Guide to the Environmental Issues Collection
Guide to the Environmental Issues Collection 1986/1997
Special Collections & University Archives
Detailed List of Contents
Final EIR: Sunroad Marina Harbor Island, Published for Port of San Diego August 02, 1986
Draft Environmental Impact Reports Appendix: Carmel Del Mar Neighborhoods 4, 5, & 6 Precise Plan Amendment, Published for The Baldwin Company June 1987
Draft Environmental Impact Reports Appendix: Carmel Del Mar Neighborhoods 4, 5, & 6 Precise Plan Amendment, Published for The Baldwin Company June 1987
Overview Report Vol. I: San Diego Area Water Reuse Study, Published for San Diego County Water Authority September 1987
Executive Summary: Development and Analysis of Water Reclamation Alternatives For Modifications to the Metropolitan Sewer System, Published for Clean Water Program for Greater San Diego March 1989
Program Environmental Impact Report: Water Distribution Plan, Published for San Diego County Water Authority April 1989
Progress Guide and General Plan, Published for City of San Diego June 1989
Interim Environmental Report, Published for Clean Water Program For Greater San Diego July 1989
Interim Environmental Report, Published for Clean Water Program For Greater San Diego July 1989
Water Reclamation and Reuse Conceptual Master Plan for Modifications to the Metropolitan Sewerage System, Published for Clea Water Program for Greater San Diego July 1989
Water Reclamation and Reuse Conceptual Master Plan for Modifications to the Metropolitan Sewerage System, Published for Clea Water Program for Greater San Diego July 1989
Water Reclamation and Reuse Conceptual Master Plan for Modifications to the Metropolitan Sewerage System Volume 2, Published for Clean Water Program for Greater San Diego July 1989
Framework Plan for Modifications to the Metropolitan Sewer System Volume I, Published for Clean Water Program for Greater San Diego Julu 1989
Framework Plan for Modifications to the Metropolitan Sewer System Volume I, Published for Clean Water Program for Greater San Diego Julu 1989
Framework Plan for Modifications to the Metropolitan Sewerage System Volume 2, Published for Clean Water Program for Greater San Diego July 1989
Final Environmental Impact Report: Santa Maria Wastewater Reclamation Project, Published for Ramona Municipal Water District July 1989
Framework Plan Report for Modifications to the Metropolitan Sewerage System Addendum to Volumes 1 and 2, Published for Clean Water Program for Greater San Diego October 1989
Interim Environmental Report Addendum, Published for Clean Water Program for Greater San Diego November 1989
Environmental Impact Report: State Ocean Plan Compliance Report, Published for City of San Diego December 29, 1989
Draft Supplemental Environmental Impact Report: The Pointe San Diego, Published for Pointe Builders January 12, 1990
Environmental Impact Report: State Ocean Plan Compliance Project, Published for City of San Diego Planning Department February 1990
Draft Environmental Impact Report: North City Water Reclamation Project, Published for City of San Diego Planning Department September 7, 1990
Environmental Impact Report: East Mission Gorge Interceptor Pump Station and Force Main Project, Published for City of San Diego Planning Department December 1990
District II Transportaiton Strategy, Published for CA Department of Transportation October 1991
Final Environmental Impact Report/EI Statement: Clean Water Program for Greater San Diego Secondary Treatment System Associated Sludge Management Facilities, Published for City of San Diego March 1991
Draft Environmental Impact Report (EIR): Pipeline 2A and Pump Station, Published for San Diego County Water Authority April 1991
Draft EIR: Pipeline 4B Phase II, Published for San Diego County Water Authority April 1991
Draft EIR Appendices: Pipeline 4B Phase II, Published for San Diego County Water Authority April 1991
Draft EIR: Pipeline 4 Extension, Phase II, Published for San Diego County Water Authority May 1991
Final EIR: Pipeline 2A and Pump Station, Published for San Diego County June 1991
EIR: Otay Ranch Corporate Center South, Published for City of San Diego November 1991
Draft Supplement to the Final EIS: Yosemite Valley Housing Plan, Published for US Department of the Interior: National Park Service May 1992
EIR: Rose Canyon Trunk Sewer, Published for City of San Diego June 1992
Draft EIR Appendices: Rose Canyon Trunk Sewer Volume I Appendices A-E, Published for City of San Diego June 1992
