SIRTF Appendices. Focal Plane Instruments and Requirements Science Team Ames Research Center. April 14, 1978 (1 of 2)

Box 1, Folder 2

SIRTF Appendices. Focal Plane Instruments and Requirements Science Team Ames Research Center. April 14, 1978 (2 of 2)

Box 1, Folder 3

Perkin-Elmer In-House SIRTF Design Study Final Report ER-409 (Prepared under Contract No. NAS 2-1066 by Perkin-Elmer Corporation). September 1979

Box 1, Folder 4

SIRTF Technology Assessment Final Report ER-414 Report No. 13667 and portion of ER-408, title/date unidentified (Prepared under Contract No. NAS 2-1066 by Perkin-Elmer Corporation). January 1980

Box 1, Folder 5

SIRTF Phase B Program/ Cost Review. NASA Ames Research Center. May 24-26, 1983 (1 of 2). NASA internal, Proprietary

Box 1, Folder 6

SIRTF Phase B Program/ Cost Review. NASA Ames Research Center. May 24-26, 1983 (2 of 2). NASA internal, Proprietary

Box 1, Folder 7

SIRTF Announcement of Opportunity Pre-Proposal Conference. Ames Research Center. July 11, 1983

Box 2, Folder 1

Study of Applications of Space Telescope Science Operations Software for SIRTF Use. NASA Contractor Report 177337 (Prepared under Contract No. NAS2-11938 by TRW). F. Dignam, E. Stetson, W. Allendoerfer. February 1985

Box 2, Folder 2

SIRTF Presentation to the Astrophysics Council. Ames Research Center. March 25, 1985 (2 copies)

Box 2, Folder 3

SIRTF Project Review for Headquarters. Ames Research Center. June 21, 1985

Box 2, Folder 4

SIRTF Project Review for Headquarters. Ames Research Center. December 1985

Box 2, Folder 5

SIRTF Review, NASA Headquarters. May 28, 1986 (1 of 2)

Box 2, Folder 6

SIRTF Review, NASA Headquarters. May 28, 1986 (2 of 2)

Box 2, Folder 7

SIRTF to the L2 Halo Orbit. February 28, 1989

Box 2, Folder 8

SIRTF Alternative Mission Study Spacecraft Status Review. Jet Propulsion Laboratory. February 28, 1989

Box 2, Folder 9

SIRTF Mission Options Study Final Report. Ames Research Center. February 28, 1989 (1 of 2)

Box 3, Folder 1

SIRTF Mission Options Study Final Report. Ames Research Center. February 28, 1989 (2 of 2)

Box 3, Folder 2

Space Infrared Telescope Facility Mission Options Presentation to Dr. Fisk. March 24, 1989

Box 3, Folder 3

Personal correspondence from Philip E. Culbertson to Dr. Dale L. Compton regarding a SIRTF meeting to be held at Ames on April 17, 18, or 21, 1989 with team comments and handwritten notes by Michael Werner and Culbertston. March 29, 1989

Box 3, Folder 4

SIRTF Science Support Center. Prepared by John Stauffer and Fred Witteborn, Ames Research Center. April 15, 1989

Box 3, Folder 5

SIRTF Project Institutional Readiness Review. Philip E. Culbertson, Alton Jones, William Horton, Bud Schurmeier, John Boeckel. May 3-5, 1989 (1 of 2)

Box 3, Folder 6

SIRTF Project Institutional Readiness Review. Philip E. Culbertson, Alton Jones, William Horton, Bud Schurmeier, John Boeckel. May 3-5, 1989 (2 of 2)

Box 3, Folder 7

SIRTF Project Plan Volumes I, II, III, and IV. Ames Research Center. May 26, 1989 (1 of 2)

Box 3, Folder 8

SIRTF Project Plan Volumes I, II, III, and IV. Ames Research Center. May 26, 1989 (2 of 2)

Box 3, Folder 9

An Assessment of the Institutional and Programmatic Capability of NASA's Ames Research Center to Manage the Space Infrared Telescope Facility (SIRTF) Project for the NASA Office of Space Science and Applications (OSSA). Philip E. Culbertson. June 21, 1989

Box 3, Folder 10

Space Infrared Telescope Facility Industry Briefing. Ames Research Center. September 15, 1989

Box 4, Folder 1

SIRTF Project Science Objectives Document STF-09 (Replacing PD-1009) draft. October 26, 1989

Box 4, Folder 2

A Proposal for a Preliminary Design Study of an Infrared Orbiting Astronomical Observatory. Jacob H. Miller and Gordon C. Augason, Ames Research Center. October 1963

Box 4, Folder 3

Symposium on Recent Results in Infrared Astrophysics. NASA Technical Memorandum (NASA TM X-73,190). January 1977, Revised August 1977

Box 4, Folder 4

Infrared Receivers for Low Background Astronomy Incoherent Detectors and Coherent Devices from One Micrometer to One Millimeter Final Report. NASA Technical Memorandum 78598. June 1979

Box 4, Folder 5

Passive Orbital Disconnect Strut (PODS III), Structural and Thermal Test Program. NASA Contractor Report 166473 (Prepared under Contract Number NAS2-10848 by Lockheed Missiles & Space Company). R.T. Parmley. March 1983

Box 4, Folder 6

Cool Circumstellar Matter Around Nearby Main Sequence Stars. H.J. Walker and R.D. Wolstencroft. August 26, 1988

Box 4, Folder 7

Progress Report: Evaluation of Hughes Si:Sb DRO Array in Proton Environment. M. McKelvey, M. Savage, R. McHugh Ames Research Center. November 2, 1989

Box 4, Folder 8

An Infrared Sky Model Based on the IRAS Point Source Data. NASA Contractor Report 177526 (Prepared under NASA Contract NAS2-12515 by Jamieson Science and Engineering and SETI Institute). Martin Cohen, Russell Walker, Richard Wainscoat, Kevin Volk, Helen Walker, Deborah Schwartz. February 1990 (1 of 2)

Box 4, Folder 9

An Infrared Sky Model Based on the IRAS Point Source Data. NASA Contractor Report 177526 (Prepared under NASA Contract NAS2-12515 by Jamieson Science and Engineering and SETI Institute). Martin Cohen, Russell Walker, Richard Wainscoat, Kevin Volk, Helen Walker, Deborah Schwartz. February 1990 (2 of 2)