Inventory of the Dept. of Public Works, Division of Architecture Records, 1914, 1937-39

Processed by The California State Archives staff; supplementary encoding and revision supplied by Brooke Dykman Dockter.
California State Archives
1020 "O" Street
Sacramento, California 95814
Phone: (916) 653-2246
Fax: (916) 653-7363
Email: ArchivesWeb@sos.ca.gov
URL: http://www.sos.ca.gov/archives/
© 2000
California Secretary of State. All rights reserved.

Inventory of the Dept. of Public Works, Division of Architecture Records, 1914, 1937-39

Inventory: F3864



California State Archives

Office of the Secretary of State

Sacramento, California

Contact Information:

  • California State Archives
  • 1020 "O" Street
  • Sacramento, California 95814
  • Phone: (916) 653-2246
  • Fax: (916) 653-7363
  • Email: ArchivesWeb@sos.ca.gov
  • URL: http://www.sos.ca.gov/archives/
Processed by:
The California State Archives staff
© 2000 California Secretary of State. All rights reserved.

Descriptive Summary

Title: Dept. of Public Works, Division of Architecture Records,
Date (inclusive): 1914, 1937-39
Inventory: F3864
Creator: Dept. of Public Works, Division of Architecture
Extent: Approx. 1,800 items
Repository: California State Archives
Sacramento, California
Language: English.

Administrative Information

Publication Rights

For permission to reproduce or publish, please contact the California State Archives. Permission for reproduction or publication is given on behalf of the California State Archives as the owner of the physical items. The researcher assumes all responsibility for possible infringement which may arise from reproduction or publication of materials from the California State Archives collections.

Preferred Citation

[Identification of item], Dept. of Public Works, Division of Architecture Records, F3864, California State Archives.

 

ARCHITECTURAL DRAWINGS. 1914, 1937-39 F3864:1-1606

Physical Description: Approx. 1,800 items

Scope and Content Note

Arrangement

Arranged principally by contract number. Includes architectural drawings and blueprints for various structures and exhibits at the Golden Gate International Exposition on Treasure Island (1939) and for the California Building at the Panama - Pacific Exposition in San Francisco (1915).
 

Golden Gate International Exposition, Treasure Island

 

Contract No. G-1

 

Alameda-Contra Costa Building

 

3A-1 Main Plan - Roof Plan 952,1465,1573

 

3A-2 Elevations 954,1466,1574

 

3A-3 Sections 953,1467,1575

 

3A-4 Exterior Details 955,1468,1576

 

3A-5 Exterior Details 956,1469,1577

 

3A-S1 Foundation & 1st Floor Framing Plan 943,1470,1578

 

3A-S2 Roof Framing Plan 944,1471,1579

 

3A-S3 Truss Details 958,1472,1580

 

3A-S4 Wall Details 959,1473,1581

 

3A-RS1 Loggia Roof - n. corner 938

 

3A-RS2 Section Lobby Entrance 935

 

3A-RS3 Front Wall Brace 936

 

3A-101 Letters for Plywood Plaques 946

 

3A-102 Letters for Plywood Plaques 947

 

3A-104 Details of Plywood Letters 949

 

3A-105 Letters Over Entrance to Lobby #112 948

 

3A-106 Layout of Letters 950

 

3A-109 Bandstand 945

 

SX-1 Typical Details 951

 

No # Intersection of Ave K and Court #6 942

 

No # Plot Plan 941

 

No # Details of Plywood Plaques 939

 

Mission Trails Building

 

3C-1 Main Plan - Mezzanine Plan - Roof Plan 1041,1474,1582

 

3C-2 Elecations - Exterior Details 1036,1475,1583

 

3C-3 Sections - Door and Window Details 1037,1476,1584

 

3C-S1 Foundation & Floor Framing Plans 1045,1477,1585

 

3C-S2 Roof Framing Plan 1049, 1478, 1586

 

3C-S3 Wall Framing 1050, 1479, 1587

 

3C-S4 Truss Details 1047, 1480, 1588

 

3C-S5 Truss Details 1046, 1481, 1589

 

3C-S6 Revised Piling Plan 1043

 

3C-RS1 End Wall Details 1048

 

3C-RS2 Details at Column 18-A 1044

 

3C-RS3 Rod Connections 1038

 

3C-RS4 Revised Tower Details 1021

 

3C-RS5 Tie at Mezzanine Floor 1022

 

SX-1 Typical Details 1042, 1482, 1590

 

3C-100 Cast Plaster Pilaster Base & Capital 1030

 

3C-101 Cast Plaster Pilaster Base & Capital 1035

 

3C-102 Cast Plaster Revised for Star Window 1024

 

3C-103 Cast Plaster Base for Flagpole Staff 1025

 

3C-104 Plaster Mouldings 1028

 

3C-105 Plaster Cornice at Diorama Roof 1027

 

3C-106 Exterior Plaster Details at Main Entrance 1031

 

3C-107 Exterior Plaster Details at Arcade Entrance 1032

 

3C-108 Exterior Plaster Details at Court Entrance 1033

 

3C-109 Plaster Details Cloister Arch Piers 1034

 

3C-110 Entablature Profile 1026

 

3C-111 Rear Gable Brackets 1029

 

3C-112 Typical Welded Connections 1040

 

3C-113 Detail of Vertical Joint 1039

 

3A-3C-R1 Revisions - Exterior Walls 1023

 

Shasta Cascade Building

 

2A-1 First Floor Plan - Mezzanine Floor Plan - Details Schedules 90?,1453,1561

 

2A-2 Clerestory & Roof Plan - Court Wall plan - Details 889,1454,1562

 

2A-3 Elevations 888,1455,1563

 

2A-4 Sections - Court Wall Elevations Exterior Details 904,1456,1564

 

2A-5 Entrance Detils 887,1457,1563

 

2A-S1 Foundation Plan 892,1458,1566

 

2A-S2 Mezzanine Floor Framing Plan 894a&b,1459,1567

 

2A-S3 Roof Framing Plan 893,1460,1568

 

2A-S4 Pylon Framing Plan 895,1461,1569

 

2A-S5 Wall Details 896,1462,1570

 

2A-S6 Fence & Miscellaneous Details 897,1463,1571

 

2A-S7 Details 898,1464,1572

 

2A-C1 Plan & Details of Portico 899

 

2A-RS1 Revision - Foundation Plan Not received?

 

2A-RS2 Revision - Section 4 - sheet S4 902

 

2A-RS3 Dimensions at Entrance 901

 

2A-RS4 Revised Footings Not received?