Draft EIR Appendices: Rose Canyon Trunk Sewer Volume II Appendix F, Published for City of San Diego June 1992
Draft EIR Appendices: Rose Canyon Trunk Sewer Volume II Appendix F, Published for City of San Diego June 1992
Draft EIR: Los Panasquitos Canyon Preserve Master Plan, Publised for City of San Diego July 01, 1992
Draft EIR: Torrey Reserve Planned Commercial Development, Published for City of San Diego July 27, 1992
Draft Program Environmental Impact Report (PEIR): Otay Ranch, Published for Otay Ranch Joint Planning Project July 1992
Draft Mitigated Negative Declaration (MND): Conceptual Plan for the Water Reclamation Facilities and Distribution Systems, Published for San Elijo Joint Powers Authority September 26, 1992
Draft EIR: San Diego River Outfall, Published for City of San Diego September 30, 1992
Draft EIR: San Diego River Outfall, Published for City of San Diego September 30, 1992
Final EIR: San Diego River Outfall, Published for City of San Diego November 16, 1992
Final EIR: San Diego River Outfall, Published for City of San Diego November 16, 1992
EIR: North City Wastewater Diversion Tunnel, North City Tunneled Treated Wastewater Pipeline, and Mission Bay Trenched Treated Wastewater Pipeline, Published for City of San Diego June 1993
Biological Technical Report (BTR): Torrey Reserve Terrace Project, Published for Turrini and Brink July 08, 1993
EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego August 1993
EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego August 1993
Revised Draft EIR: County of Imperial General Plan, Published for County of Imperial August 1993
Revised Draft EIR: County of Imperial General Plan, Published for County of Imperial August 1993
Draft EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego August 23, 1993
Draft EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego August 23, 1993
Draft EIR: Chula Vista Nautical Center, Published for San Diego Unified Port District October 01, 1993
Draft EIR: Bayside Congeneration Project, Published by Port of San Diego December 10, 1993
BTR: Neighborhood 8A, Published for Pardee Construction January 31, 1994
Final EIS Appendices: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities, Published for US EPA Region IX February 1994
Final EIS Appendices: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities, Published for US EPA Region IX February 1994
EIR Appendices: Maggio Ranch, Published for County of San Diego February 1994
EIR Appendices: Maggio Ranch, Published for County of San Diego February 1994
EIR Appendices: Maggio Ranch, Published for County of San Diego February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume I, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume I, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume I, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume I, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume II, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume II, Published for US EPA February 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities Volume II, Published for US EPA February 1994
Final Supplemental Environmental Impact Statement (SEIS): Management of Habitat for Late-Successional and Old-Growth Forest Related Species Within the Range of the Northern Spotted Owl Volume I, Published for US Department of Agriculture Forest Service February 1994
Final Supplemental Environmental Impact Statement (SEIS): Management of Habitat for Late-Successional and Old-Growth Forest Related Species Within the Range of the Northern Spotted Owl Volume II Appendices, Published for US Department of Agriculture Forest Service February 1994
Draft EIR: North Metro Interceptor Sewer Project, Published for City of San Diego March 25, 1994
Final EIR: National City Marina Project and Port Master Plan Amendment, Published for San Diego Unified Port District March 1994
Record of Decision/Standards and Guidelines: Management of Habitat for Late-Successional and Old-Growth Forest Related Species Within The Range of the Northern Spotted Owl, Published for US Department of Agriculture Forest Service April 1994
Draft EIR: Miramar Landfill General Development Plan/Fiesta Island Replacement Project/Northern Sludge Processing Facility/West Miramar Landfill: Overburden Disposal, Published for City of San Diego April 29, 1994
Draft EIR: Miramar Landfill General Development Plan/Fiesta Island Replacement Project/Northern Sludge Processing Facility/West Miramar Landfill: Overburden Disposal, Published for City of San Diego April 29, 1994
