Aswan Dam Photographs: Finding Aid
photCL Burndy 1  
View entire collection guide What's This?
Search this collection
 
 
Table of contents What's This?

Collection Contents

 

Series I. Nile Reservoirs works at Aswan, 1899-1906

Physical Description: 4 volumes

Scope and Content Note

This series contains four albums with photographs documenting the construction of the first dam built at Aswan, between 1899 and 1903, as well as the barrage built downstream at Asyut (Assuit) between 1899 and 1903, and subsequent improvements made to the dam and repairs to the temples at Philae between 1903 and 1906.
The photographs in Album 4 were removed from their bindings prior to arrival at The Huntington.
Album 1

Nile Reservoir works at Aswan and Asyut, [1899-1902]

Physical Description: 31 photographs in 1 volume ; images 24 x 29 cm, volume 33 x 40 cm

Scope and Content

This presentation album contains 31 photographs, with an eight-page printed preface by W. E. Garstin, the under secretary of state for public works in Egypt, signed at end, “Cairo, 1902.” The front flyleaf has manuscript inscription “W. L. Lowe Brown,” the resident engineer at the Asyut Barrage. Identical contents as Album 2.
Album title transcribed from printed cover title. Photograph titles transcribed from printed titles below images. Dates supplied by cataloger based on years of project.
Album 1, Page 13

Aswan Dam. Western Channel at commencement of work. [1899-1902]

Album 1, Page 14

Aswan Dam. Constructing temporary stone and sand sudds in Central Channel. [1899-1902]

Album 1, Page 15

Aswan Dam. Constructing temporary sudds in Western Channel. [1899-1902]

Album 1, Page 16

Aswan Dam. Excavation in progress at Bab-el-Kibir. [1899-1902]

Album 1, Page 17

Aswan Dam. Commencing masonry in deepest part of foundation at Bab-el-Kibir. [1899-1902]

Album 1, Page 18

Aswan Dam. Excavation at Western Channel. [1899-1902]

Album 1, Page 19

Aswan Dam. Excavation along line of Dam. [1899-1902]

Album 1, Page 20

Aswan Dam. Commencing masonry in Western Channel. [1899-1902]

Album 1, Page 21

Aswan Dam. Shewing masonry and sluices in Western Channel. [1899-1902]

Album 1, Page 22

Aswan Dam. Sluices lined with cast iron. [1899-1902]

Album 1, Page 23

Aswan Dam. Sluices lined with ashlar. [1899-1902]

Album 1, Page 24

Aswan Dam. View of Dam during construction. Down-stream. [1899-1902]

Album 1, Page 25

Aswan Dam. View of Dam during construction. Up-stream. [1899-1902]

Album 1, Page 26

Aswan Dam. From Up-stream. [1899-1902]

Album 1, Page 27

Aswan Dam. From Down-stream. [1899-1902]

Album 1, Page 28

Aswan Dam. Entrance to Locks. Up-stream. [1899-1902]

Album 1, Page 29

Aswan Dam. Entrance to Locks. Down-stream. [1899-1902]

Album 1, Page 30

Aswan Dam. Roadway. [1899-1902]

Album 1, Page 31

Aswan Dam. General view of Dam and Locks. [1899-1902]

Album 1, Page 32

Aswan Dam. Lock Gates. [1899-1902]

Album 1, Page 33

Aswan Dam. Lock Gates. [1899-1902]

Album 1, Page 34

Island of Philae. General view. [1899-1902]

Album 1, Page 35

Island of Philae. View of underpinning at the Eastern Colonnade. [1899-1902]

Album 1, Page 36

Asyut Barrage. Foundations shewing cast-iron piling. [1899-1902]

Album 1, Page 37

Asyut Barrage. Foundation of Ibrahamieh Canal head regulator. [1899-1902]

Album 1, Page 38

Asyut Barrage. Foundations and masonry in progress of construction. [1899-1902]

Album 1, Page 39

Asyut Barrage. Ibrahamieh Canal head regulator and lock. [1899-1902]

Album 1, Page 40

Asyut Barrage. From Up-stream. [1899-1902]

Album 1, Page 41

Asyut Barrage. From Down-stream. [1899-1902]

Album 1, Page 42

Asyut Barrage. Roadway and Swing Bridge over lock. [1899-1902]

Album 1, Page 43

Asyut Barrage. General view Up-stream shewing lock. [1899-1902]

Album 2

Nile Reservoir works at Aswan and Asyut, [1899-1902]

Physical Description: 31 photographs in 1 volume ; images 24 x 29 cm, volume 33 x 40 cm

Scope and Content

This presentation album has 31 black-and-white photographs, with eight introductory pages of explanatory notes by W. E. Garstin, the under secretary of state for public works in Egypt, signed “Cairo, 1902.” Photographs are signed by D.S. George. Flyleaf has bookplate inscribed to John Aird: “A Monsier J. Aird Souvenir de l’Inauguration des Résevoirs du Nil. De la part du Ministre des Travaux Publics.” Identical contents as Album 1.
Album title transcribed from printed cover title. Photograph titles transcribed from printed titles below images. Dates supplied by cataloger based on years of project.
Album 2, Page 13

Aswan Dam. Western Channel at commencement of work. [1899-1902]

Album 2, Page 14

Aswan Dam. Constructing temporary stone and sand sudds in Central Channel. [1899-1902]

Album 2, Page 15

Aswan Dam. Constructing temporary sudds in Western Channel. [1899-1902]

Album 2, Page 16

Aswan Dam. Excavation in progress at Bab-el-Kibir. [1899-1902]

Album 2, Page 17

Aswan Dam. Commencing masonry in deepest part of foundation at Bab-el-Kibir. [1899-1902]

Album 2, Page 18

Aswan Dam. Excavation at Western Channel. [1899-1902]

Album 2, Page 19

Aswan Dam. Excavation along line of Dam. [1899-1902]

Album 2, Page 20

Aswan Dam. Commencing masonry in Western Channel. [1899-1902]

Album 2, Page 21

Aswan Dam. Shewing masonry and sluices in Western Channel. [1899-1902]

Album 2, Page 22

Aswan Dam. Sluices lined with cast-iron. [1899-1902]

Album 2, Page 23

Aswan Dam. Sluices lined with ashlar. [1899-1902]

Album 2, Page 24

Aswan Dam. View of Dam during construction. Down-stream. [1899-1902]

Album 2, Page 25

Aswan Dam. View of Dam during construction. Up-stream. [1899-1902]

Album 2, Page 26

Aswan Dam. From Up-stream. [1899-1902]

Album 2, Page 27

Aswan Dam. From Down-stream. [1899-1902]

Album 2, Page 28

Aswan Dam. Entrance to Locks. Up-stream. [1899-1902]

Album 2, Page 29

Aswan Dam. Entrance to Locks. Down-stream. [1899-1902]

Album 2, Page 30

Aswan Dam. Roadway. [1899-1902]

Album 2, Page 31

Aswan Dam. General view of Dam and Locks. [1899-1902]

Album 2, Page 32

Aswan Dam. Lock Gates. [1899-1902]

Album 2, Page 33

Aswan Dam. Lock Gates. [1899-1902]

Album 2, Page 34

Island of Philae. General view. [1899-1902]

Album 2, Page 35

Island of Philae. View of underpinning at the Eastern Colonnade. [1899-1902]

Album 2, Page 36

Asyut Barrage. Foundations shewing cast-iron piling. [1899-1902]

Album 2, Page 37

Asyut Barrage. Foundations of Ibrahamieh Canal head regulator. [1899-1902]

Album 2, Page 38

Asyut Barrage. Foundations and masonry in progress of construction. [1899-1902]

Album 2, Page 39

Asyut Barrage. Ibrahamieh Canal head regulator and lock. [1899-1902]

Album 2, Page 40

Asyut Barrage. From Up-stream. [1899-1902]

Album 2, Page 41

Asyut Barrage. From Down-stream. [1899-1902]

Album 2, Page 42

Asyut Barrage. Roadway and Swing Bridge over lock. [1899-1902]

Album 2, Page 43

Asyut Barrage. General view Up-stream shewing lock. [1899-1902]

Album 3

Nile Reservoirs: views of Assuan, no. 1, 1899-1900

Physical Description: 177 photographs in 1 volume ; images 21 x 27 and smaller, volume 37 x 55 cm. + 29 photographs in 1 box

Scope and Content

This album originally contained approximately 207 photographs, though 29 photographs are now housed in a box identified as Album 3a. The remaining 177 photographs still in the original album (Album 3b) are typically affixed two to a page, with some panoramas comprised of several taped together photographs. Some of the photographs are by D.S. George, "DM," and Achille Gianny.
Album title transcribed from cover.
Album 3a

Nile Reservoirs: views of Assuan, no. 1 [Photographs in box]

Physical Description: 29 photographs in 1 box.

Scope and Content Note

Item numbers for the loose photographs added by library staff. Items no. 1-19 were originally inserted at the beginning of the album. Titles and dates chiefly transcribed from handwritten captions on photograph versos; titles and dates in square brackets devised by cataloger.
Album 03a, Item 1

[Eleven Caucasian men and women riding donkeys. Standing next to them are twelve Egyptian men, presumably their horse handlers.] [1899]

Album 03a, Item 2

No. 127. [View of plaque reading: "H.H. Abbas Helmy Khedive. This foundation stone was laid by H.R.H. The Duke of Connaught, 12th February 1899. H.E. Hussein Fakhry Pasha, Minister of Public Works."] [1899]-2-12

With stamp on verso: "Photographic-Studio Achille Gianny & Co. Nile Reservoir Works Assouan (Upper Egypt)."
Album 03a, Item 3

23. Group in the Dam Trench. [1899]

Album 03a, Item 4

29. H.R.H. the Duke of Connaught lays the Foundation Stone. 1899-02-12

Album 03a, Item 5

The Bab-el-Kebir. 3. 1899-03-17

Album 03a, Item 6

[A group of mostly Caucasian men are shown drinking and smoking in a large gathering.] [1899]

Album 03a, Item 7

[Group of mostly Caucasian men.] [1899]

Album 03a, Item 8

37. Dam Trench looking East from 1500. 1899-01-03

Album 03a, Item 9

38. View in Dam Trench looking W. from 1600. 1899-02-03

Album 03a, Item 10

50. The Bab-el-Kebir. 6. 1899-07-04

Album 03a, Item 11

[Handcar on rail track between quarry and river, with train in background.] [1899]

Album 03a, Item 12

[Group of men and women gathered at foundation stone laying ceremony.] [1899]

Album 03a, Item 13

[Train cars carrying several people passing an archaeological site, with "Welcome" sign above track.] [1899]

Album 03a, Item 14

[Train cars passing an archaeological site, with "Welcome" sign above.] [1899]

Album 03a, Item 15

[Group of men and women gathered at foundation stone laying ceremony.] [1899]

Album 03a, Item 16

[Group of men and women gathered at foundation stone laying ceremony.] [1899]

Album 03a, Item 17

[Group of men and women gathered at foundation stone laying ceremony.] [1899]

Album 03a, Item 18

[Train cars carrying several people passing an archaeological site, with "Welcome" sign and flags of the Khedivate of Egypt above tracks.] [1899]

Album 03a, Item 19

[Group of seven Egyptian and Western men posing under a "Welcome" sign on rail track.] [1899]

Album 03a, Item 20

West Bank, looking north. 1899-05-17

Album 03a, Item 21

Bab-el-Kebir. Stone sud. Taken Eastside, looking North. 1899-05-19

Album 03a, Item 22

Bab el Kebir Channel. Stone sudd, looking North. Taken Westside Channel. 1899-05-19

Album 03a, Item 23

Mohammed Ali Island. Excavating foundations. Looking West. 1899-05-19

Album 03a, Item 24

Mohammed Ali Island. Excavating trench. Looking East. 1899-05-19

Album 03a, Item 25

Masonry. Eastern Channel. Looking East. 1899-05-28

Album 03a, Item 26

Eastern Channel. Masonry. Looking East. 1899-05-28

Album 03a, Item 27

Closing Bab el Kebir Channel. Looking North. 1899-04-22

Album 03a, Item 28

Long Trench. Looking East. Showing portion of finished section dam. 1899-06-08

Album 03a, Item 29

Long Trench. Looking East. 1899-06-08

Album 3b

Nile Reservoirs: views of Assuan, no. 1 [Photographs in volume]

Physical Description: 177 photographs in 1 volume ; images 21 x 27 and smaller, volume 37 x 55 cm.

Scope and Content Note

Photograph titles, numbers, and dates chiefly transcribed from handwritten captions or captions in negatives, except for the information for Photographs 22d, 23a, and 23d, which was transcribed from handwritten captions on versos. Titles and dates in square brackets devised by cataloger.
Album 03b, Page 8a (recto)

Extreme East Channel. Looking West. Staging for Travelling Crane. 1899-06-08

Album 03b, Page 8b (recto)

Extreme East Channel. Looking East. 1899-06-08

Album 03b, Page 8c (verso)

West Bank. Looking West. Showing pitching. 1899-06-08

Album 03b, Page 8d (verso)

View of Excavation for foundations of Dam on Mohammed Ali Island. Looking East. 1899-06-12

Album 03b, Page 9a (recto)

Lock Chambers, North of Axis of Dam. Looking North. 1899-06-12

Album 03b, Page 9b (recto)

View of Lock Channel, South of Axis of Dam. 1899-06-12

Album 03b, Page 9c (verso)

Navigation Channel. South of Axis of Dam. Looking North from South end. 1899-06-12

Album 03b, Page 9d (verso)

End of 4th Lock. View of Navigation Channel directly North of same. 1899-06-12

Album 03b, Page 10a (recto)

Masonry in Long Trench, looking East. 1899-06-26

Album 03b, Page 10b (recto)

Masonry in Long Trench, looking East. 1899-06-26

Album 03b, Page 10c (verso)

Masonry West end of Long Trench. Looking East.1899-06-26

Album 03b, Page 10d (verso)

Putting rock sudd across Bab-El-Logair. Looking South. 1899-06-26

Album 03b, Page 11a (recto)

Making sudd across Bab-el-Logair. 1899-06-30

Album 03b, Page 11b (recto)

Bab-el-Logair, before being closed, Looking North. 1899-07-04

Album 03b, Page 11c (verso)

87. Dam Trench on Mohammad Ali Island looking West. 1899-06-14

Album 03b, Page 11d (verso)

94. A Turncock at Home. 1899-06-26

Album 03b, Page 12a (recto)

97. The Mohammed Ali Channel, at Low Nile. 1899-06-08

Album 03b, Page 12b (recto)

95. Foundations, West End of Mohammed Ali Island. 1899-06-08

Album 03b, Page 12c (verso)

Making sudd from East side, across Bab-el-Logair. Looking South. 1899-07-04

Album 03b, Page 12d (verso)

Mohammed Ali Island. Excavation. Water rising. 1899-07-06

Album 03b, Page 13a (recto)

Forming Relief Channel between Turmesia and Bab-el-Kebir Channels. 1899-07-06

Album 03b, Page 13b (recto)

Forming Relief Channel between Turmesia and Bab-el-Kebir Channels. 1899-07-08

Album 03b, Page 13c (verso)

Closing Bab-el-Logair Channel with Granite Blocks, wire strings, &c. 1899-07-08

Album 03b, Page 13d (verso)

Closing Bab-el-Logair Channel. Looking South.1899-07-08

Album 03b, Page 14a (recto)

Masonry Extreme East Channel. Looking West. 1899-07-08

Album 03b, Page 14b (recto)

Masonry Extreme East Channel. Looking East. 1899-07-08

Album 03b, Page 14c (verso)

Rubble Stone sudd, down stream side. Across Bab-el-Kebir and Bab-el-Haroun Channels. 1899-07-08

Album 03b, Page 14d (verso)

102. Sadd across the Bab-el-Kebir. 1899-07-08

Album 03b, Page 15a (recto)

98. Masonry in Progress, from 1000 looking West.1899-06-30

Album 03b, Page 15b (recto)

99. From the Footbridge, (1300) looking East. 1899-07-06

Album 03b, Page 15c (verso)

103. The Sadds in Bab-el-Kebir & Bab-el-Haroun. 1899-07-08

Album 03b, Page 15d (verso)

Sudd across Bab-el-Kebir showing levels of water up & down stream. 1899-07-11

Album 03b, Page 16a (recto)

Masonry Extreme East Channel, looking East. 1899-07-08

Album 03b, Page 16b (recto)

Masonry Extreme East Channel, looking West. 1899-07-08

Album 03b, Page 16c (verso)

Strengthening Sudd across Bab-el-Haroun. 1899-07-14

Album 03b, Page 16d (verso)

Masonry of Dam, down stream side, looking S.E. 1899-07-15

Album 03b, Page 17a (recto)

104. The Babel-Sughaigar. 5. 1899-07-14

Album 03b, Page 17b (recto)

Mohammed Ali Island from West bank, showing Excavation flooded. 1899-07-15

Album 03b, Page 17c (verso)

Masonry Long Trench, down stream side, looking S.E. 1899-07-15

Album 03b, Page 17d (verso)

Masonry, down stream side, looking S.W. 1899-07-15

Album 03b, Page 18a (recto)

Stone sudd across Bab-el-Kebir, Bab-el-Haroun & Bab-el-Soghair. 1899-07-19

Album 03b, Page 18b (recto)

Stone sudd across Bab-el-Kebir, Bab-el-Haroun & Bab-el_soghair, from East side of Bab-el-Kebir. 1899-07-19

Album 03b, Page 18c (verso)

Stone sudd across Bab-el-Haroun. 1899-07-19

Album 03b, Page 18d (verso)

Stone sudd across Bab-el-Haroun, looking S.E. 1899-07-19

Album 03b, Page 19a (recto)

Relief Channel, from North end. 1899-07-19

Album 03b, Page 19b (recto)

From East bank of Bab-el-Kebir near Sudd, looking N.W. showing flows of Relief Channel. 1899-07-19

Album 03b, Page 19c (verso)

Relief Channel, looking N. from the Bridge. 1899-07-19

Album 03b, Page 19d (verso)

Bab-el-Haroun from the N. showing breach in Sudd. 1899-07-26

Album 03b, Page 20a (recto)

Bab-el-Haroun from the N.E., showing breach in Sudd. 1899-07-26

Album 03b, Page 20b (recto)

Termooseyh Channel, looking East. 1899-07-26

Album 03b, Page 20c (verso)

Eastern Channel, looking East. 1899-07-26

Album 03b, Page 20d (verso)

Masonry looking East, from 1430m. 1899-07-26

Album 03b, Page 21a (recto)

Navigation Channel, looking South.1899-07-28

Album 03b, Page 21b (recto)

Navigation Channel, looking North. 1899-07-28

Album 03b, Page 21c (verso)-22b (recto)

[3 photographs taped together to create panoramic view of buildings.] [1899]

Album 03b, Page 22c (verso)

From 1420m. showing Buttress at Junction of Solid & pierced Dam. 1899-09-08

Album 03b, Page 22d (verso)

From East Pillar looking West.1899

Album 03b, Page 22e (verso)

From 1700m., looking West, up stream side.1899-10-05

Album 03b, Page 23a (recto)

From 1910, East End. [1899]

Album 03b, Page 23b (recto)

Navigation Channel, looking North. 1899-10-05

Album 03b, Page 23c (recto)

Navigation Channel; Pitching to slope of Canal. 1899-10-05

Album 03b, Page 23d (verso)

From 1750m, looking West. Down Stream Side. 1899-10-07

Album 03b, Page 23e (verso)

From 1900m [pencil correction above "1750m"], looking West. Up [pencil correction above "Down"] Stream side. 1899-10-07

Album 03b, Page 23f (verso)

Pitching of River Bank of Navigation Channel. 1899-10-07

Album 03b, Page 24a (recto)

From 1400m, looking West.1899-10-17

Album 03b, Page 24b (recto)

From 1475m, looking East. 1899-10-17

Album 03b, Page 24c (verso)

From opposite 1880m, looking South. 1899-10-17

Album 03b, Page 24d (verso)

From 1900m, looking West. Showing work in Extreme Channel. 1899-10-17

Album 03b, Page 25a (recto)

From East side of Termoseeyah Channel, looking West.1899-11-08

Album 03b, Page 25b (recto)

From 1150m. looking West, showing gap where Railway crosses. 1899-11-08

Album 03b, Page 25c (verso)

Commencement of sand bag sudd, Bab-el-Kebir. 1899-11-08

Album 03b, Page 25d (verso)

Sudding Bab-el-Kebir with sacks filled with sand. 1899-11-25

Album 03b, Page 26a (recto)

First cill stone laid, from the North.1899-11-10

Album 03b, Page 26b (recto)

First cill stones laid, from the South. 1899-11-10

Album 03b, Page 26c (verso)

[Group portrait of ten men outdoors on porch.] [1899-11]

Album 03b, Page 26d (verso)

[Group portrait of nine men and dog outdoors.] [1899-11]

Album 03b, Page 27a (recto)

[Group portrait of ten men by channel wall.]1899-11-25

Album 03b, Page 27b (recto)

Quarry for large blocks of granite. 1899-12-02

Album 03b, Page 27c (verso)

[John Aird & Co. locomotive and wagon dumping load next to river.] 1899-12-02

Album 03b, Page 27d (verso)

Bab-el-Haroun. View from sand bag sudd, looking North. 1900-01-05

Album 03b, Page 28a (recto)

Bab-el-Soghair. View from sand bag sudd, looking North.1900-01-05

Album 03b, Page 28b (recto)

Bab-el-Kebir. Three double sets 12" centrifugal pumps, commenced work 11.40a.m. 9.1.00. 1900-01-05

Album 03b, Page 28c (verso)

Bab-el-Kebir. Down stream Channel as seen from stone sudd, looking North. 1900-01-05

Album 03b, Page 28d (verso)

Bab-el-Kabir, looking North. 1900-01-12

Album 03b, Page 29a (recto)

Bab-el-Kebir. From the sand bag sudd, looking North. 1900-01-12

Album 03b, Page 29b (recto)

Masonry in Termooseyah Channel, looking West. 1900-01-12

Album 03b, Page 29c (verso)

Stone sudd in Aboo Sibian Channel of the Nile. 1900-01-12

Album 03b, Page 29d (verso)

Bab-el-Soghair; looking North from sand bag sudd. 1900-01-12

Album 03b, Page 30a (recto)

Bed of Nile from Stone Sudd of Bab-el-Kebir, looking North. 1900-01-22

Album 03b, Page 30b (recto)

Bed of Nile from Stone Sudd of Bab-el-Kebir, looking North. 1900-01-22

Album 03b, Page 30c (verso)

Bab-el-Kebir, looking West. 1900-01-22

Album 03b, Page 30d (verso)

Bab-el-Kebir, looking North. 1900-01-22

Album 03b, Page 31a (recto)

Sudds in Central Channel, Aboo Sibian. 1900-01-26

Album 03b, Page 31b (recto)

Sudds in Central Channel, Aboo Sibian, looking S.E. 1900-01-26

Album 03b, Page 31c (verso)

No. 125. Closing the Aboo Sibian Channel, showing progress of sand bag sudd. 1900-02-12

Album 03b, Page 31d (verso)

No. 128. Closing Aboo Sibian Channel; Rock sudd completed, sand sudd in progress. 1900-02-13

Album 03b, Page 32a-b (recto)