 

2A-101 Detail of Letters on Pylon 891

 

2A-102 Reflection Half Plan of Marquee 903

 

No # Sketch of Parking Lot 890

 

Contract No. G-2 & P-1

 

San Francisco Building, Main Entrance to California Court and San Francisco Court

 

AX-1A Plot Plan 256,1618

 

3B-1 First Floor Plan 257,1105,1419

 

3B-2 Second Floor and Roof Plans 258,1104,1420

 

3B-3 Elevations and Details 259,1103,1421

 

3B-4 Elevations and Details 260,1102,1422

 

3B-5 Longitudinal Sections 261,1109,1423

 

3B-6 Transverse Sections 262,1106,1424

 

3B-7 Exterior Details 263,1101,1425

 

3B-8 Exterior Details 264,1112,1426

 

3B-9 Exterior Details 265,1111,1427

 

3B-10 Exterior Details 266,1113,1428

 

3B-11 Details - Main Stairway 267,1107,1429

 

3B-12 Miscellaneous Details 268,1108,1430

 

3B-EM1 Electrical and Plumbing Plan - see E-2 280,1442

 

3B-EM2 Electrical and Plumbing Plan - see E-2 281,1443

 

3B-S1 Foundation Plan 269,1115,1417,1616

 

3B-S2 Roof Framing Plan 270,1135,1432

 

3B-S3 Foundation Plan 271,1122,1433

 

3B-S4 First Floor Framing Plan 272,1118,1434

 

3B-S5 Second Floor Framing Plan 273,1121,1435

 

3B-S6 Ceiling Framing Plan 274,1096,1436

 

3B-S7 Roof Framing Plan 275,1116,1437

 

3B-S8 Truss Details 276,1117,1438

 

3B-S9 Details 277,1119,1439

 

3B-SX-1A Typical Details 279,1114,1441

 

3B-S10 Column Schedule and Details 278,1120,1440

 

3B-S101 Plywood Jointing Diagram 1110

 

3B-S102 Entrance on NE Elevation 1098

 

3B-S301 Sign on San Francisco Building 1097

 

E-2 Horizontal Force System 1100

 

3B-R1 Revisions at Terrace Doors 1133,1413

 

3B-R1 Vault Structure 1132

 

3B-R2 Revision to Marquee at Terrace 204 1134,1414

 

3B-RS1 Miscellaneous Revisions 1124

 

3B-RS2 Footing Details 1126

 

3B-RS3 Footing Details 1125

 

3B-RS4 Location of Columns 1128

 

3B-RS5 Wall Footings near California Court 1129

 

3B-RS6 2nd Floor Sheathing 1123

 

3B-RS7 Main Entrance to California Court 1131

 

3B-RS8 Main Entrance to California Court 1130

 

200 Canopy Details Not received?

 

1-S1 Pile Plan (Contract P-1) 1099,1416,1550

 

Contract No. G-3

 

California State Building

 

1-SX1 Typical Details 103

 

1-100 Conference Room 60

 

1-101 Office 260A-253-254 61

 

1-102 Governor's Suite 62

 

1-103 Powder Room 63

 

1-104 Reception Room #242 64

 

1-105 Men's Smoking Room #211 65

 

1-106 Meeting Room #233 66

 

1-107 Office #266 67

 

1-108 Office #257 68

 

1-109 Office #256 69

 

1-110 Auditorium #1 73

 

1-111 Reception Room #128 74

 

1-112 Women's Lounge 75

 

1-113 Green Room #141 46

 

1-114 Women's Lounge #112 47

 

1-115 Women's Restroom #167 48

 

1-116 Office #268 49

 

1-117 Office #270 50

 

1-118 Office #271 51

 

1-119 Office #264 52

 

1-120 Office #272 53

 

1-122 Office #262 54

 

1-124 Passage #255 76

 

1-125 Supplementary Drawing 102

 

1-126 Promenade Room #185 42

 

1-127 Ext. & Int. Door Frames 78

 

1-128 Auditorium #2 106

 

1-128 (rev) Supplementary Drawing to 1-125 107

 

1-128A Part 1st Floor Plan - Wall Locations 105

 

1-128B Part 2nd Floor Plan - Wall Locations 104

 

1-129 Entrance to Natural Resources 70

 

1-130 Kitchen #186 110

 

1-131 Ext. and Int. Details at Ballroom 84

 

1-132 Location of Lighting Fixtures 72

 

1-200 Typical Door and Base Details 59

 

1-201 Detail of Letters on Pylon 58

 

1-202 Wood Louvre Vent Detail 59

 

1-203 Glass and Wood Partition Between Rooms 254 and 260A 109

 

1-204 Location of Exit Boxes and Hose Reel Boxes 45

 

1-206 Detail of Wood Grille 41

 

1-219 (extra) Lettering - California State Building and Auditorium 56

 

1-RS1 Lateral Force System 80

 

1-RS2 Framing and Footing Details 101

 

1-RS3 Miscellaneous Details (dup. tracing) (1 tracing-no nameplate) 81, 82

 

1-RS4 Lintel Schedule - 1st Story Walls 85

 

1-RS5 Pylon Details 71a, b&c

 

1-RS6 Revisions 84

 

1-RS7 Lintel at Stair #10 92

 

1-RS8 Wall Details Cols. 90 - 98 90

 

1-RS8A Wall Section BB 55

 

1-RS9 Wall Connections SE & SW - Ballroom 108

 

1-RS10 Connections at NE Corner 99

 

1-RS11 Ballroom Roof Sections 97

 

1-RS12 End Detail Truss T13A 100

 

1-RS13 Balcony Joist Hold-Down 86

 

1-RS14 Bracing Walls 79

 

1-RS15 Balcony Hoist Hold-Down 87

 

1-RS16 Columns 74 and 75 Ties 89

 

1-RS17 Balcony Details 93

 

1-RS18 Connections 88

 

1-RS19 Diagonal Sheathing Details 96

 

1-RS20 Detail Entrance Lagoon Court 91

 

1-RS21 Pilaster Lagoon Court 98

 

1-RS22 Connection Details 77

 

1-RS23 D.S. Walls at Checkroom 83, 95

 

1-RS24 Ballroom Firestopping 23

 

1-211 Removable Loundspeaker Grille 44

 

1-SS Supplement to Special Footings for Cols. 90 and 93 Not received?

 

1-1 Plot Plan and Roof Plan 135, 220, 230, 282, 1523

 

1-2 Schedules and Typical Details 136, 221, 231, 283, 1524

 

1-3 First Floor Plan 137, 222, 232, 284, 1525

 

1-4 Second Floor Plan 138, 223, 233, 285, 1526

 

1-5 Main Elevations 139, 224, 234, 286, 1527

 

1-6 Court Elevations 140, 225, 235, 287, 1528

 

1-7 Sections 1, 141, 226, 236, 288, 1529

 

1-8 Exterior Details 2, 142, 227, 237, 289, 1530

 

1-9 Interior Stair Details 3 143, 228, 238, 290, 1531

 

1-10 Interior Room Details 4, 144, 229, 239, 291, 1532

 

1-S1 Foundation Plan 111, 198, 199, 203, 240, 292, 294

 

1-S2 First Floor Framing Plan 112, 201, 204, 241, 295, 1535

 

1-S3 Second Floor Framing Plan 116, 205, 242, 296, 1536

 

1-S4 Second Floor Ceiling 114, 206, 243, 297, 1537

 

1-S5 Roofing Framing Plan 115, 207, 244, 298

 

1-S6 Natural Resourced Wing - Framing Plans 126, 197, 208, 245, 299

 

1-S7 Details of Pylon 117, 209, 246, 300

 

1-S8 Foundation and First Floor Details 123, 210, 247, 301

 

1-S9 Second Floor Sections 122, 211, 248, 302

 

1-S10 Steel Details 118, 212, 249, 303

 

1-S11 Bracing Wall Details 121, 199, 213, 250, 293, 304

 

1-S12 Truss Details Ballroom 113, 214, 251, 305

 

1-S13 Truss Details Hall and Foyer 119, 215, 252, 306

 

1-S14 Truss Details Hall and Foyer 125, 216, 253, 307

 

1-S15 Truss Details Auditorium 120, 217, 254, 308

 

1-S16 Column Schedule and Details 124, 218, 255, 309

 

1-RS5A Auditorium No. 2 127

 

Contract No. G-4

 

Redwood Empire - Sacramento Valley and Mountain Counties Buildings

 

2B, C-M1 Plumbing Floor Plans and Plot Plan 1157, 1341, 1378

 

2B, C-SX1 Typical Details 1162, 1295, 1317, 1354

 

