| 1 of 2 pages |
Inventory of the Project Files of the Campus Architects & Engineers, 1945-1980
Restrictions on Use and Reproduction
Container List
Project Number: 946210 ABSORPTION REHABILITATION
Project Number: 940070 ACKERMAN UNION ALTERATIONS
Project Number: 946380 ACKERMAN UNION MAINTENANCE CONSTRUCTION
Project Number: 947066 ACKERMAN UNION MEN'S LOUNGE
Project Number: 947065 ACKERMAN UNION TERRACE ROOM ALTS
Project Number: 947067 ACKERMAN UNION WOMEN'S LOUNGE
Project Number: 80020 & 80021 ACKERMAN UNION
Project Number: 946450 AIR CONDITIONING EXPANSION
Project Number: 947027 AMPITHEATRE DRIVE SITE DEVELOPMENT
Project Number: 947121 ANDERSON GSM ALTERATIONS
Project Number: 947056 ANDERSON GSM CLASSROOM ALTERATIONS
Project Number: 947032 ANDERSON GSM CLASSROOM ALTS
Project Number: 947096 ANDERSON GSM CLASSROOM RENOVATIONS
Project Number: 992300 ANDERSON GSM LANDSCAPING AND SPRINKLERS
Project Number: 947063 ANDERSON GSM LANDSCAPING
Project Number: 947078 ANDERSON GSM LEARNING CENTER
Project Number: 947089 ANDERSON GSM STUDENT AFFAIRS
Project Number: 947134 ASUCLA-LAW FOOD SERVICE FACILITY
BASEBALL FACILITY RELOCATION
Project Number: 940380 BOAT HOUSE EXPANSION
Project Number: 940490 BOAT HOUSE
Project Number: 947130 BOATHOUSE DOCK REPAIRS
Project Number: 947117 BOELTER HALL ACID WASTE SYSTEM
Project Number: 946170 BOELTER HALL CLASSROOM CONVERSION
Project Number: 947012 BOELTER HALL CLASSROOM CONVERSIONS
Project Number: 947088 BOELTER HALL ELEVATOR ALTS
Project Number: 946910 BOELTER HALL MATH CLASSROOM ALTERATIONS
Project Number: 946440 BOELTER HALL OFFICE ALTERATIQNS
Project Number: 947035 BOELTER HALL PARTITION CONSTRUCTION
Project Number: 947057 BOELTER HALL ROOM ALTS TO 1667-4538
Project Number: 992900 BOELTER HALL UNIT 3
Project Number: 947007 BOELTER HALL VACUUM SYSTEM
Project Number: 947072 BOELTER HALL YORK UNIT INSTALLATION
Project Number: 940990 BOTANICAL GARDENS DRAINAGE
Project Number: 945850 BOTANY BUILDING ALTERATIONS
Project Number: 947018 BOTANY BUILDING ALTERATIONS
Project Number: 946140 BOTANY BUILDING CLASSROOM CONVERSION
Project Number: 947130 BOTANY BUILDING REPAIRS
Project Number: 89130 BOTANY BUILDING
Project Number: 946560 BUILDING DEMOLITION #TB6A
BUNCHE HALL CLASSROOM ALTS (2225) 1964-1966
Project Number: 941250 BUNCHE HALL ELEVATOR ADDITION
Project Number: 946360 CABLE EXPANSION, CAMPUS PROGRAM
Project Number: 940910 CAMPBELL HALL ALTERATIONS
Project Number: 941500 CAMPBELL HALL ALTERATIONS
Project Number: 947024 CAMPBELL HALL HOUSING OFFICE ALTERATIONS
Project Number: 940080 CAMPUS ELECTRICAL SYSTEM EXPANSION
Project Number: 84007 CAMPUS MAP REVISION
Project Number: 940030 CAMPUS STOREHOUSE BUILDING CONVERSION
Project Number: 940420 CENTRAL CAMPUS SITE DEVELOPMENT PHASE II
Project Number: 940410 & 940140 CENTRAL CAMPUS UTILITIES
Project Number: 947006 CHEMICAL FUME HOODS, GENERAL CAMPUS
Project Number: 994700 CHEMISTRY-GEOLOGY BUILDING ADDITION 1
Project Number: 940160 CHEMISTRY-GEOLOGY BUILDING ALTERATIONS
Project Number: 940710 CHEMISTRY-GEOLOGY BUILDING ALTS. STEP 2
Project Number: 940960 CLARK LIBRARY ALTERATIONS
Project Number: 948800 CLARK LIBRARY ALTERATIONS
Project Number: 947048 CLARK LIBRARY OUTDOOR LIGHTING
Project Number: 84510 CLARK LIBRARY
Project Number: 941440 CLASSROOM CONVERSIONS TO OFFICES
Project Number: 940340 COMPUTER 7090
Project Number: 947046 COOLING TOWERS, GENERAL CAMPUS
Project Number: 940270 CYCLOTRON BUILDING ADDITION
Project Number: 941110 CYCLOTRON BUILDING ADDITION
Project Number: 946750 CYCLOTRON TRANSFORMER INSTALLATION
Project Number: 948801 DEMOLISH TEMPORARY BLDGS 2D & 2H
Project Number: 946470 DICKSON ART CENTER DUST EVACUATION
Project Number: 947099 DICKSON ART CENTER EXHAUST SYSTEM
Project Number: 946950 DICKSON ART CENTER KILN ROOF INSTALLATION
Project Number: 947052 DICKSON ART CENTER TEXTILE DARKROQM
Project Number: 940130 DICKSON ART CENTER
Project Number: 941560 DICKSON ART GALLERY EXPANSION
Project Number: 946220 DICKSON HALL BASEMENT ALTERATIONS
Project Number: 992010 DINING ROOM FACILITIES EXTENSION
Project Number: 940100 DODD HALL ALTERATIONS
Project Number: 945730 DODD HALL ALTERATIONS
Project Number: 945910 DODD HALL CLASSROOM CONVERSION
Project Number: 946300 DODD HALL CLASSROOM CONVERSION
Project Number: 947005 DODD HALL SOCIAL WELFARE ROOM ALTERATIONS
Project Number: 940780 DRAKE STADIUM TRACK & FIELD FACILITY
Project Number: 946090 DYKSTRA & SPROUL HALLS RENOVATIONS
Project Number: 80000 DYKSTRA HALL
Project Number: 945940 EAST CAMPUS PERIMETER ROAD SITE DEVELOP
Project Number: 950400 ELECTRICAL SWITCHGEAR (PRIMARY) REPLACEMENT
Project Number: 946120 ELECTRICAL SYSTEM MODIFICATION
Project Number: 945750 ELECTRICAL SYSTEM REPAIRS
Project Number: 947160 ELEVATOR EARTHQUAKE STUDY
Project Number: 946400 ELEVATOR MODERNIZATION - MURPHY, YOUNG, & DODD
Project Number: 945830 ENGINEERING BUILDING ALTS
Project Number: 89810 ENGINEERING BUILDING I UNITS 1 & 2
Project Number: 940720 ENGINEERING BUILDING UNIT 4
Project Number: 947064 EROSION CONTROL, GENERAL CAMPUS
Project Number: 940110 EXTENDING ROADS AND WALKS TO NORTH CAMPUS
Project Number: 940310 EXTENSION OF UTILITIES, ROADS & WALKS
Project Number: 946610 FACULTY CENTER ALTERATIONS
Project Number: 947140 FACULTY CENTER BASEMENT
Project Number: 940980 FACULTY CENTER KITCHEN ADDITION
Project Number: 946980 FACULTY CENTER PATIO EXPANSION
Project Number: 946037 FACULTY CENTER SITE DEVELOPMENT
Project Number: 82610 FACULTY CENTER
Project Number: 947055 FDM STORAGE BUILDING
Project Number: 946930 FERNALD SCHOOL CONSTRUCTION
Project Number: 947074 FERNALD SCHOOL LIBRARY ADDITION
Project Number: 940800 FOOD SERVICE FACILITY EXPANSION
Project Number: 89270 FOOD SERVICE FACILITY
Project Number: 946190 FOOTBALL FIELD PRACTICE FACILITIES
Project Number: 940200 FRANZ HALL ADDITION STEP 2
Project Number: 940090 FRANZ HALL ALTERATIONS
Project Number: 941470 FRANZ HALL GRU ALTERATIONS
Project Number: 89180 FRANZ HALL PSYCHOLOGY ADDITIONS
Project Number: 89380 FRANZ HALL PSYCHOLOGY SCHOOL CLINIC ADDIT.
Project Number: 946000 FREIGHT ELEVATOR CONVERSION
Project Number: 958670 FUME HOOD STUDY, GENEAL CAMPUS
Project Number: 947041 GENERATORS, GENERAL CAMPUS
Project Number: 947122 GEOLOGY BUILDING ALTS TO ROOM 3706
Project Number: 947061 GEOLOGY BUILDING ROOM ALTS TO 4619
Project Number: 89210 GEOLOGY BUILDING--GEOPHYSICS ADDITION
Project Number: 947021 HAINES HALL ALTER CLASSROOM 315
Project Number: 945740 HAINES HALL ALTS
Project Number: 947015 HAINES HALL BAR WINDOWS AND DOORS
Project Number: 945780 HAINES HALL CLASSROOM ALTERATIONS
Project Number: 946620 HAINES HALL CLASSROOM ALTERATIONS
Project Number: 946020 HAINES HALL CLASSROOM CONVERSION
Project Number: 946420 HAINES HALL CLASSROOM CONVERSION
Project Number: 947009 HAINES HALL CLASSROOM CONVERSIONS
Project Number: 946410 HAINES HALL MUSEUM CONVERSION
Project Number: 947150 HANDICAPPED RAMPS, GENERAL CAMPUS
Project Number: 941100 HAZEN CHERRY MEMORIAL LABS
Project Number: 80005 HERSHEY HALL ADDITION
Project Number: 945620 HERSHEY HALL ALTERATIONS
Project Number: 946650 HERSHEY HALL ASSETTO FOUNTAIN INSTALLATION
Project Number: 941010 HERSHEY HALL LIBRARY ADDITION
Project Number: 947153 HERSHEY HALL SHOWER ALTERATIONS
Project Number: 947029 HIGH PRESSURE WATER MAIN LOOP
Project Number: 945770 HIGH VOLTAGE IMPROVEMENTS
Project Number: 940110 HILGARD AVENUE WIDENING
Project Number: 941300 HOSPITAL TENNIS COURTS/RELOCATE BB FIELD
Project Number: 946630 INFORMATION REST AREA
Project Number: 941090 INTRAMURAL FIELD STATION
Project Number: 946590 JAPANESE GARDENS
Project Number: 946720 KERCKHOFF HALL ALTERATIONS
Project Number: 947068 KERCKHOFF HALL ICE CREAM PARLOR
Project Number: 947026 KERCKHOFF HALL OFFICE REMODEL
Project Number: 89490 KINSEY HALL ALTERATIONS STEP II
Project Number: 947008 KINSEY HALL CLASSROOM ALTERATIONS
Project Number: 947037 KINSEY HALL LAB ALTERATIONS
Project Number: 89140 KINSEY HALL PLANT SCIENCE AREA ALTERATIONS
Project Number: 940100 KNUDSEN HALL ALTERATIONS
Project Number: 940770 LAUNDRY FACILITY
Project Number: 947083 LAW BUILDING ALTS TO ELECTRICAL
Project Number: 947093 LAW BUILDING CIRCULATION ALTS
Project Number: 947022 LAW BUILDING CLASSROOM LIGHTING
Project Number: 940430 LAW LIBRARY ADDITIONS
Project Number: 947120 LAW LIBRARY ALTS TO ROOM 112F
Project Number: 946670 LAW SCHOOL ALTERATIONS
Project Number: 946760 LIFE SCIENCES BLDG ALTERATIONS
Project Number: 945880 LIFE SCIENCES BLDG ALTS (1142 & 1134)
Project Number: 947090 LIFE SCIENCES BLDG ALTS TO BACTERIOLOGY
Project Number: 947016 LIFE SCIENCES BLDG AVIARY MODERNIZATION
Project Number: 947082 LIFE SCIENCES BLDG BIOLOGY ALTS
Project Number: 946150 LIFE SCIENCES BLDG ELEVATOR INSTALLATION
Project Number: 947038 LIFE SCIENCES BLDG FISHERIES ALTERATIONS
Project Number: 940280 LIFE SCIENCES BLDG GRADUATE RESEARCH UNIT 2
Project Number: 947097 LIFE SCIENCES BLDG LECTURE ROOM 2147 RENOVATION
Project Number: 947036 LIFE SCIENCES BLDG ROOM ALTERATIONS
Project Number: 947014 LIFE SCIENCES BLDG TILE FLOORS
Project Number: 940920 LIFE SCIENCES BLDG UNIT 3
Project Number: 947053 LIFE SCIENCES BLDG. FIFTH FLOOR BACTERIOLOGY & ROOM 4132
Project Number: 89050 LIFE SCIENCES BLDG. GRADUATE INSTRUCTION & RESEARCH
Project Number: 945820 LIGHT IMPROVEMENTS
Project Number: 945980 LIGHTING, STEP 2, GENERAL CAMPUS
Project Number: 947091 MACGOWAN HALL ALTS
Project Number: 992200 MACGOWAN HALL CONSTRUCTION
Project Number: 946250 MACGOWAN HALL LIGHT TRAP CONSTRUCTION
Project Number: 947059 MACGOWAN HALL ROOM ALTS
Project Number: 946290 MACGOWAN HALL UNIT 2 LIGHT ALTERATIONS
Project Number: 940290 MACGOWAN HALL
Project Number: 946660 MARRIED STUDENT HOUSING COURT DEVELOPMENT
Project Number: 941280 MARRIED STUDENT HOUSING ROOF REPAIRS
Project Number: 946790 MARRIED STUDENT HOUSING WAREHOUSE
Project Number: 940510 MARRIED STUDENT HOUSING
Project Number: 940970 MARYMODNT SCHOOL ACQUISITION
Project Number: 940310 MASONIC TEMPLE
Project Number: 940380 MATERIALS INSTITUTE
Project Number: 947152 MATH SCIENCES BLDG 4TH FLOOR REMODEL
Project Number: 940300 MATH SCIENCES BLDG ADDITION
Project Number: 947058 MELNITZ HALL ALTS TO RM 1426
Project Number: 947087 MELNITZ HALL DUMBWAITER & 86ELEVATOR
Project Number: 947084 MELNITZ HALL HUMIDITY CONTROL
Project Number: 946810 MELNITZ HALL LIGHT INSTALLATION
Project Number: 947138 MELNITZ HALL REMODEL PROJECTION BOOTH
Project Number: 947019 MEN'S GYM ALTERATIONS
Project Number: 947023 MEN'S GYM ALTERATIONS
Project Number: 947031 MEN'S GYM ALTERATIONS
Project Number: 947079 MEN'S GYM ALTS TO RMS 127, 129, 132, 134
Project Number: 947080 MEN'S GYM ALTS TO ROOM 105
Project Number: 947060 MEN'S GYM LOCKERS
Project Number: 946510 MEN'S GYM ROOM CONVERSION
Project Number: 941220 MENS AND WOMENS GYMS ALTERATIONS
Project Number: 941230 MOORE HALL ADDITION
Project Number: 89400 MOORE HALL ALTERATIONS AND IMPROVEMENTS
Project Number: 947034 MOORE HALL CLASSROOM ALTERATIONS
Project Number: 940600 MOORE HALL CLASSROOM CONVERSIONS
Project Number: 946230 MOORE HALL CLASSROOM CONVERSIONS
Project Number: 946890 MOORE HALL CLASSROOM CONVERSIONS
Project Number: 945930 MOORE HALL REHABILITATION
Project Number: 940210 MURPHY HALL ADDITION
Project Number: 947109 MURPHY HALL AIR CONDITIONING 750 KVA SUBSTATION
Project Number: 947050 MURPHY HALL AIR CONDITIONING AREA A
Project Number: 947071 MURPHY HALL AIR CONDITIONING AREA B
Project Number: 947139 MURPHY HALL AIR CONDITIONING ELECTRICAL SYSTEM
Project Number: 940610 MURPHY HALL ALTERATIONS
Project Number: 941450 MURPHY HALL ALTERATIONS
Project Number: 947154 MURPHY HALL ALTS TO ACADEMIC SERVICES
Project Number: 992300, 2400, 2500 NORTH CAMPUS COURT DEVELOPMENT
Project Number: 940010 NORTH CAMPUS STUDENT CENTER
Project Number: 994500 NORTH CAMPUS UTILITY ROADS EXPANSION
Project Number: 89800 NUCLEAR REACTOR BUILDING
Project Number: 947135 NUCLEAR REACTOR FACILITY ALTERATIONS
Project Number: 947100 NUCLEAR REACTOR FACILITY DOOR
Project Number: 89920 ORNAMENTAL HORTICULTURAL SITE PLANNING
Project Number: 89930 PARKING AREA
Project Number: 89166 PARKING CONTROLS CENTRAL CAMPUS
Project Number: 89160 PARKING CONTROLS EQUIPMENT & INSTALLATION
Project Number: 89070 PARKING FACILITY DEVELOPMENT
Project Number: 946540 PARKING INFORMATION STATION, WYTON DRIVE
Project Number: 946520 PARKING INFORMATION STATION
Project Number: 946530 PARKING LOT 32 EXPANSION
Project Number: 80022 & 80023 PARKING STRUCTURE "A"
Project Number: 89161 PARKING STRUCTURE "B"
Project Number: 940450 PARKING STRUCTURE "B"
Project Number: 940840 PARKING STRUCTURE "E"
Project Number: 941370 PARKING STRUCTURE "H" DEFECTS CORRECTION
Project Number: 940760 PARKING STRUCTURE "H"
Project Number: 940330 PARKING STRUCTURE "J-1"
Project Number: 940650 PARKING STRUCTURE 'L"
Project Number: 89165 PARKING WESTWOOD BLVD.