200. West Bank from Habbs Island [panorama comprised of 2 photographs]. 1900-02-16

Album 03b, Page 32c (verso)

201. View [from Habbs] Island looking across sudds. 1900-02-16

Album 03b, Page 32d (verso)

203. Forming sudd across Central Channel. 1900-02-16

Album 03b, Page 33a (recto)

207. Solid & Pierced Dam. 1900-02-18

Album 03b, Page 33b (recto)

212. View of works looking towards West bank. 1900-02-19

Album 03b, Page 33c (verso)

213. Bab-el-Kebir. 1900-02-19

Album 03b, Page 33d (verso)

216. West bank lock channel looking South. 1900-02-20

Album 03b, Page 34a (recto)

217. West bank lock channel looking North. 1900-02-20

Album 03b, Page 34b (recto)

219. Trench from Bab-el-Kebir looking West. 1900-02-21

Album 03b, Page 34c (verso)

220. View from Bab-el-Kebir looking towards West bank. 1900-02-21

Album 03b, Page 34d (verso)

222. Bab-el-Sogair. 1900-02-22

Album 03b, Page 35a (recto)

223. Bab-el-Haroun. 1900-02-22

Album 03b, Page 35b (recto)

224. Starting masonry above Bab-el-Sogair. 1900-02-22

Album 03b, Page 35c-d (verso)

204. Nile Reservoir Works, Assuan. General view from West Bank [panorama comprised of 2 photographs].1900-02-16

Album 03b, Page 36a (recto)

202. West bank. View along line of dam looking East. 1900-02-16

Album 03b, Page 36b (recto)

205. View looking towards hospital. 1900-02-17

Album 03b, Page 36c (verso)

210. Philae from East bed of reservoir. 1900-02-18

Album 03b, Page 36d (verso)

211. Philae from East bed of reservoir. 1900-02-18

Album 03b, Page 37a (recto)

215. View of Trench From Bab-El-Kebir looking East. 1900-02-21

Album 03b, Page 37b (recto)

No. 139. Bab-el-Kebir, Looking North - Excavation. 1900-03-28

Album 03b, Page 37c (verso)

No. 130. Aboo Sibian Channel - looking West. General view of masonry Excavation. 1900-03-20

Album 03b, Page 37d (verso)

No. 133. Bab-el-Kebir. Excavating viewes of inferior material. 1900-03-28

Album 03b, Page 38a (recto)

No. 140. Bab-el-Sogair - looking north. Excavating views of inferior material. 1900-03-28

Album 03b, Page 38b (recto)

No. 144. Trestle Bridge parallel to axis of Dam in Bab-el-Kebir - looking S.E. 1900-04-03

Album 03b, Page 38c (verso)

No. 141. Navigation Channel on axis of Dam. 1900-04-03

Album 03b, Page 38d (verso)

No. 143. Sudding Dachanea Channel. 1900-04-03

Album 03b, Page 39a (recto)

No. 142. Aslar in Awad Island, near Dachanea Channel. 1900-04-03

Album 03b, Page 39b (recto)

No. 145. Navigation Channel - West Bank - from extreme South end looking North. 1900-04-05

Album 03b, Page 39c (verso)

No. 146. General view from Profile on West Bank - looking East. 1900-04-05

Album 03b, Page 39d (verso)

No. 147. Excavation for Locks - West Bank from axis of Dam, looking North.1900-04-05

Album 03b, Page 40a-b (recto)

255. Bab-el-Sogair[comprised of 2 photographs]. 1900-04-16

Album 03b, Page 40c-d (verso)

[View of quarry. (comprised of 2 photographs)]. [1900-04-16]

Album 03b, Page 41a (recto)

[View of quarry.] [1900-04-16]

Album 03b, Page 41b (recto)

228. Bab-el-Kebir loking N.E. 1900-04-16

Album 03b, Page 41c (verso)

229. Bigeh Quarry looking West. 1900-04-20

Album 03b, Page 41d (verso)

230. Sluices under construction. 1900-04-20

Album 03b, Page 42a (recto)

231. Bab-el-Kebir & Trench looking West. 1900-04-19

Album 03b, Page 42b (recto)

233. Quarry on Island Awad. 1900-04-20

Album 03b, Page 42c (verso)

234. Bigeh Quarry looking S.E. 1900-04-20

Album 03b, Page 42d (verso)

235. Sandsiding Quarry, Shellal. 1900-04-20

Album 03b, Page 43a (recto)

236. [View of quarry] 1900-04-19

Album 03b, Page 43b (recto)

239. Lock channel - westward. Beginning masonry. 1900-06-25

Album 03b, Page 43c (verso)

238. Nile Reservoir Works - Assuan. View along line of dam from West bank. 1900-06-25

Album 03b, Page 43d (verso)

246. Nile Reservoir Works. Assuan. View of sluices from Bab-El-Kebir looking West. 1900-06-25

Album 03b, Page 44a (recto)

245. Nile Reservoir Works. Assuan. Building sluice iron work at Mohammed Aly Channel. 1900-06-24

Album 03b, Page 44b (recto)

244. Nile Reservoir Works. Assuan. View of sluices at Mohamed Aly Channel.1900-06-26

Album 03b, Page 44c (verso)

241. View of sluices at East end of dam. 1900-06-26

Album 03b, Page 44d (verso)

240. Nile Reservoir Works. Assuan. Bab-el-Sogair. 1900-06-26

Album 03b, Page 45a (recto)

242. Nile Reservoir Works. Assuan. Bab-el-Kebir. 1900-06-26

Album 03b, Page 45b (recto)

243. Nile Reservoir Works. Assuan. Men leaving works at midday. 1900-06-26

Album 03b, Page 45c (verso)

No. 115. Central Channel Sluices. 1900-06-21

Album 03b, Page 45d (verso)

No. 116. Masonry Bab el Kebir. 1900-06-21

Album 03b, Page 46a (recto)

No. 117. Bab el Kebir looking East. 1900-06-21

Album 03b, Page 46b (recto)

No. 118. Central Channel sluicing. 1900-06-21

Album 03b, Page 46c (verso)

Sudds in mid-river. 1900-03-06

Album 03b, Page 46d (verso)

No. 161. Bab el Kebir - after sudd was cut. 1900-07-27

Album 03b, Page 47a (verso)

No. 120. West Channel. 1900-06-21

Album 03b, Page 47b (verso)

No. 121. From West bank looking East. 1900-06-27

Album 03b, Page 48a (recto)

No. 122. From West bank looking East. 1900-06-27

Album 03b, Page 48b (recto)

No. 123. Cast iron lining, Bab el Kebir. 1900-07-10

Album 03b, Page 48c (verso)

No. 124. Central Channel sluices. 1900-07-12

Album 03b, Page 48d (verso)

No. 125. Central Channel sluices.1900-07-13

Album 03b, Page 49a (recto)

No. 126. Central Channel sluices. 1900-07-13

Album 03b, Page 49b (recto)

247. Nile Reservoir Works - Assouan. Bab-el-Kebir. 1900-07-13

Album 03b, Page 49c (verso)

248. Nile Reservoir Works - Assouan. View of cut in central sadd - from Island Awad. 1900-07-13

Album 03b, Page 49d (verso)

249. Nile Reservoir Works - Assouan. Water rushing through central sluices after cutting of sadd. 1900-07-13

Album 03b, Page 50a (recto)

250. Nile Reservoir Works - Assouan. West Channel from Island Awad. 1900-07-13

Album 03b, Page 50b (recto)

251. Nile Reservoir Works - Assouan. Showing cut in central sadd. 1900-07-13

Album 03b, Page 50c (verso)

252. Nile Reservoir Works - Assouan. View of central sluices &c. from Habb's Island. 1900-07-12

Album 03b, Page 50d (verso)

No. 153. Bab el Sogair - Cutting up stream Sudd. 1900-07-19

Album 03b, Page 51a-b (recto)

253. Nile Reservoir Works - Assouan. View of water running through central sluices after cutting of sadd [panoramic comprised of 2 photographs]. 1900-07-13

Album 03b, Page 51c (verso)

No. 154. South of Dam - Central Channel, showing the two cuts made in up stream sudd. 1900-07-19

Album 03b, Page 51d (verso)

No. 155. North face of Dam, Bab el Haroun & Bab el Sogair - looking West. 1900-07-20

Album 03b, Page 52a (recto)

North face of Dam. Sluices Group 8 at RL 92.00 looking East towards Bal el Sogair Bab el Haroun & Bal el Kebir. [1900-07]

Album 03b, Page 52b (recto)

No. 158. North face of Dam - Bab el Kebir looking West towards Bab el Haroun & Bab el Sogair. 1900-07-2[3]

Album 03b, Page 52c (verso)

North face of Dam - Cast Iron lined sluices, Bab el Sogair looking S.E. 1900-07-27

Album 03b, Page 52d (verso)

North face. Bab el Kebir, looking West toward Bab el Haroun & Bab el Sogair. 1900-07-27

Album 03b, Page 53a-b (recto)

[View of buildings, river, and surrounding area (panoramic comprised of 6 photographs).] 1900-07

Album 03b, Page 53c-d (verso)

View of Bab el Sogair, Bab el Haroun & Bab el Kebir from Habbs Island, looking South East. Nile flood topping Sluice Masonry. 1900-08-10

Album 03b, Page 54a (recto)

Nile flood topping Masonry of Sluices. 1900-08-10

Album 03b, Page 54b (recto)

Masonry in progress at South 18 Sluices RL 100. 1900-08-10

Album 4

Nile Reservoirs: views of Assuan, no. 2, 1899-1907

Physical Description: 98 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 98 loose black-and-white photographs removed from album titled "Nile Reservoirs: Views of Assuan, No. 2." Most photographs are signed by D.S. George or F. Fiorello.
Album title supplied by cataloger based on original album title. Photograph titles and all dates except 291A-S transcribed from items; dates for 291A-S supplied by cataloger based on years of photographs with similar numbers.
Album 4

No. 1. Nile Reservoirs Assuan Dam – Plan and Longitudinal Section [copy of map]. 1899-01

Album 4

No. 11. Thermosia Channel Looking East. 1899-04-28

Album 4

No. 12. Reservoir Work. Escavation [i.e. Excavation]. 1899-04-28

Album 4

No. 16. East Side of Dam Masonry. 1899-06-08

Album 4

No. 19. East Side of Dam. Escavation [i.e. Excavation]. 1899-06-12

Album 4

No. 21. Asswan Dam. 1899-07-08

Album 4

No. 22. The Sadds at Bab-El-Kebir 1899-07-08

Album 4

No. 35A. Cast Iron Lining for Sluices. 1899

Album 4

No. 37. Bab El Kibir. Excavation. 1899

Album 4

No. 41. Bab El Kebir. Looking South. 1900-01-12

Album 4

No. 47. Foundation. Bab El Kebir. Looking South. 1900-01-27

Album 4

No. 49. From West Bank Looking East. 1900-01-31

Album 4

No. 50. Central Channel Sudds from Mohammed Ali Island. 1900-01-31

Album 4

No. 51. West Channel Looking South. 1900-01-31

Album 4

No. 53. Central Channel Sudds from Mohammed Ali Island. 1900-02-08

Album 4

No. 55. Mohammed Ali Channel. 1900-02-08

Album 4

No. 65. Bab El Kebir Looking North 1900-03-23

Album 4

No. 72. Sluices at Thirmosia Channel Looking West 1900-04-03

Album 4

No. 73. Sluices at Thirmosia Channel. Looking East. 1900-04-03

Album 4

No. 93. Bab El Kebir Bottom East Side. 1900-05-11

Album 4

No. 101. Masonry from Bab El Haroum. Looking East. 1900-05-22

Album 4

No. 104. Philae from East. 1900-05-24

Album 4

No. 107. Mohammed Ali Channel from Award. “During Eclipse.” 1900-05-28

Album 4

No. 113. Masonry Bab El Haroum. 1900-06-02

Album 4

No. 114. Masonry Bab El Haroum. 1900-06-02

Album 4

No. 108. Cast Iron Lining, Bab El Sogair. 1900-06-02

Album 4

No. 128. Bab El Sogair. Sudd Cutting 1900-07-19

Album 4

No. 119. Central Channel Sluices. 1900-06-21

Album 4

No. 129. Bab El Sogair, Sudd Cutting. 1900-07-19

Album 4

No. 132. Masonry, Navigation Channel. 1900-07-23

Album 4

No. 133A. Western Chanel. 1900-09-16

Album 4

No. 135. Mohammed Ali Channel. Closing Sudd. 1900-11-22

Album 4

No. 139. General View Looking West 1900-11-30

Album 4

No. 142. Dam from East. 1900-12-07

Album 4

No. 149. From West Bank Looking East 1900-12-29

Album 4

No. 152. Masonry Navigation Channel 1900-07-01

Album 4

No. 157. Daehanea Channel. Closing Sudd. 1900-01-10

Album 4

No. 172. From West Bank Looking East. 1900-02-22

Album 4

No. 173. From West Bank Looking South East. 1900-02-22

Album 4

No. 177. View of Works from Navigation Channel. 1900-03-15

Album 4

No. 184. North Side of Dam Looking East. 1901-04-06

Album 4

No. 195. West Channel Masonry Looking East. 1901-04-30

Album 4

No. 197. West Channel. 1901-07-05

Album 4

No. 203. West Channel. 1901-05-22

Album 4

No. 208. West Channel. 1901-06-02

Album 4

No. 214. West Channel. 1901-06-19

Album 4

No. 217. West Channel. 1901-06-26

Album 4

No. 222. North Side of Dam Looking West. 1901-07-06

Album 4

No. 224. West Channel Sluices. 1901-07-08

Album 4

No. 229. Masonry Navigation Channel. 1901-07-10

Album 4

No. 237. From West Bank Looking East. 1901-10-01

Album 4

No. 238. No. 238. Navigation Channel. 1901-10-24

Album 4

No. 239. Navigation Channel. 1901-10-24

Album 4

No. 240. General View from East. 1901-11-01

Album 4

No. 242. From West Bank Looking East. During Eclipse. 1901-11-11

Album 4

No. 243. From West Bank Looking East. 1901-12-06

Album 4

No. 251. Navigation Channel, First Lock Gate from South. 1902-03-12

Album 4

No. 258. South Side of Dam from West Bank. 1902-05-29

Album 4

No. 260. Navigation Channel. The Locks from North. 1902-07-09

Album 4

No. 266. South Side of Dam from West Bank. 1902-07-17

Album 4

No. 268. Navigation Channel. 1902-07-19

Album 4

No. 269. Navigation Channel, Locks from North. 1902-07-19

Album 4

No. 270. View from above Navigation Channel. 1902-07-22

Album 4

No. 273. From West Bank Looking East. 1902-11-07

Album 4

No. 276. North Side of Dam. 1902-11-10

Album 4

No. 272. From West Bank Looking East. 1902-11-07

Album 4

No. 279. Nvaigation [i.e. Navigation] Channel 1st Lock Gate. 1902-07-22

Album 4

No. 288. South Side of Dam from East Bank. 1903-03-30

Album 4

No. 291A. [Workers amid columns of Kioske on Philae Island] [1903-1905]

Album 4

No. 291B. [Workers amid columns of Kioske on Philae Island] [1903-1905]

Album 4

No. 291F. Reparation of the Kioske on Philae Island [1903-1905]

Album 4

No. 291M. [View of exterior of Kioske on Philae Island] [1903-1905]

Album 4

No. 291P. [Columns of Kioske on Philae Island] [1903-1905]

Album 4

No. 291Q. [Columns of Kioske on Philae Island] [1903-1905]

Album 4

No. 291S. Island of Philae during the Flood. [1903-1905]

Album 4

No. 293. North Side of Dam Looking East. 1905-05-15

Album 4

No. 305. Dam Looking North Set 11A. 1905-06

Album 4

No. 310. Foundation Navigation Channel Looking North. 1905-09-10

Album 4

No. 315. Set VII. Assuan Reservoir. 1906-03-01

Album 4

No. 317. Dam Looking East Set XII 1906-03-01

Album 4

No. 323. Set. VIII. Looking East. 1906-05-08

Album 4

No. 324. From West Bank Looking East. 1906-05-08

Album 4

No. 330. From West Bank Looking East. 1906-05-19

Album 4

No. 340. Set VII.B. Looking East. 1906-06-09

Album 4

No. 349. Set III. Looking East 1906-06-15

Album 4

No. 350. Set III. Looking West. 1906-06-15

Album 4

No. 351. Dam Looking West. Set XVIII. 1906-06-14

Album 4

No. 379. Philae. 1907-11-23

Album 4

No. 380. Philae from SW. 1907-11-23

 

Series II. Isna Barrage, 1907-1909

Physical Description: 3 volumes

Scope and Content Note

This series contains three albums with photographs documenting the construction of the Isna Barrage, located approximately 162 kilometers north of the Aswan Dam on the Nile River below Luxor, in 1907 and 1908. Two of the volumes are copies of the same presentation album and the photographs are accompanied by two introductory pages of printed explanatory notes by Murdoch MacDonald, the director-general of reservoirs in Egypt.
Album 5

The Isna Barrage, [1907-1909]

Physical Description: 19 photographs in 1 volume ; images 24 x 29 cm, volume 33 x 40 cm

Scope and Content

This presentation album contains 19 photographs. The title page has the handwritten inscription "M. MacDonald Esq." Photographs are undated and unsigned.
Album title transcribed from printed title page. Photograph titles transcribed from printed captions on pages; dates supplied by cataloger based on years of project.
Album 5, Page 6

Excavation on East Bank high level berm. [1907-1908]

Album 5, Page 7

Construction of cofferdams. [1907-1908]

Album 5, Page 8

Completed cofferdams. [1907-1908]

Album 5, Page 9

Pumping out cofferdams. [1907-1908]

Album 5, Page 10

Pile driving. [1907-1908]

Album 5, Page 11

Excavation for foundation. [1907-1908]

Album 5, Page 12

Building masonry floor and downstream talus. [1907-1908]

Album 5, Page 13

Building floor and up and downstream talus. [1907-1908]

Album 5, Page 14

Building masonry of lock. [1907-1908]

Album 5, Page 15

Building piers. [1907-1908]

Album 5, Page 16

Erection of lock gates. [1907-1908]

Album 5, Page 17

Upstream view of barrage. [1907-1908]

Album 5, Page 18

Downstream view of barrage. [1907-1908]

Album 5, Page 19

Lock and upstream barrage from West Bank. [1907-1908]

Album 5, Page 20

Lock in operation. [1907-1908]

Album 5, Page 21

Asfun Canal regulating head. [1907-1908]

Album 5, Page 22

View of roadway of barrage. [1907-1908]

Album 5, Page 23

View of Isna Town. [1907-1908]

Album 5, Page 24

[A group of Western and Egyptian men gathered for the ceremonial laying of the final stone, with Abbas II Hilmi, the Khedive of Egypt, on February 9, 1909.] 1909

Album 6

The Isna Barrage, [1907-1908]

Physical Description: 18 photographs in 1 volume; images 24 x 29 cm, volume 33 x 40 cm

Scope and Content

This presentation album contains 18 photographs. The title page has the handwritten inscription "Sir John Aird." Photographs are undated and unsigned. The album is similar to Album 5, but without a final image of the final stone laying ceremony.
Album title transcribed from printed title page. Photograph titles transcribed from printed captions on pages; dates supplied by cataloger based on years of project.
Album 6, Page 6

Excavating on East Bank high level berm. [1907-1908]

Album 6, Page 7

Construction of cofferdams. [1907-1908]

Album 6, Page 8

Completed cofferdams. [1907-1908]

Album 6, Page 9

Pumping out cofferdams. [1907-1908]

Album 6, Page 10

Pile driving. [1907-1908]

Album 6, Page 11

Excavation for foundation. [1907-1908]

Album 6, Page 12

Building masonry floor and downstream talus. [1907-1908]

Album 6, Page 13

Building floor and up and downstream talus. [1907-1908]

Album 6, Page 14

Building masonry of lock. [1907-1908]

Album 6, Page 15

Building piers. [1907-1908]

Album 6, Page 16

Erection of lock gates. [1907-1908]

Album 6, Page 17

Upstream view of barrage. [1907-1908]

Album 6, Page 18

Downstream view of barrage. [1907-1908]

Album 6, Page 19

Lock and upstream barrage from West Bank. [1907-1908]

Album 6, Page 20

Lock in operation. [1907-1908]

Album 6, Page 21

Asfun Canal regulating head. [1907-1908]

Album 6, Page 22

View of roadway of barrage. [1907-1908]

Album 6, Page 23

View of Isna Town. [1907-1908]

Album 7

Isna Barrage, [1907-1908]

Physical Description: 60 photographs in 1 volume ; images 23 x 29 cm volume 31 x 41 cm

Scope and Content

This album contains 60 unsigned photographs. Some consist of multiple images taped together to create panoramas.
Album title transcribed from handwritten title on album cover. Photograph titles in square brackets supplied by cataloger; photograph titles for pages 10-13 transcribed from handwritten title and dates on page margins, pages 14-58 from titles on images.
Album 7, Page 1

[Barrage construction site, early period.] [1907]

Album 7, Page 2

[Barrage construction site, early period.] [1907]

Album 7, Page 3

[Barrage construction site, early period.] [1907]

Album 7, Page 4

[Barrage construction site, early period.] [1907]

Album 7, Page 5

[Barrage construction site, early period.] [1907]

Album 7, Page 6

[Barrage construction site, early period.] [1907]

Album 7, Page 7

[Barrage construction site, early period.] [1907]

Album 7, Page 8

[Barrage construction site, early period.] [1907]

Album 7, Page 9

[Barrage construction site, early period.] [1907]

Album 7, Page 10

East Bank. 1907-04-02

Album 7, Page 11

East Bank. 1907-04-02

Album 7, Page 12

West Bank. 1907-04-02

Album 7, Page 13

West Bank. 1907-04-02

Album 7, Page 14

Isna Barrage East Bank, looking west. 1907-04-05

Album 7, Page 15

Isna Barrage East Bank, looking east 1907-04-05

Album 7, Page 16

Isna Barrage West Bank, looking east 1907-04-28

Album 7, Page 17

Isna Barrage West Bank. Lock sill. 1907-04-28

Album 7, Page 18

Isna Barrage East Bank. Looking east. 1907-06-01

Album 7, Page 19

Isna Barrage East Bank. Looking west. 1907-06-01

Album 7, Page 20

Isna Barrage West Bank Lock. 1907-06-01

Album 7, Page 21

Isna Barrage West Bank. Looking east. 1907-06-01

Album 7, Page 22

Isna Barrage East Bank. Upstream. 1907-07-01

Album 7, Page 23

Isna Barrage East Bank. Looking east. 1907-07-01

Album 7, Page 24

Isna Barrage West Bank Lock. Upstream. 1907-07-01

Album 7, Page 25

Isna Barrage West Bank, looking West. Upstream from sudd. 1907-07-04

Album 7, Page 26

Isna Barrage West Bank, looking East. Downstream. 1907-07-01

Album 7, Page 27

Isna Barrage West Bank. Downstream looking West. Showing sudd prepared for second season. 1907-07-18

Album 7, Page 28

Isna Barrage. View of East Bank. Upstream. Looking Northwest. 1908-01-03

Album 7, Page 29

Isna Barrage. View from East Bank. Looking West. Showing excavation and sudd. 1908-01-03