Redwood Empire Building

 

2B-1 First and Second Floor Plans 1271, 1297, 1318, 1348

 

2B-2 Elevations and Sections 1270, 1299, 1319, 1356

 

2B-3 Details of Wing A and Entrance #1 1303, 1320, 1357

 

2B-4 Details Center Angle Motif 1296, 1321, 1358

 

2B-5 Details Wing B 1300, 1322, 1359

 

2B-6 Details of Entrance #2 1293, 1323, 1360

 

2B-7 Stair and Miscellaneous Details 1292, 1324, 1361

 

2B-S1 Foundation and First Floor Framing Plan 1272, 1302, 1325, 1349, 1350, 1662

 

2B-S2 Second Floor Framing Plan 1273, 1287, 1326, 1363

 

2B-S3 Roof Framing Plan 1274, 1288, 1327, 1351

 

2B-S4 Wall and Pylon Details 1275, 1289, 1328, 1352

 

2B-S5 Stair Details 1276, 1290, 1329, 1366

 

2B-E1 Electrical Plan 1163, 1301, 1330, 1367

 

2B-M1 Plumbing Floor Plans 1164, 1291, 1331, 1368

 

2B-RS1 Lumber Grades 1343

 

2B-RS2 Footings for Entrance 1158, 1344

 

2B-RS3 Redwood Stump 1146, 1298

 

2B-400 Drapery Detail 1159

 

2B-RE1 Electrical Revision (2nd Floor) 1160, 1364

 

2B-RE2 Electrical Revision (Info. Office) 1161

 

Sacramento Valley and Mountain Counties Building

 

2C-1 First Floor, Mezzanine Floor and Roof Plans 1150,1332,1369

 

2C-2 Elevations and Sections-Stair Details 1149,1333,1370

 

2C-3 Exterior and Interior Details 1148,1334,1371

 

2C-4 Miscellaneous Details 1147,1335,1372

 

2C-S1 Foundation and First Floor Plans 1151,1336,1373

 

2C-S2 Roof and Mezzanine Framing Plans 1152,1337,1374

 

2C-S3 Pylon and Wall Details 1153,1338,1375

 

2C-S4 Stair, Wall Details 1154,1339,1376

 

2C-E1 Electrical Plan 1156,1340,1377

 

2C-RE1 Revision 1155,1345

 

2C-100 Metal Letters 1139

 

2C-101 Metal Letters 1140

 

2C-102 Metal Letters 1138

 

2C-103 Metal Letters Not received?

 

2C-104 Metal Letters 1136

 

2C-105 Exterior Wall Panel 1137

 

2C-106 Spacing for Wood Letters 1144

 

2C-R1 Revisions (Miscellaneous) 1145,1347

 

2C-R2 Revised Spandrels Below Windows 1142

 

2C-R3 Sketch of Exterior Wall Panel 1143,1342

 

Contract No. G-5

 

California Coliseum

 

6A-1 Ground Plan 687,1001,1383

 

6A-2 Seating Plan 997,1384

 

6A-3 Roof and Sections 1000,1385

 

6A-4 Elevations 998,1386

 

6A-5 Elevations - Details 1003,1387

 

6A-6 Elevations - Details 1004,1388

 

6A-7 Details 999,1389

 

6A-8 Details 1018,1390

 

6A-9 Details 1005,1391

 

6A-10 Wool Exhibit Plan 996

 

6A-11 Trophy Exhibit Booth 1007

 

6A-S1 Foundation and Bleacher Framing Plans 1017,1392

 

6A-S2 Roof and Wall Framing Plans 1016,1393

 

6A-S3 Purlin Trusses 1015,1394

 

6A-S4 Roof Trusses T1 and T3 1014,1395

 

6A-S5 Roof Trusses T2 and T4 1013,1396

 

6A-S6 Bleacher Details 687,1008,1397

 

6A-S7 Bleacher Details 1010,1398

 

6A-S8 Bleacher Details 1009,1399

 

6A-S9 Wall Framing Details 1012,1400

 

6A-S10 Wall Framing Details 1011,1401

 

6A-101 Detail of Plaster Shields Not receives?

 

6A-102 Connections for Letters 1019

 

6A-RS1 Truss Connections Not received?

 

6A-RS2 Footing Details Not received?

 

6A-RS3 End Bearing Detail Truss T3 1380

 

6A-RS4 Beam Connection Details Not received?

 

6A-RS5 Revised Box Detail 1002,1381

 

6A-RS6 Revised External Column Connections at Purlin Trusses Not received?

 

6A-RS7 Strut Connection Details at Columns 18A and 20A Not received?

 

6A-RS8 Revised Roof Framing Details Not received?

 

6A-RS9 Roof Details - West End Not received?

 

6A-RS10 Truss and Wall Framing Details Not received?

 

6A-RS11 Truss and Strut Details Not received?

 

6A-RS12 Roof Bracing at West Entrance Not received?

 

6A-RS13 Bleacher Details Not received?

 

6A-RS15 Plan of Arena 995

 

6A-RS16 Paving Details Not received?

 

AX-1D Plot Plan 1020,1382

 

Livestock Barns

 

6B-1 Floor and Roof Plans 760,1405

 

6B-2 Elevations and Details 751,1403

 

6B-3 Structural Details 752,1404

 

E-1 Cattle and Horse Barns 757

 

6B-101 Elevations of Letters 758

 

6B-R-101 Details of Letters Over Entrance #2 754

 

6B-RS1 Connection 6 × 20 Beam 755

 

6B-RS2 Entrance Details 753

 

6B-RS3 Girt Ties 1379

 

Contract No. G-6

 

Auditorium Building

 

AX1 Plot Plan 324,442,477

 

5-2 Schedule 327,443,478,687

 

5-3 First Floor 332,444,479,576

 

5-4 Second Floor 328,445,480

 

5-5 Roof 329,367,446,481

 

5-6 Elevations 333,447,482

 

5-7 Sections 330,448,483

 

5-8 Exterior Details - A 331,449,484

 

5-9 Exterior Details - B 334,450,485,687

 

5-10 Exterior Details - C 335,451,486,687

 

5-11 Interiors - D 336,452,487,687

 

5-12 Interiors - E 337,453,488,687

 

5-13 Interiors - F 338,454,489,687

 

5-14 Radio Studios, ets. 326,455,490,687

 

5-RS13 Offices - Second Floor 325,349

 

5-R16 Color Diagram for Seats Not received?