Draft EIR: Miramar Landfill General Development Plan/Fiesta Island Replacement Project/Northern Sludge Processing Facility/West Miramar Landfill: Overburden Disposal, Published for City of San Diego April 29, 1994
Final EIS: International Boundary and Water Commission International Wastewater Treatment Plant and Outfall Facilities, Published for US EPA May 06, 1994
Draft EIR: Central Area and Otay Mesa Inter-Connection, Published for Otay Water District May 1994
Draft EIR: Central Area and Otay Mesa Inter-Connection, Published for Otay Water District May 1994
Revised MND and BTR: North County Distribution Plan, Published for San Diego County Water Authority June 1994
BTR: Remington Hills Tentative Map #93-0140 Appendix G, Published for City of San Diego June 1994
Draft EIR: Penasquitos Relief Trunk Sewer, Published for City of San Diego July 27, 1994
Final Program Environmental Impact Statement (PEIS)/ Master Environmental Impact Report (MEIR): Miramar Landfill General Development Plan and the Northern Sludge Processing Facility and West Miramar Landfill Overburden Disposal, Published for City of San Diego July 1994
Draft EIR: East County Square Specific Plan General Plan Amendment and Major Use Permit, Published for County of San Diego August 12, 1994
Draft SEIR Technical Appendices: East County Square Specific Plan (Volume I), Published for County of San Diego August 19, 1994
uare Specific Plan (Volume II), Published for County of San Diego August 19, 1994
Draft SEIR: County of San Diego Inmate Reception Center, Published for County of San Diego August 19, 1994
Draft SEIR: County of San Diego Inmate Reception Center, Published for County of San Diego August 19, 1994
Notice of MND: Eagle Crest Reclaimed Water Distribution Pipeline, Published for City of Escondido August 25, 1994
EIR: Carmel Valley Neighborhood 8A, Published for City of San Diego October 1994
MND: San Andres West Planned Development, Published for City of San Diego October 08, 1994
EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego October 10, 1994
EIR: Sorrento Hills Community Plan Amendment/Torrey Reserve Heights/Sorrento Hills Phase II, Unit 4, Published for City of San Diego October 10, 1994
Draft EIR: Remington Hills, Published for City of San Diego October 14, 1994
Final EIS/R: Lemon Grove, La Mesa, Spring Valley State Routes 125/54, Published for US Department of Transportation October 25, 1994
Final EIS/R: Lemon Grove, La Mesa, Spring Valley State Routes 125/54, Published for US Department of Transportation October 25, 1994
Specific Plan: Rancho San Vicente, Published for County of San Diego November 18, 1994
Draft EIR: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR Technical Appendices Vol. I: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR Technical Appendices Vol. I: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR Technical Appendices Vol. II: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR Technical Appendices Vol. II: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR Technical Appendices Vol. II: Rancho San Vicente Major Use Permit and Specific Plan, Published for County of San Diego November 22, 1994
Draft EIR: Treena Mesa Planned Industrial Development, Published for City of San Diego November 23, 1994
Draft Initial Study (IS)/Environmental Assessment (EA) and ND/Finding of No Significant Impact: Special Use Permit Amendment and Construction of the Viejas Mountain Reservoir No. 2, Published for Padre Dam Municipal District February 03, 1995
Draft EIR: Potable Water and Water Reclamation Master Plans, Published for Vista Irrigation District March 1995
Draft EIR: Potable Water and Water Reclamation Master Plans, Published for Vista Irrigation District March 1995
Draft EIR: Potable Water and Water Reclamation Master Plans, Published for Vista Irrigation District March 1995
Draft EIR: San Diego Convention Center Expansion and Port Master Plan Amendment, Published for Port of San Diego March 1995
Draft EIR: San Diego Convention Center Expansion and Port Master Plan Amendment, Published for Port of San Diego March 1995
Final EIS: Operation of Glen Canyon Dam, Published for U.S. Department of the Interior March 1995
Final EIS Summary: Operation of Glen Canyon Dam, Published for U.S. Department of the Interior March 1995
Final EIS Comments/Responses: Operation of Glen Canyon Dam, Published for U.S. Department of the Interior March 1995
Draft Biotechnical Report: Stonecrest Village Project, Published for California Pacific Homes March 20, 1995
Draft EIR Addendum: Oaks at Descanso Recreational Vehicle Park, Published for County of San Diego April 1995
