernization/Reconstruction (SAB 600)
Fax from R. Rodriguez (LAUSD) to R. Gonzalez (OPSC)
Justification Document for New Construction & Modernization/Reconstruction (SAB 600)
Classroom Loading Summary (SAB 600S)
Fax from R. Gonzalez (OPSC) to J. Marmalefsky
Unresolved Issues, SAB Application # 22/64733-11-31: Letter from R. Rodriguez (LAUSD) to T. Dutton (OPSC), 1998 June 9
Attachment B: Construction of New Plant, Estimated Project Construction Cost-Cost Breakdown (SAB 506B), 1998 July 14
News Media/Legislative Contact, 1998 April 27
OPSC REST Reviewing Site Acquisition Documents: Letter from R. Cayton-Sutherland (OPSC) to B. Louargand (LAUSD), 1998 June 18
District's Proposal to Combine BMS and BSHS to form BLC (Application #22/64733-11-23 & -31): Letter from R. Cayton-Sutherland (OPSC) to B. Louargand (LAUSD), 1998 June 23
The District is Requesting a Waiver of the Reimbursement Policy Until July 22, 1998, to Allow Construction to Continue Prior to a Phase C Approval: Report of the SAB Executive Officer, Special Appeal Item: Letter from D. Hartin (OPSC) to B. Louargand (LAUSD), 1998 June 24, July 2
Special Appeal Item (Application No. 22/64733-11-31): Letter from D. Hartin (OPSC) to B. Louargand (LAUSD), 1998 July 2
Post DSA (SAB 74GRM) (22/64733-11-31), 1998 July 22
Office Review of Application Expenditures (22/64733-11-21), 1998 August 5
Extension of Time to Review the Exhibit "A" for Project 22/64733-11-21: Letter from J. Fryer (OPSC) to R. Zacarias (LAUSD), 1998 September 10
SAB Consideration of Approval: Letter from T. Hayden to T. Dutton (SAB), 1998 November 16
SAB Meeting of November 18, 1998: Memo from B. Louargand to LAUSD Board, Fax Transmittal, Transcript of Meeting, 1998 November 23-ca. December 16
News Media/Legislative Contact, from Chris Delong to Ted Dutton (22/64733-11-23), 1998 December 2
Lease-Purchase Program: Letter from B. Louargand (LAUSD) to T. Dutton (OPSC), 1999 February 2
Postponement of Consideration: Letter from B. Louargand (LAUSD) to T. Dutton (OPSC), 1999 February 8
L.A. Board of Recreation and Parks: Agenda, Report, 1999 April 7
News Articles Regarding Bond Funds, 1999 August 8-September 23
LAUSD Class-Size Reduction Program Funding Request: Memo from S. Wildman to D. Eastin, Superintendent of Public Instruction, 1999 August 25
Belmont Cost Estimates by LAUSD Independent Analysis Unit, 1999 September 17
SAB Approval of Funding for Class Size Reduction Mitigation Plan: Letter from R. Zacarias (LAUSD) to T. Hayden, 1999 September 27
Bond Funds for School Modernization: Letter from L. Park (SAB) to T. Hayden, 1999 November 2
Proposition 1A Funds: Letter from L. Park (SAB) to T. Hayden, 1999 November 2
Subseries B: Agreements and Contracts, 1994-1999
Attachment B: Resolution Regarding BLC and Joint Venture
Notice to Proceed (22/24031): Memo, Letter, 1994 January 11, February 15
Joint Venture Project-BLC: Office of the Superintendent Communication C, Project Documentation (SAB Application No. 22/64733-11-31), Financial Comparisons, Summary, 1994 July 18
Request for Phase I Proposals of Developers for 35 Acre Parcel Located in the City of Los Angeles, 1994 September 9
Request for Phase II Proposals of Developers for 35 Acre Parcel Located in the City of Los Angeles, 1994 December 23
Attachment A: BLC Memorandum of Understanding, Summary, Belmont Project Memorandum of Understanding, Draft, 1996 June 19, 27
LAUSD Board Committee of the Whole Meeting: Agenda, Office of the Superintendent Communication No. 1: Memo, 1996 July 8
BLC Memorandum of Understanding Between LAUSD and Temple Beaudry Partners, 1996 July 29
BLC Memorandum of Understanding Between LAUSD and Temple Beaudry Partners, 1996 July 29
LAUSD Board Report No. 2 (Memorandum of Understanding), Office of the Superintendent Revised Communication No. 1, Summary of MOU, 1996 June 19, July 8, August 5
Selection of Development Team for BLC-Temple/Beaudry Project: Fax Cover Sheet, Office of the Superintendent Communication No. 1, 1995 August 21, 1996 August 13
LAUSD Request for Firm to Provide Environmental Remediation Services for BLC, 1996 November 15
ECIS Proposal for Providing Environmental Site Remediation at BLC, 1996 December 9
Proposal for UST, Clarifier, and Hydraulic Lift Removal, Soil Extraction, and Recycling, 1996 December 17
Clarification of Proposal for UST, Clarifier, and Hydraulic Lift Removal, Soil Extraction, and Recycling, 1996 December 19
Acceptance and Second Clarification for Environmental Remediation Services: Letter, Notes, 1997 February 20
Amendment No. 1 to Agreement No. 97S001: Letters, Faxes, Change Orders #1 & #2, Supporting Documents, 1997 March 24-April 7
Amendments No. 2 and 3 to Agreement No. 97E017 (Previously 97S001): Letters, Faxes, Change Order #2, Supporting Documents, 1997 April 7-June 9
Amendment No. 4 to Agreement No. 97E017: Letters, Faxes, Change Orders #3–#5, Supporting Documents, 1997 April 17, September 11
LAUSD Board Meeting Agenda, Board of Education Report No. 2, Office of the Superintendent Revised Communication No. 1, Completion Guaranty (Kajma Corp.), Disposition and Development Agreement Between LAUSD and Temple Beaudry Partners LLC, 1997 February 10-April 30
Disposition and Development Agreement Between LAUSD and Temple Beaudry Partners LLC, 1997 April 8
Agreement No. WO-10733, Agreement for Installation and Transfer of Title of Water System Facilities: Letter from DWP to Psomas & Assoc., 1997 April 30
Disposition and Development Agreement, LAUSD/Temple Beaudry Partners, 1997 April 30
Selection of Program/Project Management Firms: Memo, Related Documents, 1997 May 16, June 2
Disposition and Development Agreement: Handwritten Note, Request for Information: Letter from R. Mason (LAUSD) to S. Wildman, LAUSD Memos, Agreement, 1997 February 10-September 30
Disposition and Development Agreement: Handwritten Note, Request for Information: Letter from R. Mason (LAUSD) to S. Wildman, LAUSD Memos, Agreement, 1997 February 10-September 30
Completion Guaranty: Fax Transmittal, Form, 1997 April 8, June 18
Amendment No. 5 to Agreement No. 97E017: Letters, Faxes, Change Orders #4 & #5, Supporting Documents, 1997 July 2-September 30
Proposed Geotechnical Inspection Services for BLC: Fax from J. Haffley (Law/Crandall) to J. Bruce, 1997 August 19
1200 West Colton Street (I.S. 3512): Letter from DWP, Authority for Billing: Blank Form, 1997 September 16
Amendment No. 6 to Agreement No. 97E017: Letters, Faxes, Change Orders #4 & #5, Supporting Documents, 1997 September 30-1998 January 30
Appointment of Environmental Consultant – Amendment No. 1 to Agreement No. 98E002: Memo from R. Lui to M. DeLuca (LAUSD), 1997 October 1
Professional Services Agreement Between Temple Beaudry Partners, LLC, and McLarand, Vasquez & Partners, Inc., 1997 October 10
Construction Contract BLC Between Kajima Urban Development LLC and Turner/Kajima: Letter, Contract, 1997 July 31, October 20
Construction Contract BLC Between Kajima Urban Development LLC and Turner/Kajima, 1997 July 31
Construction Contract BLC Between Kajima Urban Development LLC and Turner/Kajima, 1997 July 31
Construction Contract BLC Between Kajima Urban Development LLC and Turner/Kajima, 1997 July 31
Construction Contract BLC Between Kajima Urban Development LLC and Turner/Kajima, 1997 July 31
Lease By and Between Temple/Beaudry Partners LLC and K.V. Mart Co., ca. 1998
Media Contract Documents, 1996 September 25-1998 June 17
Design Development Agreement and Architect Services: Correspondence Between Kajima and DSA, LAUSD and O'Melveny, P. Shearer (OPSC) and R. Rodriguez (LAUSD)
SAB 74 Class B (Project # 22/64733-11-31)
Media/Legislative Contact
Fax Between OPSC and T. Dunn
To Provide a Status Report…: Report of the SAB Executive Officer
Lease with Temple Beaudry Partners: Letter from D. Tokofsky (LAUSD) to SAB, 1998 November 18
Notice to Property Owners/Occupants within a 500-Foot Radius, 1998 December 11
LAUSD Board of Education Report No. 24, Approval of Management Contracts, 1999 June 22
Subseries C: Subject Files, 1978-2002
Assembly and Senate Bills – AB 481: Background on BLC and AB 481
Assembly and Senate Bills – Assembly Bill No. 481: Text
Assembly and Senate Bills – SAB Implementation of AB 481: Correspondence Between L. Park (OPSC) and H. Blume (LA Weekly) (Includes all SAB Actions Regarding BLC and Ambassador), 1995 December 14-15
Assembly and Senate Bills – Guidelines for Implementation of AB 481, Chapter 956, Statutes of 1995, Joint Ventures, 1996 June 7
Assembly and Senate Bills – 481 Project: E-mails and Notes from OPSC (G. Shae, N. Abdallah, P. Risse, P. Shearer, D. Zian, T. Dutton), 1996 October 14-1997 May 28
Assembly and Senate Bills, 1996 October 23-1997 May 21
To Present the State Allocation Board with a Legal Analysis and Recommendations Regarding the Constitutionality of Education Code Sections 17060 through 17066: Report of the SAB Executive Officer
Report by Orrick, Herrington & Sutcliffe
Implementation of AB 481: Report of the SAB Executive Officer
AB 481, Chapter 956, Statutes of 1995, Joint Ventures
Assembly and Senate Bills – SB 993: Text, 1999 February 26
Assembly and Senate Bills – Response to Draft Addition to Education Code: [Email] from Unknown Sender to Connie [Brown], 1999 April 21
Assembly and Senate Bills – "LAUSD Washes Hands of Accountability for Changes to Toxics Bill": News Article by G. Gittrich, [Los Angeles] Daily News, 1999 May 21
Assembly and Senate Bills – Results of [LAUSD] Internal Inquiry Into Amendments to Senate Bill 162, 1999 May 25
Construction – Fire Code (FC-45), Division 90 (Section 57.90.01), Oil Wells
Construction – Review Checklist, Schools & Hospitals (SH16)
Construction – Worksite Hierarchy Explanation: Memo
Construction – Receipt of Material Worksheet (SSS 140-1) (25% Submittal) (File No. 19-H16, App. No. 66745), 1996 December 19
Construction – Access Compliance (File 19-H16, Appl.# 66745), Garage Portion III, New School Portion I, Retaining Walls Portion II, Retaining Walls Portion III, 1997 March 2-October 1
Construction – Receipt of Material Worksheet (SSS 140-1) (Portion I of 100% Submittal) (File No. 19-H16, App. No. 66745), Transmittal from J.T. Baine (Psomas) to DSA (Job No. 2MCL0102), 1997 March 13, 17
Construction – Receipt of Material Worksheet (SSS 140-1) (Increment I) (File No. 19-H16, App. No. 66745), 1997 April 9, May 20
Construction – Plant Relocate and Removal: Letter from Continental Cablevision to K. Reizes, 1997 April 22
Construction – Site Grading: Application for Building Permit, Back Room Plan Check, Drawings, Worksheet, Notes, 1997 April 24-May 30
Construction – News Articles, June 1997-June 1999
Construction – Turner/Kajima: List of Work Tasks (Partial), 1997 June 2
Construction – Removal and/or Relocation of Gas Lines, File #GWO#74377, WP#255694: Letter from K. Reizes (Kajima) to Southern California Gas Company, Collectible Work Authorization, Check No. ER 1382, 1997 June 18, 20
Construction – Soils/Geology File-2, Log #21523, Tract 1440, Lot A, Location 1101 W. First St.: Letter from Engineers (City of L.A.) to LAUSD, Fax Transmittals, 1997 June 18, 26, 30
Construction – Construction Schedule: Notes, 1997 July 10-November 14
Construction – Removal of Overhead Power Distribution Facilities "Phase 1": Letters from T. Fujiwara (DWP) to K. Reizes (Kajima International), 1997 April 16, July 29
Construction – Statement of Mix Design for Concrete, Smith-Emery Co. (Job No. 33364), Fax Cover Sheet from Smith-Emery Co. to J. Slackman (DSA), 1997 October 1-9, 16
Construction – Inspector's Semi-Monthly Reports (Jerry Slackman) (DSA Application #66745, File #19-H16), 1997 July 15-October 17
Construction, 1997 October 21-November 14
MV&P Job No. 95-215: Letter from M. Gould (McLarand) to J. Slackman (DGS, Office of Regulation Services)
Concrete Batch Plant Inspection: Letter from J. Parker (Smith-Emery Co.) to M. Gould (McLarand)
Thank You for Your Prompt Response: Letter from M. Gould to J. Slackman
Addendum, Change Order, Drawing, Deferred Approval Worksheet and Transmittal Memo
Construction – Piles 2A & 4B: Approval by Engineer, Soldier Beam Schedule, As-Built Info, Concrete Tickets, 1997 October 29-31
Construction – Law/Crandall Observation of Foundation Soils Pile #1A, Fax, Memo, Drawings, Notes, 1997 November 3-4
Construction – Structural Tests and Inspections (SSS 103-1), 1997 November 7
Construction, 1990-1997 November 10
Document Transmittal from DSA to LAUSD (File No. 19-H16, App. No. 66745, Project No. 22.24031)
Building Inspector Qualification Record (SSS 5) Phillip Koscielny
Resume, Phillip Koscielny
Letters of Recommendation
Certifications
Check #1033, Temple Beaudry Partners LLC to DSA
Proposed Schedule of Plan Check Submittals: Letter from M. Gould (McLarand) to J. Bruce (DSA)
Plan Check Worksheet (SSS 141-1)
Construction – Receipt of Material Worksheet, Increment #3 & #4, Revisions and Approvals: Transmittal from Turner/Kajima to M. Roy (BLC), Note, 1997 November 14, 17, 21
Construction – Response to Fax to Richard Sheffield: Fax from K. Rosenlieb (OPSC) to R. Friermuth (LAUSD), 1997 December 9
Construction – Inspector's Semi-Monthly Report, Jerry [Slackman], DSA Application #6674.5, File # 19-H16, 1998 January 17
Construction – Inspector's Semi-Monthly Report, 1998 January 30
Construction – Inspector's Semi-Monthly Report (DSA Application # 6674.5, File # 19-H16), 1998 February 23, 28
Construction – Change Orders: Memos and Supporting Documents, 1998 June 10-1999 March 10
Construction – News Articles Regarding Louis Caldera, Secretary of the Army, 1998 July 29-November 9
Construction – Question #3: PowerPoint Presentation, Memo to File by K. Rosenlieb, 1998 March 20, 1999 January 19
Construction – Suspension of Construction at the BLC: Letter from J. Quiñonez (Geffner & Bush) to G. Hayes (LAUSD), Fax Transmittal from Quiñonez to C. Brown (Hayden's Office), 1999 July 20, September 10
Construction – LAUSD Construction Agreement with Army Corps of Engineers: Correspondence, Press Release, 1999 November 4-December 8
Construction – News Articles Regarding LAUSD Agreement with Army Corps of Engineers, 1999 December 7-12