 

5-R17 Metal Grille and Speaker Opening 322

 

5-R18 Addition to Penthouse #203 323

 

5-S4 Sills, Pile Plan & Footings 321,363,422,424,425,459,494,686

 

5-S5 First Floor Framing Plan 364,460,495,577,686

 

5-S6 Second Floor Framing Plan 365,461,496,578,686

 

5-S7 Ceiling Framing Plan 367,462,497,579,686

 

5-S8 Girt Framing Plan 368,463,498,686

 

5-S9 Roof Framing Plan 369,464,499,580,686

 

5-S10 Roof Trusses 369,465,500

 

5-S11 Roof Trusses and Braced Frame 370,466,501,686

 

5-S12 Sill Details 372,467,512,686

 

5-S13 First Floor Details 373,468,503,686

 

5-S14 Wall Sections - Entrance Details 374,469,504,686

 

5-S15 Second Floor Details 375,470,505,686

 

5-S16 Roof Details 376,471,506,686

 

5-S17 Concrete and Miscellaneous Details 377,472,507,686

 

5-S18 Connections to Steel 378,433,473,508,686

 

5-S19 Column Schedule and Details 379,474,509,686

 

5-S20 Details 380,475,510,686

 

5-SX1 Typical Details 381,476,511

 

5-RS1 Connections of Wood Sills to Concrete Footings 351

 

5-RS2 Sill Details 355

 

5-RS3 Sill Details 356

 

5-RS4 Sill Details 357

 

5-RS5 Sill Details 358

 

5-RS6 Sill Details 360

 

5-RS7 Sill Details 350

 

5-RS8 Sill Connections 353

 

5-RS9 Framing Details 366,581

 

5-RS10 Sump Details 354

 

5-RS11 Balcony Details 359

 

5-RS12 Loudspeaker Framing 362

 

5-RS13 Girt Thrust Plate Connections 349

 

5-RS14 Blocking at Steel Tees 352

 

5-RS15 Arch Tie Adjustment 361

 

Contract No. G-7

 

San Joaquin Valley and Alta California Buildings

 

2D-1 Plans and Elevations 960,1509,1603

 

2D-2 Sections and Details 961,1510,1604

 

2D-S1 Floor Plans 962,1511

 

2D-S2 Truss and Details 963,1512

 

2D-101 Details of Letters 964

 

2D-RS1 Removable Plywood Panels 965

 

2D-RS2 Lower Chord Splice 967

 

2D-RS3 Fence Details 968

 

No # San Joaquin Valley Building Plan Not received?

 

No # San Joaquin Valley Building Elevations Not received?

 

2E-1 Plans and Elevations 969,1513,1607

 

2E-2 Sections and Details 970,1514,1608

 

2E-3 Miscellaneous Details 971,1515,1609

 

2E-S1 Floor Plans and Details 972,1516,1605

 

2E-S2 Details 973,1517,1606

 

2E-105 Spacing of Wood Letters 974

 

2E-106 Spacing of Metal Letters 975

 

2E-107 Additional Wood Letters 976

 

2E-R1 Details of Additional Office 977,1488,1489,1490

 

2E-RS1 Trellis Girder Splice 978

 

No # Main Floor Plan 979,981

 

No # Proposed Plan - Additional Office 98

 

Southern Counties Building - Mission Trails Wall

 

2-4-SX1 Typical Details 738,1578

 

4A-1 First Flooor Plan 725,1498,1592

 

4A-2 Mezzanine and Roof Plans 726,1499,1593

 

4A-3 Elevations and Details 727,1500,1594

 

4A-4 Sections 728,1501,1595

 

4A-5 Exterior Details 729,1502,1596

 

4A-6 Exterior Details 730,1503,1597

 

4A-S1 Foundation and First Floor Plan 721,1504,1598

 

4A-S2 Roof Plan 722,1505,1599

 

4A-S3 Mezzanine Floor Plan adn Details 723,1506

 

4A-S4 Details 724,1507

 

4A-102 Part Plan of Roof Over Foyer 736

 

4A-RS1 Details - Flagpole Base 741,1486

 

4A-RS2 Hold-down Footings No.s 65 and 66 735,1485

 

4A-RS3 Truss Connection Details 731,1484

 

4A-RS4 Revised Girt Connections 740,1483

 

4A-RS5 Revisions as Noted (Miscellaneous) 739,1487

 

4A-RS6 Mezzanine Floor Revision 742

 

4A-RS7 Girt Splice and Connections 734

 

4A-RS8 Sash Fasteners 733

 

No # Plan of Foyer 737

 

No # Detail of End Entrance Piers 732

 

3D-1 Plans, Elevations and Details 743,1508

 

Contract No. G-8

 

Dairy Products Building

 

9-1 Plans 538,815,1277

 

9-2 Elevations and Details 539,816,1278

 

9-3 Sections and Details 540,817,1279

 

9-4 Miscellaneous Details 541,821,1280

 

9-S1 First Floor and Foundation Plan 542,818,1281

 

9-S2 Roof Framing Plan 543,819,1282

 

9-S3 Truss Details 544,820,1283

 

9-SX1 Typical Details 545,822,1284

 

9-E1 Electrical Plan 546,823,1285

 

9-M1 Plumbing 547,824,1286

 

9-101 Plan of Typical Skylight 811

 

9-102 Details of Skylights 812

 

9-102 Elevations of Letters 813

 

9-103 Plot Plan Not received?

 

Contract No. G-9

 

Recreation Building

 

24-1 Plans 518,687,839

 

24-2 Elevations and Sections 519,687,840

 

24-3 Details 520,687,841

 

24-4 Details 521,687,842

 

24-5 Details 522,687,843

 

24-6 Details 523,687,844

 

24-7 Details 524,687,845

 

24-S1 Foundation & First Floor Framing 525,687,846

 

24-S2 Ceiling & Second Floor Framing 526,687,847

 

24-S3 Roof Framing 527,687,848

 

24-S4 Wall Details 528,687,849

 

24-S5 Column Schedule & Details 529,687,850

 

24-S6 Trusses & Details 530,687,851

 

24-S7 Details 531,687,852

 

24-SX1 Typical Details 532,853

 

24-101 Elevation of Letters 854

 

24-102 Details of Fronts for Dioramas 855

 

I Grading Plan 856

 

24-RS1 Proposed Property 857

 

Contract No. G-10

 

Agricultural Exhibit in Palace 7-A

 

20-1 Plans, Elevations & Details 748

 

20-2 Details 749

 

20-3 Light Trough Detail 746

 

20-8 Painting Diagram 744

 

20-R1 Revisions 747

 

C-4 Column Footing Detail 745

 

No # Details 750

 

Contract No. G-11

 

Floriculture Building

 

22-1 Plans 558, 1067, 1218, 1306

 

22-2 Elevations and Sections 559, 1066, 1219, 1307

 

22-3 Details 560, 1065, 1220, 1308

 

22-4 Details 561, 1073, 1221, 1309

 

22-S1 Foundation and First Floor 562, 1074, 1228, 1310

 

22-S2 Roof Framing 564, 1068, 1229, 1311

 

22-S3 Arch Details 565, 1069, 1230, 1305, 1312

 

22-S4 Wall Details 566, 1070, 1231, 1313

 

22-SX1 Typical Details 567, 1071, 1227, 1314

 

22-M1 Plumbing Plan 563, 1064, 1222, 1223, 1315

 

22-100 Details of Wood Trough 1052

 

22-101 Roof Truss Flashing 1053

 

22-102 Service Yard Plan 1055

 

22-103 Refrigerator Case 1005

 

22-104 Lettering 1063

 

22-R1 Revised Service Door Hinges 1072

 

22-RS1 Bolt Sizes at Arch Hip 1079, 1224

 

22-RS2 Revised Footing Detail 1080, 1226

 

22-RS3 Revision to Arch Footings 1075

 

22-RS4 Revised High Arch Lateral Bracing Connection 1078, 1225

 

22-RS5 Footing Detail 1076

 

FE-1 Flower Containers (2 drawings) 1092

 

FE-2 Display Benches and Plant Boxes 1061

 

FE-3 Metal Containers 1051

 

FE-4 Special Fixtures 1090

 

FE-5 Trellises and Lily Pool 1094

 

FE-6 Tree Boxes 1091

 

No # Trellis End Motif 1054

 

No # Orchid Pavilion 1056

 

No # Seat Design #1 1058

 

No # #2 Tree Box Detail 1059

 

No # #1 Shrub Box Detail 1057

 

No # Octagonal Unit - Back View 1086

 

No # Octagonal Unit - Outside Angle 1081

 

No # Octagonal Unit - Inside Angle 1087

 

No # Fountain Details 1085

 

No # Hedge Box Details 1084

 

No # Display Bench 1083

 

No # Study for Display Benches 1082

 

No # Display Layout Not received?