Project Number: 89164 PARKING, ADDITIONAL SURFACE
Project Number: 946180 PARKING, SURFACE
Project Number: 947094 PAULEY PAVILION ALTERATIONS
Project Number: 940141 PAULEY PAVILION BUILDING B ALTERATIONS
Project Number: 940142 PAULEY PAVILION STORAGE BUILDING
Project Number: 940140 PAULEY PAVILION
Project Number: 940700 PERLOFF HALL ALTERATIONS TO ARCHITECTURE
Project Number: 946680 PERLOFF HALL ALTERATIONS
Project Number: 947033 PIRLOFF HALL OFFICE CONVERSIONS
Project Number: 947085 PERLOFF HALL REMODEL B-100
Project Number: 940140 PERLOFF HALL SCHOOL OF ARCHITECTURE ALTS.
Project Number: 947086 PHYSICAL PLANT STORAGE
Project Number: 940190 PHYSICAL REHABILITATION CENTER
Project Number: 940020 PLACEMENT AND CAREER PLANNING CENTER
Project Number: 89100 PLANT PHYSIOLOGY BLDG. BASEMENT DEVELOPMENT
Project Number: 89120 4 PLANT SCIENCES BUILDING
Project Number: 89250 5 POWELL LIBRARY ADDITION
Project Number: 940220 POWELL LIBRARY ALTERATIONS STEP I
Project Number: 947143 POWELL LIBRARY EXTERIOR STAIRWAY
Project Number: 946900 POWELL LIBRARY LIBRARY SCHOOL ALTERATIONS
Project Number: 89040 POWELL LIBRARY STACK ADDITIONS
Project Number: 947081 PPD SHOP EXHAUST
Project Number: 940870 PRINTING PRODUCTION & PUBLICATION OFFICE
Project Number: 947047 PROJECTION SYSTEMS--GENERAL CAMPUS
Project Number: 89890 PSYCHOLOGY CLINIC SCHOOL
Project Number: 946110 RESIDENCE HALLS INFORMATION CENTER
Project Number: 947136 RESIDENCE HALLS KITCHEN EXHAUST
Project Number: 947070 RETAINING WALL CONSTRUCTION, GENERAL CAMPUS
Project Number: 941050 ROLFE HALL ALTERATIONS
Project Number: 947124 ROLFE HALL LAB MODIFICATIONS
Project Number: 940420 ROYCE HALL ALTERATIONS
Project Number: 945590 ROYCE HALL CLASSROOM ALTS (226 & 238)
Project Number: 945590 80 ROYCE HALL CLASSROOM ALTS (56 to 32)
Project Number: 946010 ROYCE HALL CLASSROOM CONVERSION
Project Number: 946100 82 ROYCE HALL ELECTRICAL DISTRIBUTION SYSTEM
Project Number: 946730 ROYCE HALL EXTERIOR STAIRS
Project Number: 947137 ROYCE HALL MEDIA CENTER VENTILATION
Project Number: 89980 ROYCE HALL REMODELING
Project Number: 946200 ROYCE HALL STEAM LINE ADDITION
Project Number: 946850 SCHOENBERG HALL AIR CONDITIONING INSTALLATION
Project Number: 946260 SCBOENBERG HALL LIGHT SYSTEM ALTERATIONS
Project Number: 946070 SCHOENBERG HALL REMODEL
Project Number: 947062 SCHOENBERG HALL STAGE ADDITION
Project Number: 940820 SCIENCE COURT FOOD SERVICE FACILITY
Project Number: 947069 SCIENCE COURT FOOD SERVICE FACILITY
Project Number: 89210 SERVICE YARD EXPANSION
Project Number: 946350 SLIGHTER HALL CLASSROOM CONVERSION
Project Number: 946320 SLIGHTER HALL FUME HOOD INSTALLATION
Project Number: 946240 SLIGHTER HALL LABORATORY ALTERATIONS
Project Number: 940481 SPACE SCIENCES LABORATQRY
Project Number: 946640 SPAULDING FIELD
Project Number: 948630 SPROUL HALL SPRINKLERS
Project Number: 900150 SPROUL HALL
Project Number: 945710 STEAM PLANT CABLE INSTALLATION
Project Number: 940180 STEAM PLANT EXPANSION
Project Number: 947092 STEAM PLANT RELOCATE CHEMICAL TESTING
Project Number: 940530 SUNSET CANYON RECREATION CENTER
Project Number: 940040 SUNSET CANYON SWIMMING POOL EXPANSION
Project Number: 940520 SURFACE PARKING, CENTRAL CAMPUS
Project Number: 940850 TELEPHONE FACILITY EXPANSION, CENTRAL CAMPUS
Project Number: 947028 TENNIS COURTS (SOUTH), BACKBOARDS INSTALLATION
Project Number: 947025 TENNIS COURTS (SOUTH), REPAIRS
Project Number: 89163/89390 TENNIS COURTS LANDSCAPING & BLEACHERS
Project Number: 945860 TENNIS COURTS RECONSTRUCTION
Project Number: 89950 TENNIS COURTS REMOVAL AND RELOCATION
Project Number: 947075 TENNIS COURTS RESURFACING
Project Number: 89163 TENNIS COURTS SITE DEVELOPMENT
Project Number: 946390 TROTTER FIELD PARKING
Project Number: 940540 TV FACILITY & EQUIPMENT
Project Number: 946220 UNDERGROUND FUEL STORAGE
Project Number: 89110 UNIVERSITY ELEMENTARY SCHOOL COMPLETION
Project Number: 945660 UNIVERSITY ELEMENTARY SCHOOL LIBRARY ENLARGEMENT
Project Number: 947118 UNIVERSITY ELEMENTARY SCHOOL VENTILATION
Project Number: 940670 UNIVERSITY EXTENSION BLDG. 11TH & GRAND
Project Number: 940640 UNIVERSITY EXTENSION BUILDING
Project Number: 946600 UNIVERSITY EXTENSION, DOWNTOWN ALTERATIONS
Project Number: 940620 UNIVERSITY RESEARCH LIBRARY
Project Number: 992500 UNIVERSITY RESEARCH LIBRARY
Project Number: 940940 UTILITIES 1966-67 ROYCE/STADIUM SUBSTATION
Project Number: 89900 UTILITIES AND ROADS
Project Number: 947045 UTILITIES, GENERAL CAMPUS EXTENDED
Project Number: 946030 UTILITIES, GENERAL CAMPUS
Project Number: 947044 UTILITIES, GENERAL CAMPUS
Project Number: 89390 UTILITIES, ROADS & WALKS EXTENSION STEP I
Project Number: 941030 UTILITIES
Project Number: 941130 UTILITIES
Project Number: 946310 UTILITY SYSTEM EXPANSION, GENERAL CAMPUS
Project Number: 946700 VERTICAL TRANSPORT SYSTEM
Project Number: 946570 VISITOR LOT ADMINISTRATION BUILDING
Project Number: 945970 VOLTAGE INCREASE TO MAIN SWITCHBOARD
Project Number: 941240 WEST CAMPUS SITE DEVELOPMENT STEP 5
Project Number: 940120 WEST CAMPUS SURFACE PARKING
Project Number: 940360 WEST CAMPUS TREE PROGRAM
Project Number: 940190 WEST CAMPUS UTILITIES & SITE DEVELOPMENT
Project Number: 940100 WEST CENTER
Project Number: 946080 WESTERN AIR CONDITIONING PROCESS CENTER
Project Number: 89170 WESTERN DATA COMPUTING CENTER
Project Number: 945900 WOMEN'S GYM ALTERATIONS
Project Number: 947054 WOMEN'S GYM ALTS TO RM 109
Project Number: 947076 WOMEN'S GYM ALTS TO RM 200
Project Number: 947073 WOMEN'S GYM DANCE STUDIO ALTS
Project Number: 947144 WOMEN'S GYM DANCE STUDIO VENTILATION ALTS
Project Number: 946340 WOMEN'S GYM DECK CONVERSION
Project Number: 946500 WOMEN'S GYM POOL ALTERATIONS
Project Number: 947116 WOMEN'S GYM RM ALTS 107, 108
Project Number: 946520 WOMEN'S GYM SAUNA CONSTRUCTION
Project Number: 947114 WOMEN'S INTERCOLLEGIATE SPORTS TRAILER
Project Number: 945600 YOUNG HALL ALTERATIONS
Project Number: 945690 YOUNG HALL ALTS DENTISTRY TEACHING LAB
Project Number: 945960 YOUNG HALL CLASSROOM CONVERSION
Project Number: 946160 YOUNG HALL CLASSROOM CONVERSION
Project Number: 946460 YOUNG HALL CLASSROOM CONVERSION
Project Number: 945920 YOUNG HALL CLASSROOM CONYERSIONS
Project Number: 947095 YOUNG HALL EXHAUST DEVICES
Project Number: 947141 YOUNG HALL EXHAUST SYSTEM REMODEL
Project Number: 945990 YOUNG HALL STEAM & VACUM LINES IMPROVEMENT
Project Number: 80000 DYKSTRA
General--includes Estimate and Budget 1957-1971
Construction Progress Reports 1958-1959
Construction Progress Reports/Young-Twaites 1958-1959
Construction Progress Reports/Nicks Landscaping 1959-1960
Construction Progress Reports/Shawn Erosion Control 1959
Project Number: 80005 MIRA HERSHEY HALL ADDITION
Mira Hershey Hall Addit.--includes General, Est. & Budg., Reg. Min. 1957-1969
Conference Notes--McLellan & Fortune 1958-1959
Constr. Prog. Rep.--Macisaac & Menke Co. 1958-1959
Project Number: 80020 & 80021 ACKERMAN UNION
General 1957-1963
General & Remedial Masonry 1957-1963
General--Includes Est. & Bud., Reg. Min. 1954-1970
Contractor--Merco 1960-1961
Contractor--Draucker Inc. 1961
Contractor--Construction Progress Reports/F. E. Young 1959-1961
Contractor--Construction Progress Reports/F. E. Young 1961-1962
Student Store Fixturing and Construction. 1960-1961
HHFA Approved C/O Adaptable Store Equipment 1961
HHFA Approved C/O C. L. Draucker Dimming & Projection 1961
HHFA Approved C/O Merco Site Clearance, Grading
Project Number: 80022 & 80023 PARKING STRUCTURE "A"
General--Includes Gen., Est. & Bud., Min. Arch. Gen., Contra. Gen. & Pay 1959-1971
Contractor--Construction Progress Reports/H.K. Rental 1960
Contractor--Construction Progress Reports/Allen M. Campbell Co. 1960-1961
Project Number: 82610 FACULTY CENTER
General--Includes Est. & Bud., Reg. Min, Arch. Gen., & Contra. Gen. 1946-1969
Testing Reports--Foundation Investigation 1957
Contractor--Construction Progress Reports/Robert B. Tebbe 1958-1959
Project Number: 84007 CAMPUS MAP REVISION
General 1959-1960
Project Number: 84510 CLARK LIBRARY
General--Correspondence 1947-1952
General--Minutes 1950
General--Estimates and Budgets 1946-1953
General--Minor Cap Improvements 1951-1952
Testing Reports--Osborne Labs 1950-1951
Architect--Crosby 1950-1951
Contractor--Approval 1950-1951
Contractor--General 1950-1951
Contractor--G. O. Chapman 1950-1951
Contractor--Pay Estimates 1951
Contractor--Utilities 1951-1952
Contractor--Construction and Repairs 1947-1953
Contractor--Progress Reports 1950-1952
Contractor--Change Orders 1950-1951
Project Number: 89040 POWELL LIBRARY STACK ADDITIONS
General--Includes Est. & Bud., Reg. Min., Contract. Gen. 1951-58
Contractor--Construction Progress Reports/Jamas J. Barnes 1956-1958
Project Number: 89050 LIFE SCIENCE GRAD. INSTRUCT. & RESEARCH
General--Includes Est. & Budg., Reg. Min., Contract. Gen. 1956-1970
Testing Reports--Foundation Investigation 1956-1958
Contractor--Construction Progress Reports 1958
Contractor--Construction Progress Reports 1959-1960
Project Number: 89070 PARKING FACILITY DEVELOPMENT
General 1956-1957
Project Number: 89100 PLANT PHYSIOLOGY BLDG. BASEMENT DEVELOPMENT
General--Includes Est. & Budg., Reg. Min., Contract. Gen 1957-1980
Contractor--Construction Progress Reports/King & Cowles 1959
Project Number: 89110 UNIVERSITY ELEMENTARY SCHOOL COMPLETION KINDERGARTEN/NURSERY
General--Includes Est. & Budg., Reg. Min. Contract. Gen., Arch. Gen. 1955-1972
Nursery Kindergarten Unit Stage II--General, Est. & Budg., Reg. Min. 1958-1959
Contractor--Construction Progress Reports/Merco 1957-1958
Nursery Kindergarten Unit Stage II--Constr. Prog, Rep./George Chapman 1958-1960
Project Number: 89120 PLANT SCIENCES BUILDING
General--Includes Est. & Budg., Reg. Min. 1955-1958
Project Number: 89130 BOTANY BUILDING
General--Includes Est. & Budg., Reg. Min., Contr. General 1956-1961
Testing Reports--Structural Design Index 1957
Testing Reports--Soil Report 1957
Contractor--Construction Progress Reports 1958
Contractor--Construction Progress Reports 1958-1959
Contractor--Construction Progress Reports 1958-1959
Contractor--Construction Progress Reports 1959-1960
Project Number: 89140 KINSEY HALL PLANT SCIENCE AREA ALTERATIONS
General--Includes Est. & Budg., Reg. Min., Contract. Gen 1957-1959
Contractor--Construction Progress Reports/Jones Bros. 1958-1959
Project Number: 89160 PARKING CONTROL EQUIPMENT & INSTALLATION
General 1955-1956
Equipment and Installation 1956-1957
Project Number: 89161 PARKING STRUCTURE "B"
General--Includes Foundation Report 1956-1960
Project Number: 89163 TENNIS COURTS SITE DEVELOPMENT
General--Includes Foundation Report 1958-1967
Contractor--Construction Progress Reports--Jack Higgins Co. 1960
Project Number: 89163/89390 TENNIS COURTS LANDSCAPING & BLEACHERS
Landscape--Merco 1960
Contractor--Merco for Bleachers 1960-1961
Project Number: 89164 ADDITIONAL SURFACE PARKING
General 1958-1966
Project Number: 89165 PARKING WESTWOOD BLVD.