Construction – Office of Public School Construction Employee Phone List, January 2000
Earthquake and Seismic Safety – Seismic Hazards, Concerns: Correspondence, Notes, News Articles, May 1996-March 1999
Earthquake and Seismic Safety – News Articles, 1999 June 27
Earthquake and Seismic Safety – News Articles Regarding Earthquake Risk at BLC, 1999 June 27-August 2
Earthquake and Seismic Safety – Seismic Safety Commission: Letter from Tom Hayden, Letter from Richard McCarthy, 1999 August 17, 25
Earthquake and Seismic Safety – Summary of Investigation into the Roles and Responsibilities of Government Agencies for the Site Selection of Public Schools Relative to Seismic Safety: Letter, Report by Seismic Safety Commission, September 1999, 1999 October 8
Earthquake and Seismic Safety – LAUSD Halts Further Planning to Resume Construction of the Belmont Learning Center in its Present Design: Press Release, 2002 December 4
EIR – CEQA Requirements (SAB 499): Checklist, 1994 February 2
EIR – Checklist-CEQA Requirements, ca. 1995
EIR – Notice of Preparation of Draft Environmental Impact Report, Initial Study, 1995 December 21
EIR – Notice of Preparation for the BLC Draft Environmental Impact Report (SCH #95121055): Letter from A. Rivasplata (Office of Planning and Research) to Reviewing Agencies, 1995 December 26
EIR – Initial Study, Environmental Checklist Form, Mislabeled Figure 2: Letter to Office of Planning and Research, 1996 January 3
EIR – Notice of Preparation of Draft Environmental Impact Report: Letter from W. Bamattre and D. Howard (L.A. City Engineer and Fire Marshal) to E. Harris (LAUSD), 1996 January 24
EIR – BLC DEIR Comments: Letter from D. Scott (City of L.A.) to E. Harris (LAUSD), 1996 August 15
EIR – Final Environmental Impact Report, BLC, SCH#95121055 (Prepared by Cotton/Beland/Associates, Inc., Kaku Associates, and Yaghoubian Flores Associates), October 1996
EIR – Your Request on EIR Matters: Memo from D. Shambra to D. Tokofsky (LAUSD), 1996 October 9
EIR – LAUSD Board Meeting Belmont Learning Complex EIR: Transcript of Testimony Regarding Active Oil Wells, 1996 November 18
EIR – The Site Does Not Appear…: Unsigned Note, 1998 November 9
EIR – Listing of CEQA Officers Since 1985: Memo from B. Niccum to R.K. Mason (LAUSD), 1998 December 7
EIR – BLC, Temple/Beaudry Neighborhood, SCH #95121055: Letter from W. Phillips (CRWQCB) to B. Niccum (LAUSD), 1996 January 25
EIR – Resumes: Angelo J. Bellomo, Richard Lu, Paul Joseph Hurley, Raymond A. Rodriguez, Rodger R. Friermuth, Dianne K. Doi, Articles by Bellomo, 1996-1998, 1999 March 9
EIR – Information Request Concerning BLC: Letter from D. Dickerson (CRWQCB) to S. Wildman, 1999 February 4
EIR – Update: Belmont Remedial Investigation, Facilities Committee Meeting: Presentation, 1999 May 19
EIR – Draft Remedial Investigation Report, Prepared by Environmental Strategies Corporation: Report, 1999 June 11
EIR – Transfer of California Environmental Quality Act (CEQA) Function: Letter from Dave Koch to Tom Hayden, Report (Board of Education Report No. 19), Supporting Documents, 1999 June 18, 21-29
EIR – DTSC Review of the Draft Remedial Investigation Report for BLC, 1999 June 25, July 15
EIR – Media Requests: Memo Regarding LAUSD Environmental Report, 1999 September 28
History and Background – Belmont Fact Sheet
History and Background – Los Angeles Unified School District Belmont Learning Center: Brochure Prepared by SEIU Local 99
History and Background – Campaign Contributions: Lists and Notes (Regarding Contributions for Prop. BB and Related to Belmont), 1991-1997
History and Background – Campaign Contributions: Schedule A, Monetary Contributions Received, 1995 January 1-1997 February 22
History and Background – Response to Request for Materials: Letter from D. Shambra (LAUSD) to C. Brown (Hayden's Office), 1996 August 9
History and Background – Bait and Switch: Kajima Corporation/Temple Beaudry Partners (TBP) and the BLC Deal: Research by H.E.R.E. Local 11
History and Background – Two Schools of Thought: A History of the Ambassador and Belmont Sites: Draft Memo, Fax Transmittal, 1997 May 27
History and Background – Info – How Many Elementary Schools: Fax from Gale Bush at Cal Department of Education, 1999 May 6
History and Background – Bussing (sic) Numbers: Memo, 1999 July 19
History and Background – Belmont: Líos que Aumentan: Una Presentación por el Senador Tom Hayden Para el Distrito Escolar de Los Angeles, 1999 July 20
Inspector General – "School District Auditor Making Friends and Enemies": News Article by J. Netherby, Los Angeles Business Journal
Inspector General – U.S. Statutes at Large, 1978, Vol. 92, Public Law 95-452 95 th Congress (Inspector General Act), Public Law 100-504 100 th Congress, Title I – Inspector General Act Amendment, 1978 October 12, 1988 October 18
Inspector General – Special Commissioner of Investigation for the New York City School District: Correspondence Regarding Monies Recovered, Executive Orders, Bill, News Clipping, 1990 June 28-1997 May 12
Inspector General – Audit Committee Report No. 2 (L.A.) Board of Education, 1997 February 24
Inspector General – LAUSD Inspector General: News Articles Regarding Creation, Safety Director Fired: News Articles, 1997 July 10-September 25
Inspector General – "Calling for a Watchdog": Editorial, Daily News, 1997 July 11
Inspector General – Videotape: Letter of Transmittal from J. Sanshuck (LAUSD Board) to C. Brown, 1997 October 16
Inspector General – News Articles Regarding LAUSD, May 1998-October 2000
Inspector General – L.A. School District Fills New Position for Director of Audits, Investigations: Press Release Regarding Don Mullinax, Biography, Resume, Proposed Organization Chart, Charter of Internal Audit and Special Investigations Unit, 1998 November 9-1999 January 5
Inspector General – Senate Bill 1260: Correspondence and News Articles in Support of Bill and Subpoena Power for LAUSD Inspector General, 1999 March 31-September 2
Inspector General – Internal Audit and Special Investigations Unit (IASIU) Report of Investigation, Security Grilles, Reseda High School, 1999 April 30
Inspector General – IASIU: News Articles Regarding Belmont, Mullinax, Competitive Bidding, 1999 May 8-September 2
Inspector General – Internal Audit and Special Investigations Unit (IASIU) Strategic Plan, File of Auditable Activities, Business Risk Assessment, Annual Work Plan, Cover Letter to Tom Hayden, 1999 May 20, June 8
Inspector General – Senate Bill 1260 (Hayden): Subpoena Power: Background, Memo, Text, 1999 February 26, May 25
Inspector General – Senate Bill 1260: Statement of Don Mullinax, Director Internal Audit and Special Investigations Unit LAUSD, Before the Senate Education Committee, 1999 June 9
Inspector General – Possible Crimes at Belmont: Letter from G. Garcetti to T. Hayden, 1999 June 10
Inspector General – Purchase of Portable Classrooms (OIA 99-1): Memo from D. Mullinax to Dr. Koch, 1999 June 22
Inspector General – IASIU Annual Report to the Board of Education Fiscal Year 1999, 1999 July 31
Inspector General – Correspondence Regarding Possible Retribution at LAUSD, 1999 August 17-20
Inspector General – IASIU Release of Investigation Report: Letter to Tom Hayden, 1999 September 8
Inspector General – LAUSD Statement Regarding Actions Taken to Address the Recommendations of Report of Internal Auditor on Belmont, Statement of Superintendent Zacarias Regarding Actions Taken to Consider the Recommendations of Report of Internal Auditor on Belmont, 1999 September 16
Inspector General – "School Contractor to Be Arraigned in Bribery Case": News Article, Los Angeles Times, 1999 October 12
Janaury 2000-August 2000
Inspector General – Office of the Inspector General, Report of Findings, Proposition BB Bond Program, 2000 March 28
Inspector General – Office of the Inspector General, Report of Findings, Proposition BB Bond Program, 2000 March 28
Inspector General – Proposition BB Funds Management: News Articles, 2000 March 30
Inspector General – Statement of Don Mullinax Inspector General LAUSD for the Senate Education Committee, News Articles, 2000 March 30-April 5
Inspector General – DA's Review of Belmont Referral: Press Releases, News Article, 2000 April 14-15
Inspector General – Office of Inspector General Fiscal Year 2001 Budget: Memos, 2000 June 1-October 30
Inspector General – Senate Bill 1360, as Amended on May 16, 2000: Letter, LAUSD Board of Education Report #11: Correspondence, 2000 June 8, July 21-August 25
Inspector General – Report to the California State Legislature, Use and Effectiveness of Subpoena Authority, Submitted by Don Mullinax, Inspector General LAUSD, 2000 June 28
Inspector General – Report to the California State Legislature, Use and Effectiveness of Subpoena Authority, Submitted by Don Mullinax, Inspector General LAUSD, 2000 June 28
Inspector General – News Articles Regarding Effort to Remove Independence from Office of Inspector General, 2000 July 23-25
Inspector General – Office of the Inspector General, Annual Report to the Board of Education Fiscal Year 2000, Memo, 2000 July 31, August 9
Inspector General – Senate Bill 1360: Letter and Related Documents from State Department of Finance, 2000 August 6
Inspector General – Senate Bill 1360: Correspondence to Gov. Gray Davis, 2000 August 25-September 13
Inspector General – Senate Bill 1360: Text, Correspondence, 1998 May 22-2000 September 8
Inspector General – "Funding Cuts Take Bite Out of LAUSD Watchdog": News Article by B. Barrett, Daily News, 2000 November 2
Legal – Authorization to Establish an In-house Litigation Section at the Business Services Center Related to Real Estate, Environmental, Eminent Domain, and Construction Matters: Memo
Legal, 1995 June 9-1997 May 28
LAUSD Board Meeting Transcript
News Articles
Letter from C. Greenberg (California Partnerships) to LAUSD Board
Listing of Confidential & Privileged Documents Related to the O'Melveny & Myers Conflict of Interest Issue: Partial Letter from R. Mason
Temple-Beaudry RFP Proposal Review Report and Recommendations: Memo and Supporting Documents
Legal, 1997 April 2-May 2
Leroy F. Green State School Building Lease-Purchase Law of 1976: Letter from W. Donovan (Orrick, Herrington) to D. Cregger (DGS)
School District Risks Losing $40 Million of State Funds for Belmont School Project: Press Release
Second Supplemental Declaration of David R. Koff in Support of Request for Preliminary Injunction, Day Higuchi, et. al., vs. LAUSD (Case No. BC 169554)
Legal – Taxpayers Go to Court This Morning to Halt Vote on Controversial $100 Million Los Angeles High School: Press Release, 1997 April 18
Legal – Preliminary Injunction, Day Higuchi, et al, vs. LAUSD (Case No. BC 169554), 1997 May 2
Legal – Case BC 169554/Preliminary Injunction Filed on May 5, 1997: Letter from S. Soboroff (BB Oversight Committee) to J. Horton (LAUSD), 1997 May 20
Legal – "Bond Counse" Letter: Fax from K. Rosenlieb (OPSC) to R. Rodriguez (LAUSD), 1998 April 17
Legal – BLC Project, Legal Opinion: Memo from G. Ness (DGS Office of Legal Services) to T. Dutton (SAB), 1998 November 13
Legal – Appointment of (1) Assistant General Counsel, Environmental & Real Estate and (2) Senior Assistant General Counsel: Memo to LAUSD Board, Resume of Brad Hogin, 1999 February 11
Legal – Appointment of Substitute Counsel, BLC Project: Memo, 1999 February 11
Legal – Request for Information: Memo from D. Tokofsky to R. Prescott (LAUSD), 1999 May 10
Oil Wells/Toxins – Acetone: Fact Sheet
Oil Wells/Toxins – George V. Chilingarian (or Chilingar) Engineer and Scientist Petroleum Engineering and Geology: Curriculum Vitae
Oil Wells/Toxins – Equipment Rental: Notes
Oil Wells/Toxins – Hydrogen Sulfide: Fact Sheets
Oil Wells/Toxins – Notice of Licensing Requirements for Installation and Removal of Underground Storage Tanks (Contractors State License Board)
Oil Wells/Toxins – Underground Tank Abandonment Plan Check Requirements, Information on Scheduling Underground Tank Inspections, Requirement for Submitting Documents and Reports
Oil Wells/Toxins – Los Angeles River Flow and Quality Reports, 1980-1998
Oil Wells/Toxins – Temple/Beaudry Site Oil and Gas Wells: Letter (File No. 520,000-258), 1990 May 9
Oil Wells/Toxins – Hazards from Methane Gas in the Soil: Identifying the Problem and Determining the Source: Report by Dennis Coleman of Isotech Labs, 1991
Oil Wells/Toxins – Certificates and Licenses (RMC), 1992 November 12-1998 November 30
Oil Wells/Toxins – SCAQMD – Contaminated Soil Mitigation Plan, Notes, SCAQMD Rule 1166 Soil Monitoring Records, 1992 December 15-1997 August 14
Oil Wells/Toxins – Disabled Veteran Business Enterprise: Letter, Approval, 1994 October 6
Oil Wells/Toxins – Site Mitigation Program, Management Memo (EO-94-015-MM): Interpretation of the Petroleum Exclusion (Health and Safety Code Section 25317), 1994 November 28
Oil Wells/Toxins – "Hydrogen Sulfide and Reduced-Sulfur Gases Adversely Affect Neurophysiological Functions": News Article by K.H. Kilburn and R.H. Warshaw, Toxicology and Industrial Health, Vol 11, No. 2, pp. 185-197, 1995
Oil Wells/Toxins – Notice to All Environmental Consultants and Underground Tank Contractors: Letter, Supporting Documents, 1995 February 15
Oil Wells/Toxins – Scott Fagan: Authorization Letters for Darin Martini, 1995 June 13-1997 March 20
Oil Wells/Toxins – Arsenic: Health Assessment Information, 1995 July 1
Oil Wells/Toxins – Excavation and Shoring Documents: Belmont Monitor-1REM0101, Boring Location Notes, Shoring Corrections Fax from S. Fagan to Huey [Unknown], Excavation Shoring Plans, Invoices, Application for Building Permit and Certificate of Occupancy, Other Documents, 1996-1997
Oil Wells/Toxins – Price Quotation for UST Cleaning, Degassing, and Hauling Services (Western Environmental Engineers Co): Letter, Fax, 1996 January 15, 1997 January 17, 22
Oil Wells/Toxins, 1996 March-August 1
Question #8: Workplan for Well Location (by Intera)
Workplan: Letter from K. Carlson (DOGGR) to U. Baqer (Intera)
Appendix B, Selected Photographs Taken During Excavation Operations
Appendix C, Mr. Patrick Mbaba's Field Notes
Appendix D, Construction Site Well Inspection Reports by Mr. Bill Fedasko of D.O.G.