Album 7, Page 30

Isna Barrage. View from East abutment. Showing construction of arches "B". 1908-02-11

Album 7, Page 31

Isna Barrage. View from West Bank Piers. Looking East. Showing construction of sudd "C". 1908-02-14

Album 7, Page 32

Isna Barrage. View of East Bank. Looking East. Showing foundations "D". 1908-02-11

Album 7, Page 33

Isna Barrage. View from East, looking West, showing foundation "A". 1908-02-11

Album 7, Page 34

Isna Barrage. View from cross sudd, looking East. 1908-03-08

Album 7, Page 35

Isna Barrage. View from West Bank Piers, looking East, showing sudd. 1908-03-08

Album 7, Page 36

Isna Barrage. View from East, looking West, showing foundations. 1908-03-08

Album 7, Page 37

Isna Barrage. View from sudd, showing upstream of West Bank Piers. 1908-03-08

Album 7, Page 38

Isna Barrage. View from W. Bank, looking East, showing downstream of piers. 1908-03-08

Album 7, Page 39

Isna Barrage. View from East. 1908-03-13

Album 7, Page 40

Isna Barrage. View from West Bank Piers, looking East. 1908-03-28

Album 7, Page 41

Isna Barrage. Downstream, looking East "D". 1908-04-04

Album 7, Page 42

Isna Barrage. Upstream, looking East "B". 1908-04-04

Album 7, Page 43

Isna Barrage. Upstream, looking West. 1908-04-04

Album 7, Page 44

Isna Barrage. Downstream, looking West. 1908-04-04

Album 7, Page 45

Isna Barrage. View from West Bank Piers "A". 1908-05-09

Album 7, Page 46

Isna Barrage. View showing finish of concrete floor, from upstream "A". 1908-05-13

Album 7, Page 47

Isna Barrage. View showing finish of concrete floor, from downstream "C". 1908-05-13

Album 7, Page 48

Isna Barrage. View upstream showing closing foundations "D". 1908-05-12

Album 7, Page 49

Isna Barrage. View upstream, looking West "E". 1908-05-12

Album 7, Page 50

Isna Barrage. View from West Bank downstream, looking East. 1908-06-09

Album 7, Page 51

Isna Barrage. View from West Bank Piers, looking East. 1908-05-28

Album 7, Page 52

Isna Barrage. View of upstream from East Abutment. 1908-08-14

Album 7, Page 53

Isna Barrage. Asfun Regulator, West Bank. 1908-08-14

Album 7, Page 54

Isna Barrage. View of sluice at top of flood. 1908-09-16

Album 7, Page 55

Kallabia Regulator. Barrage in background. 1908-09-16

Album 7, Page 56

Isna Barrage. View from East Abutment, upstream. 1908-09-16

Album 7, Page 57

Isna Barrage. View from West Bank, upstream. 1908-09-19

Album 7, Page 58

Isna Barrage. Model of One Bay, upstream view. [1908]

Album 7, Page 59

[Commemorative bricklayer's trowel used by Abbas II Hilmi Bey, Khedive of Egypt to lay the final stone for the completion of Isna Barrage.] 1908

Album 7, Page 60

[Tombstone for Ingsby Milford Hunley, who died at the site in June of 1906, before construction began.] [1908]

 

Series III. First heightening

Physical Description: 10 volumes

Scope and Content Note

This series contains ten albums of photographs documenting the first heightening of the Aswan Dam between 1907 and 1912.
The photographs in Albums 12-16 were removed from their bindings prior to arrival at The Huntington.
Album 8

The Heightening of the Aswan Dam, [1907]-1912

Physical Description: 21 photographs in 1 volume ; image 24 x 29 cm, volume 33 x 40 cm + 5 loose photographs

Scope and Content

This presentation album contains 21 photographs, and five additional loose prints, with a two-page printed preface. Most photographs are signed by D.S. George. Contains the bookplate of the Egyptian Government inscribed “Inauguration of the Heightening of the Assuan Dam. Dec. 23 1912, presented to Sir John Aird Bart” on the inside front cover.
Album title transcribed from cover title. Photograph titles transcribed from printed captions pasted on pages; photographs are unnumbered and undated; dates supplied by cataloger based on album title.
Album 8, Page 4c

Section showing effect of heightened dam on reservoir [copy of map]. [1907-1912]

Album 8, Page 5

H.R.H. The Duck of Connaught relaying the original foundation stone in its new position. [1907-1912]

Album 8, Page 6

Thickening solid dam, showing protection of space. [1907-1912]

Album 8, Page 7

Open sluices, Set 18. [1907-1912]

Album 8, Page 8

Thickening at solid dam. [1907-1912]

Album 8, Page 9

Thickening at Set No. 1. [1907-1912]

Album 8, Page 10

Erecting cofferdams. [1907-1912]

Album 8, Page 11

Excavating foundations in aprons. [1907-1912]

Album 8, Page 12

Thickening, showing grouting pipes. [1907-1912]

Album 8, Page 13

Extending sluices in thickened portion of dam. [1907-1912]

Album 8, Page 14

Thickening and heightening lock walls. [1907-1912]

Album 8, Page 15

View showing thickening brought up to original roadway level. [1907-1912]

Album 8, Page 16

Building heightening, view looking east. [1907-1912]

Album 8, Page 17

Downstream view showing spillways. [1907-1912]

Album 8, Page 18

Building spillways on solid dam. [1907-1912]

Album 8, Page 19

North face of heightened dam, looking east. [1907-1912]

Album 8, Page 20

Heightened dam, view looking west. [1907-1912]

Album 8, Page 21

North entrance to locks. [1907-1912]

Album 8, Page 22

Heightened dam, view looking north-east. [1907-1912]

Album 8, Page 23

Staff quarters. [1907-1912]

Album 8, Page 24

No. 846. Aswan Dam heightening, opening ceremony. 1912-12-23

Album 9

The Heightening of the Aswan Dam, [1907-1912]

Physical Description: 20 photographs in 1 volume ; image 24 x 29 cm, volume 33 x 40 cm

Scope and Content

This presentation album contains 20 photographs, with a two-page printed preface. Most photographs are signed by D.S. George. Album is similar to Album 8, but lacking bookplate and final image of opening ceremony.
Album title transcribed from cover title. Photograph titles transcribed from printed captions pasted on pages; photographs are unnumbered and undated; dates supplied by cataloger based on album title.
Album 9, Page 04c

Section showing effect of heightened dam on reservoir. [1907-1912]

Album 9, Page 5

H.R.H. The Duke of Connaught relaying the original foundation stone in its new position. [1907-1912]

Album 9, Page 6

Thickening solid dam, showing protection of space. [1907-1912]

Album 9, Page 7

Open sluices, Set 18. [1907-1912]

Album 9, Page 8

Thickening at solid dam. [1907-1912]

Album 9, Page 9

Thickening at Set No. 1. [1907-1912]

Album 9, Page 10

Erecting cofferdams. [1907-1912]

Album 9, Page 11

Excavating foundations in aprons. [1907-1912]

Album 9, Page 12

Thickening, showing grouting pipes. [1907-1912]

Album 9, Page 13

Extending sluices in thickened portion of dam. [1907-1912]

Album 9, Page 14

Thickening and heightening lock walls. [1907-1912]

Album 9, Page 15

View showing thickening brought up to original roadway level. [1907-1912]

Album 9, Page 16

Building heightening, view looking east. [1907-1912]

Album 9, Page 17

Downstream view showing spillways. [1907-1912]

Album 9, Page 18

Building spillways on solid dam. [1907-1912]

Album 9, Page 19

North face of heightened dam, looking east. [1907-1912]

Album 9, Page 20

Heightened dam, view looking west. [1907-1912]

Album 9, Page 21

North entrance to locks. [1907-1912]

Album 9, Page 22

Heightened dam, view looking north-east. [1907-1912]

Album 9, Page 23

Staff quarters. [1907-1912]

Album 10

Assuan [sic] Dam No. 1, 1907-1909

Physical Description: 61 photographs in 1 volume ; images 22 x 28 cm, volume 31 x 41 cm

Scope and Content

This album contains 60 photographs, including ones signed by A. Marques, F. Fiorello, and D.S. George (with some unsigned).
Album title transcribed from handwritten cover title. Primarily, the photograph titles, numbers, and dates are transcribed variously from information written on negatives and handwritten captions in ink and pencil. Dates and titles for unlabeled images devised by cataloger.
Album 10, Page 1

No. 1. Shellal Quarries, Some Stonecutters at work. [1907-1908]

Album 10, Page 2

No. 2. Shellal Quarries, part of the Italian Quarters. [1907-1908]

Album 10, Page 3

No. 3. Shellal Quarries. General View. Philae in the distance. [1907-1908]

Album 10, Page 4

No. 4. Shellal Quarries, General View. Ashlar being stacked along Railway. [1907- 908]

Album 10, Page 5

No. 5. General views, western section. [1907-1908]

Album 10, Page 6

No. 6. View inside Sadd. [1907-1908]

Album 10, Page 7

No. 7. Steel Drainage Pipes. [1907-1908]

Album 10, Page 8

H.R.H. The Duke of Connaught relaying the original foundation stone. [With handwritten key plan for photograph identifying Angus Blue, Mr. Webb, The Duke of Connaught, Fakhry Pasha, Mr. McCorquodale, the Duchess of Connaught, Princess Patricia of Connaught, Mr. McClure, and Mr. John Aird laid in.] 1908-02-29

Album 10, Page 9

H.R.H. The Duke of Connaught relaying the original foundation stone. 1908-02-29

Album 10, Page 10

No. 8. Sacking protection to Steel Pipes. [1907-1908]

Album 10, Page 11

No. 9. Shellal Quarries. Christmas Day 1907. Some of the Italian Stonecutters. 1907

Album 10, Page 12

No. 8. West end of Dam. 1908-03-02

Album 10, Page 13

No. 9. West end of Dam. 1908-03-02

Album 10, Page 14

No. 10. Bay No. 3 of Sluices. 1908-03-02

Album 10, Page 15

No. 11. First cill ready for sorting, West end of Dam. 1908-03-02

Album 10, Page 16

No. 12. Bay 2 & 3 of Sluices. 1908-03-02

Album 10, Page 17

No. 13. Middle portion of Solid Dam. 1908-03-03

Album 10, Page 18

No. 14. West end of Solid Dam. 1908-03-03

Album 10, Page 19

No. 15. East end of Solid Dam. 1908-03-03

Album 10, Page 20

[Commemorative bricklayers' tools used by H.R.H. The Duke of Connaught with inscriptions in English and Arabic]. [1908]

Album 10, Page 21

17. Sets 2 & 3. 1908-04-02

Album 10, Page 22

16. Sets 1, 2 & 3. 1908-04-02

Album 10, Page 23

18. Sets 5 & 6. 1908-04-02

Album 10, Page 24

19. Sets 5 & 6. 1908-04-02

Album 10, Page 25

20. W[?] part of Solid Dam 1908-04-02

Album 10, Page 26

Underpinning apron in front of set No.1. 1908-05

Album 10, Page 27

Underpinning of apron in front of set No.1. 1908-05

Album 10, Page 28

Underpinning of apron in front of set No.1. 1908-05

Album 10, Page 29

21. Sets Nos. 3, 2 & 1 showing completed arches in sluices in sets Nos. 3 & 2. Compare with old style in set No. 1. 1908-06-08

Album 10, Page 30

22. View from bottom set No. 6. 1908-06-08

Album 10, Page 31

23. General view from set No. 7. 1908-06-08

Album 10, Page 32

24. Front view set No. 6. 1908-06-08

Album 10, Page 33

25. General view from lock. 1908-06-08

Album 10, Page 34

26. View from set No.7, looking west. 1908-06-08

Album 10, Page 35

27. Solid dam. West section. 1908-06-09

Album 10, Page 36

28. Solid dam. East section. 1908-06-09

Album 10, Page 37

29. Solid dam. East section looking west. 1908-06-09

Album 10, Page 38

30. Solid dam. East section, working west. 1908-06-09

Album 10, Page 39

30. [Solid dam. East section, working west]. 1908-06-09

Album 10, Page 40

31. Western channel, section. [2 photographs taped together] 1908-07-04

Album 10, Page 41

32. Excavation of East end of wall. 1908-07-04

Album 10, Page 42

33. Western Channel sluices opened. 1908-07-04

Album 10, Page 43

34. Solid Dam nearing completion. 1908-07-04

Album 10, Page 44

35. [Solid Dam near completion]. 1908-07-04

Album 10, Page 45

Foundation stones. 1908-07-04

Album 10, Page 46

37. Western end of Dam looking West - showing 1st Season's work approaching completion. 1908-10-22

Album 10, Page 47

38. Western end of Dam looking West - showing 1st Season's work near completion. 1908-10-22

Album 10, Page 48

39. Western end of Dam looking East - Showing 1st Season's work approaching completion. 1908-10-22

Album 10, Page 49

43. Water flowing through Bab-el-Kebir Sluices - New work not begun. 1908-12-09

Album 10, Page 50

44. Bab-el-Kebir - Sluices closed - sand sudds being formed & pipes laid down to take leakage from the sluices. 1909-01-21

Album 10, Page 51

46. Bab-el-Kebir - Sudds completed, water pumped out and excavation started (Eastern section). 1909-02-01

Album 10, Page 52

48. General view of 2nd season's work looking West towards Bab-el-Kebir in which sluices are closed - In the distance the river is seen coming down the Western Channel only. 1909-02-03

Album 10, Page 53

49. Bab-el-Kebir - Sudds completed, water pumped out & excavations tarted - Western section. 1909-02-03

Album 10, Page 54

50. Looking east, showing sets of sluices Nos. 17 & 18 - masonry & excavation in progress. 1909-02-03

Album 10, Page 55

51. General view of 2nd Season's work, looking east from Bab-el-Kebir, showing sidings laid, bed of river etc. 1909-02-03

Album 10, Page 56

52. Bab-el-Kebir - Western section - Masonry in progress. 1909-04-03

Album 10, Page 57

53. Bab-el-Kebir, Eastern section, masonry in progress. 1909-04-03

Album 10, Page 58

57. Looking West - showing Sluices in sets 13, 14 & 15, built during 1909 -- 2nd Season. 1909-04-03

Album 10, Page 59

58. View of 1st & 2nd Locks showing commencement of 3rd Season's work. 1909-08-02

Album 10, Page 60

59. View of West End of Dam & 1st, 2nd & 3rd Locks. 1909-08-02

Album 10, Page 61

61. General view of Dam looking East. This shows the new work all up to the heights of the Old Dam except a short length at the extreme west. 1909-08-02

Album 11

Assuan [sic] Dam No. 2, 1909-1911

Physical Description: 60 photographs in 1 volume ; images 22 x 28 cm, volume 31 x 41 cm

Scope and Content

This album contains 60 photographs.
Album title transcribed from handwritten cover title. Photograph titles, numbers, and dates transcribed from items. Images by A. Marques (pages 1-34), chiefly with photograph numbers and dates written on negatives and handwritten captions in ink; images by F. Fiorello (pages 35-44) and D.S. George (pages 45-61) have captions, photograph numbers, and dates written on negatives.
Album 11, Page 2

60. Government Office & Firms Office on right. 1909-08-02

Album 11, Page 3

62. Doctor's House & Hospital. 1909-08-02

Album 11, Page 4

63. Engineers & Cashiers Quarters]. 1909-08-02

Album 11, Page 5

64. General view of Dam looking West -- Mr. MacDonald's house in foreground, this shows new work up to height of the Dam right across. 1909-08-02

Album 11, Page 6

65. General view showing houses, gardens, etc. [2 photographs taped together with a pencil sketch and notes showing layout of buildings affixed to verso] 1909-08-02

Album 11, Page 7

66. English Foreman's & [?] Quarters. 1909-08-02

Album 11, Page 8

No. 67 Lock No. 1, looking North, showing excavation behind West wall. 1910-01-06

Album 11, Page 9

No. 68 Lock No. 1, looking South, showing excavation behind Gate Recess. 1910-01-06

Album 11, Page 10

No. 69 Lock 2, looking North, showing additional masonry & sandstone filling behind; also excavations for foundations going on for lock 3 & 4, and sudd to enclose new lock. 1910-01-06

Album 11, Page 11

No. 70 Looking South, shows excavation [?], old wall of Lock 3 exposed & masonry just starting. 1910-01-06

Album 11, Page 12

No. 71 Taken from West end looking NW. Shows new pitching & new masonry Lock 2. 1910-01-06

Album 11, Page 13

No. 72 Looking S.E. towards West end of Dam - Shows railways & method of transport, i.e. narrow gauge loco & wagons etc. 1910-01-06

Album 11, Page 14

77. Lock No. 1. Excavations at back of old West Wall. 1910-03-05

Album 11, Page 15

75. Lock 2 & 3 showing wall completed on East side & heightening no. 3 West side. Gates turned round ready to be taken to new recesses. 1910-03-05

Album 11, Page 16

73. 4th Gate recess - Messrs. Ransomes & Rapier's crane in foreground. 1910-03-05

Album 11, Page 17

76. Lock No. 2. 1910-03-05

Album 11, Page 18

74. Lock No. 4, East wall completed, West wall in progress. 1910-03-05

Album 11, Page 19

78. General view from West end of Dam showing old West Wall abutments of Lock no. 1. New pitching in foreground which will be continued up to new cope level. 1910-03-05

Album 11, Page 20

86. View of New Lock looking South. 1910-05-05

Album 11, Page 21

87. Looking South up the old locks. Shows invert of new Lock being put in, and Cill Ashlar being laid. 1910-05-05

Album 11, Page 22

88. East wall of New Lock built up to underside of Cope. 1910-05-05

Album 11, Page 23

89. Start of new masonry behind Lock No. 1, West wall. Foundations 60 ft. deep. 1910-05-05

Album 11, Page 24

90. Government Stores. 1910-05-05

Album 11, Page 25

91. [Lock construction.] 1910-06-07

Album 11, Page 26

92. [Lock construction.] 1910-06-07

Album 11, Page 27

93. [Lock construction.] 1910-06-07

Album 11, Page 28

[94. Lock construction.] 1910-06-07

Album 11, Page 29

95. [Lock construction.] 1910-06-07

Album 11, Page 30

98. View from sudd looking South. Showing pitching of navigation channel. 1910-06-11

Album 11, Page 31

99. North end of pitching navigation channel, looking north. 1910-06-11

Album 11, Page 32

100. Pitching of navigation channel, looking north. 1910-06-11

Album 11, Page 33

101. West Wall of Lock No. 5. 1910-06-11

Album 11, Page 34

102. Front elevation of new Government Workshops. 1910-06-11

Album 11, Page 35

No. 599. Aswan Dam heightening general view from locks looking S. 1910-06-18

Album 11, Page 36

No. 600. Aswan Dam heightening from 6 looking S.W. 1910-06-18

Album 11, Page 37

No. 601. Aswan Dam heightening from 3rd lock looking N. 1910-06-21

Album 11, Page 38

No. 621. Aswan Dam heightening from recess No. 3 looking south. 1910-08-17

Album 11, Page 39

No. 622. Aswan Dam heightening. North entrance of navigation canal extension. 1910-08-17

Album 11, Page 40

No. 623. Aswan Dam heightening. From 3rd recess looking north. 1910-08-17

Album 11, Page 41

No. 624. Aswan Dam heightening. Masonry at recess No. 2. 1910-08-18

Album 11, Page 42

No. 625. Aswan Dam heightening locks looking north. 1910-08-19

Album 11, Page 43

No. 628. Aswan Dam heightening. Lock No. 1 west wall. 1910-09-02

Album 11, Page 44

No. 629. Aswan Dam heightening. The workshops. 1910-09-02

Album 11, Page 45

No. 651. Aswan Dam heightening. Recess No. 1. Lowering bowstring girders. 1910-10-07

Album 11, Page 46

No. 652. Aswan Dam heightening. From west bank. 1910-10-10

Album 11, Page 47

No. 655. Aswan Dam heightening, Lock No. 1. South entrance. 1910-10-13

Album 11, Page 48

No. 656. Aswan Dam heightening, roadway. 1910-10-20

Album 11, Page 49

No. 657. Aswan Dam heightening, South canal, silt sudd at entrance. 1910-10-22

Album 11, Page 50

No. 658. Aswan Dam Heightening. Lock gate No. 2. Placing bascules. 1910-10-24

Album 11, Page 51

No. 659. Aswan Dam Heightening, Lock gate No. 2. Bascules. 1910-10-24

Album 11, Page 52

No. 660. Aswan Dam Heightening, Lock No. 1. Looking north east. 1910-10-29

Album 11, Page 53

No. 662. Aswan Dam Heightening Lock No. 1. South entrance looking east. 1910-10-31

Album 11, Page 54

No. 666. Aswan Dam Heightening, Lock No. 1. South entrance. 1910

Album 11, Page 55

No. 665. Aswan Dam Heightening. Lock No. 1. Gate No. 2. 1910-11-07

Album 11, Page 56

No. 664. Aswan Dam Heightening. Lock No. 1. Gate No. 2. 1910-11-07

Album 11, Page 57

No. 677. Aswan Dam Heightening, solid dam, water test. Previous to grouting. 1910-12-29

Album 11, Page 58

No. 678. Aswan Dam Heightening, grout mixing machine. 1910-12-29

Album 11, Page 59

No. 688. Aswan Dam Heightening, south side looking east. 1911-01-18

Album 11, Page 60

No. 691. Aswan Dam Heightening, looking east. 1911-01-18

Album 11, Page 61

No. 697. Aswan Dam Heightening. Swing bridge. Live roller ring. 1911-02-16

Album 12

First heightening, 1907-1909

Physical Description: 93 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 93 loose photographs removed from a bound album with disintegrating bindings. All photographs are signed by D.S. George.
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs are numbered 369-459; numbers 376, 378, 405, and 410 are missing.
Album 12

No. 369. Navigation canal, pitched slope. 1907-09-27

Album 12

No. 370. Navigation canal, pitched slope. 1907-09-27

Album 12

No. 371. Navigation canal, pitched slope. 1907-09-27

Album 12

No. 372. Solid dam, excavation. 1907-10-05

Album 12

No. 373. Solid dam, excavation. 1907-10-05

Album 12

No. 374. Navigation canal, section of pitched slope. 1907-10-11

Album 12

No. 375. Navigation canal, section of pitched slope. 1907-10-12

Album 12

No. 377. The Kiosk from S.E. Philae. 1907-11-23

Album 12

No. 379. Philae. 1907-11-23

Album 12

No. 380. Philae from S.W. 1907-11-23

Album 12

No. 381. Philae on the flood. 1907-12-01

Album 12

No. 382. Philae on the flood. 1907-12-01

Album 12

No. 383. Philae and Shellal. 1907-12-01

Album 12

No. 384. Heightening of dam, Set 5 & 6 sudds. 1907-12-19

Album 12

No. 385. Heightening of dam, Set 5 & 6 sudds. 1907-12-19

Album 12

No. 386. Heightening of dam, Set 2 & 3, sudd making. 1907-12-19

Album 12

No. 387. Solid am excavation looking west. 1907-12-23

Album 12

No. 388. Solid dam excavation looking east. 1907-12-23

Album 12

No. 389. View from Sett 16. 1908-01-15

Album 12

No. 390. Dam from S. West. 1908-01-17

Album 12

No. 390A. [Dam from S. West.] 1908-01-17

Album 12

No. 391. From West Bank looking east. 1908-01-21

Album 12

No. 392. Heightening of dam, excavation Sets 2 & 3. 1908-01-21

Album 12

No. 393. Longitudinal section of the Nile from Aswan to Wadi Halfa shewing levels of water in reservoir at R.L. 106.00 and R.L. 113.00 [copy of map]. 1908