General--Includes Est. & Budg., Reg. Min., Contrt. General 1958
Project Number: 89166 PARKING CONTROLS CENTRAL CAMPUS
General 1958-1960
Project Number: 89170 WESTERN DATA COMPUTING CENTER
General--Includes Est. & Budg., Reg. Min., Contractor General 1956-1969
Contractor--Construction Progress Reports/M.J. Brock & Sons 1957-1958
Project Number: 89180 FRANZ HALL PSYCHOLOGY ADDITIONS
General--Incl. Foundation Report, Grant Applic, Est. & Bud., Reg Min etc 1956-1961
Contractor--Construction Progress Reports/ M.J. Brock & Sons 1958-1959
Project Number: 89210 GEOLOGY BUILDING--GEOPHYSICS ADDITION
General--Includes Est. & Budg., Reg. Min., Arch. & Contract. General 1956-1962
Contractor--Construction Progress Reports--Jones Bros. Constr. 1958-1959
Project Number: 89210 SERVICE YARD EXPANSION
General--Includes Est. & Budg., Reg. Min., Arch. & Contra. Gen. 1956-1958
Contractor--Construction Progress Reports--Merco, Contr. Engineer
Project Number: 89250 POWELL LIBRARY ADDITION
General--Includes Reg. Min. 1956-1957
General--Correspondence 1947-1971
Contractor--Requisitions 1947-1954
Project Number: 89270 FOOD SERVICE FACILITY
General 1956-1958
Project Number: 89380 FRANZ HALL PSYCHOLOGY SCHOOL CLINIC ADDIT
General--Includes Est. & Budg., Reg. Min., Arch. & Contract. Gen. 1957-1969
Contractor--Construction Progress Reports--Jack K. Tanner Co. 1959-1960
Project Number: 89390 UTILITIES ROADS & WALKS EXTENSION STEP I
General--Includes Est. & Bud., Reg. Min., General & Electr. Contrac. 1959-1962
Project Number: 89400 MOORE HALL ALTERATIONS AND IMPROVEMENTS
General--Includes Est. & Budg., Reg. Min., Contract. General 1958-1960
Contractor--Construction Progress Reports--Wapner and Fremer Co. 1959
Project Number: 89490 KINSEY HALL ALTERATIONS STEP II
General--Includes Est. & Bud., Reg. Min., General Arch. & Contract. 1958-1964
Contractor--Construction Progress Reports--Merco Constr. Co. 1960-1961
Project Number: 89800 NUCLEAR REACTOR BUILDING
General--Includes Est. & Bud., Reg. Min., Atomic Energy Comm. 1957-1967
Contractor--Louis C. Dunn Engineering--Nuclear Reactor 1959
Contractor--Construction Progress Reports--Dunn Engineering 1959-1960
Contractor--Construction Progress Reports--AME Atomics 1960
Project Number: 89810 ENGINEERING BUILDING I UNITS 1 & 2
General--Est. & Bud., Reg, Min., Contract. & Arch. Gen. 1952-1968
General--Includes Est. & Bud., Reg. Min. Arch. & Contra. Gen. & Breakdowns 1953-1965
Contractor--Construction Progress Reports 1955-1956
Contractor--Construction Progress Reports 1956-1957
Contractor--Construction Progress Reports 1957-1958
Contractor--Construction Progress Reports 1958-1959
Project Number: 89890 PSYCHOLOGY CLINIC SCHOOL
General--Includes Est. & Bud., Reg. Min., Contract. & Arch. Gen. HEW Grant 1952-1969
Contractor--Construction Progress Reports--John L. Meek Co. 1957
Project Number: 89900 UTILITIES AND ROADS
General--Includes Est. & Bud., Reg. Min., Arch. & Contract. General 1949-1959
Contractor--Progress Reports and Requisitions 1955-1957
Project Number: 89920 ORNAMENTAL HORTICULTURAL SITE PLANNING
General--Includes Est. & Budg., Reg. Min., Arch. & Contract. General 1954-1956
Testing Reports--Soils Report 1956
Contractor--Stoneman/Heat and Utilities 1954
Contractor--Construction Progress Reports--S.A. Cummings 1956-1957
Project Number: 89930 PARKING AREA
General 1945-1955
Project Number: 89950 TENNIS COURTS REMOVAL AND RELOCATION
General 1949-1966
Project Number: 89980 ROYCE HALL REMODELING
General--Includes Est. & Bud., Reg. Min., Arch. & Contract. General 1953-1958
Testing Report--Soils Report 1955
Contractor--Construction Progress Reports 1954-1956
Contractor--Construction Progress Reports 1956-1957
Project Number: 900150 SPROUL HALL
Shower Leaks 1962-1963
Project Number: 940010 NORTH CAMPUS STUDENT CENTER
General--Project Planning Guide 1971
General--Correspondence
General--Minutes 1972-1976
General--Regents Minutes 1972-1975
General--Group 2 and 3 Equipment 1975-1977
Testing Reports 1975
Testing Reports--Soils Report 1975
Architect--Selection Committee 1971-1972
Architect--Agreement and DCA 1973-1975
Architect--General Correspondence 1973-1977
Architect--Payment 1973-1977
Architect--Conference Notes 1975
Architect--Clarifications 1975-1976
Landscape Architect--General 1974-1977
Contractor--Site Plan 1974
Contractor--General 1975-1976
Contractor--General 1976-1977
Unsuccessful Contractors 1973-1975
Contractor--Payment Authorization/Psomas & Assoc. 1973-1974
Contractor--Payment Authorization/L. T. Evans Assoc. 1975
Contractor--Payment 1975-1976
Contractor--Wage Scale Compliance 1975-1976
Contractor--Insurance 1975-1976
Contractor--Affirmative Action 1975
Contractor--Roof Isolators/Brief Form 1976-1977
Contractor--Construction & Repairs Adjustment Requests 1974-1976
Contractor--Project Progress Reports 1975-1976
Contractor--Job Minutes 1975-1976
Change Orders-#1 - #22 1976
Change Orders-#23 - end 1976
Shop Drawings--A - Penn 1975-1976
Shop Drawings--end 1975-1976
Project Number: 940020 PLACEMENT AND CAREER PLANNING CENTER
General--Correspondence 1973-1977
General--Foundation Report/Project Planning Guide 1973/1975
General--Regents Minutes 1973-1974
General--Estimates and Budgets 1973-1980
General--Planning/Brief Form 1976
Testing Reports--Psomas 1975
Testing Reports--LeRoy Crandall 1975-1976
Testing Reports--Smith Emery 1975-1977
Testing Reports--Fondation Inspection 1976
Testing Reports--Donald Douglas 1976
Testing Reports--Roofing Consultants 1977
Architect--Agreement and DCA 1973-1976
Architect--General 1974-1977
Architect--Payment 1974-1977
Architect--Minutes and Conference Notes 1974
Architect--Job Minutes 1975-1976
Landscape Architect--General includes Bridgers & Troller 1975-1977
Landscape Architect--Site Development 1977-1978
Landscape Architect--Site Development 1978
Landscape Architect--Granada Landscape 1977
Landscape Architect--Granada Landscape Co. Site Development 1977-1978
Contractor--Approval
Contractor--General 1975-1976
Contractor--General #2--Strauss Construction 1976-1978
Contractor-Swift Wrecking Co. 1977
Contracto-Group 2 and 3 Equipment 1976
Contractor-Payment 1975-1977
Contractor--Wage Scale Provisions 1976
Contractor--Affirmative Action 1975-1976
Contractor--Purchase Orders 1976
Contractor--Construction and Repairs 1975-1978
Contractor--Clarifications 1975-1976
Contractor--Progress Reports 1975-1976
Contractor Change Orders--1 - 17 1976
Contractor Change Orders--18 - 37 1976-1977
Contractor--Cancelled Change Orders 1976
Subpoena and Xerox copies of records (1 of 2) 1976-1977
Subpoena and Xerox copies of records (2 of 2) 1976-1977
Shop Drawings
Project Number: 940030 CAMPUS STOREHOUSE BUILDING CONVERSION
Testing Reports--Psomas 1975
Testing Reports--Structural Calculations 1976
Testing Reports--Crommelin-Pringle 1976-1977
Testing Reports-California Test Labs. 1976-1977
Testing Reports--California Test Labs 1976-1977
Testing Reports-L.T. Evans 1976-1977
Testing Reports-Sorenson 1979
Architect-Agreement and DCA 1975-1977
Architect--Payment 1975-1977
Landscape Architect--Bridgers and Troller 1976
Contractor--Approval 1976-1977
Contractor-Unsuccessful Bids 1976
Contractor--General 1976-1977
Contractor--Group 2 and 3 Equipment 1976
Contractor-Payment 1977-1977
Contractor-Wage Scale Compliance 1977
Contractor--Insurance 1976-1977
Contractor--Affirmative Action 1976
Contractor--Purchase Orders 1975-1978
Contractor--Construction and Repairs 1968-1979
Contractor--Job Minutes 1976-1977
Contractor--Progres Reports 1976-1977
Contractor--Change Orders 1976-1977
Contractor--Storehouse Canopy 1980
Shop Drawings
Preliminary Shop Drawings
Project Number: 940040 SUNSET CANYON SWIMMIMG POOL EXPAN.
General 1973-1977
Landscape Architect and Testing Reports 1973-1977
Contractor--Approval 1975-1976
Contractor--General Unsuccessful Bids Affirmative Action
Contractor-nsurance 1975-1976
Contractor-Job Minutes 1975-1976
Contractor-Progress Reports 1975-1976
Contractor--Change Orders 1975-1976
Shop Drawings and Project Planning Guide 1975-1976
Project Number: 840070 ACKERMAN UNION ALTERATIONS
General-Project Planning Guide 1974
General-Correspondence 1974-1977
General-Regents Minutes 1974-1977
General--Estimates and Budgets 1974-1977
General--Conference Notes 1974-1975
General--Brief Form Contract 1977
Testing Reports--General 1974-1977
Testing Reports--Feasibility Study 1974
Testing Reports-Cal Test Lab Reports 1975-1976
Testing Reports--Cal Test Authorisation and Pay 1975-1976
Testing Reports--LeROy Crandall Soils Engineer 1975-1976
Testing Reports-Foundation Inspection 1976
Architect--Architect's Agreement and DCA 1974-1975
Architect-General 1974-1977
Architect-Payment 1975-1977
Landscape--General Bridgers, Troller & Haslett 1976
Landscape-Site Development Granada Landscape Co. 1976
Landscape--Site Development Insurance Rebid 1976
Contractor--Approval 1975
Contractor-Unsuccessful Bids 1975
Contractor--General Correspondence 1975
Contractor-General Correspondence 1976-1977
Contractor--Group 2 and 3 Equipment 1975-1976
Contractor--Payment 1975-1977
Contractor-Wage Scale Compliance 1975-1976
Contractor--Insurance 1975-1976
Contractor--Affirmative Action 1975-1976
Contractor--Purchase Orderss 1975-1976
Contractor--Construction and Repairs 1975-1977
Contractor--Job Minutes 1975-1976
Contractor--Clarifications 1975-1976
Contractor--Progress Reports 1975-1976
Contractor--Change Orders Nos 1-25 1975
Contractor--Change Orders Nos. 26 - 45 1975-1976
Contractor--Change Orders Nos. 46 - 63 1976
Contractor--Change Orders Nos. 64 - end 1976-1977
Shop Drawings and Preliminary Shop Drawings 1975-1976
Preliminary Shop Drawings 1975-1976
Project Number: 940080 CAMPUS ELECTRICAL SYSTEM EXPANSION
General--Includes Est. & Bud., Reg. Min., Archit. & Contract. Gen. 1959-1963
Contractor-Progress Reports Tanner, Jack Construction Co. 1961-1962
Contractor--Progress Reports Pierson Engineering Co. 1961-1962
Project Number: 940090 FRANZ HALL ALTERATIONS
General-Includes Est. & Bud., Reg. Min., Contract. & Archit. Gen. 1959-1962
Contractor--Progress Reports Weymouth Crowell Constr. Co. 1961
Anechoic Chamber 1960-1963
Project Number: 940100 KNUDSEN HALL ALTERATIONS
General--Includes Est. & Budg., Reg. Min., Cyclotron & IBM 1960-1965
General-Architect and Contractor 1959-1963
Testing Reports--Foundation Investigation 1960
Contractor--Construction Contracts 1961-1962
Contractor--Grading Sully, Miller, Construct. Co. 1964
Contractor--Construction Progress Reports 1961-1962
Contractor--Construction Progress Reports 1962-1963
Contractor--Construction Progress Reports 1964
Contractor--Computer Rooms 1964-1965
Contractor--Insurance for IBM Computer Rooms 1964
Contractor--Construction Progress Reports IBM Computer Facility 1964
Contractor--Insurance/Sully Miller Constrc. for Grading & Paving 1964
Project Number: 940100 DODD HALL ALTERATIONS
General Correspondence 1957-1963
Contractor--Reynolds, Robert Construction Co. 1961-1962
Contractor--Construction Progress Reports 1961-1962
Project Number: 940100 WEST CENTER
General Correspondence 1972-1974
General Corespondence 1974-1979
General--Project Planning Guide 1972
General--Regents Minutes 1973
General-Conference Notes 1973-1974
General--Meeting Minutes 1974-1976
Architect-Selection Committee 1972
Architect--Agreement and DCA 1973-1976
Architect--General Correspondence 1973-1977
Architect-Payments 1973-1977
Architect-Job Minutes 1975-1976
Architect--Insurance for Site Tours 1975
Testing Reports--Psomas & Assoc. 1973-1976
Testing Reports-LeRoy Crandall Soils 1973-1977
Testing Reports--Calif. Test Labs Reports 1974-1976
Testing Reports-Calif. Test Labs Reports 1975-1977
Testing Reports--Sewage Facilities Correspondence 1975-1980
Contractor--Approval 1974-1977
Contractor-Unsuccessful Bids 1974
Contractor--General Correspondence 1974-1975
Contractor--General Correspondence 1976-1978
Contractor--Group 2 and 3 Equipment 1975-1976
Contractor--Payment 1975-1977
Contractor--Wage Compliance Report 1975-1976
Contractor--Insurance 1975-1976
Contractor--Affirmative Action 1975-1976
Contractor--Construction and Repairs Requests 1973-1974
Contractor--Clarifications 1975-1976
Contractor--Requisitions 1974
Contractor--Progress Reports 1974-1976
Contractor-Change Orders Nos. 1-18 1975
Contractor--Change Orders Nos. 19 - 29 1975-1976
Contractor--Change Orders Nos. 30-53 1976
Contractor--Change Orders Nos. 54 - 76 1975-1976
Shop Drawings--Unapproved 1975-1976
Shop Drawings-Approved 1975-1976
Project Number: 940110 WIDENING HILGARD AVENUE
General--Correspondence 1964-1969
General--Minutes 1964-1965
General--Regents Minutes 1964-1965
General-Estimate and Budget 1964-1966
General--LA Dept. of Water and Power 1964-1965
General-Dept. of Water and Power 1985-1966
Landscape-Cornell, Bridgers & Troller 1964-1966
Contractor--Insurance 1965
Contractor--Construction and Repairs 1963-1967
Contractor--Requisitions 1963-1967
Project Number: 940110 EXTENDING ROADS AND WALKS TO NORTH CAMPUS
Step 2-Second Phase of Proj. 940110 1962-1963
Project Number: 940120 WEST CAMPUS SURFACE PARKING
General--Includes Reg. Min., Est, & Bud., Contractor General 1959-1961
Contractor--Construction Progress Reports J.W. Nicks Constr. 1960
Slope Erosion Control-Moulder Bros. Constr. 1960-1961
Slope Erosion Control-Construction Progress Reports 1960-1961
Project Number: 940130 DICKSON ART CENTER
General--Project Program 1960
General--Correspondence 1956-1963
General--Correspondence/Detailed Project Program 1958-71
General--Minutes 1959-1964
General--Regents Minutes 1958-1967
General-Conference Notes 1960-1965
General--Estimate and Budget 1956-1969
Testing Reports-California Testing Labs 1961-1964
Testing Reports-California Testing Labs 1964
Testing Reports-California Testing Labs 1965
Architect--Agreement and DCA 1959-1966
Architect--General/Beckett Welton 1958-1964
Architect-General/Pereira & Assoc. 1959-1967
Architect-General/Pereira & Assoc. 1964-1969
Architect--Outline Specifications 1961
Architect-Preliminary Drawings 1962
Architect--Payment 1959-1966
Architect--Bulletins 1964-1965
Architect-Job Minutes 1964-1965
Landscape Architect--Cornell, Bridgers, and Troller 1960-1969
Landscape Architect--Steed Brothers Allied Sprinkler Delgado 1964-1966
Landscape Architect--Allied Sprinkler 1965-1966
Contractor--Approval/Steed Brothers 1964
Contractor--Approval/Steed Brothers 1965
Contractor--Unsuccessful Bids 1962-1965
Contractor--General/Steed Brothers 1954-1967
Contractor--General/Steed Brothers 1965-1966
Contractor--Group 2 and 3 Equipment 1962-1966
Contractor--Payment 1964-1966
Contractor--Construction and Repairs 1959-1967
Contractor--Requisitions 1962-1967
Contractor--Construction Progress Reports 1964
Contractor--Construction Progress Reports 1965
Contractor--Change Orders Nos. 1-9 1964
Contractor--Change Orders Nos. 10 - 12 1964
Contractor--Change Orders Nos. 13 - 22 1964
Contractor--Change Orders Nos. 23 - 26 1965
Contractor--Change Orders Nos. 27 - 35 1965
Contractor--Change Orders Nos. 36 - 54 (end) 1965-1966
Shop Drawings and Submittal Books 1964-1965
Shop Drawings to end 1964-1965
BASEBALL FACILITY RELOCATION
General Correspondence 1973
Project Number: 940140 PERLOFF HALL SCHOOL OF ARCHITECTURE ALTS.