 

No # Display Study (no title) 1088

 

No # Proposed Horticulture Building 1089

 

No # Sketch of Outdoor Planning (no title) 1060

 

Contract No. G-12

 

Press Building

 

11-1 Plans 548, 616

 

11-2 Elevations 540, 615

 

11-3 Sections 550, 620

 

11-4 Details 551, 614

 

11-5 Details 552, 621

 

11-S1 Foundation and First Floor 553, 617

 

11-S2 Roof and Ceiling Framing 554, 619

 

11-SX-1 Typical Details 555, 623

 

11-E1 Electrical Plan 556, 622

 

11-M1 Plumbing & Heating Plan 557, 618

 

Contract No G-13

 

Coast Guard Building

 

29-1 Elevations & Sections 601, 831

 

29-2 Plans and Details 602, 832

 

29-3 Miscellaneous Details 603, 833

 

29-S1 Framing Plans 604, 834

 

29-SX1 Typical Details 605, 835

 

29-E1 Electrical Plan 606, 836

 

29-100 Wood Letters 830

 

29-R1 Revised Details of Section H-H and I-I 837

 

29-R2 Revisions in Lighting Panels 828

 

29A-S1 Dolphins 838

 

29-RS2 Meter Box for Pavilion A 827

 

29-RS3 Gangplank 829

 

No # Blueprints of Original Plans from Federal Government 825, 826

 

Contract No. G-15

 

Paving Plans

 

10-1 California Court 1188, 1232

 

10-2 Shasta-Cascade and Redwood Empire Courts 583, 1192, 1233

 

10-3 Sacramento Valley and Tahoe Region Courts 584, 1177, 1234

 

10-4 Alta California and San Joaquin Valley Courts 585, 1181, 1235

 

10-5 Mission Trails Court 586, 1182, 1236

 

10-6 Southern Counties Court 587, 1180, 1237

 

10-7 Floriculture Court 588, 1178, 1238

 

Paving Plan - San Francisco Court 589, 1168

 

Plot Plans - Flagpoles - etc.

 

A9-2 Master Plan - S.F. showing Trees and Not received?

 

D-101 Plot Plan Entire Island Not received?

 

AX-1 Plot Plan - Contract G1 1187

 

AX-1A Plot plan - Contract G2 1176

 

C Preliminary Plot Plan - State Areas (2-3-38) 1186

 

No # Plot Plan - State Areas 1185

 

No # Plot Plan - Master Plan of State Properties 1174

 

A Landscape Plot Plan (dup. tracing) 1173

 

AX-1B Plot Plan - Contract G-4 1172

 

No # Plot Plan of Property Areas (5-21-38) 1175

 

No # Key Plan of the Grounds (1 Neg., 2 dup. tracings) Not received?

 

10-F2 Concrete Footings for Flagpoles 1167

 

F-1 Flagpole Details - Lagoon Area 1184

 

Z-101 Flagpole in Ave 15 1171

 

T-10 Lagoon Area - Detail of Flag Locations 1169

 

10A-1 Lath House 1191

 

T-11 Storage Shed 1170

 

Contract No. M-1

 

Alameda-Contra Costa Building

 

3A-M1 Plumbing and Ventilating Plan 984

 

Mission Trails Building

 

3C-M1 Plumbing Plan 986,1445

 

Shasta-Cascade Building

 

2A-M1 Plumbing Plan 985,1446

 

Contract No. M-5

 

California Coliseum

 

6A-M1 Plumbing Floor Plan 987,1406

 

6A-M2 Plumbing Roof Plan - Details and Plot Plan 988,1407

 

6A-M3 Gas Piping Layout and Extensions 990

 

6A-MX Plan of Facilities in Vicinity of Livestock Show 989

 

Livestock Barn

 

6B-M1 Plumbing - First Floor Plan - Details 994,1408

 

6B-M2 Heater Room Details 983

 

Street Mains - Etc.

 

D-2 Extensions of Street Mains for State Buildings 992

 

D-6 Extensions of Street Mains for State Buildings 982

 

D-6-1 Plan of Street Mains 991

 

D-7 Extension of Street Mains at State Buildings 993

 

Contract No. M-3

 

California State Building

 

1-M1 First Floor Plan 132

 

1-M2 Second Floor Plan 131

 

1-M3 Roof, Details and Plot Plan 130

 

1-M4 Hot Water Extensions 133

 

C-5 Diagram of ADT Boxes 134

 

1-M1)128

 

1-M2) Negatives for Revisions 129

 

Contract No. M-6

 

Auditorium Building

 

5-M1 First Floor Plan - Plumbing - Heating - Ventilating 341,434,512,533,582

 

5-M2 Second Floor Plan - Plumbing - Heating - Ventilating 342,435,513,534

 

5-M3 Roof Plan - Plumbing - Heating - Ventilating 343,426,436,514,535

 

5-M4 Details - Plumbing - Heating - Ventilating 344,427,437,515,536

 

5-M5 Revisions for Master Control Suite 340

 

5-M6 Bilge Pump Sump Location 339,439

 

5-EM21 Offices - 2nd Floor 345

 

No # Plan of Sprinkler Supply Mains Not received?

 

Contract No. M-7

 

Southern Counties Building

 

4A-M1 Plumbing 346

 

4A-M2 Location of Fistures Not received?

 

San Joaquin Valley and Alta California Buildings

 

2D, 2E-M1 Plumbing 348

 

Contract No. M-9

 

Recreation Building

 

24-M1 Plumbing - Heating - Ventilating 347,517

 

Contract No. F-3

 

California State Building

 

1-1 Door and Finish Scheduled and Trim Details 24,1523

 

1-2 First Floor Plan 25,1524

 

1-3 Second Floor Plan 26,1525

 

1-4 Stairs and Toilets 27,1526

 

1-5 State Ballroom and Reception Room 28,1527

 

1-6 State Hall 29,1528

 

1-7 Auditorium and Peace Hall 1529

 

1-8 Women's Lounge, Dining Room and Promenade 1530

 

1-9 Governor's Suite and Dining Room 1531

 

1-10 Typical Offices and Secondary Rooms 1532

 

1-11 Typical Offices and Secondary Rooms 5,1533

 

1-12 Diorama Room and Typical Details 6,1534

 

Miscellaneous Drawings

 

1-133 Screen Detail - Auditorium #1 9

 

1-134 Silver Screen Detail - Auditorium #1 10

 

10-100 Detail of Tree Boxes in California Courtj 7

 

1-205 Detail of Recessed Lights in Powder Room #113 11

 

1-207 Location of Flush Type Light Boxes 12,21

 

1-209 Detail Change in Room #162 16

 

1-210 Ceiling Lights in Diorama Room #162 17

 

1-212 Passage and Stair Revisions 18

 

1-213 Stair Sections 14

 

1-213 Ballroom Details 13

 

1-214 State Court and Steps Revised 19

 

1-215 Speaker Details in Ballroom 15

 

1-216 Mural Outline for Ballroom 22

 

1-217 Pedestal for National Guard Statue Group 20

 

1-218 Light Shield Ceiling Cove - State Hall 8

 

Contract No. F-6

 

Auditorium Building

 

5-A1 First Floor Plan 313,570

 

5-A2 Second Floor Plan 314,571

 

5-A3 Sections 315,572

 

5-A4 Auditorium Details 316,573

 

5-A5 Radio Studios 311,574

 

5-A6 Radio Studio Details 312,575

 

Floodlighting

 

10-EA Floodlighting Plan 868

 

10-E1 Shasta and State Buildings 869

 

10-E2 Mission Trails Court (missing) 870

 

10-E3 State Building and Ave K 871

 

10-E4 San Francisco Building - West Side 872

 

10-E5 Alta California and Alameda Buildings 873

 

10-E6 California Court 874

 

10-E7 State Court and Alameda Building 875

 

10-E10 Auditorium - West 879

 

10-E11 Auditorium - South and East 880

 

10-E12 Sacramento Court 881

 

10-E13 Shasta-Cascade Court 882

 

10-E14 Southern Counties Court 883

 

10-E15 San Francisco Court 884

 

10-E16 Floodlighting for Entrance to California Court 885

 

10-E17 Floodlight Mountings 877

 

10-DE1 Light Standards for Courts 878

 

T-14 Cel-o-glass Fixtures for Light Standards 876

 

C-17 Light Boxes on Marquees Not received?