Appendix E, Complete D.O.G. Well File for K&K Manley Well #1
Appendix F, K&K Manley Well #1
Oil Wells/Toxins – Methane Gas Control: Maps and Diagrams by Methane Specialists, ca. May 1996
Oil Wells/Toxins – City of L.A. Building Permit: Forms, Fees, 1996 July 23
Oil Wells/Toxins – Question #9: Report on Field Operations: Location of Former Oil Wells, Prepared by Intera, 1996 August 1
Oil Wells/Toxins – LAUSD #1A Well: letter from A. Spivak (Intera Inc.) to R.K. Baker (DOGGR), Summary of Geological and Engineering Analysis Relating to "Pressure Relief" in the Los Angeles City Oil Field, 1996 October 2
Oil Wells/Toxins – Corrosion Control and Soils: Excerpts from Reports, Analytical Results, 1996 October 21, 1997 December 16
Oil Wells/Toxins – LAUSD Request for Proposals, 1996 November 15
Oil Wells/Toxins – Pre-Bid Meeting for Future BLC: Letter, Roster, 1996 November 25
Oil Wells/Toxins – Bid Request for Tank Removal Services (Nieto & Sons): Letter, Fax, 1996 November 26, 27
Oil Wells/Toxins – Request for Price Quote (Landmark Materials): Fax, Price Quote from Landmark Materials: Fax, 1996 December 2, 3
Oil Wells/Toxins – Allwest Geoscience: Work Authorization, DVBE Request Letter, Small Business Certification, Work Authorization, Professional Fee Schedule, ca. February 1987-1996 December 10
Oil Wells/Toxins – Load Haul and Dispose (Recycle) Petroleum Contaminated Soils (Proposal #96CXXCA1), 1996 December 12
Oil Wells/Toxins – Workplan for Underground Storage Tank Clarifier and Hoise Removal and Soil Remediation at BLC, 1996 December 17
Oil Wells/Toxins – Remedial Management Corporation: Fax Transmittal, Rate Sheets, Agreement for Environmental Services, 1996 December 19
Oil Wells/Toxins – Excavation and Shoring Documents: Cost Breakdown Sheets, Plans, Handwritten Notes [by Scott Fagan], 1997
Oil Wells/Toxins – Sieve Analyses, Sand Equivalent Data Sheets, Expansion Test Data, 1997-1998
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Geotechnical Reports by Law/Crandall, Inc., 1997-1999
Oil Wells/Toxins – Preliminary Groundwater Results, Soil Sampling Analysis, Non-Hazardous Waste Manifests, Other Soil-Related Documents, 1997-1999
Oil Wells/Toxins – Preliminary Groundwater Results, Soil Sampling Analysis, Non-Hazardous Waste Manifests, Other Soil-Related Documents, 1997-1999
Oil Wells/Toxins – Preliminary Groundwater Results, Soil Sampling Analysis, Non-Hazardous Waste Manifests, Other Soil-Related Documents, 1997-1999
Oil Wells/Toxins – Preliminary Groundwater Results, Soil Sampling Analysis, Non-Hazardous Waste Manifests, Other Soil-Related Documents, 1997-1999
Oil Wells/Toxins – Went Over This Bid with Charlie: Fax Cover Sheet, 1997 January 22
Oil Wells/Toxins – Relocation of Well LAUSD #1A: Letter from A. Spivak (Intera) to R. Baker (Division of Oil, Gas, and Geothermal Resources), Fax from R. Baker to C. Brown (Hayden's Office), Investigation of Alternative for Relocation of LAUSD #1A Well: Report, 1997 January, February 4, 1999 July 8
Oil Wells/Toxins – Relocation of LAUSD #1A (LAUSD Agreement # 96E001): Letter from A. Spivak (Intera) to R. Mason (LAUSD), 1997 February 5
Oil Wells/Toxins – Notes of February 6, 1997 Meeting at Manley Oil Company Re Belmont Site and Oil Field: Memo to File from R. Rodriguez (LAUSD), 1997 February 11
Oil Wells/Toxins – BLC-UST Removal: Fax, 1997 February 21
Oil Wells/Toxins – Encroachment Permit: Cost Breakdown Sheets, Signature Pages, Cost Estimates, 1997 February 25, April 2, 14
Oil Wells/Toxins – LAUSD Notice to Proceed: Letter from D. Doi (LAUSD) to S. Fagan (Remedial Management Corp.), 1997 February 25
Oil Wells/Toxins – Thursday Afternoon Is a Good Time: Fax, 1997 February 25
Oil Wells/Toxins – Excavation, Tank Removal, Equipment Rental: Correspondence, Invoices, Notes, and Reports, March-August 1997
Oil Wells/Toxins – LAFD Division 5 Permit for Atmospheric Underground Tank, 1997 March 12
Oil Wells/Toxins – Soil Sample Location: Drawings, 1997 March 12
Oil Wells/Toxins – Bare Rental Agreements: Fax from Dependable Equipment Rental and Agreements, Rental Policy Changes: Letter from Dependable to Customers, Invoices, 1996 January 14, 1997 March 19
Oil Wells/Toxins – Requests for Bids, Fax Transmittal, 1997 March 21, April 8
Oil Wells/Toxins –Birdseye Removal: Certificate of Treatment/Recycling, Transportation Service Order, Data Form, Manifests, 1997 March 21-December 25
Oil Wells/Toxins – Please Check with the Following for Shoring Information: Fax from R. Lui (LAUSD) to D. Martini (RMC), 1997 March 21
Oil Wells/Toxins – Shoring Engineers: Shoring Proposal, 1997 March 24
Oil Wells/Toxins – Pacific Caisson and Shoring: Shoring Proposal, 1997 March 27
Oil Wells/Toxins – Soil Engineering Construction: Shoring Proposal, 1997 April 2
Oil Wells/Toxins – Wagner Construction: Shoring Proposal, Revised Proposal, 1997 April 2
Oil Wells/Toxins – Geoprobe Investigation: Report, 1997 April 8
Oil Wells/Toxins – Trans Pacific Engineering: Shoring Proposal, 1997 April 16
Oil Wells/Toxins – Malcolm Drilling: Temporary Shoring Proposal, Supporting Documents, 1997 April 16
Oil Wells/Toxins – Proposal for Geotechnical and Construction Materials Testing and Inspection Services, 1997 May 9
Oil Wells/Toxins – Bond Forms for Surety Company of the Pacific from Remedial Management Corp., 1997 May 13
Oil Wells/Toxins – Shoring Corrections: Memo, Fax, 1997 May 19
Oil Wells/Toxins – Geotechnical Data for Design of Shoring, Excavation for Tank Removal, 1997 June 3
Oil Wells/Toxins – Record of Phone Conversation Regarding Soil Report, 1997 June 10
Oil Wells/Toxins – Permit for Malcolm Drilling Co., 1997 June 25
Oil Wells/Toxins – Work Schedule, Purchase Orders from RMC, Bills of Lading, Invoices, 1997 July 10-22
Oil Wells/Toxins – Receipts, 1997 July 15-22
Oil Wells/Toxins – RMS Air Monitoring Field Data Sheet, 1997 July 16
Oil Wells/Toxins – Soil Testing Results, Chain of Custody Records for Sierra Laboratories, 1997 July 17-August 4
Oil Wells/Toxins – Abandonment LAUSD #1A, Section 21, T-1S, R 13W, Boylston and Angelina Streets: Letter from B. Grayson (Grayson Services Inc.) to R. Lui (LAUSD), Bid, 1997 July 21
Oil Wells/Toxins – Disposal and Treatment of Hydrocarbon Contaminated Soils: Fax, Price Quote, 1997 July 21
Oil Wells/Toxins – Price Quotation for Recycling of Petroleum Contaminated Soil, 1997 July 21
Oil Wells/Toxins – TPS Technologies Sales Quotation for Soil Remediation, 1997 July 22
Oil Wells/Toxins – Appointment of Oil Well Abandonment and Redrilling Contractor: Memo from R. Lui to M. DeLuca (LAUSD), 1997 July 24
Oil Wells/Toxins – Groundwater Monitoring Wells: Fax from ECI to Environ. Support, Letter from LAUSD to ECI, 1997 July 22, 25
Oil Wells/Toxins – Groundwater Monitoring Wells (MW-1, MW-2, and MW-3): Correspondence, Related Documents, 1996-1997
Oil Wells/Toxins – Groundwater Monitoring Wells (MW-1, MW-2, and MW-3): Correspondence, Related Documents, 1997 July 22
Oil Wells/Toxins – Groundwater Monitoring Wells (MW-1, MW-2, and MW-3): Correspondence, Related Documents, 1997 July 22
Oil Wells/Toxins – Lab Data for Job Site: Fax, Letter, Data Sheets, Chain of Custody Sheets, 1997 July 18-22, 28
Oil Wells/Toxins – Sierra Laboratories: Fax of Raw Data, Fax of Final Report, 1997 July 28, 29
Oil Wells/Toxins – Soil Data Certification Sheet, Fax Transmittal, 1997 July 28
Oil Wells/Toxins – Rush Total Lead Results: Fax, 1997 August 3
Oil Wells/Toxins – Completed Results for the Samples Submitted on 8/4/97, 1997 August 6
Oil Wells/Toxins – Notice to Proceed: Letter from R. Lui (LAUSD) to B. Grayson (Grayson Services Inc.), 1997 August 12
Oil Wells/Toxins – Revised Proposal: Geotechnical Testing and Inspection Services by Law Crandall, Draft, Final, 1997 August 19, October 22
Oil Wells/Toxins – Purchase Order: Wilson Mays, 1997 August 20
Oil Wells/Toxins – Work Authorization Sheet for Geotechnical Testing and Inspection Services for the Initial Phase of the Proposed BLC: Fax Cover Sheet, Contract, 1997 August 22
Oil Wells/Toxins – Work Authorization for Soil Testing, Inspection, and Reports: Letter, Project Set-Up Form, 1997 August 22
Oil Wells/Toxins – Tank Certs and Manifest from LAUSD Job: Fax from Nieto & Sons Trucking to S. Fagan (Remedial), 1997 August 27
Oil Wells/Toxins – Law/Crandall Data/Test Results by American Environmental Testing Laboratory, Inc., 1997 September 26-1999 January 22
Oil Wells/Toxins – Request for Change Order, Agreement No. 98E002, Abandonment LAUSD #1A: Letter from B. Grayson (Grayson Services Inc.) to R. Lui (LAUSD), Change Order, 1997 September 26
Oil Wells/Toxins – "Exposure to Reduced Sulfur Gases Impairs Neurobehavioral Function": Article by K.H. Kilburn, Southern Medical Journal, pp. 997-1006, October 1997
Oil Wells/Toxins – Shoring at 1 st and Beaudry: Notes, Authorization, Observation of Foundation Soils, Extra Work Order Reports, Drawings, 1997 October 2-November 3
Oil Wells/Toxins – SCAQMD: Letter Regarding Violation #P18755, 1997 October 10
Oil Wells/Toxins – ECIS Underground Storage Tank Closure Report, November 1997
Oil Wells/Toxins – "Lost Opportunity: EPA Had its Chance to Regulate Hydrogen Sulfide": News Article, Houston Chronicle , 1997 November 8
Oil Wells/Toxins – Results of Groundwater Sampling and Testing by Law/Crandall: Draft and Final Report, 1997 November 11
Oil Wells/Toxins – Structural Steel Field Inspection Report Permit #E97500084, 1997 November 14
Oil Wells/Toxins – LAUSD and Law/Crandall Communication Records, 1997 November 17-1999 August 18
Oil Wells/Toxins – Contaminated Soil Between Boylston and Bixel Streets: Memo from R. Lui to R. Friermuth (LAUSD), Analytical Report, 1997 December 16, 18
Oil Wells/Toxins – Update of Environmental Activities: Memo from H. Arabzadeh to D. Koch (LAUSD), 1997 December 22
Oil Wells/Toxins – Excavation of Existing Fill in Football Field BLC: Letter, 1997 December 31
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Soccer Field), ca. January 1998
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Soccer Field), ca. January 1998
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Soccer Field), ca. January 1998
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Soccer Field), ca. January 1998
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Soccer Field), ca. January 1998
Oil Wells/Toxins – TPS Technologies Soil Recycling: Non-Hazardous Soil Manifests (Football Field, Track), January 1998
Oil Wells/Toxins – Analytical Results for Soil Stockpile: Letter from R. Lui (LAUSD) to P. Cho (CRWQCB), Soil Sample Results, Fax Transmittal from Tom [Hayden] to Connie [Brown], 1998 January 5, 6
Oil Wells/Toxins – Crude Oil Contamination in the Future Bleacher Area: Memo from R. Lui to R. Friermuth (LAUSD), Title 40 CFR, 1998 January 13
Oil Wells/Toxins – Los Angeles Fire Department Closure Report Letter, 1998 January 14
Oil Wells/Toxins – Uniform Hazardous Waste Manifest, 1998 January 14-28
Oil Wells/Toxins – Interim Report of Compacted Fill Rough Grading, 1998 January 16
Oil Wells/Toxins – Report of Well Plugging and Abandonment (Suplin Well, LAUSD No. 1A, API No. 037-19042), 1998 January 23
Oil Wells/Toxins – Impact Study for Discharge of Groundwater to Los Angeles River, 1998 February 12
Oil Wells/Toxins – Preliminary Feasibility Evaluation: Corrective Measures for Groundwater Discharge, 1998 February 12
Oil Wells/Toxins – NPDES Permit Application and Report of Waste Discharge, 1998 March 6
Oil Wells/Toxins – Report of Waste Discharge: Discharges of Groundwater: Letter, Report, 1998 March 6
Oil Wells/Toxins – Combine #1 and Dividend #2: Non-Hazardous Soil Manifests, 1998 March 16-17
Oil Wells/Toxins – TPS Technologies Soil Recycling: Letter, Notice to Owner, Non-Hazardous Soil Manifests, 1997 July 30-1998 April 8
Oil Wells/Toxins – TPS Technologies Soil Recycling: Non-Hazardous Soil Manifests, 1997 July 30-1998 April 8
Oil Wells/Toxins – TPS Technologies Soil Recycling: Non-Hazardous Soil Manifests (Lucky Land/Moret), 1998 May 1-June 15
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – Non-Hazardous Waste Manifest (Lucky Land/Moret), 1998 May 19
Oil Wells/Toxins – LAUSD #1B: Correspondence Between R. Lui (LAUSD) and R. Baker (DOGGR), Proposal to Cap and Monitor LAUSD #1B, As Requested – Monitor Well: Fax from R. Baker (DOGGR) to C. Brown (Hayden's Office), 1998 July 2-August 4, 1999 June 16