Draft Program Environmental Impact Report (PEIR): National City Redevelopment Plan, Published for City of National City April 1995
Transportation Analysis for SA-680, Published for County of San Diego April 07, 1995
Technical Appendices: Transportation Analysis for SA-680, Published for County of San Diego April 07, 1995
BTR: Carmel Valley Community Park, Published for Pacific Southwest Biological Services May 04, 1995
EIR: South Bay Tunnel and Ocean Outfall: Focused Supplement to the IBWC International Wastewater Treatment Plant and Outfall Facilities Final EIS (February 1994), Published for City of San Diego May 5, 1995
EIR: South Bay Tunnel and Ocean Outfall: Focused Supplement to the IBWC International Wastewater Treatment Plant and Outfall Facilities Final EIS (February 1994), Published for City of San Diego May 5, 1995
EIR: Kumeyaay Lake Campground, Published for City of San Diego May 13, 1995
PMND: Point Loma Water Tanks and Pipeline, Published for City of San Diego May 15, 1995
EIR: Point Loma Wastewater Treatment Plant Digesters 7 and 8 and Associated Facilities, Published for City of San Diego May 22, 1995
SEIR: Christopherhill, Published for County of San Diego May 28, 1995
SEIR: Christopherhill, Published for County of San Diego May 28, 1995
EIR Appendices: East Mission Gorge Trunk Sewer Rehabilitation Project, Published for City of San Diego June 1995
Public Review Draft: Poway Subarea Habitat Conservation Plan/Natural Community Conservation Plan, Published for City of Poway June 1995
Public Review Draft: Poway Subarea Habitat Conservation Plan/Natural Conservation Plan Volume I: Plan, Published for City of Poway June 1995
Public Review Draft: Poway Subarea Habitat Conservation Plan/Natural Conservation Plan Volume II: Appendices, Published for City of Poway June 1995
Draft EIR: California State Prison San Diego County II (Volume I), Published for California Department of Corrections June 1995
Draft EIR: California State Prison San Diego County II (Vol. II-Technical Appendices), Published for California Department of Corrections June 1995
Draft EIR: Deletion of SA 680 from the County of San Diego Circulation Element, Published for County of San Diego June 1995
Draft EIR Appendices: Deletion of SA 680 from the County of San Diego Circulation Element, Published for County of San Diego June 1995
Draft EIS: San Diego United States Courthouse, City of San Diego, California, Published for US General Services Administration, Pacific Rim Region June 30, 1995
Draft EIS Appendices: San Diego United States Courthouse, City of San Diego, California, Published for US General Services Administration, Pacific Rim Region June 30, 1995
Draft EIR: StoneCrest Village Volume I Appendices, Published for City of San Diego July 1995
Draft EIR: StoneCrest Village Volume I Appendices, Published for City of San Diego July 1995
Draft EIR: StoneCrest Village, Published for City of San Diego July 14, 1995
Biological Technical Report (BTR): Black Mountain Ranch, Published for PIA San Diego July 03, 1995
Habitat Restoration/Revegitation Plan: Torrey Reserve Terraces, Published for City of San Diego July 03, 1995
Draft EIR: Reclaimed Water Distribution Master Plan - Northern and Central Service Areas, Published for City of San Diego July 21, 1995
Draft EIR/Environmental Assessment: Reclaimed Water Distribution Master Plan - Northern and Central Service Areas, Published for City of San Diego July 26, 1995
Draft EIR: Santa Fe Valley Specific Plan, Published for County of San Diego August 1995
Draft EIR: Santa Fe Valley Specific Plan, Published for County of San Diego August 1995
Draft EIR: State Route-15/Mid-City Parks, Published for City of San Diego August 08, 1995
Supplemental Environmental Impact Report (SEIR) Appendices: Sycamore Landfill Transmission Line Relocation, Published for County of San Diego August 08, 1995
EIR: StoneCrest Village, Published for City of San Diego September 1995
EIR: Neighborhood 8A Precise Plan/Del Mar Highlands Estates/Lorenz Parcel Compromise Plan and Neighborhood 8A Acquisition Plan, Published for City of San Diego September 1995
EIR: Neighborhood 8A Precise Plan/Del Mar Highlands Estates/Lorenz Parcel Compromise Plan and Neighborhood 8A Acquisition Plan, Published for City of San Diego September 1995
EIR: East Mission Gorge Trunk Sewer Rehabilitation, Published for City of San Diego September 08, 1995
Draft EIR: Fairbanks Highlands, Published for City of San Diego September 21, 1995
Draft SEIR: East County Square Tentative Map, Published for County of San Diego September 29, 1995