Album 12

393C. [Commemorative bricklayers' tools.] 1908-02-29

Album 12

393D. [H.R.H. The Duke of Connaught relaying the original foundation stone.] [1908]

Album 12

393F. [H.R.H. The Duke of Connaught relaying the original foundation stone.] [1908]

Album 12

No. 394. View at Set 16. 1908-01-31

Album 12

No. 395. View at Set 16. 1908-01-31

Album 12

No. 396. Masonry at solid dam looking west. 1908-01-29

Album 12

No. 397. Aswan Dam heightening, masonry looking east. 1908-01-29

Album 12

No. 398. Heightening of dam, rails in masonry. 1908-02-15

Album 12

No. 399. Heightening of dam, excavation Set 2 & 3. 1908-02-20

Album 12

No. 400. Heightening of dam excavation Sett 2 & 3. 1908-02-18

Album 12

No. 401. Aswan Dam, heightening. 1908-03-12

Album 12

402. Aswan Dam heightening. Sir William Garstin ... 1908-03-18

Album 12

402A. [Photograph of Archibald McCorquodale, M. MacDonald, Arthur Webb, and Sir William Garstin.] 1908-03-18

Album 12

No. 403. Aswan Dam heightening Set 2 & 3, looking east. 1908-03-24

Album 12

No. 404. Aswan Dam heightening Set 2 & 3, looking west. 1908-03-24

Album 12

No. 406. Aswan Dam. Sluices at Set 18. 1908-03-28

Album 12

No. 407. Aswan Dam sluices at Set 18. 1908-03-28

Album 12

No. 408. Aswan Dam heightening Set 5 & 6, looking west. 1908-04-02

Album 12

No. 409. Aswan Dam heightening Set 5 & 6. 1908-04-02

Album 12

No. 411. Aswan Dam heightening masonry from 1750 to 1875. 1908-04-02

Album 12

No. 412. Aswan Dam heightening masonry from 1750 to 1875. 1908-04-02

Album 12

No. 413. Aswan Dam heightening sluice at Set 18, full bore. 1908-04-16

Album 12

No. 414. Aswan Dam heightening sluice at Set 18, full bore. 1908-04-16

Album 12

No. 415. Aswan Dam heightening sluice at Set 18, full bore. 1908-04-16

Album 12

No. 416. Aswan Dam heightening West Channel masonry. 1908-04-18

Album 12

No. 417. Aswan Dam heightening West Channel masonry. 1908-04-18

Album 12

No. 418. Aswan Dam heightening Set 2 & 3. 1908-05-19

Album 12

No. 419. Aswan Dam heightening Set 2 & 3. 1908-05-19

Album 12

No. 420. Aswan Dam heightening underpinning apron Set 1. 1908-05-21

Album 12

No. 421. Aswan Dam heightening underpinning apron Set 1. 1908-05-21

Album 12

No. 422. Aswan Dam heightening underpinning apron Set 1. 1908-05-21

Album 12

No. 423. Aswan Dam heightening, masonry from 1500 to 1700. 1908-05-30

Album 12

No. 424. Aswan Dam heightening, masonry from 1700 to 1500. 1908-05-30

Album 12

No. 425. Aswan Dam heightening, West Channel. 1908-05-30

Album 12

No. 426. Aswan Dam heightening, looking east. 1908-06-05

Album 12

No. 427. Aswan Dam heightening, Sets 5 & 6. 1908-06-05

Album 12

No. 428. Aswan Dam heightening. 1908-06-05

Album 12

No. 429. Aswan Dam heightening. 1908-06-05

Album 12

No. 430. Aswan Dam heightening, Set 5 & 6. 1908-06-05

Album 12

No. 431. Aswan Dam heightening, during flood. 1908-09-17

Album 12

No. 431A. Aswan Dam heightening, during flood. 1908-09-17

Album 12

No. 432. Aswan Dam heightening, looking east. 1908-10-21

Album 12

No. 433. Aswan Dam heightening, south side. 1908-10-21

Album 12

No. 434. Heightening of dam, sudds Set 18, looking east. 1908-11-08

Album 12

No. 435. Aswan Dam heightening, excavation Set 17 & 18, looking east. 1908-11-16

Album 12

No. 436. Aswan Dam heightening, Set 15. 1908-11-20

Album 12

No. 437. Aswan Dam heightening, Set 7, looking west. 1908-11-20

Album 12

No. 438. Aswan Dam heightening, excavation from Set 16, looking west. 1908-12-03

Album 12

No. 439. Aswan Dam heightening, Set 2 & 3. 1908-12-09

Album 12

No. 440. Aswan Dam heightening, Set 5 & 6. 1908-12-09

Album 12

No. 441. Aswan Dam heightening, Set 5 & 6. 1908-12-09

Album 12

No. 442. Aswan Dam heightening, masonry Set 1. 1909-01-07

Album 12

No. 443. Aswan Dam heightening, masonry Set 1. 1909-01-07

Album 12

No. 444. Aswan Dam heightening, masonry Set 1. 1909-01-08

Album 12

No. 445. Aswan Dam heightening, masonry Set 1. 1909-01-08

Album 12

No. 446. Aswan Dam heightening, masonry at Set 16. 1909-01-13

Album 12

No. 447. Aswan Dam heightening, sluice 1. Set 1. 1909-01-19

Album 12

No. 448. Aswan Dam heightening, sluice 1. Set 1. 1909-01-19

Album 12

No. 449. Aswan Dam heightening, sluice 1. Set 1 (looking down). 1909-01-19

Album 12

No. 450. Aswan Dam heightening, Shellal quarries. 1909-01-20

Album 12

No. 451. Aswan Dam heightening, Shellal quarries. 1909-01-20

Album 12

No. 452. Aswan Dam heightening, Shellal quarries. 1909-01-20

Album 12

No. 453. Aswan Dam heightening, view from Shellal quarries. 1909-01-20

Album 12

No. 454. Aswan Dam heightening, sudd Set 10. 1909-01-26

Album 12

No. 455. Aswan Dam heightening, masonry Set 12. 4 & 5. 1909-12-27

Album 12

No. 456. Aswan Dam heightening, Set 12, looking east. 1909-01-27

Album 12

No. 457. Aswan Dam heightening, sudd Set 10. 1909-01-29

Album 12

No. 458. Aswan Dam heightening, excavation at Set 9, 10, & 11. 1909

Album 12

No. 459. Aswan Dam heightening, Bab el Sogair 1909-02-16

Album 13

First heightening, 1908-1910

Physical Description: 102 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 102 loose photographs removed from a bound album with disintegrating bindings. All photographs are by D.S. George.
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs are numbered 460-559; number 470 is missing.
Album 13

No. 460. Aswan Dam heightening, East abutment. 1909-02-20

Album 13

No. 461. Aswan Dam heightening, Set 10. Eastward. 1909-02-23

Album 13

No. 462. Aswan Dam heightening, Set 7A to. 1909-02-23

Album 13

No. 463. Aswan Dam heightening, [?] Set 10. 1909-02-23

Album 13

No. 464. Aswan Dam heightening, the workshops. 1909-03-07

Album 13

No. 465. Aswan Dam heightening, model on West Bank. 1909-03-09

Album 13

No. 466. Aswan Dam heightening, model on West Bank. 1909-03-09

Album 13

No. 467. Aswan Dam heightening, excavation at Set [?]. 1909-03-16

Album 13

No. 468. Aswan Dam heightening, masonry Set 14. 1909-03-16

Album 13

No. 469. Aswan Dam heightening, masonry Set 14. 1909-03-20

Album 13

No. 469. Aswan Dam heightening, masonry Set 14. 1909-03-20

Note

Identified on verso as No. 469A.
Album 13

No. 471. Aswan Dam heightening, from Set 18. Looking west 1909-03-20

Album 13

No. 472. Aswan Dam heightening, masonry Set 11A. Looking west. 1909-03-25

Album 13

No. 473. Aswan Dam heightening, masonry Set 9, 10 & 11A. 1909-03-29

Album 13

No. 474. Aswan Dam heightening, masonry Set 14. 1909-03-30

Album 13

[No. 476. Aswan Dam heightening.] 1909

Album 13

No. 477. Aswan Dam heightening, soffit of sluice arch. 1909-04-04

Album 13

No. 478. Aswan Dam heightening, soffit of sluice arch. 1909-04-04

Album 13

No. 479. Aswan Dam heightening, masonry. Set 11A, looking east. 1909-04

Album 13

No. 480. Aswan Dam heightening, masonry. Set 9, 10 & 11A. 1909-04-14

Album 13

No. 481. Aswan Dam heightening, excavation Set 18. 1909-04-14

Album 13

No. 482. Aswan Dam heightening, excavation Set 18, looking east. 1909-04-14

Album 13

No. 483. Aswan Dam heightening, excavation Set 9, 10 & 11A. 1909-04-22

Album 13

No. 484. Aswan Dam heightening, Set 7A. 1909-04-23

Album 13

No. 485. Aswan Dam heightening, Set 10. 1909-04-23

Album 13

No. 486. Aswan Dam heightening, extrados of sluice arch. 1909-04-25

Album 13

No. 487. Aswan Dam heightening, Set 5 & 6. 1908-04-02

Album 13

No. 488. Aswan Dam heightening, masonry Set 8B, looking east. 1909-04-30

Album 13

No. 489. Aswan Dam heightening, Set 18, looking west. 1909-05-04

Album 13

No. 490. House at Aswan Reservior. 1909-05-05

Album 13

No. 491. View of Aswan Reservoir houses. 1909-05-05

Album 13

No. 492. Aswan Reservoir houses. 1909-05-05

Album 13

No. 493. Aswan Dam heightening, masonry. Set 18, looking west. 1909-05-10

Album 13

No. 494. Aswan Dam heightening, masonry. Set 8B, looking east. 1909-05-10

Album 13

No. 495. Aswan Dam heightening, masonry. Set 8B, looking east. 1909-05-17

Album 13

No. 496. Aswan Dam heightening, masonry at Set 9 looking west. 1909-05-17

Album 13

No. 497. Aswan Dam heightening, Set 7A. 1909-05-20

Album 13

No. 498. Aswan Dam heightening, Set 10. 1909-05-20

Album 13

No. 499. Aswan Dam heightening, Set 18 masonry. 1909-05-22

Album 13

No. 500. Aswan Dam heightening, masonry Set 18, looking west. 1909-05-22

Album 13

No. 501. Aswan Reservoir houses. 1909-05-22

Album 13

No. 502. Aswan Dam heightening, raising lock gate recess 5. 1909-07-12

Album 13

No. 503. Aswan Dam heightening. Raising lock gate at recess 5. 1909-07-12

Album 13

No. 503. Aswan Dam heightening. Raising lock gate at recess 5. 1909-07-12

Note

Identified on verso as No. 503A.
Album 13

No. 504. Aswan Dam heightening, general view looking east. 1909-09-15

Album 13

No. 505. Aswan Dam heightening, looking east. 1909-09-15

Album 13

No. 506. Aswan Dam heightening, looking west. 1909-09-15

Album 13

No. 507. Aswan Dam heightening, foundation. Set 0. 1909-09-15

Album 13

No. 508. Aswan Dam heightening, masonry. From 1600, looking west. 1909-09-15

Album 13

No. 509. Aswan Dam heightening, looking east. 1909-09-15

Album 13

No. 510. Aswan Dam. Weir at Sohail. 1909-09-29

Album 13

No. 511. Aswan Dam heightening, looking east. 1909-11-19

Album 13

No. 511. Aswan Dam heightening, looking east. 1909-11-19

Note

Identified on verso as No. 511A.
Album 13

No. 512. Aswan Dam heightening, lock 2. West wall bay 3. 1909-11-30

Album 13

No. 513. Aswan Dam heightening, lock 2. West wall bay 3. 1909-11-30

Album 13

No. 514. Aswan Dam heightening, lock 2 & 3. East wall, looking north. 1909-12-12

Album 13

No. 515. Aswan Dam heightening, Culvert bay 1. East wall lock 3. 1909-12-06

Album 13

No. 516. Aswan Dam heightening, the workshops. 1909-12-07

Album 13

No. 517. Aswan Dam heightening, the workshops. 1909-12-10

Album 13

No. 518. Aswan Dam heightening, culvert bay 1 lock 3. West wall. 1909-12-10

Album 13

No. 519. Aswan Dam heightening, lock gate No. 1. Showing timber struts. 1909-12-21

Album 13

No. 520. Aswan Dam heightening, lock gate No. 1. Showing timber struts. 1909-12-22

Album 13

No. 521. Aswan Dam heightening, removal of 25 ton crane from cope to roadway level. 1909-12-27

Album 13

No. 522. Aswan Dam heightening, lock 2 west wall looking south. 1909-12-29

Album 13

No. 523. Aswan Dam heightening, east wall from lock 1 looking south. 1909-12-28

Album 13

No. 524. Aswan Dam heightening, lock 3. East wall looking south. 1909-12-28

Album 13

No. 525. Aswan Dam heightening. 8 metre gate, south entrance. 1910-01-01

Album 13

No. 526. Aswan Dam heightening. Lock 3. East wall looking south. 1910-01-06

Album 13

No. 527. Aswan Dam heightening. Lock 3. East wall looking south. 1910-01-06

Album 13

No. 528. Aswan Dam heightening. Lock 3. East wall looking south. 1910-01-06

Album 13

No. 529. Aswan Dam heightening. Lock 3. West wall looking south. 1910-01-06

Album 13

No. 530. Aswan Dam heightening. Lock 3, looking north. West wall. 1910-01-06

Album 13

No. 531. Aswan Dam heightening, lock 1. West wall buttresses. 1910-01-06

Album 13

No. 532. Aswan Dam heightening. Culvert bay 2. Lock 2. West wall. 1910-01-06

Album 13

No. 533. Aswan Dam heightening, from lock 4. Looking north. 1910-01-08

Album 13

No. 534. Aswan Dam heightening. The locks looking south, closing sudd. 1910-01-10

Album 13

No. 535. Aswan Dam heightening. Lock 5 looking south. 1910-01-10

Album 13

No. 536. Aswan Dam heightening. Dismantling superstructure of gate lock 3. 1910-01-17

Album 13

No. 537. Aswan Dam heightening. Suspension rods. Lock gate no. 3. 1910-01-29

Album 13

No. 538. Aswan Dam heightening. Lock 3. Gate raised ready for bogies. 1910-01-29

Album 13

No. 539. Aswan Dam heightening. Lock gate no. 3 on bogies. 1910-01-31

Album 13

No. 540. Aswan Dam heightening. Sudd and locks looking south. 1910-02-01

Album 13

No. 541. Aswan Dam heightening. Lock 3. Lowering bascule. 1910-02-03

Album 13

No. 542. Aswan Dam heightening. West wall. Lock 3. 1910-02-03

Album 13

No. 543. Aswan Dam heightening. West abutment. 1910-02-05

Album 13

No. 544. Aswan Dam heightening. West abutment. 1910-02-05

Album 13

No. 545. Aswan Dam heightening. Lock gate no. 3 on bogies. North side. 1910-02-12

Album 13

No. 546. Aswan Dam heightening. Lock gate no. 3 on bogies. North side. 1910-02-12

Album 13

No. 547. Aswan Dam heightening. Locks looking south. 1910-02-14

Album 13

No. 548. Aswan Dam heightening. Locks looking south. 1910-02-14

Album 13

No. 549. Aswan Dam heightening. Lock 5 excavation. 1910-02-14

Album 13

No. 550. Aswan Dam heightening. Lock gate no. 3. Looking north. 1910-02-16

Album 13

No. 551. Aswan Dam heightening. Gate no. 2. North side. 1910-02-16

Album 13

No. 552. Aswan Dam heightening. Lock gate no. 3. Looking north. 1910-02-16

Album 13

No. 553. Aswan Dam heightening. Lock gate no. 3. Looking south. 1910-02-16

Album 13

No. 554. Aswan Dam heightening. Lock gate no. 3. Looking south. 1910-02-16

Album 13

No. 555. Aswan Dam heightening. East wall. Looking north from lock 1. 1910-02-25

Album 13

No. 556. Aswan Dam heightening. The workshops. 1910-02-25

Album 13

No. 557. Aswan Dam heightening. Locks looking west. 1910-02-25

Album 13

No. 558. Aswan Dam heightening. The workshops. 1910-02-28

Album 13

No. 559. Aswan Dam heightening. Excavation. Lock 5. Recess 6. 1910-03-17

Album 14

First heightening, 1910

Physical Description: 100 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 100 loose photographs removed from a bound album with disintegrating bindings. All photographs are by either D.S. George or F. Fiorello.
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs are numbered 560-658; number 630 is missing.
Album 14

No. 560. Aswan Dam heightening. Lock 5 looking south. 1910-03-17

Album 14

No. 561. Aswan Dam heightening. Lock 5 looking south. 1910-03-17

Album 14

No. 562. Aswan Dam heightening. Excavation lock 5. Looking north. 1910-03-17

Album 14

No. 563. Aswan Dam heightening. East wall from lock 5. 1910-03-17

Album 14

No. 564. Aswan Dam heightening. West abutment. 1910-03-17

Album 14

No. 565. Aswan Dam heightening. Spill way pierced dam. 1910-03-19

Album 14

No. 566. Aswan Dam heightening. Spill way solid dam. 1910-03-19

Album 14

No. 567. Aswan Dam heightening. Spill way dressed ashlar. 1910-03-19

Album 14

No. 568. Aswan Dam heightening. Spill way dressed ashlar. 1910-03-19

Album 14

No. 569. Aswan Dam heightening. Lock 5. Masonry. East wall. 1910-03-27

Album 14

No. 570. Aswan Dam heightening. Accumulator house. 1910-03-30

Album 14

No. 571. Aswan Dam heightening. Lock gate No. 2. Removing bascule. 1910-04-03

Album 14

No. 572. Aswan Dam heightening. Lock 5. Looking south. 1910-04-05

Album 14

No. 573. Aswan Dam heightening. Lock 5. Junction of old and new masonry. East wall. 1910-04-05

Album 14

No. 574. Aswan Dam heightening. Recess of old and new ashlar. 1910-04-05

Album 14

No. 575. Aswan Dam heightening. Lock gate No.2. Reduced to 16 meters. 1910-04-05

Album 14

No. 576. Aswan Dam heightening. Recess No. 3. West wall. 1910-04-05

Album 14

No. 577. Aswan Dam heightening. Lock 5. Excavation and masonry. Looking north. 1910-04-12

Album 14

No. 578. Aswan Dam heightening. Locks looking south. 1910-04-12

Album 14

No. 579. Aswan Dam heightening. Lock gate No. 4 on bogies. 1910-04-12

Album 14

No. 580. Aswan Dam heightening. Accumulator house. 1910-04-16

Album 14

No. 581. Aswan Dam heightening. Locks looking south. 1910-04-25

Album 14

No. 582. Aswan Dam heightening. Lock 5. East wall. 1910-04-25

Album 14

No. 583. Aswan Dam heightening. From lock 2 looking north. 1910-04-26

Album 14

No. 584. Aswan Dam heightening. Lock 5. Foundation recess 6. 1910-04-26

Album 14

No. 585. Aswan Dam heightening. Lock 5. Looking north. 1910-04-26

Album 14

No. 586. Aswan Dam heightening. Lock 5 recess 6. Looking east. 1910-05-02

Album 14

No. 587. Aswan Dam heightening. Lock 5. Looking north. 1910-05-04

Album 14

No. 588. Aswan Dam heightening. Canal extension. North end. 1910-05-06

Album 14

No. 589. Aswan Dam heightening. Canal extension. Looking north. 1910-05-06

Album 14

No. 590. Aswan Dam heightening. Locks looking south west. 1910-05-06

Album 14

No. 591. Aswan Dam heightening. Lock 1. West wall. 1910-05-07

Album 14

No. 592. Aswan Dam heightening. Lock 5. Recess 6. West. 1910-05-07

Album 14

No. 593. Aswan Dam heightening. The workshops. 1910-05-20

Album 14

No. 594. Aswan Dam heightening. From lock 3. 1910-05-25

Album 14

No. 595. Aswan Dam heightening. Locks looking south. 1910-05-25

Album 14

No. 596. Aswan Dam heightening. Canal extension looking north. 1910-06-10

Album 14

No. 597. Aswan Dam heightening. Canal extension looking south. 1910-06-11

Album 14

No. 598. Aswan Dam heightening. Locks looking south west. 1910-06-18

Album 14

No. 599. Aswan Dam heightening. General view from locks looking south. 1910-06-18

Album 14

No. 600. Aswan Dam heightening. From 6. Looking south west. 1910-06-18

Album 14

No. 601. Aswan Dam heightening. From 3rd lock. Looking north. 1910-06-24

Album 14

No. 602. Aswan Dam heightening. Lock 5. Looking south west. 1910-06-21

Album 14

No. 603. Aswan Dam heightening. Lock gate No. 2. Looking north. 1910-06-24

Album 14

No. 604. Aswan Dam heightening. Lock gate No. 2. Looking south. 1910-06-24

Album 14

No. 605. Aswan Dam heightening. Lock gate No. 2. Looking south. 1910-06-27

Album 14

No. 606. Aswan Dam heightening. Canal extension. Looking south. 1910-06-27

Album 14

No. 607. Aswan Dam heightening. Navigation chanel. Looking north. 1910-06-27

Album 14

No. 608. Aswan Dam heightening. The workshops. 1910-07-15

Album 14

No. 609. Aswan Dam heightening. Canal extension. Looking north. 1910-07-15

Album 14

No. 610. Aswan Dam heightening. Canal extension. Looking south. 1910-07-15

Album 14

No. 611. Aswan Dam heightening. General view from locks. Looking south. 1910-07-15

Album 14

No. 612. Aswan Dam heightening. Junction of west wall lock No. 1 and dam. 1910-07-16

Album 14

No. 613. Empty reservoir. Looking east. R.L. 89.60. 1910-07-17

Album 14

No. 614. Empty reservoir. Looking south east. R.L. 89.60. 1910-07-17

Album 14

No. 615. Empty reservoir. Looking east. R.L. 89.60. 1910-07-17

Album 14

No. 616. Empty reservoir. Looking south. R.L. 89.60. 1910-07-17

Album 14

No. 617. Aswan Dam heightening. Trolly under the gate. 1910-07-18

Album 14

No. 618. Aswan Dam heightening. Lock gate No. 1. Looking north. 1910-07-18

Album 14

No. 619. Aswan Dam heightening. Lock gate No. 1. Looking south. 1910-07-20

Album 14

No. 620. Aswan Dam heightening. No. 6 lock. Looking north. 1910-07-27

Album 14

No. 621. Aswan Dam heightening. From recess No. 3. Looking south. 1910-08-17

Album 14

No. 622. Aswan Dam heightening. North entrance of navigation canal extension. 1910-08-17