General--Project Planning Guide 1974
General--Project Planning Guides/Estimates Specifications 1974
General--Final Estimates 1974
Testing Reports--Smith Emery 1974-1977
Architect--Agreement and Payment 1972-1976
Architect--General Correspondence 1972-1977
Architect--General Correspondence 1973-1976
Architect--Minutes and Conference Notes 1974-1975
Architect--Minutes and Conference Notes 1975
Contractor--Approval 1975-1976
Contractor--Unsuccessful Bids 1975
Contractor--Estimates and Budgets 1972-1977
Contractor--General Correspondence 1975-1977
Contractor--Boyd Construction 1975
Contractor--Group 2 and 3 Construction 1973
Contractor--Payment 1975-1976
Contractor--Wage Scale Compliance 1975-1977
Contractor--Insurance Policies 1975-1977
Contractor--Affirmative Action 1975
Contractor--Affirmative Action 1975-1976
Contractor--Construction and Repairs 1975-1976
Contractor--Requisitions 1975
Contractor--Job Minutes Contractor--Job Minutes
Contractor--Clarifications 1975
Contractor--Project Progress Reports 1975-1976
Contractor--Change Orders Nos. 1-6 1975-1976
Contractor--Change Orders Nos. 7 - end 1976
Contractor--Cancelled Change Orders 1975-1976
Shop Drawings to end
Project Number: 940140 PAULEY PAVILION
General--Correspondence 1952-1974
General--Minutes 1951-1965
General--Regents Minutes 1959-1967
Testing Reports--Osborne Labs 1964
Testing Reports--Osborne Labs 1964
Testing Reports--Osborne Labs 1964
Testing Reports--Osborne Labs 1964
Testing Reports--Osborne Labs 1965
Architect--Agreement and DCA 1961-1965
Architect--General Correspondence 1953-1960
Architect--Payment/Welton Beckett 1962-1966
Architect--Conference Notes 1962-1966
Landscape Architect--Cornell, Bridgers, & Troller 1962-1966
Contractor--General Approvals 1963-1964
Contractor--Approvals/Miller Davis 1963-1964
Contractor--Unsuccessful Bids 1963-1965
Contractor--Estimates and Budgets 1952-1967
Contractor--General Correspondence/Pacific West Corp. 1965-1966
Contractor--General Correspondence/Miller Davis 1963-1965
Contractor--General Correspondence/Miller Davis 1965-1967
Contractor--Group 2 and 3 Equipment 1964-1965
Contractor--Payment/Miller Davis 1964-1967
Contractor--Insurance 1962-1966
Contractor--Insurance 1966
Contractor--Construction and Repairs 1952-1968
Contractor--Requisitions 1959-1966
Contractor--Progress Reports/Miller Davis 1963-1964
Contractor--Progress Reports/Miller Davis 1965-1966
Contractor--Change Orders Nos. 1 -9/Miller Davis 1964
Contractor--Change Orders Nos. 10 -27/Miller Davis 1964-1965
Contractor--Change Orders Nos. 28 -end/Miller Davis 1965
Shop Drawings--Consolidated Western Steel
Shop Drawings--Consolidated Western Steel - Cutler Hammer Inc.
Shop Drawings--Hoertig - end
Project Number: 940141 PAULEY PAVILION BUILDING B ALTERATIONS
Contractor--General Correspondence/ Goedhart 1967-1968
Testing Reports--Smith Emery Metal Tests 1963-1968
Shop Drawings and Steel Tests
Project Number: 940142 PAULEY PAVILION STORAGE BUILDING
General Correspondence 1969
Project Number: 940160 CHEMISTRY GEOLOGY BUILDING ALTERATIONS
General--Project Program 1963-1966
General--Correspondence 1959-1971
General--Minutes 1962-1965
General--Regents Minutes 1963-1965
General--Estimate and Budget 1959-1969
Testing Reports--Investigate Air Conditioning/Foundation Report 1958-1964
Testing Reports--Ventilation Tests 1966
Testing Reports--Foundation Tests 1965-1966
Architect--Welton Becket 1965
Architect--Stanton & Stockwell 1961-1966
Architect--Stanton & Stockwell Agreement & DCA 1963-1966
Architect--Stanton & Stockwell Conference Notes 1966
Architect--Stanton & Stockwell Payment 1964-1967
Landscape Architect--Cornell, Bridgers, and Troller 1965-1967
Contractor--General Approval 1965-1966
Contractor--Approval/Wilson Ray 1965-1966
Contractor--Unsuccessful Bids 1965-1968
Contractor--General Correspondence/Wilson Ray 1965-1968
Contractor--Insurance 1965-1967
Contractor--Construction and Repairs 1959-1960
Contractor--Requisitions 1964-1967
Contractor--Payment/Wilson Ray 1965-1967
Contractor--Progress Reports/Wilson Ray 1965-1966
Contractor--Change Orders Nos. 1-6/Wilson Ray 1965-1966
Contractor--Change Orders Nos. 7-end/Wilson Ray 1966-1967
Mechanical Work 1966
Shop Drawings to end
Project Number: 940180 STEAM PLANT EXPANSION
General Correspondence 1960-1965
Foundation Investigation 1962
Group II and III Equipment 1963
Contractor--Insurance 1963
Contractor--Chapman & Son Progress Report 1963
Contractor--E.O. Nay Progress Report 1963-1964
Project Number: 940190 WEST CAMPUS UTILITIES & SITE DEVELOPMENT
General Correspondence 1965-1966
General Correspondence 1966
General--Minutes 1958
General--Regents Minutes 1964
General--Estimates and Budgets 1958-1969
Landscape Architect--Cornell Bridgers & Troller 1963-1968
Contractor--Approval/Jacobs 1962
Contractor--Unsuccessful Bids 1962-1965
Contractor--Correspondence/Jacobs 1962-1963
Contractor--Payment/Jacobs 1962-1963
Contractor--Insurance/Electrical Service and Equipment 1962
Contractor--Insurance/Atlantic Fence - VC Irrigation 1966
Contractor--Construction and Repairs 1959-1966
Contractor--Progress Reports/Jacobs 1962-1963
Contractor--Change Orders/Jacobs 1963
Shop Drawings
Project Number: 940190 PHYSICAL REHABILITATION CENTER
Landscaping--Valley Crest
Project Number: 940200 FRANZ HALL ADDITION STEP 2
General--Detailed Project Program 1960
General Correspondence 1958-1966
General Correspondence 1967-1973
HEFA Grant Program 1965-1968
HEFA Grant Program 1965-1969
HEFA Grant Program 1969-1972
General--Pre-specifications 1966
General--Minutes 1960-1966
General--Minutes 1966-1968
General--Regents Minutes 1960-1967
General--Regents Minutes 1966-1967
General--Conference Notes 1969-1970
General--Conference Notes 1965-1967
General--Estimates and Budgets 1965-1971
Testing Reports--Foundation Investigation 1965-1970
Testing Reports--Smith Emery Co. 1965-1967
Architect--Agreement and DCA/Willaims and Coyne 1960-1966
Architect--Agreement and DCA/Williams & Coyne 1965-1971
Architect--General/Williams and Coyne 1960-1968
Architect--General/Williams and Coyne 1966-1972
Architect--Supervising/Welton Beckett 1965-1966
Architect--Supervising/Welton Beckett 1966
Architect--Payment/Williams and Coyne 1961-1967
Architect--Payment/Williams and Coyne 1966-1971
Landscape Architect--Supervising/ Cornell, Bridgers, & Troller 1961-1972
Landscape Architect--General/ Cornell, Bridgers, & Troller 1966-1972
Landscape Architect--Pool 1965-1971
Contractor--Approval/Tutor 1964-1970
Contractor--Approval/Newberg 1965-1967
Contractor--Unsuccessful Bids 1965-1967
Contractor--Unsuccessful Bids 1967-1969
Contractor--General/Newberg 1965-1967
Contractor--General/Newberg 1965-1968
Contractor--General/Jackson 1966-1967
Contractor--General & Site Development/Merco 1967-1968
Contractor--General/Tutor 1968-1971
Contractor--Group 2 and 3 Equipment 1965-1967
Contractor--Group 2 and 3 Equipment 1966-1967
Contractor--Group 2 and 3 Equipment 1969-1971
Contractor--Payment/Newberg 1966-1967
Contractor--Pay/Tutor 1969-1972
Contractor--Insurance/Alta - Goplen 1965-1967
Contractor--Insurance/Harper - Meehleis 1965-1967
Contractor--Insurance/Miller - Williams 1965-1967
Contractor--Insurance/Site Development 1967-1968
Contractor--Insurance 1969-1970
Contractor--Construction and Repairs 1959-1973
Contractor--Requistions 1961-1968
Contractor--Requistions 1966-1973
Contractor--Progress Reports/Newberg 1065-1967
Contractor--Progress Reports 1965-1968
Contractor--Progress Reports 1967-1968
Contractor--Progress Reports/Tutor 1969-1972
Contractor--Change Orders 1 of 5/Newberg 1966
Contractor--Change Orders 2 of 5/Newberg 1968
Contractor--Change Orders 3 of 5/Newberg 1966-1967
Contractor--Change Orders 4 of 5/Newberg 1967
Contractor--Change Orders 5 of 5/Newberg 1967
Contractor--Change Orders/Tutor 1969-1970
Shop Drawings--Alliance Steel - Federal Steel
Shop Drawings--Geo. Elie Wrecking-Western Air and Refrg.
Shop Drawings--Weiss Co. - end
Project Number: 940210 MURPHY HALL ADDITION
General--Correspondence
General--Regents Minutes
General--Estimates and Budgets
Architect--Agreement & DCA/Fortune & Assoc. 1960-1965
Architect--General/Fortune & Assoc. 1960-1966
Architect--Pay/Fortune & Assoc. 1962-1967
Contractor--General Correspondence/Allen 1964-1967
Contractor--Pay/Allen 1964-1966
Contractor--Insurance/Allen-Honeywell 1964-1966
Contractor--Insurance/Irsay-Zuniga-Potter 1965-1966
Contractor--Insurance/Safety Reports 1964-1966
Contractor--Progress Reports 1964-1965
Contractor--Progress Reports 1965-1966
Project Number: 940220 POWELL LIBRARY ALTERATIONS STEP I
General--Correspondence 1960-1969
General--Minutes 1962-1966
General--Regents Minutes 1961
General--Conference Notes 1963-1965
General--Estimate and Budget 1958-1967
Testing Reports 1964-1965
Architect--Agreement & DCA/Jones & Emmons 1961-1965
Architect--General/Jones & Emmon 1961-1966
Architect--Pay 1962-1966
Landscape Architect--Cornell, Bridgers, & Troller 1964-1965
Contractor--Approval/Wilson 1964-1965
Contractor--Unsuccessful Bids 1964
Contractor--General Correspondence/Wilson 1964-1966
Contractor--Group 2 and 3 Equipment 1965-1966
Contractor--Pay 1964-1966
Contractor--Insurance 1961-1966
Contractor--Construction and Repairs 1961-1966
Contractor--Requisitions 1964
Contractor--Progress Reports 1964-1965
Contractor--Change Order Nos. 1-8 1964-1965
Contractor--Change Order Nos. 9-16 1965
Shop Drawings
Project Number: 940270 CYCLOTRON BUILDING ADDITION
General--Includes Architect and Contractor 1959-1963
Contractor--Progress Reports 1961
Project Number: 940280 LIFE SCIENCES BLDG. GRAD. RESEARCH UNIT 2
General--Includes Architect and Contractor 1958-1969
General--Minutes 1960-1961
General--Estimate and Budget 1959-1960
General--Major Cap. Improvements 1961-1962
Contractor--Preliminary Presentation 1960-1961
Contractor--General 1962-1964
Contractor--Progress Reports 1962-1964
Project Number: 940290 MACGOWAN HALL
General--Planning Guide 1962
General--Detailed Project Program 1963
General--Correspondence 1959-1973
General--Minutes 1959-1965
General--Regents Minutes 1963-1966
General--Conference Motes 1963-1967
General--Estimate and Budget 1956-1970
Testing Reports--Industrial Eng. Review 1965
Testing Reports--California Testing Labs 1965-1968
Architect--Agreement and DCA 1956-1967
Architect--Welton Beckett 1957-1966
Architect--Luckman & Assoc. 1958-1967
Architect--Pay/Luckman & Assoc. 1963-1967
Landscape Architect--Cornell, Bridgers, & Troller 1964-1967
Landscape Architect--Gaudenti Landscaping 1967-1968
Contractor--Approval/Steed Bros. 1967-1968
Contractor--Unsuccessful Bids 1965-1967
Contractor--General Correspondence 1967-1968
Contractor--Group 2 and 3 Equipment 1965
Contractor--Group 2 and 3 Equipment 1965-1967
Contractor--Pay 1966-1967
Contractor--Insurance/ABC Hardwood - Huntley (Incl. Steed Bros.) 1967-1969
Contractor--Insurance/Gaudenti - Keith 1967-1969
Contractor--Insurance/Kaufman & Walter -Zuniga Potter 1966-1967
Contractor--Construction and Repairs 1960-1968
Contractor-Requisitions 1963-1967
Contractor--Progress Reports 1966-1967
Contractor--Progress Reports 1967
Contractor--Change Orders Nos. 1-7 1966
Contractor--Change Orders Nos. 8-22 1966
Contractor--Change Orders Nos. 23 - 36 1967
Contractor--Change Orders Nos. 37 - 47 1967
Shop Drawings--Transmittals 1967
Shop Drawings--Transmittals 1967
Shop Drawings--Operations Manual 1966
Shop Drawings--A-1 Tile -
Shop Drawings--Advance Floor Co. - Steed Bros.
Shop Drawings to end
MATH SCIENCES ADDITION
General--Planning Guide 1962
General--Correspondence 1960-1966
General--Correspondence 1966-1971
General--Minutes 1963-1966
General--Regents Minutes 1963-1964
General--Conference Notes 1966-1968
General--Estimates and Budgets 1958-1970
General--Federal Grant 1965-1966
General--Federal Grant 1966-1968
Testing Reports--Smith Emery 1966
Testing Reports--Smith Emery 1966-1968
Architect--Agreement and DCA 1963-1968
Architect--Welton Beckett 1961
Architect--General Correspondence/Stanton and Stockwell 1963-1969
Architect--Payment 1964-1968
Landscape Architect--Cornell, Bridgers, & Troller 1964-1969
Contractor--Approvals 1966-1967
Contractor--Approvals 1967-1968
Contractor--Unsuccessful Bids 1966-1968
Contractor--General Correspondence 1966-1967
Contractor--General 1967-1969
Contractor--General/Buccola and Carlos 1968
Contractor--Group 2 and 3 Equipment 1966
Contractor--Group 2 and 3 Equipment 1966-1968
Contractor--Payment 1966-1969
Contractor--Insurance/Alta - Empire (Newberg also in this file) 1966-1969
Contractor--Insurance/Federal - Permalab Metalab 1966-1968
Contractor--Insurance/Rockwin - York 1966-1968
Contractor--Insurance/Site Development 1968
Contractor--Construction and Repairs 1960-1969
Contractor--Requisitions 1964-1968
Contractor--Progress Reports 1966-1967
Contractor--Change Orders Nos. 1-7 1966
Contractor--Change Orders Nos. 8-16 1967
Contractor--Change Orders Nos. 17 - 27 1967
Contractor--Change Orders Nos. 28 - 44 1967-1968
Contractor--Change Orders Nos. 45 - 46 1968
Shop Drawings--Alta Industrial - Federal Steel
Shop Drawings--Federal Steel - Pacific Elec. & Mech.