 

Miscellaneous Drawings

 

B20 Court of Great Seal - Wooden Shelves for Flowerpots 694

 

B21 Southern Counties Court Covering to Openings in Plywood Gates 695

 

B22 Room Signs for California Building 696

 

C3 Blueprint Rack 697

 

D1 Location of Storm Sewer on Relocated Ave. K 698

 

D2 Typical Truss Details - County Building 699

 

D3 Location of Sanitary Sewer on Relocated 700

 

D4 Test Borings 701

 

D5 Plywood Test Panels 702

 

D10 Court of National Flagpoles 703

 

D12 California Auditorium Canvas Screens for Portico 704

 

D13 Restaurant on 2nd Floor - California State Building 705

 

D14 California Auditorium - Canvas Awnings at Radio Studio Windows 706

 

Landscaping

 

1 Corner of Aves. K & 16 916

 

2 Ave. 16 - Lath House 917

 

3 Ave. K - North 918

 

4 Front of San Francisco and State Buildings 919

 

4A Mission Trails Garden 920

 

5 Ave. K - South 921

 

6 Ave. K - East 922

 

7 California Court 923

 

8 Rear of Mission Trails - Ave. 3 924

 

8A Mission Trails Building 725

 

9A Sacramento Valley Building 926

 

9B Alta California Building 927

 

9C San Joaquin Valley Building 915

 

10 Garden for Floriculture Building 928

 

10A Southern Counties Court 914

 

11 Southern Counties Building 913

 

12 State Auditorium Along Ave. K 912

 

13 State Auditorium Along Lagoon 932

 

14 California Court - Rotunda - Outdoor Theatre 931

 

15 Lath House Corner Ave. 11 and Ave. J 930

 

A Landscape Plot Plan 934

 

E-3 Service Road Ave. 16 906

 

II Redwood Empire 910

 

No # Proprosed Development Around Sacramento Valley Not received?

 

No # Alta California - San Joaquin Buildings 933

 

No # Garden Study (California Court) 929

 

No # Dairy Products Building Landscaping 911

 

No # San Francisco Court - Preliminary Study 905

 

Contract No. E-1

 

Alameda-Contra Costa Building

 

3A-E1 Electrical Plan 1196

 

3A-E2 Column Lights 1197

 

3A-SE1 Alameda-Contra Costa Court 1193

 

Mission Trails Building

 

3C-E1 Electrical Plan 1195

 

Shasta-Cascade Building

 

2A-E1 Electrical Plan 1194

 

Contract No. E-2

 

San Francisco Building - Main Entrance to California Court and Appurtenances

 

3B-EM1 Electrical and Plumbing Plan - 1st Floor 1202

 

3B-EM2 Electrical and Plumbing Plan - 2nd Floor 1203

 

3B-RE2 Additional Conduit and Switches for Floodlighting 1201

 

3B-REM1 Distribution Center Switches 1198

 

Contract No. E-5

 

California Coliseum

 

6A-E1 Electrical Plan - Ground Floor 1205

 

6A-E2 Electrical Plan - Upper Levels 1206

 

6A-RE1 Service Conduit Detail 1199

 

6A-SE1 Electrical Additions 1204

 

6A-SE3 Overhead Light Elevations 1200

 

Livestock Barn

 

6B-E1 Electrical Plan 1207

 

Contract No. E-3

 

California State Building

 

1-E1 First Floor Plan 37, 170

 

1-E2 Second Floor Plan 36, 171

 

1-E3 Roof Plan - Details - Plot Plan 38, 172

 

1-SE1 Electrical Plan, Supplement to Drawing #1-E1 40, 173

 

1-SE2 Electrical Plan, Supplement to Drawing #1-E2 39, 174

 

1-SE3 Detail of Lights on Stairs 9 and 9A 32

 

1-SE4 Additions - Rooms 160-166-175 Not received?

 

1-SE5 Revisions - Rooms 141-175-187 Not received?

 

1-SE6 Change in Emergency Lights 31

 

1-SE7 AC Feed for P.A. Speakers Not received?

 

1-SE10 Electrical Work Projection Room Not received?

 

Contract No. E-3F

 

California State Building

 

1-EF1 Fixture Plan - First Floor 35, 590

 

1-EF2 Fixture Plan - Second Floor 34, 591

 

1-EF3 Fixture Details 33, 592

 

1-EF4 Recessed Ceiling in State Hall 30

 

Contract No. E-6

 

Auditorium Building

 

5-E1 Electrical Plan - First Floor 396, 414, 593

 

5-E2 Electrical Plan - Second Floor 397, 415, 594

 

5-E3 Electrical Plan - Radio Conduit (Also dup. rev.) 399, 404, 411, 416, 595

 

5-E4 Electrical Details 400, 417, 596

 

5-E5 Fixture Plan - First Floor 401, 418, 597

 

5-E6 Dixture Plan - Second Floor 402, 419, 598

 

5-E7 Electrical Plan - Roof 403, 420, 599

 

5-E8 Electrical Fixtures - Details 395, 421, 600

 

5-E9 Electrical and Radio Conduit Plan 386, 413

 

5-E11 Organ Wiring Plan 386

 

5-E12 Independent Feed for Normally ON Neon Lighting 394

 

5-E13 Revised Location of Stage Pockets 388

 

5-E14 Electrical Plan - Revision 391

 

5-E16 Radio Conduit Plan - Rooms 111 to 114A 389

 

5-E17 Additional ON AIR Sign 385

 

5-E18 Detail ON AIR Sign 387

 

5-E19 Additional Emergency Lights in Toilets 382

 

5-E20 Additional Telephone Conduit 383

 

5-E22 A.C. Feed for P.A. Loudspeakers 384

 

5-SE9 Transformer Vault - Bolt Placing and Hole Detail 390

 

5-EXE11 Organ Chamber - Electrical Plan 392

 

5-EX15 Organ Chamber - Details 393

 

Radio - Project #23

 

23-1 Radio Equipment - Block Diagram and Rack Layout 406

 

23-2 Sound System - Block Diagram 407, 409

 

23-3 Sound System - Block Schematic and Plan 408

 

23-4 California Coliseum - Sound System 405

 

23-5 Radio Technical Equipment - Setting Diagram 406

 

No # 3 Negatives of Auditorium and Radio tracing Not received?

 

Contract No. E-7

 

Southern Counties Building

 

4A-E1 Electrical Plan (neg.) 866

 

4A-E1 Electrical Plan (Revised) 865

 

San Joaquin Valley & Alta California Buildings

 

2D-2E-E1 Electrical Plan

 

Contract No. E-9

 

Recreation Building

 

24-E1 Electrical Plan 516

 

24-RE1 Electrical Plan Revision 863

 

24-RE3 Electrical Changes 859

 

24-SE5 Electrical Additions 858

 

24-E4 Additional Outlets Not received?