Oil Wells/Toxins – Report of Waste Discharge: Discharges of Groundwater, Prepared by Law Crandall (Project 70131-6-0505), 1998 August 17
Oil Wells/Toxins – Recommendations Regarding Environmentally Impacted Soil at BLC: Fax Cover and Letter from J. Haffley (Law Crandall) to M. Turner (Turner/Kajima), E-mail from G. Opiit to B. Telecky, 1998 September 22, 23
Oil Wells/Toxins – NPDES Permit Application: Letter from W. O'Braitis (Law Crandall) to K. Reizes (Temple Beaudry Partners), 1998 October 6
Oil Wells/Toxins – Alternate Equivalent Methane Control: Letter from J. Sepich (Sepich Assoc.) to L.A. Fire Dept., DSA Letter to Local Fire, Belmont Scope (J395), 1997 August 13, 1998 October 7
Oil Wells/Toxins, 1998 July 6-1999 June 25
Question #6
Alternate Equivalent Methane Control: Letter and Report from J. Sepich (Sepich Assoc. Inc. and Methane Specialists) to A. Gutierrez (L.A. Fire Dept.)
Review of the Draft Remedial Investigation Report: Letter from H. Saebfar (DTSC) to Y. Hwa Kim (LAUSD)
BLC Comment Summary for the Environmental Strategies Corporation Remedial Investigation Report
Project Status Report #5-Jun 1998: Letter from Hanscomb to LAUSD
Oil Wells/Toxins – SCRWQCB Application/Report of Wastwater Discharge, LADWP Bureau of Sanitation Industrial Wastewater Permit Application, 1998 October 8
Oil Wells/Toxins – Support Needs: Fax from Opjit Ghuman (Law Crandall) to Richard Lui (LAUSD), 1998 October 9
Oil Wells/Toxins –Toxins: News Articles, 1998 October 10-1999 September 15
Oil Wells/Toxins – Soil Removal at BLC: Fax Cover and Letter from O. Ghuman (Law Crandall) to R. Lui (LAUSD), Authorization, 1998 October 21
Oil Wells/Toxins – Samples Look Clean: Fax from O. Ghuman (Law Crandall) to Joe/Cyrus (AETL), Chain of Custody Record, Soil Sample Analyses, 1998 October 22-26
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Non-Hazardous Waste Manifests, November 1998-January 1999
Oil Wells/Toxins – Vapor Extraction/Qualifications: Fax from T. Hayden to K. Chiang, Supporting Documents, 1998 November 4
Oil Wells/Toxins – DTSC Review of Technical Documents: Letter from H. Saebfar (DTSC) to S. Wildman, Review, 1998 November 17
Oil Wells/Toxins – Augmented Facilities Committee: Transcript, 1999 January 7
Oil Wells/Toxins – Belmont Groundwater Sampling: Memo from K. Reizes (Kajima Urban Development) to W. O'Braitis (Law Crandall), Proposed Additional Groundwater Sampling, Individual NPDES Permit Application: Letters from Law Crandall to Temple Beaudry Partners, 1997-1999 January 11
Oil Wells/Toxins – Question #5: DTSC Voluntary Corrective Action Agreement (Docket #HSA, BLC), Facilities Services Division Communication No. ___ (Draft), Revisions in School Site Assessment and Construction Procedures, ca. 1998, 1999 January 19
Oil Wells/Toxins – Report of Waste Discharge: Discharges of Groundwater: Report by Law Crandall for LAUSD, 1999 January 27
Oil Wells/Toxins – Ongoing Violations of Hazardous Waste Control Statutes: Letters from A.J. Kahn (Attorney for HERE Local 11) to J. Huff (DTSC), Flyer for Community Meeting, 1999 February 1-4
Oil Wells/Toxins – Summary of Environmental Conditions Belmont High School Project: Presentation to LAUSD Facilities Committee by Environmental Strategies Corp., Handwritten Notes, 1999 February 4
Oil Wells/Toxins – Review of the Remedial Investigation (RI) Work Plan for BLC: Letters from DTSC, 1999 February 5-9
Oil Wells/Toxins – Attachment A: Hydrogen Sulfide Monitoring Record, Field Monitoring and Testing Notes, Field Activity Daily Log, 1998-1999 February 11
Oil Wells/Toxins – DTSC Voluntary Corrective Action Agreement (Docket No. HSA 98/99-031), Fax Transmittal, 1999 March 5
Oil Wells/Toxins – L.A. Board of Supervisors Support of AB 387: Letter from Board to T. Hayden, 1999 March 17
Oil Wells/Toxins – ODAC Meeting No. 56: Project Meeting Minutes, 1999 April 15
Oil Wells/Toxins – Comments Regarding My Observations from the Site Visit: Memo from Jesus Sotelo (DTSC), 1999 May 6
Oil Wells/Toxins – Tom Hayden Research Files, Information on Oil Recovery Regulation: Fax Cover Sheet, News Article, Letter from DTSC, 1998 February 13, 1999 May 11
Oil Wells/Toxins, 1998 August 31-1999 May 17
I Began Reviewing the Handwritten "Field Activity Daily Logs": Notes from Unknown Person to C. Brown Regarding Hydrogen Sulfide in Soil
Field Monitoring and Test Notes: Letter from Law/Crandall to Y.H. Kim (LAUSD)
Attachment A, Hydrogen Sulfide Monitoring Record
Oil Wells/Toxins – Data Used by LAUSD in Evaluation of BLC Site: Letter from S. Wildman to H. Saebfar (DTSC), 1999 May 18
Oil Wells/Toxins – Possible Hazardous Waste Exemption by L.A. City Council and Industrial Waste Man.: Memo from Grass Roots Coalition to L.A. Bureau of Sanitation, 1999 May 26
Oil Wells/Toxins – On Behalf of the Ferrer Family: Memo from Grass Roots Coalition to R. Baker (Division of Oil and Gas), 1999 June 3
Oil Wells/Toxins, 1998 October 21-1999 June 11
As Requested: Fax from R. Baker (DOGGR) to C. Brown (Hayden's Office)
Initial Fluid-Level Survey and Pressure Recordings Performed by Grayson Service: Letter from R. Lui (LAUSD) to R. Baker (DOGGR)
Weekly Pressure Reading Results for LAUSD #1B: Letter from R. Lui (LAUSD) to R. Baker (DOGGR)
Monthly Monitoring Report: Letters from R. Lui (LAUSD) to D. Curtis (DOGGR)
Pressure Reading Log, LAUSD #1B
Oil Wells/Toxins – Offer of Geohydrochemical/Environmental Consulting Services, Belmont Site: Fax and Letter from Sanford L. Werner, 1999 June 22
Oil Wells/Toxins – Underground Tank Program – Asset Management Organization, 1300-1314 N. Highland Ave., L.A., (File No. #900280143): Letter from D. Dickerson (CRWQCB) to F. Wehbe (Hollywood Little Red School House), 1999 July 9
Oil Wells/Toxins – Revised Impact Study for the Discharge of Groundwater to the Los Angeles River by the Bank of American Los Angeles Data Center: Fax from Zack to Sandy/Peter, Letter from L. Bauersachs (Meredith/Beli & Assoc.) to J. Workman (CRWQCB), 1997 July 30, 1999 July 15
Oil Wells/Toxins – Testimony Before LAUSD Board of Education Regarding Hydrogen Sulfide: Memo from C. Brown to K. Kilburn, Kaye H. Kilburn, M.D.: Curriculum Vitae, March 1999, 1999 July 19
Oil Wells/Toxins – Tom Hayden Research Files, Background on [Methane in] Wilshire and Curson, and Wilshire Courtyard: Notes, Report, Letter from Grassroots Coalition, 1999 September 9, 24, October 7
Oil Wells/Toxins – Tom Hayden Research Files, News Articles on Texas School Oil Problems: Note, Articles, 1995 August 26-1999 February 5, October 7
Oil Wells/Toxins – Natural Resources Committee Hearing Regarding Toxic Conditions: Letter from B. Wallerstein (SCAQMD) to T. Hayden, Reports, 1981 June 4-1989 August 24, 2000 January 12
Oil Wells/Toxins – Environmental Issues: Letter from G. Molina (County Supervisor) to P. McPherson (Grassroots Coalition), 2000 July 24
Plans and Diagrams – Academy House #1: Handwritten Notes
Plans and Diagrams – Notes, Calculations, and Sketches [from Englekirk]
Plans and Diagrams – Half-Size Bluelines: Transmittal from M. Gould (McLarand) to J. Bruce (DGS), Drawings, 1996 December 19
Plans and Diagrams – Application for Approval of Plans and Specifications (ORS-1), 1996 December 19
Plans and Diagrams – Maps and Plans: Photocopies of Blueprints, 1997-1998
Plans and Diagrams – Maps and Plans: Photocopies of Blueprints, 1997-1998
Plans and Diagrams – Notification of Progress (SSS 174-1) F-19-H16, A-66745, 1997 January 15
Plans and Diagrams – Notification of Progress (SSS 174-1) F-19-H16, A-66745, Comments [from DSA], 1997 February 7
Plans and Diagrams – Notification of Progress (BLC Construction) F-19-H16, A-66745, Plan Check Worksheet (SSS 141-1), Application for Approval of Plans and Specifications (ORS-1), Receipt of Material Worksheet (SSS 140-1), 1996 December 30, 31, 1997 February 7, March 26
Plans and Diagrams – Drawings, Building Code Chap. 18A, Div. I, 1806A.3, Fax Transmittal from M. Roy (DSA) to H. Winkler (HGW), 1997 April 3
Plans and Diagrams – Transmittal of Plans (Job No. 2MCL0102), 1997 April 9
Plans and Diagrams – Proposed Dates for Plan Check Submittal, Reviews, and Permits: Letter from M. Gould (McLarand) to J. Bruce (DSA), 1997 April 9, July 16, 1998 April 10
Plans and Diagrams – Notification of Progress (SSS 174-1) (BLC Portion I) F-19-H16, A-66745, 1997 April 17
Plans and Diagrams – Plan Check Increment III (Garage) (File No. 19-H16, Appl. No. 66745): Transmittal from DSA to Becker & Pritchett, 1997 April 30
Plans and Diagrams – Plan Check Worksheet (School) (SSS 141-1) (BLC Portion I) File 19-H16, Application 66745, 1997 May 3
Plans and Diagrams – Belmont High School: Fax from Becker & Pritchett to J. Bruce (DSA), Fax from J. Bruce to M. Gould (McLarand), 1997 May 7, 8
Plans and Diagrams – Construction of Belmont High School (Portion II), F-19-H16, A-66745 (SSS 174-1): Memo from DSA to LAUSD, Transmittal from Psomas to DSA, 1997 April 7, May 16
Plans and Diagrams – Belmont Site Plan with Square Footage: Fax Transmittal, Map, 1997 June 13
Plans and Diagrams – Construction of BLC, File No. 19-H16 Application #66745 (Portion I, Grading Plans Only): Letter from V. Mujumdar (ORS) to D. Shambra (LAUSD) (ORS 182-1), 1997 June 23
Plans and Diagrams – Proposed Schedule for Plan Check Submittals, Reviews, and Permits: Letter from M. Gould (McLarand, Vasquez & Partners) to J. Bruce (DSA), 1997 July 16
Plans and Diagrams – Specs and Calcs, Increment 4: Transmittal from M. Gould (McLarand) to J. Bruce (DGS), Schedule for Plan Check Submittals: Letter from M. Gould to J. Bruce, Delivery Receipt (OCB Reprographics, Inc.), 1997 July 16, 17, 28
Plans and Diagrams – Receipt of Material Worksheet (SSS 140-1), Increment #4, 1997 July 21
Plans and Diagrams – Current Increment 3 Architectural Drawings: Transmittal from M. Saenz (McLarand) to Y. Jamgochian (DGS), 1997 July 28
Plans and Diagrams – Partial Set of Belmont Consisting of: House 1 Plans, Sections and Elevations, Triple Gym Plans, Sections and Elevations: Transmittal from McLarand to Y. Jamgochian (DGS), Delivery Receipt (OCB Reprographics, Inc.), Shipment Receipt (Overnight Express), 1997 July 30
Plans and Diagrams – Retaining Wall Design: Fax from H. Winkler (HGW Consulting Structural Engineer) to Y. Jamgochian (DSA), 1997 July 30
Plans and Diagrams – Notification of Progress (SSS 174-1) (BLC Portion IV) F-19-H16, A-66745, 1997 August 11
Plans and Diagrams – Proposed Bleachers: Fax from H. Winkler (HGW Consulting Structural Engineer) to Y. Jamgochian (DSA), 1997 September 18
Plans and Diagrams – Plan Review – Status Report: Memo from R. Rodriguez to D. Shambra (LAUSD), Faxes from K. Rosenlieb (OPSC) to R. Rodriguez & R. Friermuth (LAUSD), Fax from R. Friermuth (LAUSD) to R. Sheffield, Fax from K. Rosenlieb (OPSC) to R. Rodriguez and B. Louargand (LAUSD), 1997 September 30-1998 February 4
Plans and Diagrams – Response to Request for Information: Letter from S. Olsen (DGS) to S. Wildman, 1997 October 3
Plans and Diagrams – Plan Check Worksheet (School), Increment III (SSS 141-1) (File 19-H16, Application 66745), 1997 October 15
Plans and Diagrams – Expand Units: Fax from H. Winkler (HGW Consulting Structural Engineer) to Y. Jamgochian (DSA), 1997 October 30
Plans and Diagrams – Notice of the Progress: Letter from DSA to LAUSD, 1997 June 16, December 10
Plans and Diagrams – Revisions to Increment II Retaining Walls (File No. 19-H16, DSA #66745): Letter from M. Roy (DSA) to J. Crum (LAUSD), 1997 December 16
Plans and Diagrams – Plan Check Worksheet (School) (SSS 141-1) (Inc #3 Revision) File 19-H16, Application 66745, 1997 December 18
Plans and Diagrams – Additional Plan Check Fee: Letter from K. Reizes (Kajima Urban) to M. Roy (DSA), 1998 January 9
Plans and Diagrams – Construction of BLC (File No. 19-H16, Application #66745, Portion III, Garage Portion Only): Letter from V. Mujumdar (Office of Regulation Services) to D. Shambra (LAUSD), and Worksheets and Checklists, 1998 January 9
Plans and Diagrams – Belmont H.S. REI Project No. 95-N067: Interoffice Memo, Robert Englekirk Consulting Structural Engineers, 1998 January 26
Plans and Diagrams – October Submittal of Plans: Fax from K. Rosenlieb (OPSC) to R. Rodriguez and R. Friermuth (LAUSD), 1998 February 4