Shopdrawings--Permalab Metalab - York
EXTENSION OF UTILITIES, ROADS & WALKS
General and Contractor 1960-1964
Contractor--Rosecrans 1962
Contractor--Insurance 1963-1964
Contractor--Progress Reports 1962-1963
PARKING STRUCTURE J-1
General--Foundation Report 1958-1961
COMPUTER 7090
General Correspondence 1960
WEST CAMPUS TREE PROGRAM
General Correspondence 1961-1965
MATERIALS INSTITUTE
General Correspondence 1960-1962
CENTRAL CAMPUS UTITITIES
General Correspondence--Includes Est. & Bud., Arch., & Contract. 1963-1965
Contractor--Progress Reports 1963-1965
CENTRAL CAMPUS SITE DEVELOPMENT PHASE II
General--Correspondence 1961-1967
General--Minutes 1965-1966
General--Regents Minutes 1963
General--Conference Notes 1966-1968
General--Estimate and Budget 1961-1968
Testing Report 1966
Landscape Architect 1963-1968
Contractor--Unsuccessful Bids 1966
Contractor--General/Merco 1966-1968
Contractor--General/Granada 1967-1968
Contractor--Insurance/Dabo - Orco (File includes Merco) 1966
Contractor--Construction and Repairs 1961-1967
Contractor--Requisitions 1966-1968
Contractor--Progress Reports 1966-1967
ROYCE HALL ALTERATIONS
Contractor--Insurance 1974
Contractor--Progress Reports 1974
Contractor--Progress Reports and Shop Drawings 1974
LAW LIBRARY ADDTIONS
General--Detailed Project Program 1963
General--Correspondence/Air Conditioning 1951-1958
General--Correspondence 1963-1966
General--Minutes 1957-1965
General--Regents Minutes 1963
General--Conference Notes 1965-1966
General--Estimate and Budget 1958-1969
Testing Report
Architect--Approval and DCA 1963-1966
Architect--Welton Beckett 1965
Architect--Risley, Gould, & Van Heuk. 1963-1966
Architect--Pay 1963-1967
Landscape Architect--Cornell, Bridgers & Troller 1963-1967
Contractor--Approvals 1965
Contractor--Approvals 1966-1967
Contractor---Unsuccessful Bids 1965-1967
Contractor--General/Newberg 1965-1967
Contractor--General/Newberg 1966-1967
Contractor--General/Sanker (Landscaping) 1966-1967
Contractor--Group 2 and 3 Equipment 1964-1965
Contractor--Pay 1965-1967
Contractor--Insurance/A-1 Title -Fiberglas Eng. (Includes Newberg) 1965-1967
Contractor--Insurance/Goplen - Otis Elevator 1965-1967
Contractor--Insurance/R & R Masonry - York 1965-1967
Contractor--Insurance/Sanker (Landscaping) 1967
Contractor--Construction and Repairs 1961-1971
Contractor--Requisitions 1965-1966
Contractor--Progress Reports 1965
Contractor--Progress Reports 1966-1967
Contractor--Change Orders Nos. 1-15 1965-1966
Contractor--Change Order Nos. 16 - 31 1966-1967
Shop Drawings--Art Crete - Otis
Shop Drawings to end
PARKING STRUCTURE B
Contractor--Insurance
SPACE SCIENCES LABORATORY
General/Architect/Contractor 1961-1966
General--Federal NASA Grant 1962-1966
Testing Reports--Foundation Report 1964
Contractor--Insurance/J.B. Allen - LA Lathing 1965-1966
Contractor--Insurance/Mahaffey - Soule Steel 1965-1966
Contractor--Progress Report 1964-1965
BRUIN BOAT HOUSE
General/Architect/Contractor 1962-1966
MARRIED STUDENT HOUSING
General/Architect/Contractor 1959-1970
SURFACE PARKING, CENTRAL CAMPUS
General 1962
SUNSET CANYON RECREATION CENTER
General--Correspondence 1958-1973
General--Regents Minutes 1962-1966
General--Estimate and Budgets 1959-1966
Architect--Agreement and DCA 1962-1965
Architect--General/Smith & Williams 1961-1973
Contractor--General 1964-1967
Contractor--Pay 1964-1965
Contractor--Insurance/A & S Air - Soule Steel 1964-1965
Contractor--Insurance 1964-1965
Contractor--Progress Reports 1964-1966
TV FACILITY & EQUIPMENT
General 1962
MOORE HALL CLASSROOM CONVERSION
General--Correspondence 1972-1975
General--Group 2 aad 3 Equipment 1975
Contractor--General/Pay/Change Orders 1974-1975
Contractor--Insurance 1974-1975
Contractor--Progress Reports 1974-1975
Shop Drawings to end
MURPHY HALL ALTERATIONS
General--Planning Guide 1963
General--Correspondence 1959-1971
Genera1--Minutes 1970
General--Regents Minutes 1964-1968
General--Conference Notes 1968
General--Estimate and Budget 1960-1972
Contractor--Project Planning Guide
Architect--Agreement and DCA 1964-1969
Architect--General Correspondence/Fortune & Assoc. 1964-1970
Architect--Correspondence/Welton Beckett 1964
Arehitect--Pay 1964-1970
Contractor--Project Budget 1970
Contractor--Construction and Repairs 1963-1971
Contractor--Requisitions 1967-1970
UNIVERSITY RESEARCH LIBRARY
General--Project Program 1964
General--Correspondence 1963-1968
General--Correspondence 1969-1974
General--Minutes 1961-1970
General--Regents Minutes 1964-1968
General--Conference Notes 1965
General--Estimate and Budget 1958-1973
General--HEFA Budget 1968-1973
Testing Reports 1969-1970
Architect--Design Development 1965
Architect--Agreement and DCA 1969-1970
Architect--General Correspondence/Jones & Emmons 1964-1965
Architect--General Correspondence/Jones & Emmons 1966-1970
Architect--General Correspondence/Jones & Emmons 1970-1972
Architect--Pay 1965-1972
Architect--Job Meetings 1968-1969
Architect--Job Meetings 1970-1971
Landscape Architect--Cornell, Bridgers & Troller 1965-1971
Contractor-- Approval/Coastate Bldrs. 1969-1970
Contractor--Approval/Coastate Bldrs. 1969-1970
Contractor--Unsuccessful Bids 1968-1971
Contractor--General Correspondence--Coastate Bldrs. 1968-1969
Contractor--General Correspondence--Coastate Bldrs. 1969-1970
Contractor--General Correspondence--Coastate Bldrs. 1970-1971
Contractor--General Correspondence--Coastate Bldrs. 1971-1973
Contractor--General Correspondence (Site Development)/Tideman 1971
Contractor--Group II and III Equipment 1966-1971
Contractor--Pay 1969-1971
Contractor--Insurance 1968-1972
Contractor--Insurance 1971
Contractor--Construction and Repairs 1963-1977
Contractor--Requisitions 1968-1970
Contractor--Progress Reports 1968-1971
Contractor--Progress Reports 1968-1971
Contractor--Progress Reports 1968-1971
Contractor--Change Orders Nos. 1-10 1969
Contractor--Change Orders Nos. 11-19 1970
Change Orders Nos. 20 - 28 1970-1977
Contractor--Shop Drawings/Acme Hardware -end
UNIVERSITY EXTENSION BUILDING
General--Correspondence 1956-1967
General--Correspondence 1967-1968
General--Correspondence 1968-1973
General--Correspondence/Downtown Center 1973-1980
General--Minutes 1967-1973
General--Regents Minutes 1962-1969
General--Conference Notes 1965-1969
General--Estimate and Budget 1956-1973
General--Economic Study 1965
General--Balance Report 1971
General--HEFA Grant 1967-1972
Testing Reports--Schematic Submission 1967
Testing Reports--Soil Report 1972
Testing Reports--Smith Emery 1969-1970
Architect--Design Development Submission 1967
Architect--Agreement and DCA 1965-1971
Architect--General Correspondence/Jones & Emmons 1965-1968
Architect--General Correspondence/Jones & Emmons 1968-1971
Architect--General Correspondence/Jones & Emmons 1970-1973
Architect--Pay 1966-1972
Architect--Job Meetings 1969-1970
Architect--Job Meetings 1970-1973
Landscape Architect--Cornels Bridgers, & Troller 1967-1972
Contractor--Approvals 1969-1971
Contractor--Unsuccesful Bids 1966-1969
Contractor--General Correspondence/Burke Constr. 1989-1970
Contractor--General Correspondence/Burke 1970-1971
Contractor--General Correspondence/Burke Constr. 1970-1971
Contractor--General Correspondence 1971-1973
Contractor--Pending Lawsuit/Burke Constr. 1969-1972
Contractor--Media Installation 1969-1972
Contractor--Group II and III Equipment 1967-1978
Contractor--Pay 1969-1973
Contractor--Insurance 1969-1972
Contractor--Construction and Repairs 1960-1971
Contractor--Requisitions 1964-1973
Contractor--Progress Reports 1969-1970
Contractor--Progress Reports 1969-1970
Contractor--Progress Reports 1971
Contractor--Change Orders Nos. 1-4 1969-1970
Contractor--Change Orders Nos. 8-11 1969-1970
Contractor--Change Orders Nos. 12 - 16 1970-1971
Contractor--Change Orders Nos. 17 to end 1970-1971
Shop Drawings--Acme Sign Co. - Pacific States Steel
Shop Drawings--Republic Steel to end (includes operating manuals)
PARKING STRUCTURE L
General--Correspondence 1963-1965
Genera1--Correspondence 1965-1970
General--Regents Minutes 1963-1964
General--Estimate & Budget 1963-1967
Architect--Agreement and DCA 1963-1966
Architect--Conference Motes 1963-1966
Landscape Architect--Cornell, Bridgers, & Troller 1964-1966
Shop Drawings: Alta Roofing - Bethlehem Steel
Shop Drawings Bethlehem Steel - end
UNIVERSITY EXTENSION BLDG. 11TH & GRAND
General Correspondence 1963
PERLOFF HALL ALTERATIONS TO ARCHITECTURE
General--Project Planning Guides 1965-1966
General--Minutes 1967
General--Regents Minutes 1965
General--Conference Notes 1967-1968
General--Estimate and Budgets 1961-1970
Testing Reports 1967-1968
Architect--Agreement & DCA/Hunter 1965-1967
Architect--General Correspondence (includes Pay) 1965-1968
Landscape Architect--Cornell, Bridgers, Troller 1966-1969
Engineer--Agreement & DCA/Storms & Lowe 1965-1967
Engineer--General Correspondence 1965-1968
Contractor--Approval 1967-1968
Contractor--Unsuccessful Bids 1967
Contractor--General Correspondence 1967-1968
Contractor--Group II and III Equipment 1966-1969
Contractor--Payment 1967-1968
Contractor--Insurance/Johnson - Walling 1967-1968
Contractor--Construction and Repairs 1964-1970
Contractor--Requistions 1967-1968
Contractor--Progress Reports 1967-1968
Contractor--Change Orders 1968
Shop Drawings--start to end and Operations Manuals
CHEMISTRY-GEOLOGY BLDG. ALTS. STEP 2
General--Correspondence 1964-1969
General--Minutes 1966
General--Regents Minutes 1966
General--Conference Notes 1968
General--Estimates and Budgets 1964-1970
General--NSF Grants 1965-1970
Architect--Agreement/DCA 1966-1969
Architect--General Correspondence 1965-1970
Architect--Payment 1966-1969
Contractor--Project Planning Guide 1964
Contractor--Approval 1968-1969
Contractor--Unsuccessful Bids 1968
Contractor--General Correspondence 1968-1969
Contractor--Payment 1968-1969
Contractor--Construction and Repairs 1964-1969
Contractor--Requisitions 1968-1969
Contractor--Progress Reports 1968-1969
Contractor--Change Orders 1968-1969
Shop Drawings to end
ENGINEERING BUILDING UNIT 4
General--Project Planning Guide 1964-1966
General--Detailed Project Program 1966
General--Correspondence 1956-1971
PARKING STRUCTURE "H"
General--Project Program 1964
General--Correspondence 1964-1970
General--Widening of Gayley 1965-1967
General--Minutes 1964-1967
General--Regents Minutes 1984-1965
General--Estimate and Budget 1958-1973
General--HHFA 1963-1965
General--Westwood Plaza Traffic Study 1966
General--Traffic Control Requirements 1966
Testing Reports 1965
Testing Reports 1966
Testing Reports 1966
Testing Reports 1966
Testing Reports 1966-1967
Architect--Agreement and DCA/A.C. Martin 1964-1968
Architect--Welton Beckett 1965
Architecture--General Correspondence 1964-1972
Architecture --Pay 1964-1968
Architecture--Conference Notes 1964-1967
Architecture--Job Meetings 1965-1967
Architecture--Punch list Inspection 1967
Landscape Architect--Cornell, Bridgers, & Trailer 1964-1967
Contractor--Approvals 1965-1967
Contractor--Unsuccessful Bids 1965-1967
Contractor--General Correspondence 1965-1969
Contractor--Landscape Construction 1966-1967
Contractor--General Gorrespondence/Valley Crest Phase Two 1967-1968
Contractor--Insurance/A&S Air - Craneveyor (Includes Mereo Constr.) 1965-1967
Contractor--Insurance/Daily Assoc. -United Concrete 1965-1967
Contractor--Landscaping Insurance (Includes Marco Constr.) 1966-1967
Contractor--Construction and Repairs 1964-1968
Contractor--Requisitions 1966-1968
Contractor--Information Guarantees 1967
Contractor--Progress Reports/Merco 1965-1967
Contractor--Progress Reports/Valley Crest v
Contractor--Change Orders Nos. 1-26 1965-1967
Contractor--Change Orders Nos. 27 - end 1967
Shop Drawings--Henri - Merco
Shop Drawings to end (includes landscaping drawings)
LAUNDRY FACILITY
Contractor--Insurance/AM Monorail -Insul-Acoustics (Includes Steed) 1968-1969
Contractor--Insurance/Milhouser Poulos -Zuniga Potter 1968-1969
DRAKE STADIUM TRACK AND FIELD FACILITY
General--Project Planning Guide 1965
General--Design Development Docs. 1963-1966
General--Correspondence 1956-1974
General--Minutes 1964-1968
General--Regents Minutes 1964-1966
General--Estimate & Budget 1959-1969
Testing Reports--Soils Reports 1964
Testing Reports 1967-1969
Architect--Agreement and DCA 1965-1969
Architect--General Correspondence 1965-1970
Architect--General/Welton Beckett 1962-1968
Architect--Pay 1965-1970
Architect--Conference Notes 1966-1969
Landscape Architect--Cornell, Bridgers, & Troller 1964-1969
Contractor--Approvals 1967-1968
Contractor--Unsuccessful Bids 1967-1969
Contractor--General Correspondence 1967-1971
Contractor--Stadium Seating 1969
Contractor--Site Development/Granada 1968-1971
Contractor--Group II and III Equipment 1969
Contractor--Pay 1967-1969
Contractor--Insurance 1968
Contractor--Insurance 1969
Contractor--Construction and Repairs 1964-1970
Contractor--Requisitions 1964-1969
Contractor--Progress Reports 1967-1969
Contractor--Change Orders Nos. 1 - end 1967-1969
Shop Drawings to end
FOOD SERVICE FACILITY EXPANSION
General--Planning Guides 1966, 1968
General--Correspondence 1964-1969
General--Minutes 1965-1968
General--Estimate and Budget 1966-1969
Architect--Agreement and DCA 1967-1969
Architect--General 1967-1969
Architect--Pay 1968-1969
Architect--Conference Notes 1968-1969
Landscape Architect--Cornell, Bridgers, Troller 1969
Contractor--Construction and Repairs 1965-1969
SCIENCE COURT FOOD SERVICE FACILITY
General--Project Planning Guide 1966
General--Correspondence 1965-1970
General--Minutes 1966
General--Regents Minutes 1965-1967
General--Estimates and Budgets 1964-1969
Testing Reports 1967-1968
Architect--Agreement and DCA 1965-1967
Architect--General Correspondence/Bowerman 1965-1969
Architect--Welton Beckett 1967
Architect--Pay 1966-1968
Architect--Conference Notes 1967-1968
Landscape Architect--Cornell, Bridgers, & Troller 1967-1969
Contractor--Approvals 1967
Contractor--Unsuccessful Bids 1967
Contractor--General Correspondence /Escherich 1967-1968
Contractor--Pay 1967-1968
Contractor--Insurance 1967-1968
Contractor--Construction and Repairs 1985-1968
Contractor--Requisitions 1966-1968
Contractor--Progress Reports 1967-1968
Contractor--Change Orders Shop Drawings to end 1967-1968
BOAT HOUSE EXPANSION
General/Architect/Contractor 1966-1968
PARKING STRUCTURE "E"
General--Correspondence 1967-1969
General--Correspondence 1967-1971
General--Minutes 1964-1968
General--Regents Minutes 1964-1969
Testing Reports--Pile and Foundation Inspections 1967
Testing Reports--Osborne Labs 1968-1969
Testing Reports--Osborne Labs 1969
Testing Reports--Osborne Labs 1969
Testing Reports--Osborne Labs 1969
Testing Reports--Osborne Labs 1969-1971
Architect--Agreement and DCA 1965-1969
Architect--Pre Specs/Froehlich 1967
Architect--Supervisor/Welton Beckett 1958-1967
Architect--General/Froehlich 1965-1971
Architect--Pay 1965-1970
Architect--Conference Notes 1965-1968
Architect--Job Meeting 1968-1970
Contractor--Site Development 1969-1970
Contractor--Site Development 1970
Contractor--Approvals 1968-1970
Contractor--Unsuccessful Bids 1968-1969
Contractor--General Correspondence/Moulder Bros. 1968-1969
Contractor--General Correspondence/Newberg 1968-1971
Contractor--General Correspondence/Merco 1968-1969
Contractor--General Correspondence/Granada 1969-1970
Contractor--Pay 1968-1970
Contractor--Insurance/Newberg 1968-1970
Contractor--Insurance/Merco 1968-1969
Contractor--Insurance 1968-1970
Contractor--Insurance/Site Development 1969-1970
Contractor--Insurance/Granada 1969
Contractor--Construction and Repairs 1966-1973
Contractor--Requisitions 1967-1973
Contractor--Progress Reports 1968-1970
Contractor--Progress Reports /Weymouth-Crowell 1971
Contractor--Progress Reports/Granada 1969-1970
Contractor--Change Orders Nos. 1-24 1968-1969
Contractor--Change Orders Nos. 25 - 33 1969-1970
Shop Drawings to end
CENTRAL CAMPUS TELEPHONE FACILITY EXPAN.