 

Contract No. E-11

 

Floriculture Building

 

22-E1 Electrical Plan Not received?

 

22-E2 Electrical Changes Not received?

 

22-E3 Additional Outlets Not received?

 

California State Building

 

No # Full Size Slab Seal 1208a & b

 

Press Building

 

3004T Contract No.h233-PR 1996-1/24/39 Plan of Kitchen 624

 

A-1 Plans, Details and Schedules 625

 

A-2 Elevations and Details 626

 

A-3 Interiors and Details 627

 

S-1 Structural Plans and Details 628

 

S-2 Typical Construction Details 629

 

M-1 Mechanical Plans 631

 

M-1-R Revised Heating Plan 630,632

 

E-1 Electrical Plans 633

 

Treasure Mountain - Mining Exhibit

 

4 Longitudinal & Cross Section 643,1209

 

2 Second Floor Plan 641,1210

 

6 Glass-Elevations & Details 645,1211

 

1 First Floor Plan 640,1212

 

7 Lecture Hall Details 646,1213

 

3 First Floor Elevations 642,1214

 

5 Transverse Sections 644,1215

 

No # Pencil Sketch - Light Fixture 1252

 

No # Electrical Layout - Lighting - Outlet 1253

 

2 Electrical Layout - General & Emergency Lighting - 2nd Floor 1254

 

2 (rev) Electrical Layout - 2nd Floor Plan 1255

 

No # Section Elevation & Plan - Typical Exhibit Case 1256,1257

 

3 Elevations - Details - 1st Floor 1258

 

Miscellaneous Drawings

 

5-S1 Framing 318,456,491

 

5-S2 Details 319,431,457,492

 

5-S3 Trusses 320,432,458,493

 

5-R1 Supplemental Drawing 317

 

5-M 1st Floor Plan 582

 

1 Sx1 Typical Details 219,256,310

 

1RS2 Details 200

 

1-125 Supplemental 202

 

1-S8(1) Special Footings 43

 

1-RS-3 Miscellaneous Details 82

 

1-207 (FE) Floor Check Details 21

 

5-S-18 Connections 433

 

5-SE-10 Electrical Work - Projection Room 1127

 

2-C-105 Wall Panel 1141

 

No # Plot Plan - Entire Island (VanDykes) 1165,1166,1174,1183,1189,1190

 

No # California Counties tracings 681,682

 

No # Plans - Elevations & Sections - San Joaquin Pylon - Blueprint 2DA2 677

 

No # Plans - Elevations & Sections - Calif. Counties Pylon - Blueprint 1A1 678

 

No # Plot Plan - Treasure Island - Key Plan of the Grounds Drawing No. 101 679

 

No # Canopy Details - Entrance to California Court Drawing No. 200 680

 

California Highway Department Miniature Highway Display, 1912-1939

 

No # Master Sheet-Scale Drawing of Display 1412

 

No # 4 Full size Drawings - Model of Cloverleaf Interchange 1412

 

No # 1 Half Scale Drawing of Entire Display 1412

 

No # Drawing Showing Sections & Profiles at Various Stations. 1412

 

Western States Map Pit

 

27Sx1 Typical Details 569,671

 

27S1 Plans & Details 568,673,675,676

 

27R1 Revisions 672

 

27E1 Electrical Plan 674

 

Treasure Mountain - Mining Exhibit

 

1 Plot Plan 640

 

2 2nd Floor Plan 641

 

3 1st Floor Elevations 642

 

4 Cross Sections 643

 

5 Transverse Sections 644

 

6 Details 645

 

7 Lecture Hall Details 646

 

No # Plot Plan 657

 

No # Overlay 656

 

No # Plan - Elevations - Sections 1½"=1'0" 655

 

No # Exhibit Case, Plans - Elevations & Sections 658

 

No # Treasure Mountain - 2nd Floor Revisions 8/2/38 647

 

No # Mining Exhibit - Alternate Scheme 648

 

No # Plan Veiw - 1st Floor 649

 

No # Second Floor Plan 650

 

No # Revised 1st Floor Plan - August 26th 1938 651

 

No # Sectional Contour Plans ¼"=1'0" 652

 

No # Longitudinal Contour Plans ¼"=1'0" 653

 

No # Isometric View of 1st Floor 654a & b

 

Agricultural Exhibit - In Palace 7-A

 

20-1 Plan - Elevations & Details 1259

 

20-2 Details 1260

 

Redwood Empire Building

 

B2 Elevations & Sections 1270

 

B1 First & Second Floor Plans 1271

 

BS1 Foundation and First Floor Framing Plans 1272

 

BS2 Second Floor Framing Plan 1273

 

BS3 Roof Framing Plan 1274

 

BS4 Wall & Pylon Details 1275

 

BS5 Stair Details 1276

 

Sacramento Valley Building

 

No # Shasta - Cascade Exterior Court - Plan Showing - Location of Hose Bibs and Water Lines 1261

 

D-8 Plumbing & Grade Plan - Mission Trails Gardens 1262

 

D-9 Garden Grades & Piping - Mission Trails Building 1263

 

D-10 Garden Piping Plan - California Court 1264

 

D-11 Garden Piping Plan 1265

 

D-12 Garden Piping Plan 1266

 

D-13 Garden Piping Plan - Avenue 15 1267

 

D-14 Landscape Plot Plan - Master Garden Piping Plan 1268

 

D-15 Sacramento Valley Building 1269

 

Miscellaneous Drawings

 

No # Sketch of Partition in Office 761

 

No # Staffing Diagram 762

 

No # Staffing Diagram - Industrial West Inc. 763

 

No # Details & Sections - Wood & Concrete Flagpole Base 764

 

No # Floorplan - Diorama Layout - Panorama Building 765

 

No # Typical Toilet Stall 766

 

No # Sketch - San Francisco Court-Oriental 767

 

No # Details - Steel Truss - T13 - Reinforcing 768

 

No # Details - Steel Truss - T13 - Hole Detail 769

 

No # New Hood & Glass Partition 770

 

No # West Elevation - California Auditorium 771

 

No # West Elevation - Californis Auditorium 772

 

No # Ballroom - Temporary Seating Arrangement 773

 

No # Plan of Entrance - Reception Room & Stairs 774

 

No # Location of Entrances, State Ballroom & Auditorium 775

 

No # Roof Diagram 776

 

No # Roof Framing 777

 

No # Mullion Details - Various Buildings 778

 

No # Sculpture for Pylon - Entrance to California Court from Avenue L 779

 

No # Diagram Showing Location of Sculpture 780

 

No # Sketch of Flagpole Locations 781

 

No # Sketch of Reception Room 782

 

No # Sketch of Reception Room 783

 

No # Sketch of Flagpole & Flag Array 784

 

No # Sketch of Flagpole & Flag Array 785

 

No # Sketch or tracing - 2nd Floor Plan - California State Building 786

 

No # 1st Floor Plan - California State Building 787

 

No # Wind Load Stresses on Trusses (Kips and Tension) 788

 

No # Dead Load Factors - Roof 789

 

No # Full Live Load on Auditorium Roof and Tensions 790

 

No # Corrected Wind Load Calculations in 8' Added Parapet on Auditoriom 791

 

No # Dead Load Stresses, including Exterior Wall & Furring 792

 

No # Engineering Schematic Showing Wind Load Live Load One Side & Both Sides 793

 