Plans and Diagrams – Construction of Belmont High School (Learning Complex) (Portion 2), F-19-H16, A-66745 (SSS 174-1): Memo from DSA to LAUSD Regarding Plans and Specifications, 1998 February 24
Plans and Diagrams – Belmont/Admin Bldg: E-mail from Y.A. Jamgochian to M. Roy
Plans and Diagrams – CD-Complete Belmont Specs: Fax Transmittal from M Saenz (McLarand) to L. Euerle (SFPD), 1998 March 17
Plans and Diagrams – Typical EBF Beam Calc: Fax from Englekirk to Y. Jamgochian (DSA), 1998 April 1
Plans and Diagrams – EBF A Column Check: Fax from Englekirk to Y. Jamgochian (DSA), 1998 April 2
Plans and Diagrams – BLC Facilities: Letter from R. Rodriguez (LAUSD) to K. Rosenlieb (OPSC), 1998 April 7
Plans and Diagrams – Final Approval by CDE: Letter from F. Bush & C. Johnson (SFPD) to D. Shambra (LAUSD), Note, Preliminary Approval by CDE: Letter from C. Johnson (SFPD) to LAUSD, 1997 November 11, December 11, 1998 April 9
Plans and Diagrams – As of This Date and Time: Fax Cover Sheet from DSA to Englekirk, 1998 April 23
Plans and Diagrams – INC 5A, EBF Column Moments: Memo from Y. Jamgochian to S. Leeruangsri, 1998 April 24
Plans and Diagrams – Our Office Has Reviewed Calcs: Fax Cover Sheet from DSA to Englekirk, Pushover Analysis: Fax from Englekirk to DSA, 1998 April 23, 24
Plans and Diagrams – Academy Buildings, Increment 5A (File No. 19H16, 66745): Letter from J. Bruce (Office of Regulation Services) to B. Kaufmann (Englekirk), 1998 May 7
Plans and Diagrams – Column Design: Letter from B. Kaufmann (Englekirk) to J. Bruce (DGS), Fax Cover Sheet, 1998 May 8, 13
Plans and Diagrams – INC 5A, 66745, New Items: Memo from Y. Jamgochian to S. Leeruangsri, 1998 May 13
Plans and Diagrams – 3A Final Plan Diagrams by McLarand Vazquez & Partners, Inc., 1998 May 19
Plans and Diagrams – Confirmation of Backcheck Appointment: Fax from DSA to B. Kaufmann (Englekirk Consulting), 1998 June 2
Plans and Diagrams – INC 5A, Exterior Veneer Cladding Detail, 25/S_.8: Memo from Y. Jamgochian to S. Leeruangsri, INC 5A, Detail, 29/S_.6: Memo, 1998 June 3, 5
Plans and Diagrams – Just Heard the Great News!: Letter from B. Louargand (LAUSD) to J. Bruce (DSA), 1998 June 11
Plans and Diagrams – Portion IVA – Site Utilities Only (File No. 19-H16, Application #66745): Letter from V. Mujumdar (DSA) to D. Shambra (LAUSD), Plan Check Worksheet (School) (SSS 141-1), 1998 June 11, 26
Plans and Diagrams – Construction of BLC, File No. 19-H16, Application #66745 (Portion 5A-Construction of Four Classroom Buildings, and Two Admin./Classroom Buildings): Letter from V. Mujumdar (DSA) to B. Louargand (LAUSD), 1998 June 22
Plans and Diagrams – Construction of BLC, File No. 19-H16, Application #66745 (Portion II-Construction of Site Retaining Walls): Letter from V. Mujumdar (DSA) to B. Louargand (LAUSD), 1998 June 22
Plans and Diagrams – Construction of BLC, File No. 19-H16-Application #66745 (Portion 5B – Construction of Admin. Bldg., Triple Gym, Two M/P Bldgs., and Field House Bldg.): Letter from V. Mujumdar (DSA) to B. Louargand (LAUSD), Plan Check Worksheets (SSS 141-1), 1998 June 22
Plans and Diagrams – Construction of BLC, File No. 19-H16-Application #66745 (Portion 4B – Construction of Retaining Walls: Letter from V. Mujumdar (DSA) to B. Louargand (LAUSD), Plan Check Worksheet (School) (SSS 141-1), 1997 November 21, 1998 June 22
Plans and Diagrams – Teaching Station Counts: Letter from R. Gonzalez (OPSC) to B. Louargand (LAUSD), 1998 June 25
Plans and Diagrams, 1996 December 31-September 1998
Plan Check Worksheet (School) (SSS 141-1), File 19-H16, Application 66745: Revision Portion II
Plan Check Worksheet (School) (SSS 141-1) Portion II
Application for Approval of Plans and Specifications (ORS-1), Receipt of Material Worksheet (SSS 140-1), Increment #2
Plans and Diagrams – Review of the Division of the State Architect (DSA) Approved Plans and Specifications: Letter from T. Dutton (OPSC) to B. Louargand (LAUSD), 1998 July 2
Plans and Diagrams – Response to July 2, 1998 Plan Review Letter: Letter from R. Friermuth (LAUSD) to R. Gonzalez (OPSC), 1998 July 14
Plans and Diagrams, 1998 August 31
Supplemental Geotechnical Recommendations, Pile Design for Retaining Walls Along Boylston Street (Law/Crandall Project 70131-6-0532-0005): Letter from V. Langhaar (Law/Crandall) to K. Reizes (Temple Beaudry)
BLC: Fax from Law/Crandall to T. Baine (Psomas & Associates)
Plans and Diagrams – Drawings as Issued by McLarand, Vasquez & Partners: ABI-1.05 & ADT-1.02, 1998 November 30
Plans and Diagrams – Belmont A66745: Handwritten Notes, 1999 January 5
Property Acquisition – Grand Deed, Title Insurance for Sale of Property from V. & C. Ramos to LAUSD, 1988 April 12
Property Acquisition – Resolution (Shimizu/Housing) [Draft No. 2 – 11/10/93], 1993 November 10
Property Acquisition – Partnership Grant Deed, 1994 March 14
Property Acquisition – Response to Recent Request: Letter from B. Louargand (LAUSD) to R. Cayton (OPSC), 1996 September 10
Property Acquisition – From Lawsuit Docs Submitted to Court by Local 11 & UTLA, Two Pages of Letter, 1997 May 28, August 5
Retail – Proposal for the Retail Component of the Belmont Academy High School: Letter from J. de Jesus Legaspi (Temple Beaudry) to B. Louagard (LAUSD), Supporting Documents, 1998 September 25
Retail – Proposal for Retail Component: Letter from M. Riley (Malcolm Riley & Assoc.) to R. Rodriguez (LAUSD), 1998 October 13
Retail – RLA Grocery Store Market Potential Study, October 1995
Site Review and Assessment – Pacific Stock Exchange Building: Letter from Tom Hayden, Supporting Correspondence, 1999 September 21-October 6
Site Review and Assessment – 107 Broadway Building: News Articles, 1997 July 14-December 22
Site Review and Assessment – 107 Broadway: Correspondence from D. Cartwright (O'Melveny & Myers) to R. Mason and D. Shambra (LAUSD), 1997 August 4
Site Review and Assessment – Correspondence Regarding LAUSD Site Selection Procedures, 1999 May 4-June 4
Site Review and Assessment – News Articles Regarding Site Selection, 1999 August 8-December 7
Site Review and Assessment – Estimated Average Daily Attendance (Application No. 22/64733-70-00), 1994 February 1
Subseries D: Reports, 1996-1999
Health Risk Assessment for Belmont Learning Complex by LAUSD Environmental Health and Safety Branch, January 1996
Health Risk Assessment for Belmont Learning Complex by LAUSD Environmental Health and Safety Branch, January 1996
Report of Geotechnical Investigation Proposed BLC: Partial Report, Fax Transmittal, 1996 October 27
Report of Geotechnical Investigation: Letter from Law Crandall to K. Reizes (Temple Beaudry), Report, 1996 October 29
Report of Geotechnical Investigation, 1996 October 29
Report of Geotechnical Investigation: Fax from S. Fagan (Remedial Management Corp.) to Rick (Wagner Construction), Partial Report, 1996 October 29, 1997 March 27
Revised Report of Geotechnical Investigation, Proposed BLC, Prepared by Law Crandall, 1997 April 16
Revised Report of Geotechnical Investigation, Proposed BLC, Prepared by Law Crandall, 1997 April 16
Revised Report of Geotechnical Investigation, Proposed BLC, Prepared by Law Crandall, 1997 April 16
Documents Prepared During the Course of Negotiations Regarding the Temple Beaudry Project, LAUSD Independent Analysis Unit and Temple Beaudry Oversight Committee, 1997 May 14
Design-Build: Competitive Market Project Listings by Sector, Graphs, 1997 August 6
Draft Tank Removal Report: Comments of M. Quesada, American Remedial Technologies, 1997 September 12
Draft Tank Removal Report: Comments of R. Lui (LAUSD), 1997 September 15
Draft Tank Removal Report: Comments of S. Fagan, Remedial Management Corporation, 1997 September 16
Draft Tank Removal Report: Comments of R. Lui (LAUSD), 1997 September 16
Tank Removal Report Prepared by Remedial Management Corporation, 1997 September 19
Tank Removal Report Prepared by Remedial Management Corporation, 1997 September 19
Tank Removal Report Prepared by Remedial Management Corporation, 1997 September 19
Tank Removal Report Prepared by Remedial Management Corporation, 1997 September 19
Tank Removal Report Prepared by Remedial Management Corporation, 1997 September 19
LAUSD's Business Services Center: An Investigative Report of the Joint Legislative Audit Committee (JLAC)
The Safest Learning Environment: An Inquiry into Health and Safety Standards in California School Construction Viewed Through the Belmont Learning Complex (Draft): Report of the JLAC, 1998 April 14
Site Acquisition and Related Environmental Concerns: Report of the Joint Legislative Audit Committee, July 1998
Where Has the Money Gone? School Construction in Los Angeles Unified School District: Report Prepared by the JLAC, July 1998
Request for Copy of Legislative Audit Report: Letter from R. Dezember (SAB) to S. Wildman, 1998 July 3
Design-Build School Construction Process Case Study: Belmont Learning Complex, 1998 July 15
Preliminary Report by the JLAC Regarding State Allocation Board Funding of the LAUSD's BLC, 1998 July 22
Toxic School Sites in Los Angeles: Weaknesses in the Site Acquisition Process: Report from the JLAC, August 1998
Partnerships Between Public Schools and Private Developers: A Report of the JLAC, 1998 December 1
Partnerships Between Public Schools and Private Developers: A Report of the JLAC, 1998 December 1
Partnerships Between Public Schools and Private Developers: A Report of the JLAC, 1998 December 1
Partnerships Between Public Schools and Private Developers: A Report of the JLAC, 1998 December 1
Remedial Investigation Work Plan for BLC by Environmental Strategies Corporation (ESC), 1999 January 20
Remedial Investigation Work Plan for BLC by ESC, 1999 January 20
Remedial Investigation Work Plan for BLC by ESC, 1999 January 20
Remedial Investigation Work Plan for BLC by ESC, 1999 January 20
The Environmental Quality Act and the Belmont Learning Complex: A Breakdown in Process, a Special Report of the Joint Legislative Audit Committee (Draft), 1999 February 4
The Environmental Quality Act and the Belmont Learning Complex: A Breakdown in Process, a Special Report of the Joint Legislative Audit Committee (Draft), 1999 February 5
The Environmental Quality Act and the Belmont Learning Complex: A Breakdown in Process: A Special Report of the JLAC, March 1999
LAUSD Site Selection Procedure: Report Prepared by Facilities Services Division, Real Estate and Asset Management Branch (Draft), May 1999
Draft Remedial Investigation Report, BLC, by Environmental Strategies Corp., Vol. 1, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 1, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 1, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 2, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 2, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 2, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 2, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 2, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 3, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 3, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 3, Appendices, 1999 June 11
Draft Remedial Investigation Report, BLC, by ESC, Vol. 3, Appendices, 1999 June 11
Review and Recommendations Regarding Belmont Remedial Investigation Report: Memo from Safety Team to LAUSD Board, Report, Presentation, Letter from T. Hayden to R. Zacarias, 1999 June 11, 15, 20
The Building Belmont Blues: Notes and Correspondence by Senator Tom Hayden, Presented to the Los Angeles Unified School District, 1999 July 20
LAUSD Board of Education Report No. 1, Confirmation of Independent Commission and Related Matters Regarding the BLC, 1999 August 20
Draft Site Selection Procedure and Community Participation Program: Report, Note, 1999 August 31, September 10
Report of Findings by Internal Audit and Special Investigations Unit, 1999 September 13
Report of Findings by IASIU, 1999 September 14