General Correspondence 1953-1968
PRINTING PRODUCTION & PUBLICATION OFFC.
General--Correspondence 1964-1966
General--Minutes 1965
General--Regents Minutes 1965
General--Estimate and Budget 1964-1965
Architect--Agreement & DCA 1965
Architect--General Correspondence /Hutchason 1964-1965
Architect--Payment 1965-1966
Architect--Conference Notes 1965
Contractor--Approval 1965
Contractor--Unsuccessful Bids 1965
Contractor--General Correspondence 1965-1966
Contractor--Pay 1965-1966
Contractor--Insurance 1965-1966
Contractor--Construction and Repairs 1965-1966
Contractor--Requisitions 1965
Contractor--Progress Reports 1965
Contractor--Change Orders 1965-1966
Shop Drawings to end
CAMPBELL HALL ALTERATIONS
General--Project Planning Guide 1965-1970
General--Correspondence 1965-1970
General--Minutes 1966
General--Regents Minutes 1966-1967
General--Estimate and Budget 1965-1970
General--HEFA Grant 1967-1968
Architect--Agreement and DCA 1966-1969
Architect--General Correspondence 1966-1969
Architect--Pay 1966-1969
Architect--Conference Notes 1969
Landscape--Cornell, Bridgers, & Troller 1968
Contractor--Construction and Repairs 1965-1969
LIFE SCIENCES UNIT 3
General--Project Planning Guides 1965-1967
General--Project Planning Guides 1967-1971
General--Project Planning Guide 1971
General--Correspondence 1966-1972
General--Correspondence 1972-1976
General--Correspondence 1976-1979
General--Minutes 1966-1973
General--Regents Minutes 1966-1973
General--Estimates and Budgets 1962-1979
General--NSF/NIH Grant 1966-1972
General--NSF/NIH Grant 1971-1975
General--NSF/NIH Grant 1975-1977
General--Cancer Center Application 1971
General--HEFA Grant 1972
Testing Reports--Dynamic Analysis Reports 1972
Testing Reports--Smith-Emery 1973-1975
Testing Reports--Smith-Emery 1975
Testing Reports--Smith Emery 1973-1975
Testing Reports--Steel 1974
Testing Reports--Reinforcing Steel 1974
Testing Reports--Betz Entec System Review 1976
Testing Reports--Soil and Foundation Report 1973-1976
Architect- -Agreement and DCA 1966-1975
Architect--General Correspondence/Beckett 1966
Architect--General Correspondence/Honnold Rex 1966-1972
Architect--General Correspondence/Honnold Rex 1972-1977
Architect--Payment 1967-1977
Architect--Job Meetings 1974-1976
Architect--Job Minutes 1975-1976
Landscape Architect--General Correspondence 1967-1977
Landscape Architect--Site Development 1976
Landscape Architect--Site Development Job Minutes 1976
Contractor--Approval 1973-1976
Contractor--Approval/Building Specifiers 1977
Contractor--Approval/Kinnemetrics, Inc. 1976-1977
Contractor--Approval/Vaughn 1974-1975
Contractor--Approval/Willens-Bertisch 1977
Contractor--Unsuccessful Bids 1973
Contractor--General Correspondence 1973-1974
Contractor--General Correspondence 1974-1975
Contractor--General Correspondence 1975-1976
Contractor--General Correspondence 1976-1978
Contractor--General Correspondence/Site Development 1976-1977
Contractor--Group II and III Equipment 1974-1979
Contractor--Pay 1973-1975
Contractor--Pay 1975-1976
Contractor--Insurance 1973-1977
Contractor--Insurance 1976
Contractor--Construction and Repairs 1965-1979
Contractor--Requisitions 1973
Contractor--Progress Reports 1973-1975
Contractor--Progress Reports 1975-1976
Contractor--Change Orders Nos. 1-10 1973-1974
Contractor--Change Orders Nos. 11 - 26 1974
Contractor--Change Orders Nos. 27 - 36 1974-1975
Contractor--Change Orders Nos. 37 - 49 1975
Contractor--Change Orders Nos. 50-61 1975
Contractor--Change Orders Nos. 62 - 74 1975-1976
Contractor--Change Orders Nos. 75 - 77 v
Contractor--Cancelled Change Orders 1973-1976
Shop Drawings--ABC Schools - Newberg
Shop Drawings continued
Shop Drawings to end
UTILITIES 1966-67 ROYCE/STADIUM SUBSTATION
General Correspondence 1965-1969
Contractor--General Correspondence 1966-1968
Contractor--Insurance 1967-1968
Shop Drawings 1967
CLARK LIBRARY ALTERATIONS
General Correspondence 1950-1960
General--Minutes 1950-1966
General--Regents Minutes 1959-1966
General--Estimate and Budget 1950-1971
General--Testing Reports 1966-1967
Architect--Agreement and DCA 1965-1967
Architect--General Correspondence/Cordes & Crosby 1965-1967
Architect--Supervising 1961-1966
Architect--Cordes & Crosby 1966-1987
Architect--Conference Notes 1966-1967
Architect--Landscape/Cornell, Bridgers, & Troller 1955-1964
Contractor--Approval 1966-1987
Contractor--Unsuccessful Bids 1966
Contractor--General Correspondence 1966-1968
Contractor--Group II and III Equipment 1967
Contractor--Pay. 1967
Contractor--Insurance 1966-1967
Contractor--Construction and Repairs 1965-1968
Contractor--Requisitions 1965-1968
Contractor--Gate Closure 1966
Contractor--Progress Reports 1966-1967
Coatractor--Change Orders 1966-1967
Shop Drawings
MARMOUNT SCHOOL ACQUISITION
General Correspondence 1965-1966
FACULTY CENTER KITCHEN ADDITION
General Correspondence 1865-1966
Contractor--General Correspondence 1966
Contractor--Insurance 1966
Shop Drawings to end
BOTANICAL GARDENS DRAINAGE
General Correspondence 1965-1967
General Correspondence 1965-1969
Contractor--Insurance 1966-1967
Contractor--Progress Reports 1966-1967
Shop Drawings to end
HERSH1Y HALL LIBRARY ADDITION
General--Project Planning Guide 1966
General Correspondence 1965-1971
General--Soil Report 1967
Contractor--General Correspondence/Reeves Co. 1967-1968
Contractor--Progress Reports 1967-1968
Shop Drawings to end
UTILITIES
General--Project Planning Guide 1966
General Correspondence 1965-1969
ROLFE HALL ALTERATIONS
General--Project Planning Guide 1966-1968
General Correspondence 1967-1971
INTRAMURAL FIELD STATION
General Correspondence 1966-1967
HAZEN CHERRY MEMORIAL LABS
Contractor--Insurance 1967-1968
CYCLOTRON BLDG. ADDITION
General--Project Planning Guide 1967
General Correspondence (includes Architect) 1966-1970
Contractor--General Correspondence/Strauss 1968-1969
Contractor--Insurance 1968-1969
Contractor--Progress Reports 1968
Shop Drawings to end
UTILITIES
General Correspondence 1967-1969
MENS AND WOMENS GYMS ALTERATIONS
General Correspondence 1965-1969
MOORE HALL ADDITION
General Correspondence 1958-1971
WEST CAMPUS SITE DEVELOPMENT STEP
General--Project Planning Guide 1968
General Correspondence 1958-1969
BUNCHE HALL ELEVATOR ADDITION
General--Project Planning Guide 1968
General--Correspondence 1965-1971
MARRIED STUDENT HOUSING ROOF REPAIRS
General Correspondence 1967-1970
Contractor--General Correspondence 1969
Contractor--Insurance 1969
HOSPITAL TENNIS COURTS/RELOCATE BB FIELD
General Correspondence 1955-1969
MASONIC TEMPLE
General Correspondence no date
PARKING STRUCTURE "H" DEFECTS CORRECTION
General Correspondence--Includes Architect, Testing, & Contractor 1969-1970
Contractor--Includes Sue. & Unsuc. Bids, Minutes, Funds, & C & Rs 1970
Contractor--Insuurance 1970
Contractor--Correspondence to Morgan 1965-1969
Contractor--Law Suit Correspondence 1969-1975
Contractor--Correspondence to Jones Bros. 1970
Contractor--Construction Documents 1970
Contractor--Construction Documents 1970
Contractor--Construction Documents 1970
Contractor--Counsel's Review of Documents 1970
Contractor--Construction Documents 1970
Contractor--Defects Correspondence 1970-1975
Contractor--Defects Correspondence 1975
Contractor--Defects Correspondence 1975
Contractor--Defects Correspondence 1975
Contractor--Defects Correspondence 1975
Contractor--Defects Puchase Order 1976
Contractor--Defects Interrogations 1975-1976
Contractor--Structural Engineer' s Investigation of Defects 1976
Contractor--Minasian Assoc. Engineering Consultants to Defects 1976-1977
CLASSROOM CONVERSIONS TO OFFICES
General Correspondence 1970-1972
MURPHY HALL ALTERATIONS
General Correspondence 1970-1973
FRANZ HALL GRU ALTERATIONS
General--Feasibility Study 1969
General--Project Planning Guide 1970
General --Correspondence 1969-1972
General--Minutes 1970-1971
General--Regents Minutes 1971
General--Estimates and Budgets 1970-1974
Testing Reports--Structural Investigation 1969
Testing Reports 1971
Testing Reports--Smith Emery 1971-1972
Architect--Agreement and DCA 1970-1971
Archtect--General 1969-1972
Architect---Pay. 1971-1972
Architect--Job Minutes 1971-1972
Contractor--Approval 1971-1972
Contractor--Unsuccessful Bids 1971
Contractor--General Correspondence/Jones 1971-1973
Contractor--Group II and III Equipment 1970
Contractor--Pay 1971-1972
Contractor--Insurance 1971
Contractor--Construction and Repairs 1971-1972
Contractor--Requisition 1969-1971
Contractor--Computer Floor 1972
Contractor--Construction Progress Reports 1971-1972
Contractor--Change Orders--Nos. 1-7 1971-1972
Contractor--Change Orders Nos. 8-17 1972
CAMPBELL HALL ALTERATIONS
General--Project Planning Guides 1971
General--Correspondence 1971-1973
General--Minutes 1972-1973
General--Estimates and Budgets 1971-1973
Contractor--Approval 1973
Contractor--Unsuccessful Bids 1972-1973
Contractor--General Correspondence 1973
Contractor--Payment 1973
Contractor--Insurance 1972
Contractor--Construction and Repair 1973-1974
Contractor--Requisitions 1972
Contractor--Job Minutes 1973
Contractor--Construction Progress Reports 1973
Contractor--Change Orders to end 1973
Shop Drawings
DICKSON ART GALLERY EXPANSION
General--Project Planning Guide 1972
General--Correspondence 1971-1978
General--Estimate and Budget 1972-1976
General--Correspondence 1975
General--Regents Minutes 1973
Testing Reports--Soil and Foundation Reports 1972-1973
Testing Reports--Engineers 1974-1975
Testing Reports--Materials Testing /California Labs 1973
Testing Reports--California Labs 1973
Architect--Approval and DCA 1972
Architect--General Correspondence 1972-1974
Architect--Pay 1972-1974
Architect--Conference Notes 1972-1973
Architect--Job Minutes 1973
Landscape Architect--General Correspondence 1973-1974
Contractor--Approval 1973-1975
Contractor--Unsuccessful Bids 1973-1975
Contractor--General Correspondence 1973-1974
Contractor--General Correspondence/Storage Mezzanine 1975
Contractor--Pay 1973-1974
Contractor--Insurance 1973
Contractor--Insurance 1975
Contractor--Construction and Repairs 1972-1978
Contractor--Requisitions 1972-1977
Contractor--Construction Clarification 1973
Contractor--Construction Progress Report 1973-1975
Contractor--Change Orders Nos. 1-12 1973
Contractor--Change Orders Nos. 13-23 1973-1974
Shop Drawings
ROYCE HALL CLASSROOM ALTS (226 & 238)
General Correspondence 1960-1965
Contractor--General Correspondence 1962-1966
Contractor--Insurance 1962
ROYCE HALL CLASSROOM ALTS (56 to 32)
General Correspondence 1963-1966
YOUNG HALL ALTERATIONS
General Correspondence--Elevators 1965
HERSHEY HALL ALTERATIONS
General Correspondence 1958-1964
General Correspondence 1964-1965
Contractor--General Correspondence 1965-1966
Contractor--Insurance 1965-1966
UNIVERSITY ELEMENTARY SCHOOL LIBRARY ENLARGEMENT
General Correspondence 1963-1967
Contractor--General Correspondence 1966
YOUNG HALL ALTS DENTISTRY TEACHING LAB
General Correspondence 1863-1966
STEAM PLANT CABLE INSTALLATION
General Correspondence
1964-1966--BUNCHE HALL CLASSTOOM ALTS (2225)
General Correspondence 1964-1966
DODD HALL ALTERATIONS
General Correspondence 1964-1966
HAINES HALL ALTS
General Correspondence 1964-1966
ELECTRICAL HALL ALTS
General Correspondence 1965-1968
Contractor--General Correspondence 1967
Contractor--Insurance 1967
HIGH VOLTAGE IMPROVEMENTS
General Correspondence 1965-1967
HAINES HALL CLASSROOM ALTERATIONS
General Correspondence 1964-1966
LIGHT IMPROVEMENTS
General Correspondence 1963-1967
ENGINEERING BUILDING ALTS
General Correspondence and Shop Drawings 1962-1967
Contractor--General Correspondence and shop Drawings 1966
Contractor--Insurance 1962 & 1966
BOTANY BUILDING ALTERATIONS
General Correspondence 1965-1967
TENNIS COURTS RECONSTRUCTION
General Correspondence 1965-1969
Contractor General Correspondence 1966
LIFE SCIENCES BUILDING ALTS (1142 & 1134)
General Correspondence 1965-1967
WOMEN'S GYM ALTERATIONS
General Correspondence 1965-1972
Contractor--General Correspondence 1966-1967
Contractor--Insurance 1966
Shop Drawings
DODD HALL CLASSROOM CONVERSION
General Correspondence 1965-1967
YOUNG HALL CLASSROOM CONVERSIONS
General Correspondence 1965-1968
MOORE HALL REHABILITATION
General Correspondence 1965-1967
EAST CAMPUS PERIMETER ROAD SITE DEVELOP
General Correspondence 1965-1968
Contractor--General Correspondence 1966-1969
YOUNG HALL CLASSROOM CONVERSION
General Correspondence 1965-1968
VOLTAGE INCREASE TO MAIN SWITCHBOARD
General--Correspondence 1965-1968
GENERAL CAMPUS LIGHTING STEP 2
General Correspondence 1965-1967
YOUNG HALL STEAM & VACUM LINES IMPROVEMENT
General Correspondence 1967
FREIGHT ELEVATOR CONVERSION
General Correspondence 1965-1966
Shop Drawings
ROYCE HALL CLASSROOM CONVERSION
General Correspondence 1964-1968
HAINES HALL CLASSROOM CONVERSION
General Correspondence 1964-1969
Contractor--General Correspondence 1967
Shop Drawings
FACULTY CENTER SITE DEVELOPMENT
General Correspondence 1976-1978
SCHOENBERG HALL REMODEL
General Correspondence 1965-1969
Contractor--General Correspondence 1967-1968
WESTERN AIR CONDITIONING PROCESS CTR
General Correspondence 1965-1966
DYKSTRA & SPROUL HALLS RENOVATIONS
General Correspondence 1965-1968
Contractor--General Correspondence 1966-1968
Contractor--Insurance 1963-1966
Shop Drawings
ROYCE HALL ELECTRICAL DISTRIBUTION SYS
General Correspondence 1966-67
RESIDENCE HALLS INFORMATION CENTER
General Correspondence 1966-1967
Contractor--General Correspondence 1966
KLICTRICAL SYSTEM MODIFICATION
General Correspondence 1965-1969
BOTANY BLDG CLASSROOM CONVERSION
General Correspondence 1965-1969
LIFE SCIENCES BLDG ELEVATOR INSTALLATION
General Correspondence 1965-1969
Contractor--General Correspondence 1967-1969
Contractor--Insurance 1967-1968
Shop Drawings
YOUNG HALL CLASSROOM CONVERSION
General Correspondence 1965-1970
BOELTER HALL CLASSROOM CONVERSION