No # Hinge at Bottom Chord 794

 

No # Dead Load Stresses 795

 

No # Final Design Stresses Revised 796

 

No # Earthquake Forces on Arches 797

 

No # Superseded Drawing on Wind Loads 798

 

No # Superseded Drawing on Wind Loads 799

 

No # Reactions at H to Dead Loads, Live Loads & Wind Loads - Lower Chord 800

 

No # Earthquake Forces on Arches 801

 

No # Reflection of Arch Tie 802

 

No # Reactions - Arches - Work Sheet 803

 

No # Reactions - at Various Stations on Arch 804

 

No # Wind Stresses on Arches - Distribution of Thrust of Arches 805

 

No # Purlin Truss - Dead Load Stress at 5[UNK] 0" Depth & 6[UNK] 0" Depth 806

 

No # Stresses for Wind Loads on Stage End 807

 

No # Preliminary Studies - California Building - New York Worlds Fair 808

 

No # Untitled Pencil Sketch 809

 

San Joaquin Valley Building

 

Miscellaneous Drawings

 

2D-2 Secion & Details 960

 

2D-RS4 Roof Plan 970

 

2D-RS3 Fence Details 971

 

2D-RS1 Remivable Plywood Panels 972

 

2D-101 Details of Letters 973

 

No # Drawing By Ernest Born (Architect) 974, 975

 

2D-S1 Floor Plans 976

 

2D-S2 Truss & Details 977

 

2D-1 Plans & Elevations 981

 

Alta California Building

 

Miscellaneous Drawings

 

RS-1 Trellis Girder Solice 961

 

2ER-1 Details of Additional Office 962

 

2E-107 Additional Wood Letters 963

 

2E-105 Spacing of Wood Letters 964

 

No # Proposed Plan Additional Office Space 965

 

No # Main Floor Plan 966

 

2E-106 Details of Spacing for Medal Letters 967

 

2E-S2 Details 968

 

2E-S1 Floor Plans & Details 969

 

2E-3 Miscellaneous Details 978

 

2E-2 Sections & Details 979

 

2E-1 Plans & Elevations 980

 

Miscellaneous Drawings - Various Contracts

 

AX1B Plot Plan 1294,1316,1353

 

22S3 Revised Arch Details (Floriculture) 1305

 

22E1 Electrical Plan 1304

 

2BS1 Revised Drawing 1350,1362

 

2BS3 Roof Framing Plan 1364

 

2BS4 Details 1365

 

GABSX1 Details - California Col. & Livestock Barn 759,1402

 

AX1 Plot Plan 1443(1),1447,1451,1551,1555,1559

 

AX2 Details 1452,1560

 

2AE1 Electrical Plan 1450,1558

 

3AE1 Electrical Plan 1448,1556

 

AX1C Plot Plan 1491,1494,1497,1544,1547

 

2D-2E-M1 Plumbing 1493,1549

 

2D-2E-E1 Electrical Plan 1496,1546

 

4AM2 Plumbing 1492

 

4AE1 Electrical Plan 1495

 

1X1 Alterations & Additions 1519

 

1X2 Alterations & Additions 1520

 

1X3 Alterations & Additions 1521

 

1X4 Alterations & Additions 1522

 

6AE1 Electrical 1538

 

6AE2 Electrical 1539

 

6BE1 Electrical 1540

 

6AM1 Plumbing 1541

 

6AM2 Plumbing 1542

 

6EM1 Plumbing 1543

 

4AE1 Electrical Plan 1545

 

4AM1 Plumbing 1548

 

24SX1 Typical Details 1610

 

5AX1 Plot Plan 1611

 

5S1 Framing 1612

 

5S2 Details 1613

 

5S3 Trusses 1614

 

5S4 Pile Plan 1615

 

5AX1 Plot 1617

 

2AM1 Plumbing 1554

 

3AM1 Plumbing & Ventilating Plan 1352

 

3BEM1 Electrical & Plumbing 1619

 

3BEM2 Electrical & Plumbing 1620

 

AX1A Plot Plan 1618

 

3D1 Mission Trails Wall 1602

 

CM1 Plumbing 1553

 

3CE1 Electrical 1557

 

SRS9 Framing Details 366,581

 

2-D-A-2 Plans - Elevaitons & Sections - San Joaquin Pylon (Blueprint) 677

 

1-A-1 Plans - Sections & Elevations - California Counties Pylon (Blueprint) 678

 

D-101 Plot Plan - Treasure Island - Key Plan of the Grounds 679

 

200 Canopy Details - Entrance to Calif. 680

 

No # Wall & Column Loads 607 a&b,608 a&b,609 a&b

 

No # Load for Ceiling Joist 610 a&b,611 a&b

 

No # Brads for Bracing 612

 

No # Loads Above 1st Floor 613

 

Western States Map Pit

 

27SX1 Typical Details 669,671

 

27S1 Plans & Details 670,673,675,676

 

27R1 Revised Section 672

 

27E1 Electrical Plan 674

 

California State Building

 

Interior Decorations (Furnishings)

 

1 Ballroom 1239

 

2 Ballroom Balcony 1240

 

3 Foyer 1241

 

4 Green Room & Women's Rest Room 1242

 

5 Promenade 1243

 

6 Powder Room & women's Lounge 1244

 

7 Men's Smoking Room 1245

 

8 Women's Lounge 1246

 

9 Reception Room 1247

 

10 Conference Room 1248

 

11 Governor's Reception Room 1249

 

12 Waiting Room & Passage - Governor's State Rooms 1250

 

13 Governor's Private Office 1251

 

Miscellaneous Drawings

 

T-5 Plan of Ballroom & Reception Room 693,713

 

T-1 Typical Detail of Recess for Hose Rack 707

 

T-2 Typical Roof Hose Rack Box 708

 

T-15 Frame for Oil Painting 709

 

T-13 Proposed Addition - Ballroom (void) 710

 

T-4 Paneled Entrance to Natural Resources Building 711

 

T-101 Painted Sign for Buildings Sponsored by Comm. 712

 

T-6 Ballroom Balcony 714,715

 

T-7 Furniture Layout - State Hall 716

 

T-3 Plan of Ballroom & Reception Room - Loudspeaker & Scuttle Detail 717,720

 

T-12 California Legislature Dinner 719

 

Panama-Pacific International Exposition San Francisco, California

 

S-1 Framing Plan 155,680(1)

 

S-2 Framing Plan 154,681(1)

 

S-3 Framing Plan 149,682(1)

 

S-4 Details - Footings & Transformer 148,683(1)

 

S-5 Trusses 147,684(1)

 

S-6 Trusses 146,685(1)

 

S-14 Details 169

 

S-21 Details 161,674(1)

 

S-22 Framing 160,675(1)

 

S-25 Alternative Design 157,678(1)

 

X Index 156,679(1)

 

No # No Description 145

 

S-10 Trusses 150,689(1)

 

S-9 Trusses 151,688(1)

 

S-8 Trusses 152,687(1)

 

S-7 Trusses 153,686(1)

 

S-23 Framing Details 159

 

S-20 Framing Details 162,673(1)

 

S-19 Framing Details 163,672(1)

 

S-18 Framing Details 164,671(1)

 

S-17 Framing Details 165,670(1)

 

S-16 Framing Details 166,689(1)

 

S-15 Framing Details 167,688(1)

 

S-14 Framing Details 168,693(1)

 

S-24 Framing Details 158,677(1)

 

S-11 Trusses 690(1)

 

S-12 Framing Details 691(1)

 

S-13 Framing Details 692(1)