Report of Findings by IASIU, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 1, #1-4, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 1, #5-9, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 1, #10-17, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 1, #18, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 1, #19, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 2, #22-21, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 2, #22-25, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 2, #25 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 2, #25 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 3, #26-39, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 3, #40-49, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 3, #50-64, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 3, #65-72, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 4, #73, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 4, #73 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 4, #74-100, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 5, #101-110, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 5, #111, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 5, #111-117, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 6, #118, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 6, #118 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 6, #119-125, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 7, #127, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 7, #127 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 7, #128-141, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 7, #142-150, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 8, #151-157, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 8, #157-160, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 8, #161-175, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 8, #176, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 9, #177-183, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 9, #184, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 9, #184 (Continued), 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 9, #185-187, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 10, #188, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 10, #188-196, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 10, #197-200, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 11, #201-212, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 11, #213-219, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 11, #222-225, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 12, #245-258, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 12, #259-275, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 12, #276-285, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 13, #286-298, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 13, #299-315, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 13, #316-330, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 14, #331-333, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits Vol. 14, #334-340, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits, Final Supplement, #341-353, 1999 September 13
Report of Findings by IASIU, Supporting Exhibits, Final Supplement, #354-370, 1999 September 13
Findings of Belmont Learning Complex Investigation Revealed: Press Release, 1999 September 14
Monitoring Environmental Hazards at LAUSD: Investigative Report by Public Interest Investigations, Inc., 1999 September 28
Monitoring Environmental Hazards at LAUSD: Investigative Report by Public Interest Investigations, Inc., 1999 September 28
Monitoring Environmental Hazards at LAUSD: Investigative Report by Public Interest Investigations, Inc., Exhibits 1-24, 1999 September 28
Monitoring Environmental Hazards at LAUSD: Investigative Report by Public Interest Investigations, Inc., Exhibits 25-43, 1999 September 28
Monitoring Environmental Hazards at LAUSD: Investigative Report by Public Interest Investigations, Inc., Exhibits 44-56, 1999 September 28
Executive Summary: Fax from E. Pardo (LAUSD) to R. Rushing (Hayden's Office), Fax from Pardo to Maria Armoudian (JLAC), Executive Summary, Monitoring Environmental Hazards at LAUSD, 1999 September 29
Report of Independent Commission Regarding the Belmont Learning Center, November 1999
Report of Independent Commission Regarding the Belmont Learning Center, November 1999
Report of Independent Commission Regarding the Belmont Learning Center, November 1999
Report of Independent Commission Regarding the Belmont Learning Center, November 1999
Report Released Detailing Financial Implications of Belmont Learning Complex: Press Release, 1999 December 14
Report of Findings by Internal Audit and Special Investigations Unit-Part II, Report and Exhibits #1-4, 1999 September 13
Report of Findings by IASIU-Part II, Exhibits #5-21, 1999 September 13
Report of Findings by IASIU-Part II, Exhibits #22-47, 1999 September 13
Report of Findings by IASIU-Part II, Exhibits #48-67, 1999 September 13
Report of Findings by IASIU-Part II, Exhibits #68-72, 1999 September 13
I Am Voting Against: Handwritten Note, ca. 1999 December 13
Subseries E: Commissions, Hearings, and Investigations, 1994-2000
Ad Hoc Planning and Advisory Task Force: Roster
Meeting with A.G.: Note from Luisa Park to Oscar, 1994 March 11
Interview with Art M. Gastelum by S. Timmons and A. Demyanenko: Transcript, 1997 January 6
Requests for Hearings to Investigate BLC: Correspondence, News Articles, September 1996-February 1997
Temple-Beaudry Oversight Committee Reports: Memo from R. Rasmussen (LAUSD) to BB Oversight Committee Members, 1997 May 13
Response to Inquiries: Memo from D. Shambra (LAUSD) to Blue Ribbon Oversight Committee, Cost Comparisons, Other Requested Materials, 1996 May 16, 1997 May 16
In Response to Numerous Inquiries: Letter from S. Wildman to L. Smoot (SAB), 1997 June 17
LAUSD Board Meeting Transcript, 1997 July 28
News Articles Regarding Proposition BB Committee, 1997 September 29-2000 October 31
Proposition BB Blue Ribbon Citizens' Oversight Committee: Status Report on Program/Project Management, Related Documents, 1998 January 15-1999 April 15
"Belmont: Bad Decisions Mount": Newspaper Editorial, Los Angeles Times, "LAUSD's Belmont High School Project": Letter to the Editor, Los Angeles Times, 1998 January 28, February 4
Toxic Schools Hearing: Hayden's Hearing Notebook, Senate Panel to Probe Pollution and Inner-city Schools: Press Release, September 1998
Toxic Schools Hearing: Hayden's Hearing Notebook, September 1998
Toxic Schools Hearing: Hayden's Hearing Notebook, September 1998
Toxic Schools Hearing: Hayden's Hearing Notebook, September 1998
Toxic Schools Hearing: Hayden's Hearing Notebook, September 1998
News Media/Legislative Contact (OPSC 317E), 1998 March 18
News Media/Legislative Contact, 1998 March 30
JLAC Hearing – Design-Build, Statement of Testimony Presented by Dominic Shambra, 1998 July 15
Primary Care Centers: News Articles, 1998 October 5-1999 May 7
Senate Natural Resources Committee (SNRC) Hearing on Pollution and Urban Schools: T. Hayden's Hearing Notebook, 1998 November 5
SNRC Hearing on Pollution and Urban Schools: T. Hayden's Hearing Notebook, 1998 November 5
SNRC Hearing on Pollution and Urban Schools: T. Hayden's Hearing Notebook, 1998 November 5
SNRC Hearing on Pollution and Urban Schools: T. Hayden's Hearing Notebook, 1998 November 5
SNRC Hearing on Pollution and Urban Schools: T. Hayden's Hearing Notebook, 1998 November 5
Senate Committee on Natural Resources and Wildlife, Hearing on Toxic Inner City Schools: Transcript, 1998 November 5
Senate Committee on Natural Resources and Wildlife, Hearing on Toxic Inner City Schools: Transcript, 1998 November 5
An Agenda for Education Reform (Again): Report by T. Hayden, 1998 December 1
News Media/Legislative Contact, 1998 December 2
Request for Documents: Letter from T. Hayden to P. Stamison (Department of General Services), 1998 December 28
BLC Documents: E-mail Correspondence Between N. Holtz (DSA) and D. Kerns, 1999 January 8-13
LAUSD Organization: Letter from LAUSD Office of General Counsel, Supporting Documents, 1999 February 12
New Direction for Cal/EPA: Letter from T. Hayden to W. Hickox (EPA), 1999 March 5
Your Letter of March 2, 1999, Requesting Various LAUSD Documents: Letter from R.K. Mason (LAUSD) to C. Brown, Previous Correspondence, January 1998-February 1999
Hearing on BLC: Memo from S. Wildman to JLAC Members, BLC Environmental Hearing Agenda, Timeline: the BLC, 1999 March 18, 19
School Construction: Correspondence Between LAUSD and Forest Construction Co., Inc., "Promised Campus Turns to Eyesore": News Article by H. Martin, Los Angeles Times, 1999 March 1-23, 29
Primary Centers Task Force: Correspondence, Vision Statement, Roster, 1999 April 6-June 2
Roundtable Discussion/LAUSD School Construction: Correspondence Between T. Hayden and R. Zacarias, 1999 April 6-13
LAUSD Reform Roundtable: Agenda, Related Documents, June 1997-April 1999
LAUSD Reform Roundtable: Attendance List, 1999 April 22
LAUSD Reform Roundtable: Back to Basics: Proposals for Reform of the LAUSD, by Senator Tom Hayden Presented to LAUSD Roundtable on Reorganization, 1999 April 22
LAUSD Reform Roundtable: List of Contacts, 1999 April 22
LAUSD Reform Roundtable: Written Testimonies, 1999 April 22
Little Hoover Commission Public Hearing on School Facilities: Written Testimony, 1999 May 27
Hayden, Antonovich Call for a Criminal Investigation into Belmont Scandal: Press Release Regarding Press Conference June 11, Supporting Documents, 1999 May 25-June 6, 10
Statement on Belmont Report by Senator Tom Hayden, 1999 June 21
Belmont H.S. Teachers' Meeting: Roster, Teachers' Packet, 1999 June 25
LAUSD Special Board Meeting: Agenda, Board of Education Report No. 1, 1999 July 20
Belmont Commission: News Articles, 1999 July 21-November 12
Comments by Steven R. Tekosky on Behalf of UTLA, Fax Transmittal, 1999 September 13
Testimony of Bernard Endres Before the [Belmont] Commission: Letter, 1999 September 15
Belmont Commission: Correspondence, Framework for Analysis, News Articles, Notes, 1999 September 19-October 27
Statement by Senator Tom Hayden on Belmont Commission Decision: Press Release, 1999 October 20
Schools White Paper Prepared by the California DTSC: Letter from E. Lowry (DTSC) to R. Polanco (State Senate), Report, 1999 October 14, 27
Little Hoover Commission – Recommendations for Improving the School Facility Program in LAUSD, November 1999
Little Hoover Commission – Report on LAUSD Property Management, 1999 November 3
Good Schools Are Key to Healthy Neighborhoods: Seminar Invitation, Notes, Handouts, 1999 November 9
Good Schools Are Key to Healthy Neighborhoods: Letter from Organizers Regarding Seminar, 1999 November 19
Little Hoover Commission – To Build a Better School: Report, February 2000
Primary Centers Task Force: Correspondence Regarding Privatization of Construction, 2000 February 12-May 11
Every Day 2,000 Children Living in the Belmont Area Spend up to 3 Hours on Buses: Motion, 2000 March 2
Proposition BB Blue Ribbon Citizens' Oversight Committee: Memos Regarding LAUSD Board Meeting, Resolution, 2000 March 21-22, 29
Little Hoover Commission – Public Hearing on LAUSD: Report, 2000 April 27
Subseries F: General Correspondence and Los Angeles Unified School District [LAUSD] Documents, 1990-1999
Privilege Log (LAUSD 520,000-435), 1990-1994
LAUSD Board Facilities and Operations Committee Report No. 6, 1994 August 1
Handwritten Notes, 1997-1999
Public Utilities Commission (PUC) – Application of Southern California Gas Co. … to Sell its Storage Field in Montebello, 1998 January 16
PUC – Order Instituting Investigation Regarding Southern California Gas Co. Montebello Gas Storage Facility, Note, 1999 April 22, December 10
I Intend to Update You Periodically with News Reports Concerning the Battles, Scandals and Developments at the LAUSD: Letter from T. Hayden to Members of Legislature, News Articles, April-July 1999
Resume: Fax from K. Knight to C. Brown, 1999 August 9
Presentation by the LAUSD Regarding the Facilities Master Plan for School Construction: Memo, Motion, Fax, 1999 October 14-27
"Valley Secession Drive Turns its Focus to LAUSD Split": News Article by K. Sauerwein, Los Angeles Times, 1999 November 14
Series IV: Other Toxic School Sites, 1985-2000
Subseries A: General Information on Toxic Schools, 1989-2000
Advisory on Relocatable and Renovated Classrooms: Fact Sheet from Department of Health Services
Neurobehavioral Impairment from Long-Term Residential Arsenic Exposure: Article by K.H. Kilburn
The Public's Role: Hazardous Waste Sites and Facilities: DTSC Publication