Draft SEIR: East County Square Tentative Map, Published for County of San Diego September 29, 1995
Draft EIS: Realignment to MCAS/MCB Camp Pendleton, Published for U.S. Department of the Navy October 1995
Draft EIR: Sorrento Valley Road Realignment, Published for City of San Diego October 06, 1995
Draft MND: North Torrey Pines Road Bridge Replacement Projects, Published for City of San Diego October 06, 1995
Draft SEIR: Sycamore Landfill Transmission Line Relocation, Published for County of San Diego October 19, 1995
Subregional Natural Community Conservation Plan, Published for San Diego Gas and Electric October 20, 1995
Draft EIR: Kumeyaay Lake Camping Facilities: Appendices, Published for City of San Diego October 27, 1995
Draft EIR: Kumeyaay Lake Camping Facilities: Appendices, Published for City of San Diego October 27, 1995
Draft EIR: Kumeyaay Lake Campground, Published for City of San Diego October 30, 1995
Final EIS: Development of Facilities in San Diego/Coronado to Support the Homeporting of one NIMITZ Aircraft Carrier, Published for U.S. Department of the Navy November 1995
Final EIS: Development of Facilities in San Diego/Coronado to Support the Homeporting of one NIMITZ Aircraft Carrier, Published for U.S. Department of the Navy November 1995
Final EIS: Development of Facilities in San Diego/Coronado to Support the Homeporting of one NIMITZ Aircraft Carrier Response to Comments, Published for U.S. Department of the Navy November 1995
Final EIS: Development of Facilities in San Diego/Coronado to Support the Homeporting of one NIMITZ Aircraft Carrier Technical Appendices, Published for U.S. Department of the Navy November 1995
Final EIS: Development of Facilities in San Diego/Coronado to Support the Homeporting of one NIMITZ Aircraft Carrier Technical Appendices, Published for U.S. Department of the Navy November 1995
Draft EIR: Carmel Mountain Ranch Unit 23, Published for Carmel Mountain Ranch Properties December 1995
Draft Environmental Alternatives Analysis (EAA) for proposed rule for the Conservation of the Northern Spotted Owl on Non-Federal Lands, Published for US Department of the Interior - Fish and Wildlife Service Water Authority December 1995
Draft EIR: Carmel Mountain Ranch Unit 23, Published for City of San Diego December 12, 1995
Master Environmental Impact Statement (MEIS): Water Resources Master Plan, Published for Otay Water District December 19, 1995
Final EIR: Olivenhain Municipal Water District Non-Potable Water Distribution and Storage System, Published for Olivenhain Municipal Water District January 1996
Draft EIR/EIS: Nobel Drive I-805 Interchange and Extension Project, Published for CA Department of Transportation January 1996
Draft EIR/EIS: Nobel Drive I-805 Interchange and Extension Project, Published for CA Department of Transportation January 1996
Draft Master EIR: Lemon Grove General Plan, Published for City of Lemon Grove January 01, 1996
Draft Master EIR: Lemon Grove General Plan, Published for City of Lemon Grove January 01, 1996
Draft SEIR: Las Montanas, Published for County of San Diego February 1996
Draft SEIR: Las Montanas, Published for County of San Diego February 1996
Draft SEIR: Las Montanas Appendices, Published for County of San Diego February 1996
Draft SEIR: Las Montanas Appendices, Published for County of San Diego February 1996
EIS: Realignment of NAS Miramar, Published for US Marine Corps February 1996
EIS: Realignment of NAS Miramar, Published for US Marine Corps February 1996
EIS: Realignment of NAS Miramar, Published for US Marine Corps February 1996
Final EIS: Realignment of NAS Miramar Comments/Response to comments Volume I, Published for US Marine Corps February 1996
s/Response to comments Volume II, Published for US Marine Corps February 1996
s/Response to comments Volume II, Published for US Marine Corps February 1996
s/Response to comments Volume III, Published for US Marine Corps February 1996
s/Response to comments Volume III, Published for US Marine Corps February 1996
GMP and FEIS: Cabrillo National Monument, Published for US Department of the Interior National Park Service February 1996
Draft EA: Proposed Multi-Agency Training Facility at the East Mesa Detention Facility San Diego, California, Published for Joint Task Force Six February 1996
EIR: Point Loma Wastewater Treatment Plant Master Plan, Published for City of San Diego February 1996
EIS: Realignment to MCAS/MCB Camp Pendleton, Published for US Marine Corps March 1996
EIS: Realignment to MCAS/MCB Camp Pendleton, Published for US Marine Corps March 1996