Album 14

No. 623. Aswan Dam heightening. From 3rd recess looking north. 1910-08-17

Album 14

No. 624. Aswan Dam heightening. Masonry at recess No. 2. 1910-08-18

Album 14

No. 625. Aswan Dam heightening. Locks looking north. 1910-08-19

Album 14

No. 626. Aswan Dam heightening. North side of dam. Looking east. 1910-08-25

Album 14

No. 627. North side of dam. Looking west. 1910-08-26

Album 14

No. 628. Aswan Dam heightening. Lock No. 1. West wall. 1910-09-02

Album 14

No. 629. Aswan Dam heightening. Lock No. 1. South entrance. 8M gate. 1910-09

Album 14

No. 629. Aswan Dam heightening. The workshops. 1910-09-02

Note

Identified on verso as No. 629A.
Album 14

No. 631. Aswan Dam heightening. Locks looking south. 1910-09-03

Album 14

No. 632. Aswan Dam heightening. East wall at recess No. 2. 1910-09-03

Album 14

No. 633. Flood looking north from set 3. 1910-09-06

Album 14

No. 634. Dam from north canal pitched bank. 1910-09-06

Album 14

No. 634A. [Aswan Dam heightening. Dam from north canal pitched bank.] 1910-09-06

Album 14

No. 635. Aswan Dam heightening. Recess No. 2. Gate erection. 1910-09-09

Album 14

No. 636. Aswan Dam heightening. Lock No. 2. Sudd looking north. 1910-09-09

Album 14

No. 637. Aswan Dam heightening. Lock No. 1. South entrance looking west. 1910-09-09

Album 14

No. 638. Aswan Dam heightening. Masonry at lock No. 1. 1910-09-10

Album 14

No. 639. Lock No. 1. South entrance looking east. 1910-09-09

Album 14

No. 640. Aswan Dam heightening. Workshop from north west. 1910-09-13

Album 14

No. 641. Aswan Dam heightening. Lock No. 1. Air compressed plant. 1910-09-14

Album 14

No. 642. Aswan Dam heightening. Lock No. 1. East wall looking west. 1910-09-21

Album 14

No. 643. Aswan Dam heightening. Lock No. 1. West wall looking north east. 1910-09-21

Album 14

No. 644. Aswan Dam heightening. Gate erection. Recess No. 2. 1910-09-22

Album 14

No. 645. Aswan Dam heightening. Lock No. 1. Recess No. 2. Gate erection. 1910-09-22

Album 14

No. 646. Aswan Dam heightening. Erection of gate No. 1. 1910-09-22

Album 14

No. 647. Aswan Dam heightening. Lock No. 1. South entrance. 1910-09-26

Album 14

No. 648. Aswan Dam heightening. Lock No. 1. Gate erection. 1910-09-30

Album 14

No. 649. Aswan Dam heightening. Lock No. 1. Recess No. 2. Gate erection. 1910-09-30

Album 14

No. 650. Aswan Dam heightening. The workshops. 1910-09-30

Album 14

No. 651. Aswan Dam heightening. Recess No. 1. Lowering bowstring girders. 1910-10-07

Album 14

No. 652. Aswan Dam heightening. from west bank. 1910-10-10

Album 14

No. 653. Aswan Dam heightening. Air compressor plant. 1910-10-10

Album 14

No. 654. Aswan Dam heightening. Grout mixing machine. 1910-10-13

Album 14

No. 655. Aswan Dam heightening. Lock No. 1. South entrance. 1910-10-13

Album 14

No. 656. Aswan Dam heightening. Roadway. 1910-10-20

Album 14

No. 657. Aswan Dam heightening. South canal. Silt sudd at entrance. 1910-10-22

Album 14

No. 658. Aswan Dam heightening. Lock gate No. 2. Placing bascules. 1910-10-24

Album 15

First heightening, 1910-1911

Physical Description: 92 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 92 loose photographs removed from a bound album with disintegrating bindings. All photographs are by either D.S. George or F. Fiorello.
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs are numbered 659-758; numbers 679, 692, 693, 694, 697, 702, 723, and 724 are missing.
Album 15

No. 659. Aswan Dam heightening. Lock gate No. 2. Bascules. 1910-10-24

Album 15

No. 660. Aswan Dam heightening. Lock No. 1. Looking north east. 1910-10-29

Album 15

No. 661. Aswan Dam heightening. South canal. Silt sudd at entrance. 1910-10-29

Album 15

No. 662. Aswan Dam heightening. Lock No. 1. South entrance. Looking east. 1910-10-31

Album 15

No. 663. Aswan Dam heightening. Lock No. 1. Gate No. 2. 1910-11-07

Album 15

No. 664. Aswan Dam heightening. Lock No. 1. Gate No. 2. 1910-11-07

Album 15

No. 665. Aswan Dam heightening. South canal looking south. 1910-11-07

Album 15

No. 666. Aswan Dam heightening. Lock No. 1. South entrance. 1910

Album 15

No. 667. Aswan Dam heightening. Grout mixing machine. 1910-11-11

Album 15

No. 668. Aswan Dam heightening. Grout mixing machine. 1910-11-12

Album 15

No. 669. Aswan Dam heightening. Lock No. 1. South entrance. Looking east. 1910-11-12

Album 15

No. 670. Aswan Dam heightening. Pitched slope. South canal. 1910-11-14

Album 15

No. 671. Aswan Dam heightening. Lock gate No. 1. South entrance. 1910-11-28

Album 15

No. 672. Aswan Dam heightening. Lock gate No. 1. South entrance. 1910-11-28

Album 15

No. 673. Aswan Dam heightening. Lock No. 1. Looking north east. 1910-11-29

Album 15

No. 674. Aswan Dam heightening. South entrance. Lock No. 1. Temporary sud gate. East wall. 1910-11-29

Album 15

No. 675. Aswan Dam heightening. Lock No. 1. South entrance. Temporary sud gate. West wall. 1910-11-29

Album 15

No. 676. Aswan Dam heightening. Grout mixing machines. 1910-12-06

Album 15

No. 677. Aswan Dam heightening. Solid dam. Water test. Previous to grouting. 1910-12-29

Album 15

No. 678. Aswan Dam heightening. Grout mixing machine. 1910-12-29

Album 15

No. 680. Aswan Dam heightening. Grouting experiment end view. 1910-12-30

Album 15

No. 681. Aswan Dam heightening. Grouting experiment. Front elevation. 1910-12-30

Album 15

No. 682. Aswan Dam heightening. Transporting grouting mixer. 1911-01-02

Album 15

No. 683. Aswan Dam heightening. Lock No. 1. South entrance. 1911-01-03

Album 15

No. 684. Aswan Dam heightening. Looking east. 1911-01-03

Album 15

No. 685. Aswan Dam heightening. Solid dam masonry. Looking west. 1911-01-11

Album 15

No. 686. Aswan Dam heightening. Solid dam looking south. 1911-01-13

Album 15

No. 687. Aswan Dam heightening. Swing bridge pit. 1911-01-17

Album 15

No. 688. Aswan Dam heightening. South side looking east. 1911-01-18

Album 15

No. 689. Aswan Dam heightening. Pitched slope. South canal entrance. 1911-01-18

Album 15

No. 690. Aswan Dam heightening. Solid dam looking south. 1911-01-25

Album 15

No. 691. Aswan Dam heightening. Looking east. 1911-01-25

Album 15

No. 695. Aswan Dam heightening. Solid dam looking south. 1911-02-13

Album 15

No. 696. Aswan Dam heightening. Solid dam masonry. Looking west. 1911-02-16

Album 15

No. 698. Aswan Dam heightening. Swing bridge, erection. 1911-02-21

Album 15

No. 699. Aswan Dam heightening. Swing bridge. 1911-02-24

Album 15

No. 700. Aswan Dam heightening. Solid dam. Looking south. 1911-02-27

Album 15

No. 701. Aswan Dam heightening. From lock 1. Looking north. 1911-03-02

Album 15

No. 703. Aswan Dam heightening. Sets 1, 2, & 3. 1911-03-01

Album 15

No. 704. Aswan Dam heightening. Sets 4, 5, 6, & 7A. 1911-03-01

Album 15

No. 705. Aswan Dam heightening. Solid dam masonry from 1750. Looking west. 1911-03-03

Album 15

No. 706. Aswan Dam heightening. Solid dam. Looking south. 1911-03-10

Album 15

No. 707. Aswan Dam heightening. General view. Looking west. 1911-03-13

Album 15

No. 708. Aswan Dam heightening. Solid dam. Spillway interior arching. 1911-03-13

Album 15

No. 709. Aswan Dam heightening. Solid dam looking south. 1911-03-13

Album 15

No. 710. Aswan Dam heightening. From east bank. 1911-03-16

Album 15

No. 711. Aswan Dam heightening. Set 5. 1911-03-17

Album 15

No. 712. Aswan Dam heightening. Sets 1, 2, 3, & 4. 1911-03-17

Album 15

No. 713. Aswan Dam heightening. Set 17. 1911-03-21

Album 15

No. 714. Aswan Dam heightening. Solid dam looking south. 1911-03-21

Album 15

No. 715. Aswan Dam heightening. Set 17. 1911-03-23

Album 15

No. 716. Aswan Dam heightening. Looking west from 1500. Masonry. 1911-03-28

Album 15

No. 717. Aswan Dam heightening. Spillway floor No. 50. Solid dam. 1911-03-28

Album 15

No. 718. Aswan Dam heightening. From south canal. 1911-03-29

Album 15

No. 719. Aswan Dam heightening. Solid dam looking south. 1911-04-04

Album 15

No. 720. Aswan Dam heightening. Solid dam looking south west. 1911-04-04

Album 15

No. 721. Aswan Dam heightening. Transporting grouting mixer. 1911-04-05

Album 15

No. 722. Aswan Dam heightening. Pierced dam spillway. No. 1 to 8. 1911-04-11

Album 15

No. 725. Aswan Dam heightening. Looking south. 1911-12-29

Album 15

No. 726. Aswan Dam heightening. Swing bridge. 1911-04-14

Album 15

No. 727. Aswan Dam heightening. Swing bridge. 1911-04-14

Album 15

No. 728. Aswan Dam heightening. Cutting projecting beams. 1911-04-15

Album 15

No. 729. Aswan Dam heightening. North of dam. 1911-04-21

Album 15

No. 730. Aswan Dam heightening. Looking south. 1911-04-21

Album 15

No. 731. Aswan Dam heightening. Solid dam looking south west. 1911-05-05

Album 15

No. 732. Aswan Dam heightening. From 1600. Masonry. Looking west. 1911-05-05

Album 15

No. 733. Aswan Dam heightening. Grout mixers at set 18. 1911-05-05

Album 15

No. 734. Aswan Dam heightening. Looking west. 1911-05-08

Album 15

No. 735. Aswan Dam heightening. South side. 1911-05-12

Album 15

No. 736. Aswan Dam heightening. South side. 7A & 8A. 1911-05-12

Album 15

No. 737. Aswan Dam heightening. South side looking east. 1911-05-12

Album 15

No. 738. Aswan Dam heightening. Looking east. 1911-05-22

Album 15

No. 739. Aswan Dam heightening. Looking east. 1911-05-22

Album 15

No. 740. Aswan Dam heightening. Lock 1. South entrance. 1911-05-27

Album 15

No. 741. Aswan Dam heightening. South side looking west. 1911-06-01

Album 15

No. 742. Aswan Dam heightening. From solid dam looking west. 1911-07-27

Album 15

No. 743. Aswan Dam heightening. From buttress No. 17. Looking east. 1911-07-27

Album 15

No. 744. Aswan Dam heightening. Pierced and solid dam. South side. 1911-07-27

Album 15

No. 745. Aswan Dam heightening. Tugs undergoing repairs in locks 1 & 2. 1911-07-31

Album 15

No. 746. Shellal station. 1911-09-04

Album 15

No. 747. Aswan Dam heightening. Dam from north. 1911-09-05

Album 15

No. 748. Shellal station. 1911-09-18

Album 15

No. 749. Shellal station. 1911-09-18

Album 15

No. 750. Aswan Dam heightening. Looking west. 1911-10-23

Album 15

No. 751. Aswan Dam heightening. From buttress 19. 1911-10-24

Album 15

No. 752. Aswan Dam heightening. Approach road. East end of dam. 1911-10-24

Album 15

No. 753. Aswan Dam heightening. Set 18. Looking west. 1911-10-25

Album 15

No. 754. Aswan Dam heightening. Set 18. Looking east. 1911-10-26

Album 15

No. 755. Aswan Dam heightening. East of buttress 19. 1911-10-26

Album 15

No. 756. Aswan Dam heightening. Set 18. Looking east. 1911-10-27

Album 15

No. 757. Aswan Dam heightening. Grout mixer. 1911-10-31

Album 15

No. 758. Aswan Dam heightening. South side of solid and pierced dams. 1911-11-01

Album 16

First heightening, 1911-1912

Physical Description: 72 photographs in 1 box ; images 24 x 29 cm

Scope and Content

Set of 72 loose photographs removed from a bound album with disintegrating bindings. All photographs are by D.S. George.
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs are numbered 759-837; numbers 771, 785, 792, 795, 798, and 813 are missing.
Album 16

No. 759. Aswan Dam heightening. Tell-tale pipes discharging. Water test at set 17. 1911-11-07

Album 16

No. 760. Aswan Dam heightening. South canal entrance. Portable gate on pontoon. 1911-11-09

Album 16

No. 761. Aswan Dam heightening. South canal entrance. Portable gate being raised. 1911-11-10

Album 16

No. 762. Aswan Dam heightening. South canal entrance. Portable gate in position. 1911-11-10

Album 16

No. 763. Aswan Dam heightening. South canal scouring operation. 11 am. 1911-11-12

Album 16

No. 764. Aswan Dam heightening. South canal. Scouring operation 4 pm. 1911-11-12

Album 16

No. 765. Aswan Dam heightening. Locks scouring operation. 11:30 am. 1911-11-13

Album 16

No. 766. Aswan Dam heightening. Scouring operation. 11 am. 1911-11-13

Album 16

No. 767. Aswan Dam heightening. Scouring operation. 4 pm. 1911-11-13

Album 16

No. 768. Aswan Dam heightening. Water supply for grouting. 1911-11-14

Album 16

No. 769. Aswan Dam heightening. South canal scouring operation. 10:40 am. 1911-11-16

Album 16

No. 770. Aswan Dam heightening. Sets 9, 10 & 11A. Suds. 1911-11-24

Album 16

No. 772. [Three Egyptian men standing on rocks. Aswan Dam is shown in the distance.] 1911

Album 16

No. 773. Sir M. MacDonald & Partners. Hanover House, 73 High Holborn, W.C.I. 1911

Album 16

No. 774. Aswan Dam heightening. Water test set 9. Tell-tale pipes discharging. 1911-12-08

Album 16

No. 775. Aswan Dam heightening. Timber sudd gate. 1911-12-08

Album 16

No. 776. Aswan Dam heightening. Sluice 1. Set 1. Looking out. 1911-12-14

Album 16

No. 777. Aswan Dam heightening. Sluice 1. Set 1. Looking out. 1911-12-14

Album 16

No. 778. Aswan Dam heightening. Water test. 9 & 10 tell-tale pipes discharging. 1911-12-16

Album 16

No. 779. Aswan Dam heightening. Pitching at east end of solid dam. 1911-12-16

Album 16

No. 780. Aswan Dam heightening. Set 10. 1911-12-16

Album 16

No. 781. Aswan Dam heightening. Pitching south canal looking south west. 1911-12-22

Album 16

No. 782. Aswan Dam heightening. Looking south. 1911-12-22

Album 16

No. 783. Aswan Dam heightening. Apron masonry. Set 18. 1911-12-26

Album 16

No. 784. Aswan Dam heightening. Pitching south canal looking north west. 1911-12-28

Album 16

No. 786. Aswan Dam heightening. Government office. 1911-12-31

Album 16

No. 787. Aswan Dam heightening. South side solid dam. Looking north west. 1912-01-09

Album 16

No. 788. Aswan Dam heightening. South side. Masonry from 620 1/2 to 712. 1912-01-09

Album 16

No. 789. Aswan Dam heightening. From 7B. Looking east. 1912-01-09

Album 16

No. 790. Aswan Dam heightening. Sluice grabs. Stacked at lock 3. 1912-01-11

Album 16

No. 791. Aswan Dam heightening. Looking west. 1912-01-13

Album 16

No. 793. Aswan Dam heightening. Looking west. 1912-01-19

Album 16

No. 794. Aswan Dam heightening. Looking south west. 1912-01-22

Album 16

No. 796. Aswan Dam heightening. South side. Looking north east. 1912-01-23

Album 16

No. 797. Aswan Dam heightening. South side looking north west. 1912-01-23

Album 16

No. 799A. [View of Aswan Dam from opposite bank.] 1912-02-06

Album 16

799B. [View of Aswan Dam from opposite bank.] 1912-02-06

Album 16

No. 799. Aswan Dam heightening. From Awad. 1912-02-06

Album 16

No. 800. Aswan Dam heightening. Apron set 18. 1912-02-12

Album 16

No. 801. Aswan Dam heightening. From 1500. Masonry. 1912-02-12

Album 16

No. 802. Aswan Dam heightening. Approach road. East end of dam. 1912-02-12

Album 16

No. 803. Aswan Dam heightening. Looking west. 1912-02-23

Album 16

No. 804. Aswan Dam heightening. South side. Looking north west. 1912-02-23

Album 16

No. 805. [View of Aswan Dam.] [1912]

Album 16

No. 806. Aswan Dam Heightening. South side. 1912-02-24

Album 16

No. 807. Aswan Dam Heightening. Open sluices. Set 1. 1912-02-26

Album 16

No. 808. Aswan Dam Heightening. Open sluices. Set 1. Looking east. 1912-02-26

Album 16

No. 809. Aswan Dam Heightening. Open sluices. Set 1. 1912-02-27

Album 16

No. 810. Aswan Dam Heightening. Open sluices. Set 1. 1912-02-27

Album 16

No. 811. Aswan Dam Heightening. Open sluices. Set 1, looking east. 1912-02-27

Album 16

No. 812. Aswan Dam Heightening. Sluice curtains. 1912-03-01

Album 16

No. 814. Aswan Dam Heightening. Boats arriving. 1912-03-11

Album 16

No. 815. Aswan Dam Heightening. South side looking north west. 1912-03-12

Album 16

No. 816. Aswan Dam Heightening. Set 18. Looking east. 1912-03-12

Album 16

No. 817. Aswan Dam Heightening. Looking west. 1912-03-16

Album 16

No. 818. Aswan Dam Heightening. Looking west. 1912-03-18

Album 16

No. 819. [Aswan Dam heightening. Sluice curtain.] [1912-03-22]

Note

Title supplied by cataloger from title on image in Album 17.
Album 16

No. 820. Aswan Dam heightening. From set 16. Looking west. 1912-03-23

Album 16

No. 821. Aswan Dam heightening. Boats arriving. 1912-03-26

Album 16

No. 822. Aswan Dam heightening. Apron masonry. Set 7A & 8B. 1912-03-27

Album 16

No. 823. Aswan Dam heightening. Lock 1. East wall. Pitching. 1912-03-28

Album 16

No. 824. Aswan Dam heightening. Looking east. 1912-04-02

Album 16

No. 825. Aswan Dam heightening. Boats leaving. 1912-04-03

Album 16

No. 826. Aswan Dam heightening. Boats leaving. 1912-04-03

Album 16

No. 827. Aswan Dam heightening. South side. Looking west. 1912-04-04

Album 16

No. 828. Aswan Dam heightening. South side. Looking north west. Distant view. 1912-04-04

Album 16

No. 829. Aswan Dam heightening. South side. Looking north west. 1912-04-04

Album 16

No. 830. Aswan Dam heightening. The locks. North canal entrance. 1912-04-04

Album 16

No. 834. Aswan Dam heightening. General view from north east. 1912-04-24

Album 16

No. 835. Aswan Dam heightening. From north. 1912-04-24

Album 16

No. 836. [Aswan Dam heightening. From north.] [1912-04-24]

Scope and Content Note

Creates panorama with No. 835.
Album 16

No. 837. Aswan Dam heightening. Apron masonry. Set 7A & 8B. 1912-04-29

Album 17

First heightening, 1911-1912

Physical Description: 56 photographs in 1 volume ; images 24 x 29 cm, volume 31 x 41 cm.

Scope and Content

This album contains 53 photographs. All of the photographs are by D.S. George. D.S. George
Album title devised by cataloger. Photograph titles and dates transcribed from items. Photographs contain numbers from 702-836, with gaps. Many of the photographs duplicate those found in Albums 15 and 16.