Confidential Report of Student Accident (Baldwin Hills Elementary), 1991 September 10
Toxic/Hazardous Site Acquisition Policy: Memo from B. Van Gundy to F. Harding, 1992 September 30
To Present the District's Request that the Board Amend That Portion of its August 26, 1992 Action Which Requires the Site to be Cleaned-Up Prior to the Release of Funds: Report of the SAB Executive Officer, Supporting Documents, 1992 October 28
[H2S] Sour-Gas Design Considerations: Book, Chapter 2 "Definition, Test Methods, Safety, and Properties of Sour Gas," by B.D. Craig, Society of Petroleum Engineers, Richardson, TX, 1993
Proposition 65 Warning: Flyer, 1993 March 25
Health Effects: Understanding Health Risks from Exposure to Hazardous Substances, DTSC Publication, June 1994
The Legislative Framework: How DTSC Regulates Hazardous Waste: DTSC Publication, August 1994
Model Ordinance Locks in Corporate Responsibility: Article from Just Cause, Model Ordinance: Text, 1996 May 30, 1998 September 22
Pesticide Use in LAUSD: Correspondence, News Articles, Newsletter, January 1997-September 1998
OSHA Complaints/Investigation (Manchester Elementary/John Morton), 1997 February 11-September 22
Growth/Phase S & C – 50/50 (Bell Elementary): Project Data, Summary of Costs, Budget Summary, 1997 May 30
OSHA Complaints/Investigation (Stanford Elementary), 1997 July 10-15
Toxic Inner City Schools in the L.A. Area, Senate Natural Resources Committee: Hearing Agenda, Related Documents, August 1997-1997 September 23, 1998 September 23
Chemical Brain Injury: Book by Kaye H. Kilburn, M.D., 1998
Little Hoover Commission Public Hearing on School Facilities: Report of Written Testimony, 1998 March 26
Herbicide/Pesticide Licensing at LAUSD: Correspondence, 1998 June 26-September 28
Indoor Environmental Quality in California Schools: Critical Needs: Report by California Department of Health, August 1998
Toxic School Sites in Los Angeles: Weaknesses in the Site Acquisition Process, Special Report of the Joint Legislative Audit Committee, August 1998
Toxic Schools: News Articles, 1998 September 11-2000 April 26
Toxic School Sites: Letter from T. Dutton (OPSC) to B. Louargand (LAUSD), 1998 October 7
Meeting on Legislative Issues: Letter from T. Hayden to R. Zacarias (LAUSD), 1998 November 23
DTSC Technical Review of Five School Sites: Letter from H. Saebfar (DTSC) to S. Wildman, Reports, 1999 January 11
Schoolsite Acquisition and Construction: Hazardous Substance Contamination-#157: Letter from B. Gregory (Legislative Counsel) to S. Wildman, 1999 February 8
Little Hoover Commission Public Hearing on School Facilities: Report of Written Testimony, 1999 February 25
Little Hoover Commission Public Hearing on School Facilities: Report of Written Testimony, 1999 February 25
Toxic Portable Classrooms: Fact Sheet, News Articles, 1999 March 4-July 11
Reading, Writing and Risk: Air Pollution Inside California's Portable Classrooms: Report by Environmental Working Group, May 1999
LAUSD New Schools, Expansion: News Articles, 1999 August 8-2000 February 24
Augmented Facilities Committee LAUSD: Agenda, Documents Related to Cahuenga Elementary, 1999 June 3
Portable Classrooms: Correspondence Regarding Indoor Air Quality, 1999 June 4-October 14
Gratts Elementary: Letter from T. Hayden, News Articles Regarding Gasoline Removal, 1999 June 10, 20-21
Little Hoover Commission Public Hearing on School Facilities: Letter, Agenda, Report of Written Testimony, 1999 July 6, 22
State Liability: Contaminated Schoolsites -- #8420: Letter from Legislative Counsel of California, 1999 July 26
Assembly Bill 1207 Child Health and Safety: Environmental Hazards: Text of Bill from California State Senate Current Session Legislation, 1999 August 17
Golden Valley High School in Santa Clarita: Correspondence and Supporting Documents Related to Environmental Toxins, 1999 October 9
Membership Directory of the California Coalition for Adequate School Housing, 2000
AQMD Gas Sampling: Letter to T. Hayden, Source Test Report 89-0193 Conducted at Sheldon/Arleta Landfill: Report by SCAQMD, 1989 August 24, 2000 January 12
Requesting Support of Allies Against Asthma Grant: Letter from R. Edwards (Can Do Coalition) to T. Hayden, Supporting Documents, 1996-2000
Summary of January 24, 2000, Meeting in Sacramento Regarding the Status of 60 Phase I Environmental Site Assessments Submitted by the LAUSD: Letter from DTSC, Note, 2000 February 7, 10
Correspondence Regarding Park Avenue Elementary School: Letter from B. Steele to T. Hayden, Letter from B. Steele to H. Saebfar (DTSC), Letter from H. Saebfar to B. Steele, 2000 February 10, 24
Asbestos – Summary of State and Federal Asbestos Regulations
Asbestos – Be Suspect of Selection of Howard Miller: Notes, October 1
Asbestos – News Articles, 1997-1999
Asbestos, 1998 November 20-December 21
Proposed Policies and Procedures Regarding Review of Contaminated or Potentially Contaminated Public School Sites: Letter from A. Evans (SFPD) to SFPD Advisory Committee and IWGSSSEC
Update on DOE's Recent Actions: Letter from A. Evans to S. Wildman
Policy Development: Memo from B. Steele to J. Bush
Proposed Policies and Procedures: Letter from B. Coler (DTSC) to A. Evans
Selecting a Consultant: Letter and Brochure
Asbestos – Code of Federal Regulations Title 40, Chapter 1, Subchapter R, Part 763 – Asbestos: Text, 1999
Asbestos – Code of Federal Regulations Title 40, Chapter 1, Subchapter R, Part 763 – Asbestos: Text, 1999
Asbestos – Code of Federal Regulations Title 40, Chapter 1, Subchapter R, Part 763 – Asbestos: Text, 1999
Asbestos – To Whom It May Concern: A Report on Serious Deficiencies of LAUSD/EHSB Asbestos Control Program, 1999 October 12
Asbestos – Senator Hayden to Hold Hearing on Asbestos in L.A. Unified Schools: Press Release, Notes, Correspondence, Background Information, 1999 November 8-24
Asbestos – Asbestos Hearing: Fax Transmittal from C. Brown to Kate, Notes, Witness List, Witness Testimony, 1999 November 23, December 1-8
Asbestos – Asbestos Hearing: Correspondence Notes, Memo from Connie to Tom, 1999 November 23
Asbestos – Lists of Approved Asbestos Abatement Contractors: Fax Transmittal, Memo, Lists, 1999 December 7, 30
Asbestos – Asbestos Hearing Notebook: Witness Questions, Law Summary, Whistleblower Report, News Articles, 1999 December 8
Asbestos – News Articles, 2000 January 27-March 15
Asbestos – Correspondence from M. Saulenas, "Asbestos-Related Disease in Custodial and Building Maintenance Workers from a Large Municipal School District," by J.R. Balmes, et al, Third Wave of Asbestos Disease , 1991 December 31, 2000 February 2
Asbestos – LAUSD Emergency Asbestos Declaration: Memo, Board Minutes, 2000 February 21-22
Asbestos – HR 1283: Letter to T. Hayden from A. White, 2000 April 21
Community Coalition – Community Coalition: News Articles, June 1993-March 1998
Community Coalition – Confronting Sacramento: State Pre-Emption, Community Control, and Alcohol-Outlet Blight in Two Inner-City Communities: Partial Report, December 1994
Community Coalition – Center for Substance Abuse Prevention (CSAP)/Community Coalition: Correspondence, News Articles, and Newsletters, 1995-November 1997
Community Coalition – Community Coalition: Report by South Central Youth Empowered Thru Action, 1998
Community Coalition – New School – Better Neighborhoods: Correspondence, Symposium Agenda, 1999 May 21, 26-27
Subseries B: Individual Toxic Schools, 1985-1999
Ambassador – To Approve Feasibility Studies in Accordance with Board Regulation 1865.60(a)(2)(A) and (B): SAB Exhibit (Item No. C2-1) (Application #22/64733-10-81), 1989 May 3
Ambassador – To Add a Recommendation to a Phase I Project Application: SAB Exhibit (Item No. M2-6), 1989 May 17
Ambassador – Acquisition of a Portion of the Hotel Site: Letter from B. Hancock (OLA) to B. James (LAUSD), 1990
Ambassador – Approval of Property Acquisition: Letter from D. Brooks and B. Hanson (SFPD) to LAUSD Board, 1990 January 25
Ambassador – SAB Meeting Minutes, 1990 February 28
Ambassador – To Present the District's Request for Authorization of the Site Acquisition: Exhibit (Item No. M2-51) (Application #22/64733-10-81), SAB Resolution M2 90-02, 1990 February 28
Ambassador – Support of Site for High School: Letters from W. Cooper, Chair of Legislative Committee on School Overcrowding, 1990 March 18, 22
Ambassador – Presentation by Trump Wilshire Associates to the State Allocation Board (22/64733-11-31): Discussion Draft, April 1990
Ambassador – Hotel Site: Letter from R. Miller (Munger, Tolles) to L. Smoot (SAB), 1990 April 20
Ambassador – To Present the District's Request for Approval to Acquire a Site Currently Occupied by the Ambassador Hotel: SAB Exhibit, Report of the SAB Executive Officer (Includes Alternative Site Analysis), Notes, Maps, 1990 April 25, May 3, 23
Ambassador – Alternate Sites: Notes from B. Hanson (SFPD) to D. Brooks (SPFD), 1990 May 1
Ambassador – Rodriguez v. LAUSD: Letter from Attorney P. James to J. Huff (SAB), 1990 May 1
Ambassador – Alternative Sites: Notes by [Luisa Park] on Conversation with B. Hanson, 1990 May 2
Ambassador – L.A. New S.H. #1 Attendance Area Study, 1990 May 3
Ambassador – Hotel Site: Letter from R. Miller (Munger, Tolles) to L. Smoot (SAB), 1990 May 8
Ambassador – Midway Ford/Hankey Investment Co.: Letter from A. Parrille, Map, 1990 May 9
Ambassador – Possible Alternative Sites: Letter from B. James (LAUSD) to B. Hancock, (OLA), Notes, Maps, 1990 May 3, 10
Ambassador – Hotel Site: Letter from R. Miller (Munger, Tolles) to B. Hancock (SAB), 1990 May 11
Ambassador – LAUSD Financial Plan: Correspondence Between R. Booker (LAUSD) and D.B. Korff, OLA, 1990 May 15-17
Ambassador – Resolution of Necessity: Letter from R. K. Mason (LAUSD) to K. Brogan (Hill, Farrer & Burrill), 1990 May 15
Ambassador – Public Hearing/Potential Condemnation Action by LAUSD Board of Education on Wilshire/Catalina Site (Ambassador Hotel Site): Letter from J. Goldberg (LAUSD) to W. Anthony (Dept. of General Services), Site Analyses, Maps, Diagrams, 1990 May 17
Ambassador – SAB Meeting Minutes (Application #22/64733-10-81): Motions, Transcript, 1990 May 23
Ambassador – Funding: Correspondence (to and from B. Hancock, B. James, B. Van Gundy, L. Britton, R. Booker, J. Goldberg, R. Mason, J. Glymph), Board Motions, 1990 May 31-August 2
Ambassador – News Articles, 1990 June 8-August 15
Ambassador – Funding: Letter from R. Miller (Munger, Tolles) to State Sen. L. Greene, 1990 August 16
Ambassador – To Approve Authorization for Site Acquisition with a $-0- Apportionment: SAB Exhibit, 1990 November 21
Ambassador – Hotel Site Acquisition: Review
Ambassador – To Approve an Apportionment for Site Acquisition: SAB Exhibit, 1991 May 8
Ambassador – To Present the District's Request for Approval of Legal Fees Related to Site Acquisition and to Apportion Funds: SAB Exhibit, 1992 May 27
Ambassador – Petition for Writ of Mandate, Trump Wilshire Assoc. vs. LAUSD, 1993 December 15
Ambassador – Motion by Defendant Trump Wilshire Assoc. to Set Aside Abandonment: Court Document, 1994 January 14
Ambassador – To Rescind an Apportionment (Application #22/64733-11-81): SAB Exhibit, 1994 February 23
Ambassador – Ambassador Hotel Site Background, Chronology, ca. March 1994
Ambassador – Hotel Site: Fax Cover from D. Fallis (OLA) to M. Scinto (LAUSD), 1994 March 17
Ambassador – Lease-Purchase Project Accounting System, Application Transaction Detail (Application #22/64733-10-81), 1994 March 25
Belmont Elementary School (BES) – LAUSD Building Committee Communication No. 6, Prepared by Building Services Division (Real Estate Branch) for Presentation to the Committee of the Whole, 1987 August 3
BES – Final Order of Condemnation (Case No. C 729856), Parcel No. 2, Belmont Area New Elementary School No. 5 (LAUSD v. J.A. Hernandez), Letter from Attorney to Realty Agent, 1990 October 10, 22
BES – Final Order of Condemnation (Case No. C 726007), Parcel No. 10, Belmont Area New Elementary School No. 3 (LAUSD v. D. Haim, et al.), Warrant #24274159, 24226294 & 23311761, 1991 June 25-October 23, November 4
BES – Final Order of Condemnation (Case No. C 733868), Parcel No. 11, Belmont Area New Elementary School No. 3 (LAUSD v. S.L. Goldflam, et al.), Letter from Attorney to Realty Agent, 1991 October 25, 1992 January 2