EIS: Realignment to MCAS/MCB Camp Pendleton, Published for US Marine Corps March 1996
Draft EIR: General Dynamics Facilities Demolition Project, Published for Port of San Diego March 1996
Final EIS: San Diego Unites States Courthouse, City of San Diego, California, Published for US General Services Administration March 1996
Draft EIR: Palomar Aggregates Quarry, Published for Palomar Aggregates April 1996
Draft EIR: Palomar Aggregates Quarry, Published for Palomar Aggregates April 1996
SEA: Issuance of an Incidental Take Permit to the City of Poway for the California Gnatcatcher and Other Threatened Endangered Species, Published for US Fish and Wildlie Services April 1996
Biological Resources Report Appendix D: USD Master Plan EIR, Published for City of San Diego April 19, 1996
Draft EIR: University of San Diego Master Plan, Published for City of San Diego April 26, 1996
SEIR Technical Appendices: San Miguel Ranch General Plan Amendment General Development Plan Amendment, Published for City of Chula Vista May 10, 1996
Draft EIR: Country Estates, Published for Joseph Jaoudi June 1996
EIR Addendum: River Trail, Published for City of San Diego June 04, 1996
EIR: Del Mar Mesa Specific Plan in the North City Future Urbanizing Area, Published for City of San Diego June 06, 1996
Final EIS Comments/Analysis: Realignment of NAS Miramar San Diego, CA February 1996, Published for Richard Hertzberg June 08, 1996
Draft EIR: San Pasqual Heights, Published for City of San Diego June 11, 1996
Environmental Assessment: North Mission Valley Interceptos Sewer Phase II - City Contract, Published for US EPA July 1996
EIR: University of San Diego Master Plan, Published for City of San Diego July 17, 1996
EIR: University of San Diego Master Plan, Published for City of San Diego July 17, 1996
Report to the Planning Commission: University of San Diego Master Plan, Published for City of San Diego July 26, 1996
Draft SEIR: San Miguel Ranch, Published for City of Chula Vista August 1996
SEIR: Torrey Hills. Technical Appendices: Biological Resources Reports, Published for City of San Diego August 05, 1996
Synopsis of Biological Resource Values and Evaluation of Impacts: Indian Springs Open Space Encroachment Project, Published for Peninsula Properties September 1996
Draft MND: Burlington Sante Fe Railroad Expansion, National City Marine Terminal, Published for San Diego Unified Port District September 1996
Draft MND Appendix A: Burlington Northern Santa Fe Railroad Expansion, National City Marine Terminal, Published for San Diego Unified Port District September 1996
EIR: Ranch at Stallions Crossing, Published for City of San Diego September 1996
Summary of Actions Proposed for Torrey Hills: Planned Residential Development/Planned Industrial Development/Sorrento Hills Community Plan Amendment, Published for AG Land Associates September 1996
Draft SEIR: Sorrento Hills Community Plan Amendment/Torrey Hills, Published for City of San Diego September 16, 1996
Draft SEIR: Sorrento Hills Community Plan Amendment/Torrey Hills, Published for City of San Diego September 16, 1996
Draft SEIR: Sorrento Hills Community Plan Amendment/Torrey Hills, Published for City of San Diego September 16, 1996
Draft EA/SEIR: Oceanside-Escondido Rail Project, Published for North County Transit District October 11, 1996
Draft EA/SEIR: Oceanside-Escondido Rail Project, Published for North County Transit District October 11, 1996
Draft EA/SEIR: Oceanside-Escondido Rail Project, Published for North County Transit District October 11, 1996
Draft Addendum/Supplement to the Final EIS for the General Management Plan: Yosemite Valley Housing Plan, Published for US Department of the Interior December 06, 1996
Draft EIR: Orchard Run, Published for County of San Diego December 24, 1996
Draft EIR: Middel Segment of SR-56, Published for City of San Diego December 24, 1996
Draft EIR: Middel Segment of SR-56, Published for City of San Diego December 24, 1996
Evaluation of Secondary Pond Treatment Systems for the South Bay International Wastewater Treatment Plant: Phase II Pond Study, Published for International Boundary and Water Commission March 1997
Biological Survey and Report for the Chavez Property, Published for Rudolfo Cabanas Chavez April 1997
Wetland Delineation and Sensitive Plant Impacts at Poco Lago, Published for Hidden Valley Partners May 02, 1997
Hydraulic Calculations for TM 5104/L-1768, Published for County of San Diego June 06, 1997
Draft MND: Hagey Tentative Map, Published for County of San Diego June 10, 1997