Processing/Project Information

Volume 17 was received without a front cover. The Huntington Conservation Department created a new cover for the volume in 2014.
Album 17, Page 1

No. 702. Aswan Dam heightening. Lock 5. Looking south west. 1911-03-01

Album 17, Page 2

No. 705. Aswan Dam heightening. Solid dam masonry from 1750. Looking west. 1911-03-03

Album 17, Page 3

No. 706. Aswan Dam heightening. Solid dam. Looking south. 1911-03-10

Album 17, Page 4

707. Aswan Dam heightening. General view looking west. 1911-03-13

Album 17, Page 5

No. 708. Aswan Dam heightening. Solid dam spillway. Interior arching. 1911-03-13

Album 17, Page 6

No. 710. Aswan Dam heightening. From east bank. 1911-03-16

Album 17, Page 7

No. 712. Aswan Dam heightening. Sets 1, 2, 3 & 4. 1911-03-17

Album 17, Page 8

No. 717. Aswan Dam heightening. Spill way floor No. 50. Solid dam. 1911-03-28

Album 17, Page 9

No. 718. Aswan Dam heightening. From south canal. 1911-03-29

Album 17, Page 10

No. 719. Aswan Dam heightening. Solid dam. Looking south. 1911-04-04

Album 17, Page 11

No. 722. Aswan Dam heightening. Pierced dam spill way No. 1 to No. 8. 1911-04-11

Album 17, Page 12

No. 730. Aswan Dam heightening. Looking south. 1911-04-21

Album 17, Page 13

No. 729. Aswan Dam heightening. North of dam. 1911-04-21

Album 17, Page 14

No. 732. Aswan Dam heightening. From 1600. Masonry. Looking west. 1911-05-05

Album 17, Page 15

No. 734. Aswan Dam heightening. Looking west. 1911-05-08

Album 17, Page 16

No. 736. Aswan Dam heightening. South side. 7A & 8A. 1911-05-12

Album 17, Page 17

No. 737. Aswan Dam heightening. South side. Looking east. 1911-05-12

Album 17, Page 18

No. 739. Aswan Dam heightening. Looking east. 1911-05-22

Album 17, Page 19

No. 740. Aswan Dam heightening. Lock 1. South entrance. 1911-05-27

Album 17, Page 20

No. 744. Aswan Dam heightening. Pierced and solid dam. South side. 1911-07-27

Album 17, Page 21

No. 745. Aswan Dam heightening. Tugs undergoing repairs in locks No. 1 & 2. 1911-07-31

Album 17, Page 22

No. 752. Aswan Dam heightening. Approach road. East end of dam. 1911-10-24

Album 17, Page 23

No. 757. Aswan Dam heightening. Grout mixer. 1911-10-31

Album 17, Page 24

No. 750. Aswan Dam heightening. Looking west. 1911-10-23

Album 17, Page 25

No. 751. Aswan Dam heightening. From buttress 19. 1911-10-24

Album 17, Page 26

No. 754. Aswan Dam heightening. Set 18. Looking east. 1911-10-26

Album 17, Page 27

No. 771. Aswan Dam heightening. Apron masonry. Set 18. 1911-11-24

Album 17, Page 28

No. 763. Aswan Dam heightening. South canal scouring operation. 11 am. 1911-11-12

Album 17, Page 29

No. 766. Aswan Dam heightening. Scouring operation. 11 am. 1911-11-13

Album 17, Page 30

No. 765. Aswan Dam heightening. Locks scouring operation. 11:30 am. 1911-11-13

Album 17, Page 31

No. 758. Aswan Dam heightening. South side of solid and pierced dams. 1911-11-01

Album 17, Page 32

No. 774. Aswan Dam heightening. Water test set 9. Tell-tale pipes discharging. 1911-12-08

Album 17, Page 33

No. 776. Aswan Dam heightening. Sluice 1. Set 1. Looking out. 1911-12-14

Album 17, Page 34

No. 781. Aswan Dam heightening. Pitching south canal looking S.W. 1911-12-22

Album 17, Page 35

No. 786. Aswan Dam heightening. Government office. 1911-12-31

Album 17, Page 36

No. 785. Aswan Dam heightening. Looking south. 1911-12-29

Album 17, Page 37

No. 787. Aswan Dam heightening. South side. Solid dam. Looking N.W. 1912-01-09

Album 17, Page 38

No. 790. Aswan Dam heightening. Sluice grabs. Stacked at lock 3. 1912-01-11

Album 17, Page 39

No. 792. Aswan Dam heightening. South side. Looking N.W. 1912-01-13

Album 17, Page 40

No. 798. Aswan Dam heightening. Open sluices 7B & 8A. 1912-02-05

Album 17, Page 41

No. 799. Aswan Dam heightening. From Awad. 1912-02-06

Album 17, Page 41

No. 799A. [and No. 799B. Aswan Dam heightening. From Awad.] 1912-02-06

Scope and Content Note

Two attached images, laid in, which create panorama with No. 799.
Album 17, Page 42

No. 802. Aswan Dam heightening. Approach road. East end of dam. 1912-02-12

Album 17, Page 43

No. 813. [A group of eight Caucasian men standing in front of Aswan Dam.] [1912]

Album 17, Page 44

No. 812. Aswan Dam heightening. Sluice curtains. 1912-03-01

Album 17, Page 45

No. 819. Aswan Dam heightening. Sluice curtain. 1912-03-22

Album 17, Page 46

No. 815. Aswan Dam heightening. South side. Looking N.W. 1912-03-12

Album 17, Page 47

No. 823. Aswan Dam heightening. Lock 1. East wall. Pitching. 1912-03-28

Album 17, Page 48

No. 821. Aswan Dam heightening. Boats arriving. 1912-03-26

Album 17, Page 49

No. 825. Aswan Dam heightening. Boats leaving. 1912-04-03

Album 17, Page 50

No. 829. Aswan Dam heightening. South side. Looking N.W. 1912-04-04

Album 17, Page 51

No. 83[?]. Aswan Dam [View]. [1912]

Album 17, Page 52

No. 832. Aswan Dam heightening. Looking west. 1912-04-12

Album 17, Page 53

No. 835. Aswan Dam heightening. From north. 1912-04-24

Album 17, Page 53

No. 836. [Aswan Dam heightening. From north.] [1912-04-24]

Scope and Content Note

Folds out from No. 835 to create panorama.
 

Series IV. Second heightening

Scope and Content Note

This Series contains 11 albums of photographs documenting the second heightening of the Aswan Dam between 1929 and 1933.
Album 18

O.H.E.M.S. Aswan Dam second heightening, 1930-1933

Physical Description: 31 photographs in 1 volume ; images 18 x 25 cm, volume 30 x 40 cm

Scope and Content

This red leather-bound presentation album contains 31 photographs. Photographs are unsigned except for the photograph on page 11, which has an illegible signature possibly "Hilessy 1932."
Album title transcribed from cover title written in gold lettering in Arabic and English. Photograph titles transcribed from printed captions titles; dates supplied by cataloger based on years of second heightening.
Album 18, Page 1

Original dam. [1930-1933]

Album 18, Page 3

First heightening. [1930-1933]

Album 18, Page 5

Second heightening downstream. [1930-1933]

Album 18, Page 7

General view of locks and dam. [1930-1933]

Album 18, Page 9

General view upstream dam. [1930-1933]

Album 18, Page 11

Rush of water sets 14 and 15 (power). [1930-1933]

Album 18, Page 13

Excavation of foundation and dressing of downstream face. [1930-1933]

Album 18, Page 15

Buttresses during construction. [1930-1933]

Album 18, Page 17

Buttresses and heightening blocks. [1930-1933]

Album 18, Page 19

Buttresses and heightening blocks general view. [1930-1933]

Album 18, Page 21

Heightening blocks upstream. [1930-1933]

Album 18, Page 23

Heightening blocks upstream. [1930-1933]

Album 18, Page 25

Heightening blocks upstream. [1930-1933]

Album 18, Page 27

Junction of lock and dam. [1930-1933]

Album 18, Page 29

Thickening west lock wall. [1930-1933]

Album 18, Page 31

Thickening east lock wall. [1930-1933]

Album 18, Page 33

Thickening and heightening east lock wall. [1930-1933]

Album 18, Page 35

Boring machine for upstream solid dam reinforcement. [1930-1933]

Album 18, Page 37

Reinforcement of lock gate recess. [1930-1933]

Album 18, Page 39

subsidiary dams during construction. [1930-1933]

Album 18, Page 41

Subsidiary dams from top of hill west side. [1930-1933]

Album 18, Page 43

Subsidiary dams upstream. [1930-1933]

Album 18, Page 45

Seluga quarry. [1930-1933]

Album 18, Page 47

Sluice gates. [1930-1933]

Album 18, Page 49

Extension of lock gate No. 2. [1930-1933]

Album 18, Page 51

Lock gate No. 2 downstream. [1930-1933]

Album 18, Page 53

Lock gate No. 2 upstream. [1930-1933]

Album 18, Page 55

Operating machine. [1930-1933]

Album 18, Page 57

[Dam construction dedication ceremony.] [1930-1933]

Album 18, Page 59

[Dam construction dedication ceremony.] [1930-1933]

Album 18, Page 61

[Dedication wall in Arabic.] [1930-1933]

Album 19

Second heightening, 1930

Physical Description: 81 photographs in 1 volume ; images 24 x 29 cm, volume 31 x 41 cm

Scope and Content

This black photograph album contains 81 unsigned photographs, each with typed photograph numbers, titles, and dates in the print margin.
Album title supplied by cataloger; album has handwritten title “Aswan 1930 / 23 to 148 / [Vol.] 1” on spine. Photograph titles and dates transcribed from captions on items.
Album 19, Page 1

23. Excavation eastern extension of solid dam. 1930-04-08

Album 19, Page 2

24. Rock excavation for eastern approach road. 1930-04-08

Album 19, Page 3

25. Henderson face dressing machine at work set 18. 1930-04-08

Album 19, Page 4

27. Excavation in progress in set 18 looking east. 1930-04-08

Album 19, Page 5

28. Excavation set 18 - Showing method of chuting leakage water from sluices. 1930-04-08

Album 19, Page 6

29. Excavation in set No. 17 showing method chuting leakage water from sluices. 1930-04-08

Album 19, Page 7

30. Method of chuting leakage water set 16. 1930-04-08

Album 19, Page 8

31. Excavation in set 16 showing method of chuting leakage water from sluices. 1930-04-08

Album 19, Page 9

33. Demolition of downstream face of solid dam (to accommodate new batter). 1930-04-08

Album 19, Page 10

34. Demolition of government workshops west bank. 1930-04-08

Album 19, Page 11

61. Preparing for commencing building east solid dam. 1930-05-25

Album 19, Page 12

62. Demolition of D.S. string course east solid dam. 1930-05-25

Album 19, Page 13

63. Demolition of top of east solid dam. 1930-05-25

Album 19, Page 14

64. Excavation east solid dam. 1930-05-25

Album 19, Page 15

65. Excavation east solid dam. 1930-05-25

Album 19, Page 16

67. Looking east from top of gantry set No. 18. 1930-05-25

Album 19, Page 17

68. Ingersoll Rand in compressors. 1930-05-25

Album 19, Page 18

69. Excavation set No. 18. 1930-05-25

Album 19, Page 19

70. Excavation west end set No. 18. 1930-05-25

Album 19, Page 20

71. Excavation set No. 17. 1930-05-27

Album 19, Page 21

72. Buttress dressing by hand set No. 16. 1930-05-27

Album 19, Page 22

73. Excavation set No. 16. 1930-05-27

Album 19, Page 23

74. Chase cutting machine set No. 16. 1930-05-27

Album 19, Page 24

75. Excavation east side lock No. 1. 1930-05-27

Album 19, Page 25

76. Excavation west side lock No. 1. 1930-05-27

Album 19, Page 26

77. Excavation west side lock No. 1. 1930-05-27

Album 19, Page 27

78. Demolition of old workshops - west bank. 1930-05-27

Album 19, Page 28

79. Formation of new berm west bank - demolition of dam. 1930-05-27

Album 19, Page 29

80. Formation of new berm west bank. U.S. of dam. 1930-05-27

Album 19, Page 31

97. Heightening block No. 179 - looking west. 1930-06-01

Album 19, Page 32

98. Heightening block No. 179 - looking south. 1930-06-01

Album 19, Page 33

99. Inside sluice well. 1930-06-01

Album 19, Page 34

100. View of D.S. face of solid dam - dressg. but. No. 214 low part. 1930-06-02

Album 19, Page 35

101. View of D.S. face of solid dam showing high part dressing buttress 214. 1930-06-02

Album 19, Page 36

102. Foundations of side ashlar stone for buttresses Nos. 153 & 154 & sill stones D.S. sluices 153 & 152. Looking west. 1930-06-12

Album 19, Page 37

103. Foundations of side ashlar stones for buttresses 153 & 154 & sill stones D.S. sluices 152 & 153. Looking east. 1930-07-12

Album 19, Page 38

104. Heightening block 179 showing back of masonry on U.S. side, chase & shuttering. 1930-06-12

Album 19, Page 39

105. Heightening block No. 179 showing back of masonry of D.S. side, chase and shuttering. 1930-06-12

Album 19, Page 40

106. Building D.S. face of solid dam to the new batter K 1970. 1930-06-12

Album 19, Page 41

107. Building D.S. face of solid dam to the new batter K1990. 1930-06-12

Album 19, Page 42

108. Foundation of buttress No. 160. 1930-06-15

Album 19, Page 43

109. Foundation of buttress 154. 1930-06-15

Album 19, Page 44

110. Foundation of buttress 155. 1930-06-15

Album 19, Page 45

111. Foundation of buttress 156. 1930-06-15

Album 19, Page 46

112. Foundation of buttress No. 157. 1930-06-15

Album 19, Page 47

113. Foundation of buttress 158. 1930-06-15

Album 19, Page 48

114. Sluice well forms and pipe forms - of reinforcing bars. 1930-06-16

Album 19, Page 49

115. Block 179 - looking to the back of the masonry on the D.S. side showing concrete skip. 1930-06-16

Album 19, Page 50

116. Barges of aggregates, cement, sand and concrete mixtures U.S. the dam block No. 179. 1930-06-16

Album 19, Page 51

117. Foundation D.S. sluice No. 172 second downstream part. 1930-06-16

Album 19, Page 52

118. Foundations D.S. sluice 172 part of apron directly D.S. sluice. 1930-06-16

Album 19, Page 53

119. Foundations of buttress 179 - low part - looking east. 1930-06-24

Album 19, Page 54

120. Foundations of buttress No. 176 - low part - looking east. 1930-06-24

Album 19, Page 55

121. Foundations of buttress 176 - high part - looking east. 1930-06-24

Album 19, Page 56

122. Foundations of buttress 175 - low part - looking west. 1930-06-24

Album 19, Page 57

123. Foundations of buttress 175 high part - looking west. 1930-06-24

Album 19, Page 58

124. Foundations of buttress 170 low part looking east. 1930-06-25

Album 19, Page 59

125. Foundations for buttress 170 high part - looking east. 1930-06-25

Album 19, Page 60

126. Foundations of buttress 172 - looking east. 1930-06-25

Album 19, Page 61

127. Foundations of buttress 171 - looking west. 1930-06-25

Album 19, Page 62

128. Foundations of buttress 174 during erection of iron reinforcement & cement laying - looking east. 1930-06-25

Album 19, Page 63

129. Foundations of buttress 173 during erection of iron reinforcement & concrete laying (looking west). 1930-06-25

Album 19, Page 64

130. Foundations of buttress 174 high part enlarged - looking east. 1930-06-25

Album 19, Page 65

131. Foundations of buttress 173 - high part enlarged - looking west. 1930-06-25

Album 19, Page 66

132. Foundations to buttress 178 low part looking west. 1930-06-25

Album 19, Page 67

133. Foundations of buttress 178 - looking west. 1930-06-25

Album 19, Page 68

134. Foundations of buttress 179 low part. 1930-06-26

Album 19, Page 69

135. Foundations of buttress 179 - high part. 1930-06-26

Album 19, Page 70

136. Foundations of buttress 180 - low part. 1930-06-26

Album 19, Page 71

137. Foundations of buttress 180 - high part. 1930-06-26

Album 19, Page 72

138. Block No. 155 back view of downstream masonry. 1930-06-26

Album 19, Page 73

139. Block No. 151 - back view of downstream masonry. 1930-06-26

Album 19, Page 74

140. Block No. 175 - view of D.S. masonry 2nd layer back view. 1930-06-26

Album 19, Page 75

141. Block No. 179. View of U.S. masonry & shuttering for sluice wells while laying concrete. 1930-06-26

Album 19, Page 76

142. Laying concrete for foundations of buttresses 186, 187 & 188 D.S. solid dam (looking east). 1930-07-07

Album 19, Page 77

143. Laying concrete for foundations buttresses 186, 187 & 188 D.S. solid dam looking west. 1930-07-07

Album 19, Page 78

144. Retaining wall part of main buttress 181. To retain earth near the steps. 1930-07-07

Album 19, Page 79

145. Ashlar sill stones D.S. sluice No. 167. 1930-07-07

Album 19, Page 80

146. Ashlar cill stones D.S. sluice No. 164. 1930-07-07

Album 19, Page 81

147. Ashlar cill stones D.S. sluice No. 157. 1930-07-07

Album 19, Page 82

148. Ashlar cil stones D.S. sluice No. 152 and foundations of buttress 153. 1930-07-07

Album 20

Second heightening, 1930

Physical Description: 79 photographs in 1 volume ; images 24 x 29 cm, volume 31 x 41 cm

Scope and Content

This black photograph album contains 79 unsigned photographs, each with typed photograph numbers, titles, and dates in the print margin.
Album title supplied by cataloger; album has handwritten title “Aswan Dam 1930 / Photos No. 149 to 230 / [Vol.] 2” on spine. Photograph titles and dates transcribed from captions on items.
Album 20, Page 1

149. Heightening block No. 176, 3 mts. high (looking east). 1930-07-07

Album 20, Page 2

150. Block 246 solid dam back of face work U.S. side. 1930-07-14

Album 20, Page 3

151. Block 246 solid dam back of face work. D.S. side. 1930-07-14

Album 20, Page 4

152. Eastern extension, excavation on the U.S. side of the existing dam. 1930-07-14

Album 20, Page 5

153. Excavation at the far end of eastern extension - looking east. 1930-07-14

Album 20, Page 6

154. Demolition of old masonry & excavation underneath the east end of existing dam (looking west). 1930-07-14

Album 20, Page 7

155. Excavation of cut off wall at the far end of eastern extension. 1930

Album 20, Page 8

156. General view of east wall of lock No. 1. Showing buttresses under demolition. 1930-07-15

Album 20, Page 9

157. Excavation of east side of lock No. 1. 1930

Album 20, Page 10

158. Spoil of excavation behind west lock wall. 1930-07-15

Album 20, Page 11

159. Excavation behind western extension of dam. 1930-07-15

Album 20, Page 12

160. West lock wall of recess for gate No. 1. 1930-07-15

Album 20, Page 13

161. Back of west lock wall partially uncovered (looking north). 1930-07-15

Album 20, Page 14

163. Deep foundations of buttresses 171 & 172. 1930-07-17

Album 20, Page 15

164. Rocky foundations of main buttress 159. 1930-07-17

Album 20, Page 16

165. Heightening blocks 152 & 156 with gantry between D.S. side. 1930-07-17

Album 20, Page 17

166. Throwing concrete of apron set 18 and foundations of buttresses No. 176-180. 1930-07-22

Album 20, Page 18

167. Throwing concrete of apron and buttresses 173 & 174 - looking west. 1930-07-22

Album 20, Page 19

168. Throwing concrete of apron and foundation of buttresses 173 & 174 - looking east. 1930-07-22

Album 20, Page 20

169. Erection of ashlar for cill and sides of buttress No. 164. 1930-07-22

Album 20, Page 21

170. Throwing concrete hand mixed in buttress No. 154. 1930-07-22

Album 20, Page 22

171. Dressing face of buttress 153. 1930-07-22

Album 20, Page 23

172. Dressing face of buttress No. 168. 1930-07-23

Album 20, Page 24

173. Dressing face of buttress 167. 1930-07-23

Album 20, Page 25

174. Dressing face of buttress 166. 1930-07-23

Album 20, Page 26

175. Dressing face of buttress No. 175. 1930-07-23

Album 20, Page 27

176. Dressing face of buttress No. 164. 1930-07-23

Album 20, Page 28

177. Dressing face of buttress 163. 1930-07-23

Album 20, Page 29

178. Dressing face of buttress 162. 1930-07-23

Album 20, Page 30

179. Dressing face of buttress 161. 1930-07-23

Album 20, Page 31

180. Dressing face of buttress 160. 1930-07-23

Album 20, Page 32

181. Korore Village protection bank and revetment. 1930

Album 20, Page 33

182. Korore Village protection bank and revetment. 1930

Album 20, Page 34

183. Spur No. 1 and steps. 1930-07-30

Album 20, Page 35

184. New harbour of inland road project (looking east). 1930-07-30

Album 20, Page 36

185. Ogee curve set XVIII. 1930-08-02

Album 20, Page 37

186. View showing reinforcing bars in buttresses of set 18. 1930-08-02

Album 20, Page 38

162. Heightening blocks 176 & 180 with gantry between D.S. side. [1930]

Album 20, Page 39

187. Reinforcing bars in buttresses set 16. [1930]

Album 20, Page 40

188. View of reinforcement bars in buttress No. 167. [1930]

Album 20, Page 41

189. Foundation of buttress No. 168. 1930-08-03

Album 20, Page 42

190. View of D.S. side of buttresses No. 171 & 172. 1930-08-03

Album 20, Page 43

191. Bonding in rubble masonry for foundation of buttress 172. 1930-08-03

Album 20, Page 44

192. D.S. view of buttress No. 175. 1930-08-03

Album 20, Page 45

193. Foundation of buttress No. 170 set 18. 1930-08-08

Album 20, Page 46

194. Foundation of buttress 162 set 17. 1930-08-08

Album 20, Page 47

195. Foundation of buttress No. 160 set 17. 1930-08-10

Album 20, Page 48

196. Temporary offices of maintenance staff. 1930-08-10

Album 20, Page 49

197. Works hospital. 1930-08-10

Album 20, Page 50

200. Foundation of buttress 169. 1930-08-14

Album 20, Page 51

201. Ogee curve set No. 18 looking east. 1930-08-14

Album 20, Page 52

202. Set No. 17 looking east. 1930-08-14

Album 20, Page 53

203. Set No. 16 looking west. 1930-08-14

Album 20, Page 54

205. Models of downstream coping. 1930-08-17

Album 20, Page 55

206. Red granite ashlar at quarry Shellal. 1930-08-19

Album 20, Page 56

207. Red granite quarry Shellal. 1930-08-19

Album 20, Page 57

208. Red granite ashlar at quarry Shellal. 1930-08-19

Album 20, Page 58

209. Red granite ashlar at quarry Shellal. 1930-08-19

Album 20, Page 59

210. Red granite ashlar at quarry Shellal. 1930-08-19

Album 20, Page 60

211. Red granite ashlar quarry Shellal. 1930-08-19

Album 20, Page 61

212. Red granite ashlar at quarry Shellal. 1930-08-19

Album 20, Page 62

213. Red granite quarry Shellal. 1930-08-19

Album 20, Page 63

214. Red granite quarry for broken stone Shellal. 1930-08-19

Album 20, Page 64

215. Red granite quarry for broken stone partially opened by contractor & abandoned. 1930-08-20

Album 20, Page 65

216. Work stopped by flood water in set 17. 1930-08-20

Album 20, Page 66

217. Flood water near set 18. 1930-08-20

Album 20, Page 67

218. Work stopped by flood in set 17. 1930-08-20

Album 20, Page 68

219. Sudd covered by flood opposite set 17. 1930-08-20

Album 20, Page 69

220. Sudd covered by flood opposite set 17. 1930-08-20

Album 20, Page 70

221. Flood looking north from set 17. 1930-08-20

Album 20, Page 71

222. Grey granite ashlar at quarry No. 3. 1930-08-20

Album 20, Page 72

223. Grey granite at quarry No. 3. 1930-08-20

Album 20, Page 73

224. Quarry No. 3 - lead cut in rock by contractor. 1930-08-20

Album 20, Page 74

225. Cutting grey granite in quarry No. 3. 1930-08-20

Album 20, Page 75

226. Quay wall at quarry No. 2. 1930-08-23

Album 20, Page 76

227. Quay wall at quarry No. 2. 1930-08-23

Album 20, Page 77

228. Rejected grey granite ashlar being re-dressed at quarry No. 2. 1930-08-23

Album 20, Page 78

229. Quarrying in progress in quarry No. 2. 1930-08-23

Album 20, Page 79

230. Ruthless steel plates laid buttress No. 152. 1930-08-24

Album 21

Aswan Dam. Second heightening, 1931

Physical Description: 60 photographs in 1 volume ; images 23 x 28 cm, volume 28 x 38 cm

Scope and Content

This album contains 60 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1931 / Photos 271 - 390 / [Vol.] 3." Photograph titles, dates, and numbers chiefly transcribed from handwritten captions written on negatives or typed captions below images. Photograph 349 is signed "Hilmy."
Album 21, Page 1