BES – Final Order of Condemnation (Case No. C 728927), Parcel No. 1, Belmont Area New Elementary School No. 3 (LAUSD v. R.F. Hammond, et al.), Warrant #23983362, Correspondence Between Real Estate Agent and Attorney, Warrant #21675860, 1989 June 5-1994 November 28
BES – Activity Log, Belmont New Elem #5, 309 Lucas Ave., 1993 September 14-1994 December 20
BES – Judgment, 1989 October 20-1994 April 28
LAUSD v. Madan, et al. (Case No. C737414)
Correspondence Between Attorney and Realty Agent
Warrants #22270572, 21843887, 25912990, 25912989
Belmont Elementary – Request for Land Reimbursement: Letter from M. Scinto (LAUSD) to S. McSherry (OLA)
Summary of Land Costs and OLA Reimbursement
Summary of Payments Due Under Madan Court Judgment
BES – Request for Land Reimbursement (Project No. 22/64733-00-00): Letter from M. Scinto (LAUSD) to S. McSherry (OLA), 1994 April 21
BES – Lease-Purchase Accounting System, Application Budget Summary (Application: 22-64733-11-27), 1995 April 21
BES – Worksheet-Furniture and Equipment Computation (SAB 522) (Application No. 22/64733-18-75), 1997 May 30
Jefferson Middle School (JMS) – DTSC Case No. 96/97-003 Imminent and Substantial Endangerment Determination and Remedial Order
JMS – Hearing: Roster
JMS – Underground Storage Tank Chronology
JMS – Activity Log, 1993 September 13-1996 June 4
JMS – Fire Permit Application for Underground Tanks or Atmospheric Tanks System, Analytical Report (Hydrocarbons) by Calscience Environmental Laboratories, Related Applications and Correspondence, 1994 April 15, 1995 January 31, February-November 1995
JMS – Documents Related to Site Assessment: Letter, 1996 March 11
JMS – Extension to Fire/Life Safety Violation Number 082722: Letter, 1996 March 25
JMS – Documents Sent to Cal/EPA 4/8/96
JMS – Analytical Report by Calscience Environmental Laboratories, 1996 June 4
JMS – Proposition 65 Reportings: Letter from K. Chiang, DTSC, to W. Eroff, L.A. County Emergency Response Unit, 1996 June 12
JMS – Non-Hazardous Soils Manifests, 1996 July 17
JMS – Work Plan to Install Ground-Water Monitoring Wells: Report by Miller Brooks Environmental, 1996 August 20
JMS – Hard Chrome Products Site Proposition 65 Notification: Fax from K. Chiang, DTSC, to R. Loftin, USEPA, Report, Related Documents, 1996 August 23-October 9
JMS – Contamination of Future Site of Jefferson Middle School: Letter from L. Kawasaki (City of L.A.) to Councilmember Walters, 1996 November 27
JMS – Potential Toxic Hazards in the Soil and Groundwater: Letter from S. Thompson (LAUSD) to Supervisor Y.B. Burke, 1996 December 5
JMS – Tale 4 Soil Sampling Data Chromium Analyses, Former Hard Chrome Products: Report, 1997 January 7
JMS – Rule 212 Notification for LAUSD: Memo, Letter, SCAQMD Application for Permit to Construct and Permit to Operate, 1997 January 31, April 24, May 6
JMS – Chronology of DTSC Involvement with JMS, 1997 April 30
JMS – Issues or Concerns Hard Chrome Products Site, Issues Related to Jefferson New Middle School, 1997 April 30
JMS – Hard Chrome Products Site: Letter from H. Saebfar (Cal/EPA) to P. Blais (Site Mitigation Program), 1997 April 30
JMS – Documents Pertaining to JMS: Letter from S. Thomas (LAUSD) to K. Chiang, DTSC, 1997 May 1
JMS – Laboratory Report, Hard Chrome Products, 1997 July 11-14
JMS – Review of Screening Risk Calculations: Letter from H. Saebfar (DTSC) to D. Doi (LAUSD), Supporting Documents, 1997 July 28
JMS – Evaluation of Hexavalent Chromium in Drinking Water: Cal/EPA Memo, 1997 September 19
JMS – Lead Agency Responsibilities: Letter from H. Saebfar (DTSC) to H. Arabzadeh (LAUSD), 1997 September 23
JMS – Potential Migration of Chromium Contamination into Drinking Water Wells in South Central Los Angeles Area: Letter from Cal/EPA to California Department of Health Services, 1997 November 20
JMS – Interview Questions from E. Kalafus for D. Hung and B. Piazza, 1998 January 22
JMS – Memo from B. Coler to H. Saebfar, 1998 June 10
JMS – Toxic School Site: News Articles, 1998 June 18-November 1998
JMS – Acquiring Urban Land for Public School Construction and Related Environmental Concerns: Hearing Summary, 1998 June 17
JMS – Notice of Proposed Determination of Non-Compliance with Order: Letter from S. Holzer (Atty.) to H. Saebfar (DTSC), 1998 July 24
JMS – Toxic School Sites in Los Angeles: Weaknesses in the Site Acquisition Process: Special Report of the Joint Legislative Audit Committee, August 1998
JMS – Toxic School Sites in Los Angeles: Weakness in the Site Acquisition Process, August 1998
JMS – Review of Risk Assessment: Draft Memo, Handwritten Note, 1998 August 10
JMS – Response to JLAC II: Press Release, Fax Transmittal, 1998 August 27-28
JMS – Jefferson High School/CCSCLA: LAUSD Memo (Partial), 1998 September 1
JMS – JLAC Toxic School Sites Report: Letter from S. Wildman to Cal/EPA, Fax Transmittal, 1998 September 3
JMS – LAUSD Use of Outside Consultants to Draft Press Releases: Letter from S. Wildman to K. Mason (LAUSD), 1998 September 9
JMS – Soil Vapor Extraction (PCA 12050 Site Code 300665-11): DTSC Memorandum, 1998 September 18
JMS – Public Hearing on Environmental Conditions at JMS (SLIC No. 638): Letter from D. Dickerson (CRWQCB) to J. Crain (LAUSD), 1998 September 24
JMS – Toxic Issues at JMS: Letter from B. Steele (JLAC) to F. Genetti (UTLA), Draft, Notes, 1998 September 28
JMS – DTSC Raw Data from Soil and Air Sampling, October 1998
JMS – DTSC Raw Data from Soil and Air Sampling, October 1998
JMS – DTSC Raw Data from Soil and Air Sampling, October 1998
JMS – DTSC Raw Data from Soil and Air Sampling, October 1998
JMS – DTSC Raw Data from Soil and Air Sampling, October 1998
JMS – Interim Remedial Action Plans, Letter, 1994 December 16, 1997 February 7, 1998 October 30
JMS – Supplemental Investigation and Assessment Phase I Work Plan: Report, Related Correspondence, 1998 October 1-2
JMS – Review of the Levels of Some Chemicals in Regards to JMS: Letter from N. Brautbar to T. Hayden, N. Brautbar Curriculum Vitae, Exhibits, 1998 August 8, October 9
JMS – Certificate of Analysis by Weck Laboratories, Fax Transmittal, 1998 October 12
JMS – Draft Public Participation Plan: Letter from H. Saebfar to T. Hayden, Letter from T. Watson (ESC) to J.W. Kimmel (Cal/EPA), Plan, 1998 October 30, November 5
JMS – Proposed Approach to Safe Completion of Remedial Work at the Jefferson New Middle School (SLIC No. 638): Letter from CRWQCB to T. Watson (Environmental Strategies Corp.), 1998 November 3
JMS – Letter from S. Johnson (Concerned Citizens of South Central L.A.) to T. Hayden, Fax Transmittal, 1998 November 9, 10
JMS – Draft Phase I-A Supplemental Investigation and Assessment Report: Comments from DTSC, Draft Phase II Supplemental Investigation and Assessment Work Plan: Comments from CRWQCB, 1998 December 15, 17
JMS – Draft Phase I-A Supplemental Investigation and Assessment Report: Letter from S. Amir (DTSC) to T. Boxwell (LAUSD), 1998 December 15
JMS – DTSC Voluntary Corrective Action Agreement (Docket No. HAS 98/99-019), 1999 February 18
JMS – Draft Phase I-B Supplemental Investigation and Assessment Report at the Jefferson New Middle School: Letter from CRWQCB to E. Nasarenko (LAUSD), 1999 February 17
JMS – Air Contaminant Tests: Letter from T. Hayden to R. Zacarias (LAUSD), 1999 June 10
JMS – DTSC Open House: Invitation, August 1999
JMS – CRWQCB Fourth Quarterly Report to JLAC, LAUSD Jefferson Middle School No. 1 Site (SLIC No. 638), 1999 August 10
Playa Vista – Notes of Conversation with P. McPherson
Playa Vista – Toxins: Maps, Notes, Hearing Notice, News Article, November 1986-1993 January 6
Playa Vista – News Articles Regarding Toxins, Maps, 1987 October 1-December 3
Playa Vista – Projected Enrollment and Mitigation: Correspondence and Reports, 1988-1990
Playa Vista – Projected Enrollment and Mitigation: Correspondence and Reports, 1988-1990
Playa Vista – Projected Enrollment and Mitigation: Correspondence and Reports, 1988-1990
Playa Vista – Projected Enrollment and Mitigation: Correspondence and Reports, 1988-1990
Playa Vista – Gas Fumes: Correspondence, 1988 July 28-October 23
Playa Vista – Preliminary Environmental Audit Playa Vista Project – Parcel A, Fiji Way/Lincoln Boulevard/Ballona Creek, Marina Del Rey (Job No. F-88473), 1988 December 21
Playa Vista – Assessment of Potential Environmental Contamination Mid-Tidal Flushing Project Ballona Wetlands (LCA L90127.FD), 1990 June 20
Playa Vista – Environmental Review File, 1991-1994
Playa Vista – Environmental Review File, 1991-1994
Playa Vista – Master Plan for Playa Vista, Draft Program EIR: Report (Pages V.I-2-V.I-7: Underground Storage and Facilities), 1992 September 28
Playa Vista – Comments Regarding Playa Vista Draft EIR (No. 90-0200 SUB(C)(CUZ)(CUB): Letter from Environmental Science and Technology, Inc. to L.A. City Planning Dept., 1992 December 30
Playa Vista – Environmental Report, Concerns Pertaining the Failure to Properly Address the Known Gas Migration Hazards: Memo, 1992 December 30
Playa Vista – Playa Del Rey and Alleged Gas Migration: Interoffice Memo from The Gas Company, 1993 November 16
Playa Vista – Dreamworks Campus: News Articles, 1994 November 4-1996 April 5
Playa Vista – School Site Donation: Correspondence Between LAUSD and Maguire Partners, School Board Proposal, 1994 December 14-1998 November 10
Playa Vista – Environmental Review File, 1995-1999
Playa Vista – Environmental Review File, 1995-1999
Playa Vista – Environmental Review File, 1995-1999
Playa Vista – Environmental Review File, 1995-1999
Playa Vista – Dreamworks Campus: Correspondence, Notes, 1995 August 29-1996 January 20
Playa Vista – DreamWorks: News Articles, December 1995
Playa Vista – First Phase and Master Plan Draft EIR (Partial) Regarding Schools: Correspondence, Notes, Draft EIR, 1997 August 8, 11-September 4, 28
Playa Vista – Data Review and Limited Phase II Subsurface Site Assessment (ENSR Consulting and Engineering, Doc. No. 0477-140), October 1997
Playa Vista – Data Review and Limited Phase II Subsurface Site Assessment: Report (Doc No. 0477-140), October 1997
Playa Vista – Data Review and Limited Phase II Subsurface Site Assessment: Report (Doc No. 0477-140), October 1997
Playa Vista – Data Review and Limited Phase II Subsurface Site Assessment: Report (Doc No. 0477-140), October 1997
Playa Vista – Data Review and Limited Phase II Subsurface Site Assessment: Report (Doc No. 0477-140), October 1997
Playa Vista – Cleanup and Abatement Order No. 98-125 (File No. 98-192), CRWQCB, Exhibits B-1-B-14, ca. 1998
Playa Vista – Spills, Leaks, Investigations and Cleanups (SLIC) Oversight Cost Reimbursement Account (SLIC No. 810): Letter from CRWQCB to D. Chernik (Playa Vista), 1998 October 23
Playa Vista – Cleanup and Abatement Order No. 980125, Playa Capital Co., LLC, and Playa Phase I Commercial Land Co., LLC (File No. 98-192): Letter from D. Dickerson (CRWQCB) to B. Harrigan (Playa Capital), 1998 December 22
Playa Vista – Interim Groundwater Sampling and Analysis Plan, Prepared by Brown and Caldwell, January 1999
Playa Vista – DTSC Concept Paper on Naturally Occurring Haz Constituents by Integrated Environmental Services, Inc.: Fax from M. Young (Integrated Environmental Services) to R. Chou (LA-RWQCB), Draft Concept Paper, ARB's Airborne Toxic Control Measures, 1999 January 19
Playa Vista – Methane Management Recommendations: Correspondence, Report, 1998 October 14, 1999 January 13-19
Playa Vista – Dreamworks Campus: Prospective Purchaser Agreement & Covenant not to Sue, 1999 January 25
Playa Vista – Revised Interim Groundwater Sampling and Analysis Plan (LA-FWQCB File 98-192), March 1999
Playa Vista – Requesting Assistance in Obtaining All Documentation/Files on the CAD 982418139 Remediation Information: Memo from P. McPherson, 1999 March 9
Playa Vista – California Coastal Commission (CCC) Staff Report, Request for Revocation Preliminary Recommendation (App No. R5-91-463), Notes, 1999 March 18, June 9
Playa Vista – Background for Revocation Request of Catch Basin: Memo from P. McPherson and K. Knight to CCC, 1999 March 29
Playa Vista – News Articles, 1999 March 29-August 11
Playa Vista – Methane Recommendations Related to Issuance of Mass Grading Permit: Report by Sepich Assoc. Inc.: Report, 1999 April 2
Playa Vista – Methane Recommendations Related to Issuance of Mass Grading Permit: Report by Sepich Assoc. Inc.: Report with Notes,