General Correspondence 1965-1969
SURFACE PARKING
General--Correspondence 1966
FOOTBALL FIELD PRACTICE FACILITIES
General--Correspondence 1966-1967
ROYCE HALL STEAM LINE ADDITION
General Correspondence 1968
ABSORPTION REHABILITATION
General Correspondence 1966-1969
DICKSON HALL BASEMENT ALTERATIONS
General Correspondence 1966-1969
UNDERGROUND FUEL STORAGE
General--Project Planning Guide 1973
General--Construction Documents 1975
General--Correspondence 1973-1979
General--Testing Reports 1975-1976
General--Testing Engineer Approval and Pay 1974-1977
Architect--Agreement and DCA 1973-1976
Architect--Job Minutes 1975-1976
Architect--Clarification Drawings 1975
Contractor--Approval 1975-1976
Contractor--General Correspondence 1975-1976
Contractor--Pay 1975-1976
Contractor--Wage Compliance 1975-1976
Contractor--Insurance 1975-1976
Contractor--Affirmative Action 1975-1976
Contractor--Requisitions 1975
Contractor--Construction Progress Reports 1975-1976
Contractor--Change Orders to end 1975-1976
Shop Drawings to end
MOORE HALL CLASSROOM CONVERSIONS
General Correspondence 1965-1968
SLICHTER HALL LABORATORY ALTERATIONS
General Correspondence 1965-1969
MACGOWAN HALL LIGHT TRAP CONSTRUCTION
General Correspondence 1964-1969
SCHOENBERG HALL LIGHT SYSTEM ALTERATIONS
General Correspondence 1965-1969
MACGOWAN HALL UNIT 2 LIGHT ALTERATIONS
General Correspondence 1967-1968
DODD HALL CLASSROOM CONVERSION
General Correspondence 1967-1969
GENERAL CAMPUS UTILITY SYSTEM EXPANSION
General Correspondence 1967-1969
SLICHTER HALL FUME HOOD INSTALLATION
General Correspondence 1967-1969
WOMEN'S GYM DECK CONVERSION
General Correspondence 1967-1969
SLICHTER HALL CLASSROOM CONVERSION
General Correspondence 1966-1969
GENERAL CAMPUS PROGRAM CABLE EXPANSION
General Correspondence 1968-1971
ACKERMAN UNION MAINTENANCE CONSTRUCTION
General Correspondence 1968-1971
TROTTER FIELD PARKING
General Correspondence 1968-1969
Contractor--General Correspondence 1969
Contractor--Insurance 1969
ELEVATOR MODERNISA. MURPHY, YOUNG, & DODD
General Correspondence 1967-1970
Contractor--General Correspondence V
Contractor--Insurance 1970
HAINES HALL MUSEUM CONVERSION
General Correspondence 1967-1970
HAINES HALL CLASSROOM CONVERSION
General Correspondence 1968-1970
BOELTER HALL OFFICE ALTERATIONS
General Correspondence 1965-1970
AIR CONDITIONING EXPANSION
General Correspondence 1968-1970
YOUNG HALL CLASSROOM CONVERSION
General Correspondence 1965-1970
DICKSON ART CENTER DUST EVACUATION
General Correspondence 1968-1970
WOMEN'S GYM POOL ALTERATIONS
General Correspondence 1968-1971
MEN'S GYM ROOM CONVERSION
General Correspondence 1967-1969
WOMEN'S GYM SAUNA CONSTRUCTION
General Correspondence 1969-1970
846520--PARKING INFORMATION STATION
General Correspondence 1971-1973
PARKING LOT 32 EXPANSION
General Correspondence 1969
WYTON DRIVE PARKING INFO STATION
General--Correspondence 1969-1971
Construction--Insurance 1970
BUILDING DEMOLITION #TB6A
General Correspondence 1975-1976
Contractor--Insurance 1976
VISITOR LOT ADMIN BUILDING
General Correspondence 1969
JAPANESE GARDENS
General Correspondence 1969-1971
Landscape Contractor--Correspondence/Granada 1968-1970
DOWNTOWN UNIVERSITY EXTENSION ALTERATIONS
General Correspondence 1969
FACULTY CENTER ALTERATIONS
General Correspondence 1970-1971
HAINES HALL CLASSROOM ALTERATIONS
General Correspondence 1970-1971
--INFORMATION REST AREA
General Information 1970
SPAULDING FIELD
General--Correspondence 1970
BERSHIY HALL ASSETTO FOUNTAIN NSTALLATION
General Correspondence 1970
MARRIED STUDENT HOUSING COURT DEVELOPMENT
General Correspondence 1970
LAW SCHOOL ALTERATIONS
General Correspondence 1970
PERLOFF HALL ALTERATIONS
General Correspondence 1970
VIRTICAL TRANSPORT SYSTEM
General Correspondence 1970-1972
KERCKHOFF HALL ALTERATIONS
General Correspondence 1970-1973
Shop Drawings
ROYCE HALL EXTERIOR STAIRS
General Correspondence 1970-1971
CYCLOTRON TRANSFORMER INSTALLATION
General Correspondence 1965-1970
LIFE SCIENCES BUILDING ALTERATIONS
General Correspondence 1969-1972
MARRIED STUDENT HOUSING WAREHOUSE
General Correspondence 1970-1973
Contractor--General Correspondence 1971-1972
Contractor--Insurance 1971
Shop Drawings
MELNITZ HALL LIGHT INSTALLATION
General Correspondence 1968-1971
SCHOENBERG HALL AIR CONDITIONING INSTALL
General Information 1970-1972
MOORE HALL CLASSROOM CONVERSION
General Correspondeonce 1971-1972
POWELL LIBRARY LIBRARY SCHOOL ALTERATIONS
General Correspondence 1971
BOELTER HALL MATH CLASSROOM ALTERATIONS
General Correspondence 1971-1972
FERNALD SCHOOL CONSTRUCTION
General--Project Planning Guide 1971
General--Correspondence 1970-1973
General--Estimates and Budgets 1971-1972
Testing Reports--Smith Emery 1971
Testing Reports--General Correspondence 1971
Architect--General Correspondence 1971
Contractor--Approval 1971
Contractor--General Correspondence 1971-1972
Contractor--Pay 1971-1972
Contractor--Construction and Repairs 1971-1972
Contractor--Job Minutes 1971
Contractor--Job Minutes 1971
Contractor--Construction Progress Reports 1971
Contractor--Change Order Nos. to end 1971
DICKSON ART CENTER KILN ROOF INSTALLATION
General Correspondence 1971
FACULTY CENTER PATIO EXPANSION
General Correspondence 1971
DODD HALL SOCIAL WELFARE ROOM ALTERATIONS
General Correspondence 1970-1971
GENERAL CAMPUS CHEMICAL FUME HOODS
General Correspondence 1970-1973
BOELTER HALL VACUUM SYSTEM
General Correspondence 1970-1971
KINSEY HALL CLASSROOM ALTERATIONS
General Correspondence 1970-1973
HAINES HALL CLASSROOM CONVERSIONS
General Correspondence 1970-1974
BOELTER HALL CLASSROOM CONVERSIONS
General Correspondence 1971-1973
LIFE SCIENCE BUILDING TILE FLOORS
General Correspondence 1971
HAINES HALL BAR WINDOWS AND DOORS
General Correspondence 1971-1972
LIFE SCIENCES BLDNG AVIARY MODERNIZATION
General Correspondence 1971-1973
BOTANY BUILDING ALTERATIONS
General Correspondence 1971-1974
MEN'S GYM ALTERATIONS
General Correspondence 1972-1975
HAINES HALL ALTER CLASSROOM 315
General Correspondence 1972-1975
LAW BUILDING CLASSROOM LIGHTING
General Correspondence 1972-1973
MEN'S GYM ALTERATIONS
General Correspondence 1972-1974
CAMPBELL HALL HOUSING OFFICE ALTERATIONS
General Correspondence 1972-1974
SOUTH TENNIS COURTS REPAIRS
General Correspondence 1972-1973
KERCKHOFF HALL OFFICE REMODEL
General Correspondence 1972-1976
AMPITHEATRE DRIVE SITE DEVELOPMENT
General Correspondence 1972-1975
SOUTH TENNIS COURTS BACKBOARDS INSTALLATION
General Correspondence 1973-1974
HIGH PRESSURE WATER MAIN LOOP
General Correspondence 1972-1978
GENERAL CAMPUS UTILITIES
General Correspondence 1968-1974
MEN'S GYM ALTERATIONS
General Correspondence 1972-1974
Project Number: 947032 ANDERSON CLASSROOM ALTS
General Correspondence 1972-1973
Project Number: 947033 PERLOFF HALL OFFICE CONVERSIONS
General Correspondence 1972-1973
Project Number: 947034 MOORE HALL CLASSROOM ALTERATIONS
General Correspondence 1972-1974
Project Number: 947035 BOELTER HALL PARTITION CONSTRUCTION
General Correspondence 1972-1975
Project Number: 947036 LIFE SCIENCES ROOM ALTERATIONS
General Correspondence 1973-1976
Contractor--Construction Progress Reports 1973-1974
Shop Drawings to end
Project Number: 947037 KINSEY HALL LAB ALTERATIONS
General Correspondence 1972-1975
Project Number: 947038 LIFE SCIENCES FISHERIES ALTERATIONS
General Correspondence 1972-1974
Project Number: 947041 GENERAL CAMPUS GENERATORS
General Correspondence 1972-1977
Project Number: 947044 GENERAL CAMPUS UTILITIES
General Correspondence 1970-1973
Project Number: 947045 GENERAL CAMPUS EXTENDED UTILITIES
General Correspondence 1969-1975
Project Number: 947046 GENERAL CAMPUS COOLING TOWERS
General Correspondence 1971-1972
Project Number: 947047 GENERAL CAMPUS PROJECT ION SYSTEMS
General Correspondence 1971-1973
Project Number: 947048 CLARK LIBRARY OUTDOOR LIGHTING
General Correspondence 1972-1973
Project Number: 947050 MURPHY HALL A/C AREA A
General Correspondence
Project Number: 947052 DICKSON ART CENTER TEXTILE DARKROOM
General Correspondence 1974
Contractor--Insurance 1975
Project Number: 947053 LIFE SCIENCES 5TH FLR BACTER. & RM 4132
General Correspondence 1973-1975
Contractor--Insurance 1974-1975
Contractor--Change Orders to end 1974
Shop Drawings to end
Project Number: 947054 WOMEN'S GYM ALTS TO RM 109
General Correspondence 1973-1974
Project Number: 947055 FDM STORAGE BUILDING
Testing Reports--Soil Report 1974
Shop Drawings to end
Project Number: 947056 ANDERSON GSM CLASSROOM ALTERATIONS
General Correspondence 1971-1977
Project Number: 947057 BOELTER HALL ROOM ALTS TO1867--4538
General Correspondence 1974-1977
Project Number: 847058 MILNITZ ALTS TO RM 1426
General Correspondence 1975-1977
Project Number: 947059 MACGOWAN HALL ROOM ALTS
General Correspondence 1974-1977
Project Number: 947060 MEN'S GYM LOCKERS
General Correspondence 1973-1977
Project Number: 947061 GEOLOGY BLDG ROOM ALTS TO 4619
General Correspondence 1972-1974
Project Number: 947062 SCHOENBERG HALL STAGE ADDITION
General Correspondence 1968-1975
Project Number: 947063 ANDERSON GSM LANDSCAPING
General Correspondence 1971-1974
Project Number: 947064 GENERAL CAMPUS EROSION CONTROL
General Correspondence, Including Landscaping and Insurance
Contractor--Insurance 1968-1974
Project Number: 947065 ACKERMAN UNION TERRACE ROOM ALTS
General Correspondence 1973-1974
Contractor--General Correspondence &Change Orders to end 1973-1974
Contractor--Insurance 1970-1973
Contractor--Progress Reports 1973
Shop Drawings to end
Project Number: 947066 ACKERMAN UNION MEN'S LOUNGE
General Correspondence 1973-1974
Project Number: 947067 ACKERMAN UNION WOMEN'S LOUNGE
General Correspondence 1973
Project Number: 947068 KERCKHOFF HALL ICE CREAM PARLOR
General Correspondence 1973
Project Number: 947069 SCIENCE COURT FOOD SERVICE
General Correspondence 1973
Project Number: 947070 GENERAL CAMPUS RETAINING WALL CONSTRCT
General Correspondence 1971-1974
Project Number: 947071 MURPHY HALL A/C AREA B
General Correspondence
Project Number: 947072 BOELTER HALL YORK UNIT INSTALLATION
General Correspondence 1971-1975
Project Number: 947073 WOMEN'S GYM DANCE STUDIO ALTS
General Correspondence 1973-1977
Project Number: 947074 FERNALD SCHOOL LIBRARY ADDITION
General Correspondence 1974-1976
Testing Reports--Calif. Testing Labs and LT Evans Engin. 1975
Contractor--General Correspondence 1975
Contractor--Insurance 1975-1977
Contractor--Progress Reports 1975
Shop Drawings to end
Project Number: 947075 TENNIS COURTS RESURFACING
General Correspondence 1973-1974
Project Number: 947076 WOMEN'S GYM ALTS TO RM 200
General Correspondence 1974-1975
Project Number: 947078 ANDERSON GSM LEARNING CENTER
General Correspondence 1974-1975
Contractor--Insurance 1974
Project Number: 947079 MEN'S GYM ALTS TO RMS 127, 129, 132, 134
General Correspondence 1974-1975
Project Number: 947080 MEN'S GYM ALTS TO ROOM 105
General Correspondence 1975-1977
Contractor--General Correspondence 1975-1976
Contractor--Insurance 1976
Contractor--Job Minutes 1975
Contractor--Construction Progress Reports 1975
Shop Drawings to end
Project Number: 947081 PPD SHOP EXHAUST
General Correspondence 1974-1977
Project Number: 947082 LIFE SCIENCES BLDG BIOLOGY ALTS
General Correspondence 1974-1977
Project Number: 947083 LAW BUILDING ALTS TO ELECTRICAL
Contractor--General Correspondence 1975-1976
Contractor--Approval and Unsuccessful Bids 1975
Contractor--Authorizations, Pay, Change Orders, Shop Drawings 1976-1977
Contractor--Insurance 1975
Contractor--FED Insurance 1976-1977
Contractor--Job Meetings 1976
Contractor--Construction Progress Reports (Electrical) 1975-1976
Contractor--Construction Progress Reports (Mechanical) 1975-1976
Shop Drawings to end
Project Number: 947084 MELNITZ HALL HUMIDITY CONTROL
General Correspondence 1974-1975
Project Number: 947085 PERLOFF HALL REMODEL B-100
General Correspondence 1974-1975
Project Number: 947086 PHYSICAL PLANT STORAGE
General Correspondence 1974-1975
Project Number: 947087 MELNITZ DUMBWAITER & ELEVATOR
General Correspondence 1975-1976
Contractor--General Correspondence 1976
Contractor--Insurance 1977
Contractor--Construction Progress Reports 1976
Contractor--Change Orders to end 1976
Project Number: 947088 BOELTER HALL ELEVATOR ALTS
General Correspondence 1975-1976
Project Number: 947089 ANDERSON GSM STUDENT AFFAIRS
General Correspondence 1975-1977
Contractor--General Correspondence 1975-1976
Contractor--Insurance 1975
Contractor--Construction Progress Reports 1975-1976
Shop Drawings to end
Project Number: 947090 LIFE SCIENCES BLDG ALTS TO BACTERIOLOGY
General Correspondence 1974-1977
Project Number: 947091 MACGOWAN HALL ALTS
General Correspondence 1974-1975
Project Number: 947092 STEAM PLANT RELOCATE CHEMICAL TESTING
General Correspondence 1974-1976
Project Number: 947093 LAW BUILDING CIRCULATION ALTS
General Correspondence 1975-1977
Project Number: 947094 PAULEY PAVILION ALTERATIONS
General Correspondence 1975-1977
Project Number: 947095 YOUNG HALL EXHAUST DEVICES
General Correspondence 1975-1980
Project Number: 947096 ANDERSON GSM CLASSROOM RENOVATIONS
General Correspondence 1976-1979
Project Number: 947097 LIFE SCIENCES BLDG LSC 2147 RENOVATION
General Correspondence 1975-1979
Project Number: 947099 DICKSON ART CTR EXHAUST SYSTEM
General Correspondence 1976-1979
Project Number: 947100 NUCLEAR REACTOR FACILITY DOOR
General Correspondence 1971-1972
Project Number: 947109 MURPHY HALL A/C 750 KVA SUBSTATION
General Correspondence 1975-1979
Contractor--Unsuccessful Bids 1976
Contractor--Insurance 1976
Contractor--Construction Progress Reports 1976
Project Number: 947114 WOMEN'S INTERCOLLEGIATE SPORTS TRAILER
General Correspondence 1974-1975
Project Number: 947116 WOMEN'S GYM RM ALTS
General Correspondence 1975-1979
Contractor--General Correspondence 1975-1977
Contractor--Wage Compliance and 1975