270. First new gate being lowered into position. 1931-01-05

Album 21, Page 2

271. East wall of Lock No. 1. 1931-01-05

Album 21, Page 3

272. West wall of Lock No. 1. 1931-01-05

Album 21, Page 4

273. West wall of Lock No. 1. 1931-01-05

Album 21, Page 5

274. Part of quarry No. 2. 1931-01-06

Album 21, Page 6

275. General view of stone yard quarry No. 2. 1931-01-06

Album 21, Page 7

276. Sample of rejected stone quarry No. 2. 1931-01-06

Album 21, Page 8

277. Excavation of solid dam. 1931-01-10

Album 21, Page 9

278. Partly completed buttresses and face dressing set 18. 1931-01-10

Album 21, Page 10

279. Partly completed buttresses and face dressing set No. 18. 1931-01-10

Album 21, Page 11

280. Face dressing executed by government Set Nos. 15 & 14. 1931-01-10

Album 21, Page 12

281. Face dressing executed by government. Set No. 14. 1931-01-10

Album 21, Page 13

282. General view of western portion of dam. 1931-01-15

Album 21, Page 14

283. General view of sets Nos. 18, 17 & 16. 1931-01-15

Album 21, Page 15

284. Set No. 16. 1931-01-15

Album 21, Page 16

285. Set No. 16, 17, 18. 1931-01-15

Album 21, Page 17

286. Sets Nos. 15 & 14. Face dressing executed by government. 1931-01-15

Album 21, Page 18

287. Solid dam from upstream. 1931-01-17

Album 21, Page 19

288. Eastern extension & approach road. 1931-01-17

Album 21, Page 20

289. Set No. 17. 1931-01-17

Album 21, Page 21

290. Model of second heightening of dam. 1931-01-25

Album 21, Page 23

292. Demolition of temporary wall on solid dam. 1931-02-05

Album 21, Page 24

293. Demolition of heightening block No. 180 East side. 1931-02-05

Album 21, Page 25

294. Demolition of heightening block No. 180 West side. 1931-02-05

Album 21, Page 26

295. Heighten block No. 246 before demolition. 1931-02-05

Album 21, Page 27

296. Heightening block No. 156 before demolition. 1931-02-05

Album 21, Page 28

297. Demolition of temporary wall pierced dam. 1931-02-05

Album 21, Page 29

298. Demolition of heightening block No. 176. 1931-02-05

Album 21, Page 30

299. Foundation for eastern extension. 1931-02-05

Album 21, Page 31

300. Upstream face of excavation for eastern extension. 1931-02-05

Album 21, Page 32

301. Erection of chutes for leakage water set No. 13. 1931-02-07

Album 21, Page 33

302. Extension of eastern training wall. 1931-02-07

Album 21, Page 34

303. Extension of training wall set No. 17 - 18. 1931-02-07

Album 21, Page 35

304. Face dressing executed by government set No. 18. 1931-02-07

Album 21, Page 36

305. Leakage through rollerless sluice under full head subsidiary gate removed. 1931-02-07

Album 21, Page 37

306. Rustless steel plates in position set No. 17. 1931-02-10

Album 21, Page 38

307. Ogee curve set No. 18 West side. 1931-02-10

Album 21, Page 39

308. Cutting through rock face and dressing face of dam set No. 14. 1931-02-10

Album 21, Page 40

309. Excavation of apron set No. 13. 1931-02-26

Album 21, Page 41

310. Set No. 13. 1931-02-26

Album 21, Page 42

311. Sets 9, 10 & 11A (Bab el Kebir). 1931-02-26

Album 21, Page 43

312. Piers for temporary railway se [sic] 18. 1931-03-07

Album 21, Page 44

313. Piers for temporary railway set No. 17. 1931-03-07

Album 21, Page 45

314. Piers for temporary railway. Set No. 13. 1931-03-07

Album 21, Page 46

315. Straining wire used in buttress survey. 1931-03-07

Album 21, Page 47

316. "Spotters" at work - fixing dressing line on buttresses set No. 11A. 1931-03-07

Album 21, Page 48

321. Vertical staunching. New R.C. 87.50 gate. 1931-03-22

Album 21, Page 49

322. Suspension pulleys and lintel staunching new R.L. 87.5 gate. 1931-03-22

Album 21, Page 50

338. Rock exposed set No. 12. 1931-03-30

Album 21, Page 51

347. Battary of new air compressors. 1931-04-16

Album 21, Page 52

349. Flumes for chuting discharge during placing of temporary shield set No. 13. 1931-04-20

Album 21, Page 53

356. 6 Temporary crane rails and trolley track sets 9, 10 and 11A. 1931-05-04

Album 21, Page 54

359. Erection of reinforcing rods in buttresses 102, 103, 104 & 105. 1931-05-21

Album 21, Page 55

362. Laying concrete in foundation of buttress 102 - Looking East. 1931-05-30

Album 21, Page 56

364. Chutes in set 8B to carry aggregates, sand and cement from top to apron. 1931-05-30

Album 21, Page 57

365. Concrete mixture opposite buttress 81 to feed sets 9, LO & LLA. 1931-05-30

Album 21, Page 58

372. General view of work in sets 9, 10 and 11A facing West. 1931-06-17

Album 21, Page 59

380. Preparation for foundations west of gate recess No. 2 Facing North. 1931-06-20

Album 21, Page 60

383. Excavation Western Extension. 1931-06-24

Album 21, Page 61

385. Titan crane completely erected. 1931-06-24

Album 22

Aswan Dam. Second heightening, 1931

Physical Description: 62 photographs in 1 volume ; images 23 x 28 cm, volume 28 x 38 cm

Scope and Content

This album contains 62 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1931 / Photos 388- / [Vol.] 4." Photograph titles, dates, and numbers transcribed from typed titles below images, with some captions handwritten.
Album 22, Page 1

388. Construction of buttress and downstream veneers set 18. 1931-06-24

Album 22, Page 2

393. General view of construction of buttresses sets 9, 10 & 11A facing Aast. 1931-06-30

Album 22, Page 3

408. Finished D.S. face of eastern extension, block No. 249 and steel gantry for heightening blocks -facing South East. 1931-07-11

Album 22, Page 4

409. Excavation for foundations of buttresses No. 14. 1931-07-12

Album 22, Page 5

411. Erecting cill stones set No. 12. 1931-07-12

Album 22, Page 6

413. Construction of buttresses, set No. 11. 1931-07-12

Album 22, Page 7

416. Seluga quarry for rubble and rock faced stones. 1931-07-12

Album 22, Page 8

Buckets and trestles for lowering Concrete into sluice wells. 1931-08-24

Album 22, Page 9

Interior of sluice well No. 167 showing demolition and new concrete arch under construction. Timber mould for forming key in each lift of concrete is shown in foreground. 1931-09-02

Album 22, Page 10

Sluice well interior Bab-el-Kebir showing launch for concrete and after demolition of brickwork. Timber form for concrete seen below. 1931-09-05

Album 22, Page 11

Moulds for precast concrete arches for the extension of the sluice wells through the Heightening Blocks. 1931-09-26

Album 22, Page 12

Strengthening of sluice wells timber frame for casting Concrete in situ. The centre portion is detachable to permit of collapsing and withdrawing the frame after the Concrete has set. 1931-09-26

Album 22, Page 13

Building behind Gate No. 2 Recess Locks. 1931-08-08

Album 22, Page 14

East end of No. 2 Lock gate with end beams removed. Ready for new castings. 1931-09-08

Album 22, Page 15

Grouting East bearing pads for No. 2 Lock Gate at new centres. 1931-09-08

Album 22, Page 16

Floor of locks. Work on gate No. 2 and preparing lay arch in floor of Locks. 1931-09-14

Album 22, Page 17

Gauging Station on East Bank. 1931-09-05

Album 22, Page 18

Gauging Station on West Bank Concrete metal for set No. 14 as delivered to Decauville Wagons for transport across Dam. 1931-09-26

Album 22, Page 19

Locks. Arch in floor of lock. D.S. of Gate No. 2 under construction. 1931-09-26

Album 22, Page 20

Locks. Masonry commenced in floor of Lock. D.S. Gate No. 1. 1931-09-26

Album 22, Page 21

Locks. Precast stop logs for sudding lock entrance during raising of floor of locks (intermediate section after casting). 1931-09-08

Album 22, Page 22

Locks. Lowering precast Concrete beam into position across scouring gate recess. 1931-09-16

Album 22, Page 23

Construction of Buttresses Set No. II. 1931-07-28

Album 22, Page 24

Set No. 18 looking west showing scaffolding in course of erection. 1931-08-26

Album 22, Page 25

Bab-el-Kebir new scaffolding at R.L. 95. - erected to work to continue by means of cranes on top of Dam after rise of flood. All derricks dismantled and removed. 1931-08-03

Album 22, Page 26

Flood passing through Bab-el-Kebir after opening the Sluices. 1931-08-08

Album 22, Page 27

Excavation for foundations oF Buttress, Sets 14 & 15. 1931-07-19

Album 22, Page 28

Set No. 15 from Buttress No. 151 setting of Cills of extension to Sluices. 1931-09-06

Album 22, Page 29

Set No. 14 Non-corrosive plates fixed on dressed face of Dam. 1931-09-06

Album 22, Page 30

Buttress No. 182 West side showing junction with first heightening Ashlar. 1931-09-06

Album 22, Page 31

Set No. 14 Ashlar in sluice extensions showing method of Grouting beds. Sacking in the joints is removed when grout has hardened, the joints are pointed later. 1931-09-06

Album 22, Page 32

Set No. 14 Concreted [sic] being deposited in Buttress hearting by bottom dump skips. 1931-09-21

Album 22, Page 33

Set No. 13 looking East during unwatering after subsidence of flood showing amount of silt deposited. 1931-09-21

Album 22, Page 34

Set No. 18 Looking East showing wooden profiles for curved portion of Buttress face work. 1931-09-24

Album 22, Page 35

Set No. 18 Buttress No. 181 dressing D.S. face of Buttress round curved portion. The chases seen on the left and centre are first cut to profile to provide a datum for finishing off the rest of the face. 1931-09-24

Album 22, Page 36

Set No. 18 1st curved non-corrosive plate laid showing distance piece & plate propped up 1.5 cms of face of Dam by wooden pegs before concreting. 1931-09-24

Album 22, Page 37

Set No. 18 Looking East Top 2" Steel Reinforcement Rods in position. 1931-10-01

Album 22, Page 38

Concrete metal crusher and Gauging Station at Shellal. 1931-07-13

Album 22, Page 39

Solid dam - Western extension - Excavation. 1931-08-24

Album 22, Page 40

Excavation for Western Extension cut off. Masonry building proceeding at Western end. 1931-08-27

Album 22, Page 41

Soft excavation in progress between foundation rock and East end of dam. Pneumatic drills working in background heading up surface boulders. 1931-08-11

Album 22, Page 42

Solid Dam West of foundation Rock. Foundation for Buttress footing being excavated. 1931-09-06

Album 22, Page 43

Dressing D.S. Face of Solid Dam - heightening blocks already completed. 1931

Album 22, Page 44

Solid Dam looking East from stairway, showing construction of D.S. Veneer. 1931-09-24

Album 22, Page 45

Erection of Gantry for construction of Heightening Blocks. East Solid Dam. 1931-01-28

Album 22, Page 46

Gantry for construction of Nos. 239, 241, 243, 245 & 247 Heightening Blocks East end Solid Dam. 1931-07-23

Album 22, Page 47

Top of Gantry for Construction of Blocks on Solid Dam showing Cranes at work. 1931-07-23

Album 22, Page 48

Solid Dam Heightening Blocks in Construction at East end of Dam. 1931-08-25

Album 22, Page 49

Solid Dam - Eastern Extension, showing heightening blocks. 1931

Album 22, Page 50

Eastern extension from U.S. showing rubble face between adjacent Heightening Blocks to be rendered later & "V" groove for bituminous joint & special groove for lead wool seal. 1931-09-07

Album 22, Page 51

Special 10" Diameter pipe moulds for leaving holes in U.S. of Heightening Blocks in preparation for Reinforcing the U.S. of the Solid Dam. 1931-09-07

Album 22, Page 52

Construction joint and space for bituminous sheeting and groove for lead wool seal in Heightening blocks. 1931-08-25

Album 22, Page 53

590. Solid dam - Downstream side looking West showing alternate heightening blocks under construction. 1931-10-11

Album 22, Page 54

593. Sluice Wells - Placing concrete arch in sluice well No. 179. The three pipes projecting through the concrete are for grouting the existing masonry arch below. 1931-10-17

Album 22, Page 55

Sluice wells concrete arch cast in situ in sluice well 179. 1931-10-13

Album 22, Page 56

Lock - Excavation behind East wall of lock No. 1. 1931-10-13

Album 22, Page 57

Western extension of dam. Rubble masonry in progress. 1931-10-13

Album 22, Page 58

Locks. Progress of work behind west lock wall and gate No. 2 recess. 1931-10-20

Album 22, Page 59

Erection new steel jamb castings East side No. 2 lock gate. 1931-10-21

Album 22, Page 60

Western extension - looking East. 1931-10-24

Album 22, Page 61

East solid dam rubble masonry. Retaining wall to protect excavation for foundations of buttresses Nos. 210 - 226 facing West. 1931-10-27

Album 22, Page 62

East Solid Dam - Dressing D.S. face of dam for laying non-corrosive steel plates behind the new buttresses. 1931-10-27

Album 23

Aswan Dam. Second heightening, 1931-1932

Physical Description: 62 photographs in 1 volume ; images 24 x 28 cm, volume 28 x 38 cm

Scope and Content

This album contains 62 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1931-32 / Photos No. 6[24]-788 / [Vol.] 5." Photograph titles, dates, and numbers transcribed from typed titles below images, with some numbers handwritten numbers.
Album 23, Page 1

Set No. 14 - looking East buttresses in progress of construction. 1931-11-03

Album 23, Page 2

Set No. 18 - looking East buttresses nearly completed. Alternate heightening blocks on solid dam nearly completed up to set 18. 1931-11-03

Album 23, Page 3

628 - Junction of pierced and solid dam showing special 9.5 space jointing over in buttresses. 1931-11-03

Album 23, Page 4

Locks - precast concrete beams at lock entrance during dewatering of U.S. of lock No. 1. 1931-11-03

Album 23, Page 5

Set No. 8B. Looking East excavating apron masonry for foundation of buttresses. 1931-11-12

Album 23, Page 6

639 - Foundation of East wall of lock No. 2. 1931-11-14

Album 23, Page 7

Laying precast concrete blocks sluice well 18 set 18. 1931-11-16

Album 23, Page 8

Set No. 18 - Solid dam looking East buttresses and alternate heightening blocks. 1931-11-16

Album 23, Page 9

Solid dam - commencing concreting foundation of buttress No. 228. 1931-11-21

Album 23, Page 10

Set 7B, demolition of apron setts for foundation of buttresses. 1931-11-24

Album 23, Page 11

Set No. 15 - Looking East buttress building in progress. 1931-11-24

Album 23, Page 12

664 - Pintle casting and base supporting west end of gate No. 2 for removal of bascules. 1931-11-29

Album 23, Page 13

Ransomes and Rapier's floating workshops at set No. 6. 1931-12-02

Album 23, Page 14

Solid dam, concrete poured in foundations of buttresses Nos. 227, 228, 229, looking East. 1931-12-02

Album 23, Page 15

Solid dam. Rendering the inside faces of the heightening blocks prior to building the intermediate blocks and forming the contraction joint between them. 1931-12-06

Album 23, Page 16

Solid dam. Foundations of buttresses Nos. 230 - 233 before concreting with steel reinforcement set in position. 1931-12-07

Album 23, Page 17

Sets Nos. 7B and 8A looking West. Progress of demolition of apron sets of ogee curve. 1931-12-06

Album 23, Page 18

View of side of heightening block showing one half of chase for lead seal and one half of chase for asphalt seal with steam pipes in position. 1931-12-07

Album 23, Page 19

Solid dam, buttress No. 233 spring issuing from joint in rock under foundation of first heightening. 1931-12-08

Album 23, Page 20

Lock - Thickening of East wall lock No. 2. 1931-12-09

Album 23, Page 21

690 - Solid dam - Pouring concrete for foundation of buttresses No. 228 - 232. 1931-12-15

Album 23, Page 22

692 - Locks. Rock exposed for foundation of thickening of East wall lock No. 1. C.S.14. 1931-12-17

Album 23, Page 23

692 - Set No. 1 looking West showing progress of excavation for foundation of buttresses. 1931-12-17

Album 23, Page 24

697 - Solid dam - commencing the filling of the alternate heightening blocks. Geightening [i.e. heightening] block No. 246. 1931-12-22

Album 23, Page 25

703 - Set No. 1 sluice No. 1 excavation for foundation of buttresses, cutting through a soft layer at rock to obtain a better foundation below. 1931-12-24

Album 23, Page 26

708 - Thickening East wall of lock No. 1 looking North. 1931-12-24

Album 23, Page 27

711 - Set No. 7A, looking West excavation for foundation of buttresses. 1931-12-30

Album 23, Page 28

715 - Solid dam building intermediate heightening block No. 246 from D.S. side showing joint between heightening blocks. 1931-12-30

Album 23, Page 29

737 - Junction of dam and East wall of lock No. 1 showing foundation of thickening and commencement of masonry. In right hand corner can be seen former buttress of lock wall partly undercut during excavation to obtain good found. 1932-01-28

Album 23, Page 30

741 - Locks - Buttress at end of thickening of East wall lock No. 1 from the North side. 1932-01-28

Album 23, Page 31

716 - Locks - thickening of East wall of lock No. 1, looking North. 1932-01-10

Album 23, Page 32

717 - Set No. 1 looking West. Dressing the D.S. face of the existing dam to allow of erection of non-corrosive plates behind the buttresses. 1932-01-10

Album 23, Page 33

720 - Set No. 8B, looking West, foundations for buttresses showing reinforcing bars in position. 1932-01-11

Album 23, Page 34

721 - Set No. 7A, looking West showing excavation for foundation of buttresses in progress. 1932-01-11

Album 23, Page 35

725 - Solid dam - foundation of buttress No. 225 - showing reinforcing bars and shuttering for concrete in position. 1932-01-18

Album 23, Page 36

726 - Scar end between North and South sections of the heightening of the East wall lock No. 1 - looking north. 1932-01-24

Album 23, Page 37

729 set No. 8B, looking East ashlar sills for the extension of sluice culverts being laid in position. 1932-01-21

Album 23, Page 38

742 - Set No. 12 - Looking West sluice gates being opened for first time after building of the buttresses. Flow of river being diverted from the West to the Central channel. The spray is being caused by the discharge striking the old masonry pier at the contractors Rly. Which is in the foreground one hidden under the earth sudd. 1932-01-31

Album 23, Page 39

670. Solid dam - concrete poured in foundations of buttresses Nos. 227, 228 & 229 looking East. 1931-12-02

Album 23, Page 40

686. Heightening block No. 181 profile of ashlar top of buttress No. 181. 1931-12-09

Album 23, Page 41

743. Western channel after discharge through set No. 4 had been diverted to central channel. 1932-02-01

Album 23, Page 42

744. Junction of dam with East wall of lock No. 1. Rubble masonry of thickening in progress looking West. 1932-02-01

Album 23, Page 43

745. Locks. Thickening of East wall lock No. 1 overflow pipe bends set in position. 1932-02-01

Album 23, Page 44

746. Locks - Thickening of East wall of lock No. showing leakage pipes built into masonry. 1932-02-01

Album 23, Page 45

747. Locks - Thickening of East wall of lock No. 1 undercutting under foundation of existing masonry during excavation for foundation of thickening. 1932-02-01

Album 23, Page 46

749. North end of thickening of East wall lock No. 1. 1932-02-01

Album 23, Page 47

756 - Sets Nos. 8A & 7B, looking West, concreting ogee apron showing method of shuttering concrete during construction. 1932-02-20

Album 23, Page 48

757. Buttresses No. 77 & 78 looking East. Laying ashlar extension to sluices in progress. 1932-02-20

Album 23, Page 49

762. Sets Nos. 5 & 6 from top of dam looking West excavation in aprons for foundation of buttresses in progress. 1932-02-27

Album 23, Page 50

763. Sluice No. 40 sluice No. 4 East side showing pitting in granite sides of sluice culvert immediately D.S. of recess below the sluice gate groove casting. 1932-02-29

Album 23, Page 51

765 - Solid dam - Foundation and reinforcing bars of buttress No. 206. 1932-03-05

Album 23, Page 52

769 - Set No. 1. Looking West. Extension of sluice in sides of buttresses. 1932-03-07

Album 23, Page 53

770. Set No. 1. Looking south. Perforated pipes for grouting in foundation of buttress No. 3 and sluice No. 3 with concrete meal and temporary rough wall round to form chambers during concreting. 1932-03-07

Album 23, Page 54

771. Set No. 1 Perforated pipes for grouting in formation of sluice No. 3 and buttress No. 3. 1932-03-07

Album 23, Page 55

773. Junction between Lock No. 1 and Dam. Thickening No. 1 Lock East Wall in progress. 1932-03-07

Album 23, Page 56

774 - Locks. Widening excavation for East wall lock No. 1 Masonry pier on left will be incorporated in the building. 1932-03-07

Album 23, Page 57

775 - Locks. Excavation side of foundation for East Wall Lock No. 1 showing leakage pipes. Re cavities at the inner end of the pipe will be grouted up later. 1932-03-07

Album 23, Page 58

778 - Locks. Progress of work in East and West Lock Walls round recess No. 2. 1932-03-07

Album 23, Page 59

779 - Locks. Two Top sections of C.I. for extra sluice of East Lock Wall No. 1 with West pipe filled to lower one and hole being drilled in upper section for next vent pipe. 1932-03-07

Album 23, Page 60

780 - Locks. Progress of work in West Lock Wall south of recess No. 2 showing counter weight recess. 1932-03-07

Album 23, Page 61

783 - Set No. 1 Looking West showing demolition of existing D.S. face before construction of veneer. 1932-03-07

Album 23, Page 62

788 - Pierced dam. Set No 14 looking down on heightening block No. 141 from gantry. Sluice well precast concrete arch being fixed in position. 1932-03-13

Album 24

Aswan Dam. Second heightening, 1932

Physical Description: 60 photographs in 1 volume ; images 23 x 29 cm, volume 28 x 38 cm

Scope and Content

This album contains 60 photographs with no supplementary texts. (Note: pages 37-38 are blank.)
Album title devised by cataloger. Volume spine label: "Aswam Dam 1932 / Photos No. 1026-1163 / [Vol.] 7." Photograph titles, dates, and numbers transcribed chiefly from typed titles below images, with some numbers handwritten numbers.
Album 24, Page 1

1026 - Outlet pipes for springs buttresses Nos. 52, 55 & 57 set No. 6. 1932-07-23

Album 24, Page 2

1029 - Intermediate blocks when work stopped for conscentrating [sic] work in alternate blocks according to programme. 1932-07-23

Album 24, Page 3

1030 - Reinforcement of U.S. Face of solid dam - Boring machine at work. 1932-07-28

Album 24, Page 4

1031 - Reinforcement of U.S. of Solid dam - Boring machine at work. 1932-07-28

Album 24, Page 5

1032 - Setting up ashlar for sill of gate recess No. 2 - Looking North Eastwards. 1932-07-28

Album 24, Page 6

1033 - Heightening of recess No. 1 showing ashlar quoins & North counterweight recess looking west. 1932-07-28

Album 24, Page 7

1034 - Ogee curve sets 7A & 8B and training walls 66 & 76 measuring tank. 1932-07-28

Album 24, Page 8

1035 - Masonry in progress subsidiary dam No. 2 Eastern abutment. 1932-07-30

Album 24, Page 9

1036 - Masonry in progress subsidiary dam No. 2 Looking Westwards. 1932-07-30

Album 24, Page 10

Subsidiary dam No. 2. Progress of masonry D.S. face work looking east. 1932-08-09

