Jump to Content

Collection Guide
Collection Title:
Collection Number:
Get Items:
Register of the WPA San Joaquin County Projects files, 1935-1941
MS 104  
View entire collection guide What's This?
PDF (60.94 Kb) HTML
Search this collection
Table of contents What's This?

Container List

Box Box 1





-Index WPA projects


-General corresp. & project approvals/denials


-7/18--Survey of El Rancho del Campo de los Franceses


-7/19--Clks./Welfare Dept. for tabulating relief trends


-7/19--Clerical assistance for County Welfare Dept.


-7/19--Clerical assistance for County Assessor's Office


-7/19--Adobe brick production, Cty. Fairgrounds


-7/22--Production clay roof tiles for County Fair Grounds


-7/22--Reconstruction County Fair horse barns


-7/22--Construction adobe brick bldg. for County Fair Grounds


-7/23--Construction of fences on county roads


-7/25--Improvements physical plant, County Welfare Dept.


-7/31--Flood Control Littlejohn Creek


-8/1---Rd. improvement NE of Tracy


-8/2---Clerical assistance for County Supt. Schools Office


-8/6---Painting & roofing, SJ Gnl. Hospital


-8/8---Flood control, Calaveras R.


-8/9---SJ Co. scenic exhibit for San Diego Fair


-8/19--Weed removal cty. roads


-8/22--Painting wards & kitchen, SJ Gnl. Hospital


-9/10--Filling abandoned ditch, levelling street [loc. unspec.]


-9/16--Physiotherapy training for trainees in Bur. Rehabilitation


-9/23--Gathering, splitting, piling wood for indigent families at County Fair Grounds


-9/25--Do. for south county families


-10/3--Clerical assistance new filing system, Bur. of Identification


-10/3--Construction, County Supt. Schools Offices


-10/8--Garment renovation for relief recipients


-10/12-Garment manufacture for relief recipients


-10/14-Brush clearing, Paradise Park, Stockton


-10/18-Maintenance & operation of sewing rooms in Lodi and Manteca


-10/23-Housekeepers for elderly & infirm


-10/24-Construction of shoulders on cty. rds.


-11/13-Architectural draftsman to design bldg. County Fair Grounds


-11/19-Establishment camp at Paradise Park for county weed abatement crew


-11/19-Preparing advertisements for WPA jobs


-11/21-Personnel for three nursery schools


-11/30-Construction judging ring, main exhibit bldg., etc. County Fair Grounds


-12/16-Sewing project for women


-12/23-Installation metal drainage pipes, central cty. rds.




-General correspondence & project approvals/denials


-1/13--Construction of rd., south levee, Smith's Canal


-1/18--Cty. Office bldg., Stockton


-1/20--Rodent eradication, eastern cty.


-1/29--Drainage improvement, Commeta & Bellota rds.


-2/6---Do., West Ln. betw. 8 Mile Rd. & Hammer Ln.


-2/7---Improvement shoulders, Old French Camp Rd.


-2/7---Raising rd. grade on Copperopolis Rd. from Diverting Canal east


-2/7---Improvement shoulders, Jack Tone Rd. betw. French Camp Rd. and Mariposa Rd.


-3/1---Concrete drainage pipe from Acampo Rd. to Mokelumne R.


-3/1---Improvement interior Ag. Exhibit bldg., Cty. Fair Grnds.


-3/3---Construction sidewalks, Escalon


-3/12--Loading, hauling, spreading dirt, SJ Genl. Hospital


-4/20--Construction storm sewers, Ripon


-5/25--Gathering, cutting, collecting wood for indigent use, County Fair Grounds


-6/1---Repair concrete apron, Diverting Canal, nr. Bellota


-7/17--Drainage improvement, rd. right-of-ways [loc. unspec.]


-8/24--Surveying throughout cty. of unsurveyed rds.


-9/28--Construction warehouse & parking shed, SJ Genl. Hospital


-11/3--Clerical assistance for indexing, Cty. Sheriff's Office


-12/16-Reconstruction rd. drainage thru Bethany


-12/16-Demolish timber bridge, Mormon Slough & replace w/ earth fill

Box Box 2





-General corresp. & project approvals/denials


-2/19--Production clay roofing tiles


-4/13--Traffic census, Cty. Hwy. Dept.


-4/15--Grading streets in El Ricardo Terrace


-4/20--Wood cutting for indigent persons


-4/26--Construction, S side Hazelton betw. Bieghle Alley & B St.


-4/26--Shoulder & drainage work on Mariposa Rd. betw. Jack Tone Rd. & Hogan Rd.


-5/13--Street constr. & reconstr. [loc. unspec.]


-5/15--Repair & improve cty. hwys. [loc. unspec.]


-5/28--Construction adobe garages, Cty. Office Bldg.


-8/6---Maintenance & operation of sewing rms., Stockton


-8/20--Cataloguing, indexing for Cty. Sheriff's Office


-9/8---Improvement north levee, Mormon Channel


-11/18--Improvement shoulders & drainage on Copperopolis Rd.


-12/22--Additions to storm sewers, Ripon




-General corresp. & fiscal report on expenditures, July 1935 to December 1937


-5/7---Sewer installation, County Fair Grounds


-5/10--Cataloguing, indexing for Cty. Sheriff's Office


-5/23--Housekeepers & childcare for indigent families where mothers are infirm


-6/16--Federal Rd. improvements, [loc. unspec.]


-6/30--Cty. rd. improvements [loc. unspec.]


-7/6---Cty. rd. improvements, Sup. Dist. #5


-7/7---Improvements at Micke Grove Cty. Park


-7/8---Improvements to streets, SJ Genl. Hospital


-7/10--Improvements, County Fair Grounds


-7/18--Cutting timber for indigent poor


-8/4---Cty. rd. improvements, Sup. Dist. #4


-8/5---Oiling, spreading gravel, cty. rds. [loc. unspec.]


-8/15--Clerical, professional workers to assist in county-wide lands survey


-9/12--Construction dormitory, poultry & cattle barns, County Fair Grounds




-General corresp.


-3/14--Recreation supervisors, SJ Genl. Hospital


-6/?---Garment renovation, Stockton


-10/2--Housekeepers & childcare for indigent families where mothers are infirm




-1/19--Cutting timber for indigent poor


-1/?---Construction warehouse, Cty. Corp. Yards, Stockton


-2/?---Indexing, Cty. Identification Bur.


-8/12--Establish triangulation system for county-wide survey


-9/3---Garment renovation for indigent poor


-12/5--Housekeepers & childcare for indigent families where mothers are infirm




-3/11--Construct primary rd., Sharp Ln.


-4/28--Agricultural Dept. relief workers