Contractor--Insurance 1975
Contractor--Construction Progress Reports 1975
Shop Drawings to end
Project Number: 947117 BOELTER HALL ACID WASTE SYSTEM
General Correspondence 1977
Contractor--Insurance 1977
Shop Drawings to end 1977-1979
Project Number: 947118 UNIVERSITY ELEMENTARY SCHOOL VENTILATION
General Correspondence 1977-1979
Project Number: 947120 LAW LIBRARY ALTS TO ROOM 112F
General Correspondence 1976-1979
Project Number: 947121 ANDERSON GSM ALTERATIONS
General Correspondence 1976-1979
Project Number: 947122 GEOLOGY BUILDING ALTS TO ROOM 3706
General Correspondence 1977-1979
Project Number: 947124 ROLFE HALL LAB MODIFICATIONS
General Correspondence 1977-1979
Project Number: 947130 BOATHOUSE DOCK REPAIRS
General Correspondence 1976-1977
Contractor--Insurance 1977
Contractor--Insurance 1976-1977
Project Number: 947130 BOTANY BUILDING REPAIRS
General Correspondence 1972
Project Number: 947134 ASUCLA-LAW FOOD SERVICE FACILITY
General Correspondence 1975-1977
Project Number: 947135 REACTOR FACILITY ALTERATIONS
General Correspondence 1976
Contractor--Insurance 1976-1977
Project Number: 947136 RESIDENCE HALLS KITCHEN EXHAUST
General Correspondence 1976-1977
Project Number: 947137 ROYCE HALL MEDIA CENTER VENTILATION
General Correspondence 1976
Project Number: 947138 MELNITZ HALL REMODEL PROJECTION BOOTH
General Correspondence 1976-1980
Contractor--General Correspondence 1976-1979
Contractor--Insurance 1977
Contractor--Job Minutes 1977-1978
Contractor--Construction Progress Reports 1977
Contractor--Preplan not approved 1977
Shop Drawings to end
Project Number: 947139 MURPHY HALL A/C ELECTRICAL SYSTEM
General Correspondence 1976-1977
Contractor--Insurance 1976-1977
Shop Drawings to end
Project Number: 947140 FACULTY CENTER BASEMENT
General Correspondence 1976-1978
Project Number: 947141 YOUNG HALL EXHAUST SYSTEM REMODEL
General Correspondence 1978
Contractor--Engineering 1978-1979
Contractor--Insurance 1978
Shop Drawings to end
Project Number: 947143 POWELL LIBRARY EXTERIOR STAIRWAY
General Correspondence 1977-1979
Architect--Authorization and DCA 1978-1979
Contractor--General Correspondence 1978-1979
Contractor--Insurance 1978
Contractor--Construction Progress Reports 1978
Shop Drawings to end
Project Number: 947144 WOMEN'S GYM DANCE STUDIO VENTILATION ALTS
General Correspondence 1977-1979
Architect--Approval 1977-1978
Contractor--Unsuccessful Bids 1978
Contractor--Insurance 1978
Contractor--Change Orders to end 1978-1979
Shop Drawings
Project Number: 947150 GENERAL CAMPUS HANDICAPPED RAMPS
Contractor--Insurance 1978
Project Number: 947152 MATH SCIENCE BLDG 4TH FLOOR REMODEL
Architect--Agreement 1976-1978
Contractor--General Correspondence 1977-1978
Contractor--Unsuccessful Bids 1978-1978
Contractor--Insurance 1977
Project Number: 947153 HERSHEY HALL SHOWER ALTERATIONS
General Correspondence 1975-1979
Contractor--Insurance 1978
Project Number: 947154 MURPHY HALL ALTS TO ACADEMIC SERVICES
General Correspondence 1978-1979
Contractor--Approvals 1978
Contractor--General Correspondence 1978-1979
Contractor--Building Specifiers Auth and Pay 1978
Contractor--Insurance 1969-1979
Shop Drawings to end
Project Number: 947160 ELEVATOR EARTHQUAKE STUDY
General Correspondence 1972
Project Number: 948630 SPROUL HALL SPRINKLERS
General Correspondence 1974-1977
Contractor--Insurance 1975-1976
Contractor--Construction Progress Reports 1975
Shop Drawings to end
Project Number: 948800 CLARK LIBRARY ALTERATIONS
General Correspondence 1971-1972
Project Number: 948801 DEMOLISH TEMPORARY BLDGS 2D &
General Correspondence 1971-1973
Project Number: 950400 PRIMARY ELECTRICAL SWITCHGEAR REPLACEMENT
General Correspondence 1958-1962
Project Number: 958670 GENERAL CAMPUS FUME HOOD STUDY
General Correspondence 1967-1969
Project Number: 992010 DINING ROOM FACILITIES EXTENSION
General Correspondence 1960-1961
Contractor--Construction Progress Reports 1960-1961
Project Number: 992200 MACGOWAN HALL CONSTRUCTION
General Correspondence 1959-1974
Testing Reports--Foundation Investigation 1958
Contractor--General Correspondence 1962-1963
Contractor--Insurance 1963
Contractor--Insurance 1963
Contractor--Insurance for Costume Area Addition 1963
Contractor--Construction Progress Reports 1960-1962
Contractor--Construction Progress Reports 1962-1963
Project Number: 992300 ANDERSON GSM LANDSCAPING AND SPRINKLERS
General Correspondence 1961-1962
Testing Reports--Caisson Inspection 1959
Contractor--Equipment List 1958
Contractor--Construction Progress Reports 1959-1960
Contractor--Construction Progress Reports 1960-1961
Contractor--Construction Progress Reports 1961-1962
Project Number: 992300, 992400, 992500 NORTH CAMPUS COURT DEVELOPMENT
General Correspondence 1964-1966
General--Regents Minutes 1963 & 1967
General--Estimates and Budgets 1963-1964
Contractor--General Correspondence 1964-1965
Contractor--Payment Requests 1964-1965
Contractor--Insurance 1965
Contractor--Construction Progress Reports 1964-1965
Project Number: 992500 UNIVERSITY RESEARCH LIBRARY
General Correspondence, Minutes, Budgets, Contractor Approval 1958-1973
Testing Reports--Air Balance Report 1964-1968
Landscaping--General Correspondence 1964
Contractor--Insurance 1964
Contractor--Insurance/Merco 1964
Contractor--Insurance/S. Patti Co. 1962-1964
Contractor--Freestanding Bookshelving Insurance 1963-1964
Contractor--Construction Progress Reports 1962-1963
Contractor--Construction Progress Reports 1963-1964
Project Number: 992900 BOELTER HALL UNIT 3
General Correspondence 1956-1969
Testing Reports--Smith Emery Co. 1957-1960
Testing Reports--Smith Emery Co. 1960-1961
Contractor--Construction Progress Reports 1959-1960
Contractor--Construction Progresa Reports 1960-1962
Project Number: 994500 NORTH CAMPOS UTILITY ROADS EXPANSION
General Correspondence 1957-1962
Landscaping--General Correspondence 1961
Contractor--General Correspondence 1961-1962
Contractor--Construction Progress Reports 1960-1961
Contractor--Construction Progress Reports 1961-1962
Project Number: 994700 CHEMISTRY-GIOLOGY BUILDING ADDITION 1
General Correspondence 1980-1967
Landscaping--Site Development 1963-1964
Contractor--General Correspondence 1961-1963
Contractor--Construction Progress Reports 1961-1962
Contractor--Construction Progress Reports 1963
Project Number: 940176 SCHOENBERE HALL RONDEL ENTIRE FILE
Project Number: 940520 JACKLE ROBINSON FIELD EXP
Project Number: 940520 JACKLE ROBINSON FIELD EXP/940730 ROYLE MUORE HALL 100
Project Number: 940840 LOS ANGLES TENNIS CENTER
Project Number: 940840 LOS ANGLES TENNIS CENTER
Project Number: 940840 LOS ANGLES TENNIS CENTER
Project Number: 940840 LOS ANGLES TENNIS CENTER
Project Number: 940840 LOS ANGLES TENNIS CTR LOOSE/940141
Project Number: 940915 ROYLE HUMANITIES CONFERENCE HALL
Project Number: 940910 ROYLE HALL RENOVATION
Project Number: 940910 ROYLE HALL RENOVATION
Project Number: 940910 ROYLE HALL RENOVATION
Project Number: 940910 ROYLE HALL RENOVATION
Project Number: 940910 ROYLE HALL RENOVATION
Project Number: 940910 ROYLE HALL RENOVATION & LOOSE
Project Number: 940910 ROYLE HALL RENOVATION LOOSE
Project Number: 944180 LOUIS FACTOR FIXED EQUIPMENT/945060 CHS TOXICOLOGY WAB ALT.
Project Number: 944450 DREW CLINICAL SCIENCES CENTER
Project Number: 944450 DREW CLINICAL SCIENCES CENTER & LOOSE/944451 EQUIP.
Project Number: 944640 CHS3S-138 OR # 17 TRAUMA CTR ALT./944650 CHS OUTPATIENT
Project Number: 945010 CHS BORY SCANNER REPLACEMENT/945140 FONAR SCANNER
Project Number: 945140 FONAR SCANNER/945910 PADIATRIC EMERGENCY ROOM ALT.
Project Number: 946500 LOT 32 DEMOUNTABLE PARKING STRUCTURE
Project Number: 946500 LOT 32 DEMOUNTABLE PARKING STRUCTURE
Project Number: 946500 LOT 32 DEMOUNTABLE PARKING STRUCTURE & LOOSE
Project Number: 940630 LUVALLE COMMONS CONST.
Project Number: 940630 LUVALLE COMMONS CONST.
Project Number: 940630 LUVALLE COMMONS CONST.
Project Number: 940630 LUVALLE COMMONS LOOSE
Project Number: 940680 CA&E STUDY/940830 MORGAN CENTER
Project Number: 940830 MORGAN CENTER RENOVATION
Project Number: 940830 MORGAN CENTER RENOV.LOOSE/949120 NPI 1 WEST ENOVATION
Project Number: 940980 PETER V.VEBERROTH BLDE REMODEL
Project Number: 941010 LAKE ARROWHEAD CONFERENCE CENTER
Project Number: 941010 LAKE ARROWHEAD CONFERENCE CENTER
Project Number: 941010 LAKE ARROWHEAD CONFERENCE CENTER
Project Number: 941010 LAKE ARROWHEAD CONFERENCE CENTER
Project Number: 941010 LAKE ARROWHEAD CONF.CTR LOOSE/9441011 LAKE ARROWHEAD EQUIPMENT./947003 URL CHILLER
Project Number: 941050 POWELL LIBRARY 280 OLD MULTIMEDIA LEARNING LAB/
Project Number: 941090 BUSINESS ENTERPRISES ADMINISTRATION BLDG 2ND FLADD.
Project Number: 945000 JSEIA A-188 OR. ALTERATION/949121 CHS SEWAEE ELECTORS/949122 CHS 6E + 6W WARD REFURBISHMENT.
Project Number: 947007/947009/947013/947014/947017/947018,947020/94724/947030/947040/947043/947047/ 947063/947075/947077
Project Number: 947078/947084/947101/947211/947223/947224/947227/947240/947241/947243/947245/947246/ 947278/947283/947360/947361
Project Number: 947363/947380/947387/347394/947400/947423/947430/947435/947436/
Project Number: 947460/947470/947501/947505/947508/947556/947572/947580/947581/947604/947610/947613 47656/947658
Project Number: 947632/947659/947615/947629/
Project Number: 947618/947630/947631/947668/947671/947673/947675
Project Number: 947701/947703/947705/947707/947712/947800/947803/947805/948819/947004/947031/947033/
Project Number: 947032/947039/947045/947045/947074/947079/947103/947108/947110/947148/
Project Number: 947111/947112/947203/
Project Number: 947225/947254/947255/947259/947260/947280/947282/947284/947288/947292/947300
Project Number: 947301/947304/947306/947307/947341/947342/947343/
Project Number: 947344/947345/947364/947365/947366/947367/947368/947372/947374/947376/947379/
Project Number: 947384/947395/947396/947397/947439/947441/
Project Number: 947447/947450/947451/947453/947454/947455/
Project Number: 947456/947462/947466/947467/947469/947472
Project Number: 947474/947480/947481/947490/947549/947553/947562
Project Number: 947571/947576/947583/947584/947588/947599/947605/947606/
Project Number: 947608/947609/947617/947621/947625/947634/947641/947644/947645
Project Number: 947652/947660/947661/947662/947663/947664
Project Number: 947666/947669/947670/947688/947689/947699
Project Number: 947709/947720/947721/947727/947730/947750/947752/947801/947810
Project Number: 947811/947812/947813/947817/947818/947825/947826/947827/947828/947829/947830/ 947831/947833/847835
Project Number: 947836/947845/947847/947850/949128/949130
Project Number: 948808/948812/948820/949132
Project Number: 949134 CHS 9TH & 10TH FL REFURBISHMENT
Project Number: 949135 CHS EMEREENCY ROOM ALT./949138 CHS MAIN LOBBY ALT.
Project Number: 948900 NORTHWEST CAMPUS MASTER PLAN.
Project Number: 948900 NW. CAMPUS MASTER PLAN LOOSE/949140 JSEI KATHABAR UNIT.
Project Number: 945100 CHS GIFT SHOP ALT/944790 NRI 1 SOUTH REFIXB.
Project Number: 945170 HSB-MC 4 WEST SPECIAL PROCEDURES ROOM ALT. 944720 LOT/ IMPLEMNTATION STUOY REED
Project Number: 944810 HSB-SOM DEAN'S SUITE/944820 HSB-SOM 4TH FL NEUROLOGICAL RESEARCH LAB/944860 BIOMEDICAL LIBRARY URL RARE BOOK ROOM.
Project Number: 940410 PLASMA FUSION AXISYMETRIC MIRROR FAC/940440/940490 WEST CAMPUS INTERIM STAGNE FACILITY (WEST MEDICAL BUILDING)
Project Number: 940490 WEST CAMPUS INTERIM STAGNE FAC & LOOSE
Project Number: 940730 WIGHT GALLERY AIRCONDITIONING/942270.. MURPHY 3RD FL WEST WINE ALT.
Project Number: 944520 CHS OB/GYM OPD UNIT ALT./944540 MDCC/06 PEDIATRICS ALT.
Project Number: 940660 PUBLIC HEALTH, SCHOOL OF DRAWER 63
Project Number: 940660 PUBLIC HEALTH DRAWER 64
Project Number: 940750 MENTAL RETARDATION UNIT DRAWER 64
Project Number: 940750 MENTAL RETARDATION UNIT DRAWER 65
Project Number: 940750 NRU & TO/ 66 & 67 DRAWER
Project Number: 940750 MRU
Project Number: 940870 DYRSTRA ALL
Project Number: 940880 DRARE STADIUM
Project Number: 940930 BUNCHE HALL
Project Number: 940940 VISITOR CENTER
Project Number: 944130 BIO-MEA LIBRARY REMODEL
Project Number: 944360 CHS HEAD SCANNER REMODEL
Project Number: 944360 CHS HEAD SCANNER REMODEL
Project Number: 944400 AHMANSON LAB & BRAIN RESERARCH INSITUTE
Project Number: 944400 REMODEL
Project Number: 944400 (SAME AS ABOVE) CONT.
Project Number: 944462 CHS PERINATEL CANE REMODEL
Project Number: 944470 EMERGENCY MEDICAL CENTER
Project Number: 947016 SCRC REPLASTER FAMILY POOL
Project Number: 947111 CHS A3-231 DPC II ALTERATIONS
Project Number: 947176 MURPHY CORRIDOR
Project Number: 947298 MELNIT & ARCHIVES
Project Number: 947317 CHS HEAD & NECK SURGERY ROOM
Project Number: 947321 BOELTER HALL CONVERT SMOKE TERRACES
Project Number: 947329 PUBLIC HEALTH HOT WATER SYSTEM
Project Number: 947330 YOUNG HALL CARCINOGEN ROOM REMODEL
Project Number: 947940 WESTWOOD HADICAPPED PARKING
Project Number: 947356 GYMNASIA LOCKER SECURITY
Project Number: 947380 MURPHY VENDING
Project Number: 947381 UNEX 3RD FLOOR
Project Number: 947386 SUNSET CANYON REL CENTER(SCRC) HANDICAPPED ACCESS
Project Number: 947011 SCRC FAMILY LOCKER ROOM RENOVATION
Project Number: 947394 GSM CLASSROOM 2250 REMODEL
Project Number: 947409 LIFE SCEIENCE RINESIOLOGY LAB PHASE II
Project Number: 947410 KINSEY ROOM 199
Project Number: 947411 LIFE SCIENCES ROOM 5109 & 5109A
Project Number: 947414 GEOLOGY ROOM 3656
Project Number: 947416 BOELTER ROOMS 4800 & 5800
Project Number: 947418 MOORE ROOMS 224 & 314
Project Number: 947424 DICKSON ROOM 3263
Project Number: 947431 MURPHY FIN & PAYROLL
Project Number: 947432 MURPHY A316/A324/A328
Project Number: 947439 LIFE SCIENCES 4226
Project Number: 947440 LIFE SCIENCES 4800
Project Number: 947521 NPI AUDITORIUM LIGHTING
Project Number: 947441 LIFE SCIENCES 4300
Project Number: 947547 WARREN HALL
Project Number: 947553 PHYSICAL REHAB A5-46
Project Number: 947616 OPERATING ROOM BS-469