Album 24, Page 11

1043. Subsidiary dam No. 1 General view of excavation looking west. 1932-08-09

Album 24, Page 12

Subsidiary dam No. 1 General view D.S. side looking west. 1932-08-09

Album 24, Page 13

Subsidiary dam No. 1 U.S. rock facing at eastern abutment. 1932-08-20

Album 24, Page 14

Solid dam. Reinforcement in foundation buttress No. 182 looking west. 1932-08-10

Album 24, Page 15

Lead wool caulking in the special chase provided upstream of the construction joint. 1932-08-27

Album 24, Page 16

Lead wool seal U.S. face of dam at contraction joint showing the special chase provided for the head wool seal. 1932-08-27

Album 24, Page 17

Back of recess No. 1 showing heightening of recess & reinforcing bars fixed so as to bond this to the thickening to be carried up later. 1932-08-06

Album 24, Page 18

Locks face work east wall round recess No. 1 during heightening. 1932-08-17

Album 24, Page 19

Locks. Interior of locks No. 1 & 2 showing gates 2 & 3. 1932-08-06

Album 24, Page 20

Locks. Demolition and re-building of dolphins at South entrance to locks. 1932-09-14

Album 24, Page 21

Locks. No. 2 lock gate lifted to R.L. 123 with 4M. extension added upstream side. 1932-09-13

Album 24, Page 22

No. 2 lock gate with 4M. extension added cast steel jambs not yet fitted. 1932-09-13

Album 24, Page 23

No. 2 lock gate. Downstream side of 4M. extension showing 12 new face openings, and the old foot valve operating rods. 1932-09-13

Album 24, Page 24

Locks. Spindle recesses & sluices of extra flushing pipe at east wall of lock No. 1. 1932-09-14

Album 24, Page 25

Locks. General progress of work in East and West walls and view for back of heightened East recess No. 1 showing bars for bonding with thickening. 1932-09-14

Album 24, Page 26

Locks. Thickening of West recess No. 1. The vertical 2 1/2" perforated pipes are for grouting between heightening already built and thickening in progress: horizontal 2" pipes laid horizontally are for checking the level of the grout. 1932-09-19

Album 24, Page 27

Locks. Progress of work in East wall of lock No.1. 1932-09-14

Album 24, Page 28

Lock No. 1. Setting string course East parapet of East stairway. 1932-09-19

Album 24, Page 29

Subsidiary Dam No. 1. Progress masonry West side R.L. 109. East side R.L. 106. 1932-09-04

Album 24, Page 30

Subsidiary Dam No. 1. General view looking East. 1932-09-15

Album 24, Page 31

Subsidiary Dam No. 2. Western side lowest portion of foundation looking from top of hill. 1932-09-15

Album 24, Page 32

Subsidiary Dam No. 2. Eastern abutment first section completed. 1932-09-15

Album 24, Page 33

Set No. 18. Erection of 27 ton. Government crane at new level R.L. 123.00. 1932-09-21

Album 24, Page 34

Asphalt seal. Intermediate Heightening blocks. Bituminous sheeting on side of alternate block and bituminous emulsion being sprayed on sides of masonry before pouring asphalt into "V" groove. The upper bituminous sheet is placed temporarily to protect the "V" groove while masonry is in progress. 1932-09-17

Album 24, Page 35

Set No. 6. Demolition of roadway for foundation of heightening blocks. 1932-09-21

Album 24, Page 36

Heightening block No. 63 Set 7A completed looking East top of existing Dam. 1932-09-12

Album 24, Page 39

Heightening block at set No. 7A. Buttresses sets No. 2 - 5 under construction looking east from top of lock wall. 1932-09-19

Album 24, Page 40

Set No. 18. Spillway arches to sluice wells from upstream. 1932-09-21

Album 24, Page 41

Set No. 1. Grouting masonry upstream of sluice wells. Grouting pump and connection in position. 1932-09-21

Album 24, Page 42

Solid dam. Foundation of buttresses. Trial borings. View showing the boring machine working opposite buttress No. 194. 1932-09-21

Album 24, Page 43

No. 1115. Subsidiary Dam. Vertical seal looking downwards. 1932-10-03

Album 24, Page 44

No. 1116. Subsidiary Dams Nos. 1 & 2. General view looking East. Taken from top of hill. 1932-10-05

Album 24, Page 45

No. 1122. Locks. Building East and West dolphins at South entrance to Locks. 1932-10-07

Album 24, Page 46

No. 1123. Locks. Ashlar work for cill of Lock gate No. 1. 1932-10-07

Album 24, Page 47

No. 1124. Locks. Demolition at top of middle part of East wall of Lock No. 1 finished. 1932-10-07

Album 24, Page 48

No. 1126. Locks. Working in the parapet of East stairway between Locks Nos. 1 & 2. 1932-10-07

Album 24, Page 49

No. 1127. Work in buttresses sets Nos. 1 and 2 nearly finished. 1932-10-07

Album 24, Page 50

No. 1129. Asphalt seal experimental heating of seal. Steam pipes as connected to stothert and pitt gantry crane. 1932-10-10

Album 24, Page 51

No. 1131. Crane rails pierced dam. Concrete as cast for seating of crane rails No. 18. 1932-10-10

Album 24, Page 52

No. 1134. Set No. 6. Cleaning top of Dam preparatory to building Heightening block No. 61. 1932-10-12

Album 24, Page 53

No. 1135. Set No. 6 looking West. U.S. side. Gantry erected over Sets. 6 & 5 before recommencing work on the Heightening Blocks. 1932-10-12

Album 24, Page 54

No. 1137. Subsidiary Dam No. 1. Sluice culvert from U.S. 1932-10-13

Album 24, Page 55

No. 1139. Reinforcement of the U.S. Solid Dam. Grouting machine and lifting tackle for the non-corrosive steel perforated hollow rods which are lowered into the boreholes drilled in the U.S. side of the dam. 1932-10-17

Album 24, Page 56

No. 1140. Solid Dam. General view for buttresses Nos. 222 - 234. facing East. 1932-10-18

Album 24, Page 57

No. 1149. Western portion of subsidiary dam No. 2 showing progress of work. 1932-10-20

Album 24, Page 58

No. 1157. Reinforcement of solid dam - Types of two metres and three metres non-corrosive perforated pipes. Foot guides, plain coupling and left hand reducing coupling for top or pipe. These pipes are being grouted into the bore holes in the upstream face of the dam. 1932-10-22

Album 24, Page 59

No. 1158. Locks. Wooden model of coping for main buttress of East wall of Lock. 1932-10-22

Album 24, Page 60

No. 1161. Locks. No. 2 lock gate practically complete. Upstream side. 1932-10-25

Album 24, Page 61

No. 1162. Locks No. 1 Lock gate U.S. side of 4 metres extension before jointing to old gate. 1932-10-25

Album 24, Page 62

No. 1163. Locks. No. 1 Lock gate. 4 metres extension before jointing to old gate. 1932-10-25

Album 25

Aswan Dam. Second heightening, 1932-1933

Physical Description: 62 photographs in 1 volume ; images chiefly 21 x 29 cm, volume 28 x 38 cm

Scope and Content

This album contains 62 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1932-33 / Photos 1164-1285 / [Vol.] 8." Photograph titles, dates, and numbers transcribed chiefly from typed titles below images, with some numbers handwritten numbers.
Album 25, Page 1

No. 1164. Locks. No. 1 Lock gate. Erecting U.S. Bascule. 1932-10-25

Album 25, Page 2

No. 1165. Solid Dam. General view showing progress of work. Buttresses Nos. 182 - 190. 1932-10-26

Album 25, Page 3

No. 1167. Pierced Dam. Set No. 13. Preparing new position for mortar mixers on the Heightened Dam. 1932-10-27

Album 25, Page 4

No. 1169. Pierced dam - set No. 18. Model of buttress cap in position. In back ground a model of the coping over the main buttress can be seen. 1932-10-27

Album 25, Page 5

No. 1170. Reinforcement of U.S. Solid Dam. Grouting the non-corrosive pipe. Type of grouting machine used. 1932-10-27

Album 25, Page 6

No. 1171. Reinforcement of U.S. Solid Dam. Lowering 1 1/2" diameter grouting pipe into position. 1932-10-27

Album 25, Page 7

No. 1172. Solid Dam. Foundation of buttresses 197 & 196. (South side Dam of the Pit). 1932-10-27

Album 25, Page 8

No. 1174. Solid dam foundation of buttress 197 and 196 North East side of the pit. 1932-10-29

Album 25, Page 9

No. 1176. Pierced Dam. Heightening blocks and gantry Sets Nos. 4, 5, & 6. 1932-10-31

Album 25, Page 10

No. 1185. Solid Dam. Foundation for buttresses Nos. 197 & 196. 1932-10-31

Album 25, Page 11

1187. Locks. Dismantling of swing bridge started - part of timber decking removed. 1932-11-02

Album 25, Page 12

1189. View of Western extension from the North, demolition at top of West Solid dam and excavation for addition D.S. of same. 1932-11-02

Album 25, Page 13

1190. Western extension completed Downstream side from the North. 1932-11-03

Album 25, Page 14

1191. Subsidiary Dam No. 1 from Upstream showing Sluice culvert. 1932-11-03

Album 25, Page 15

1192. Subsidiary dam No. 1. Sluice culvert from downstream. 1932-11-03

Album 25, Page 16

1193. Subsidiary Dam No. 1 from U.S. masonry at R.L. 116. 1932-11-03

Album 25, Page 17

1197. Solid dam - foundation of buttresses Nos. 194 & 195. 1932-11-03

Album 25, Page 18

1200. Solid Dam - foundation of buttresses Nos. 194 and 195. 1932-11-03

Album 25, Page 19

1205. Solid Dam. Foundation of buttress No. 195. Cavity under 1st thickening (old Sump). 1932-11-05

Album 25, Page 20

1206. Thickening the D.S. side of West Solid dam with vertical pipes apparent at the junction for grouting later on. 1932-11-09

Album 25, Page 21

1207. Locks. No. 1 Lock gate from D.S. Work practically finished. 1932-11-09

Album 25, Page 22

1209. Solid dam. General view showing first shift of concrete in shuttering above level 91.60 for buttresses Nos. 197 - 194. 1932-11-13

Album 25, Page 23

1215. Locks. Grouting the pipes leading to vertical section of masonry inside East wall of lock No. 1. 1932-11-16

Album 25, Page 24

1216. Locks. Building Ashlar steps of East stairway in progress. 1932-11-16

Album 25, Page 25

1218. Locks. View of horizontal chases formed in the east wall D.S. gate recess No. 1 for reinforcement struts. 1932-11-16

Album 25, Page 26

1219. Locks. Boring slightly inclined holes for non-corrosive steel girders of reinforcement D.S. gate recess No. 2 East. 1932-11-16

Album 25, Page 27

1220. Locks. Heightening of West Dolphin at South entrance to locks. 1932-11-16

Album 25, Page 28

1227. Solid Dam. General view for buttresses Nos. 238 - 222. 1932-11-23

Album 25, Page 29

1228. Set No. 1 Pierced Dam. Raising Titan for building of Heightening blocks. 1932-11-23

Album 25, Page 30

1230. Locks. Recesses in top of East wall of lock No. 1 for working apparatus of Sluice of auxiliary discharge pipe. Cover of manhole to chamber at entrance of pipe can be seen. 1932-11-23

Album 25, Page 31

1231. Locks. Crab winches in their temporary positions lifting scouring gate for scouring operation of floor of locks. 1932-11-23

Album 25, Page 32

1232. Locks. Rush of water into Lock No. 2 during scouring operation. 1932-11-23

Album 25, Page 33

1233. General view for the subsidiary Dams looking East. 1932-11-24

Album 25, Page 34

1238. Pierced Dam. Heightening blocks Sett [sic] No. 3 under construction from gantry looking East. 1932-11-26

Album 25, Page 35

1239. Pierced Dam. Set No. 1 commencing Heightening blocks starting from West end of Dam. 1932-11-28

Album 25, Page 36

1240. Solid Dam. General view looking West for concrete in shuttering for buttresses Nos. 197 - 194. Between R.L. 91.60 to 97.60. 1932-11-30

Album 25, Page 37

1244. Set No. 1 from upstream. Alternate heightening blocks under construction. 1932-12-07

Album 25, Page 38

1245. Set No. 1 Looking East. Alternate heightening blocks under construction. 1932-12-07

Album 25, Page 39

1248. Locks. Progress of work in West Solid Dam. 1932-12-07

Album 25, Page 40

1250. Locks. Corbelling in West dolphin for recess of scouring gate. 1932-12-07

Album 25, Page 41

1251. Hydraulic accumulation partially erected in new position. 1932-12-07

Album 25, Page 42

1252. General view for subsidiary dams looking East. 1932-12-17

Album 25, Page 43

1254. Pierced dam from Upstream. Intermediate heightening blocks in progress set No. 12. 1932-12-21

Album 25, Page 44

1256. Pierced Dam from upstream. Alternate heightening blocks nearing completion. 1932-12-21

Album 25, Page 45

1258. Remaining section of C.I. pipe for extra sluice of lock No. 1 set in position "Looking North from Set No. 1". 1932-12-21

Album 25, Page 46

1260. Solid Dam - general view for buttresses Nos. 198 - 195. Looking West. 1932-12-21

Album 25, Page 47

1261. Solid dam. General view for buttresses Nos. 230 - 221 Looking West. 1932-12-21

Album 25, Page 48

1263. Solid Dam. Buttresses Nos. 198 - 195 manhole opposite pannel [sic] No. 195. 1932-12-21

Album 25, Page 49

1267. Shellal Quarries - Caps for small buttresses. 1932-12-28

Album 25, Page 50

1270. Pierced dam set No. 18. Inside face work to D.S. parapet before pointing. 1932-12-29

Album 25, Page 51

1271. Locks. Progress of work in dolphins at south entrance to locks showing carbels above scouring gate recesses. 1932-12-29

Album 25, Page 52

1273. Pierced dam from upstream. Completion of work on alternate blocks set no. 1. 1932-12-29

Album 25, Page 53

1273. Pierced dam from U.S. completion of work on alternate blocks Set No. 1. 1932-12-29

Album 25, Page 54

1274. Pierced dam from U.S. sets Nos. 11 & 12 intermediate heightening blocks in progress. 1933-01-05

Album 25, Page 55

1276. Progress of work in West solid dam at its junction with West wall of locks. 1933-01-05

Album 25, Page 56

1277. Progress of work in west solid dam. 1933-01-05

Album 25, Page 57

1279. Stairway between locks Nos. 1 and 2 complete. 1933-01-05

Album 25, Page 58

1280. Erection of iron gates and grillage for sluices at entrance of auxiliary pipe in East wall of lock No. 1. 1933-01-05

Album 25, Page 59

1281. Pierced dam set No. 15. Section of roadway setts. 1933-01-17

Album 25, Page 60

1283. Locks. Operating cylinders of Subsidiary sluices in lock No. 1. 1933-01-17

Album 25, Page 61

1284. Pierced dam. Sets 12 and 11 looking West from upstream. 1933-01-17

Album 25, Page 62

1285. Pierced dam set No. 1. Downstream looking East. 1933-01-17

Album 26

Aswan Dam. Second heightening, 1933

Physical Description: 62 photographs in 1 volume ; images chiefly 22 x 27 cm, volume 28 x 38 cm

Scope and Content

This album contains 62 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1933 / Photos 1287 - 1386 / [Vol.] 9." Photograph titles, dates, and numbers transcribed chiefly from typed titles below images, with some numbers handwritten numbers.
Album 26, Page 1

1287. Pierced dam. Set No. 1 from D.S. Looking East. 1933-01-17

Album 26, Page 2

1289. Pierced dam. Heightening block No. 84. Thermometer pipes in position east side of block. 1933-01-21

Album 26, Page 3

1290. Pierced dam. Caps of small buttresses set No. 3 under construction. 1933-01-21

Album 26, Page 4

1291. Locks. Start of building swing bridge recess west side of lock entrance. 1933-01-21

Album 26, Page 5

1292. Locks. East side of entrance. 1933-01-21

Album 26, Page 6

1294. Pierced dam Set No. 18. Laying D.S. Coping. 1933-01-31

Album 26, Page 7

1295. Solid dam. Downstream. General view looking West. 1933-01-31

Album 26, Page 8

1296. Pierced dam. Set No. 18 Laying upstream coping. 1933-01-31

Album 26, Page 9

1300. Pierced dam D.S. coping set No. 18 from inside. 1933-02-05

Album 26, Page 10

1301. Pierced dam laying U.S. coping set No. 18. 1933-02-05

Album 26, Page 11

1302. Pierced dam cutting return ends for expansion joint in coping. 1933-02-05

Album 26, Page 12

1304. Set No. 14 new shield supporting girders in position on roadway. 1933-02-06

Album 26, Page 13

1305. General view for buttresses sets 14 to 9. Taken from top of dam showing caps of buttresses set 14. 1933-02-06

Album 26, Page 14

1306. Pivot stone of swing bridge and holding down bolts for crab winches on West dolphin. 1933-02-06

Album 26, Page 15

1307. Scabbling top of West solid dam between metrage 30 & 50 to prepare for heightening. 1933-02-06

Album 26, Page 16

1308. Heightening pf 1pck [i.e. of lock], East entrance and dam West pf [i.e. of] block No. 1. 1933-02-06

Album 26, Page 17

1313. Ashlar for swing bridge showing ram on west side and centre pivot for bridge. 1933-02-16

Album 26, Page 18

1314. Heightening of West solid dam between metrage 30 & 50. Showing upstream face and scar end. 1933-02-16

Album 26, Page 19

1316. Pierced dam looking East from locks. 1933-02-16

Album 26, Page 20

1317. View of locks Nos. 2, 3, 4 & 5 showing existing gauge D.S. looking South. 1933-02-16

Album 26, Page 21

1318. General view for the subsidiary dam taken from the top of the Western hill. 1933-02-20

Album 26, Page 22

1319. Pierced dam - set No. 16 - laying D.S. coping. 1933-02-21

Album 26, Page 23

1320. Pierced dam - timber model of proposed design for tops of main buttresses from roadway side. 1933-02-21

Album 26, Page 24

1325. Pierced dam set No. 18 New sluice gate operating crabs ready for erection. 1933-03-02

Album 26, Page 25

1326. Pierced dam set No. 14 roadway looking West to mortar mixers. 1933-03-02

Album 26, Page 26

1327. Pierced dam set No. 11 Roadway looking East. Inside face to D.S. parapet and concrete crane rail bearers built in position. 1933-03-02

Album 26, Page 27

1328. Pierced dam set No. 8 construction of gantry for intermediate heightening blocks. 1933-03-02

Album 26, Page 28

1329. Pierced dam -building lining to sluice wells - heightening block No. 78. 1933-03-02

Album 26, Page 29

1332. Pierced dam set No. 8 - setting central spillway sill in position. 1933-03-02

Album 26, Page 30

Pierced dam set No. 8 - setting spillway sill in position. 1933-03-02

Album 26, Page 31

1337. Heightening of middle part of West solid dam looking South. 1933-03-03

Album 26, Page 32

1338. Locks. Swing bridge. Recess ready for ironwork. 1933-03-03

Album 26, Page 33

1340. Solid dam. General view for Buttresses Nos. 190 - 199. 1933-03-06

Album 26, Page 34

1343. Solid dam. General view for Buttresses Nos. 225 to 235. 1933-03-06

Album 26, Page 35

1344. Eastern extension. Downstream pitching slopes. 1933-03-12

Album 26, Page 36

1346. Swing bridge. Grouting lower roller path. 1933-03-12

Album 26, Page 37

1347. Pierced Dam Set No. 18. New sluice gate operating crabs in position on wells. 1933-03-12

Album 26, Page 38

1349. Swing Bridge. Erection of first section of main girders. 1933-03-19

Album 26, Page 39

1350. Dry granite pitching West of Locks. 1933-03-21

Album 26, Page 40

1352. Locks. Making chases & drilling holes in east lock wall for reinforcement downstream gate No. 2. 1933-03-21

Album 26, Page 41

1359. Pierced dam set No. 17 looking West. Setting rails of U.S. trolley track. 1933-04-01

Album 26, Page 42

1362. Pierced dam roadway. Set No. 16 looking West. Levelling off top of masonry under roadway with mortar and spalls. Expansion joint between heightening blocks in the foreground. 1933-04-12

Album 26, Page 43

1355. Locks. Swing bridge replacing counterbalance weights. 1933-03-27

Album 26, Page 44

1356. Locks. Swing bridge, Main structure completely erected. 1933-03-27

Album 26, Page 45

1357. Pierced dam - Heightening from upstream looking East. 1933-03-27

Album 26, Page 46

1367. Pierced dam looking West, Set No. 18 sluices opened by new winding gear. 1933-04-19

Album 26, Page 47

1364. Reinforcement of upstream solid dam. Apparatus for testing the direction of inclination from the vertical of the bore holes. 1933-04-13

Album 26, Page 48

1365. Reinforcement of U.S. solid dam. Details of apparatus for testing the amount of inclination from the vertical of the bore holes. 1933-04-13

Album 26, Page 49

1369. East side pitching of new approach road. 1933-04-19

Album 26, Page 50

1370. Transfer yard East bank looking South. Precast concrete arches for sluice wells, final casting to complete order with rubble stack for heightening blocks in background. 1933-04-19

Album 26, Page 51

1371. Pierced dam set No. 18 surface boxes for curtain support joists and asphalt groove steam pipes as laid with concrete surrounds. 1933-04-19

Album 26, Page 52

1372. Pierced dam set No. 18 roadway setts and surface boxes as completed. 1933-04-19

Album 26, Page 53

1373. Sluice gates. Lifting shield from barge on to sluice No. 77 set 8B. 1933-04-19

Album 26, Page 54

1374. Pierced dam sets Nos. 1 and 2 from upstream intermediate heightening blocks under construction on left. 1933-04-19

Album 26, Page 55

1375. View of U.S. face of West solid dam showing end of parapet. 1933-04-19

Album 26, Page 56

1379. Top of West solid dam showing inside face of upstream parapet, laying out of crane rails and trolley lines. 1933-04-19

Album 26, Page 57

1380. Foundation for sump of turbine outlet pipe. 1933-04-24

Album 26, Page 58

1381. Making grooves for marble gauges in the upstream face of West solid dam. 1933-04-24

Album 26, Page 59

1382. Swing bridge hydraulic operating cylinders. 1933-04-24

Album 26, Page 60

1383. East bank. U.S. berm pitching in progress. 1933-05-02

Album 26, Page 61

1385. Turbine sump in apron set No. 1 nearly completed. 1933-05-02

Album 26, Page 62

1386. New workshop. Accumulator house walls built to R.L. 123. 1933-05-02

Album 27

Aswan Dam. Second heightening, 1933

Physical Description: 63 photographs in 1 volume ; images chiefly 22 x 28 cm, volume 28 x 38 cm

Scope and Content

This album contains 63 photographs.
Album title devised by cataloger. Torn volume spine label: "[Aswam Dam 1933] / Photos 1387 - May-Aug / [Vol.] 10." Photograph titles, dates, and numbers transcribed chiefly from typed titles below images, with some numbers handwritten numbers.
Album 27, Page 1

1387. New workshop. Foundation of walls from the west. 1933-05-02

Album 27, Page 2

1390. Pierced dam sets No. 1, 2, and 3 from upstream. 1933-05-06

Album 27, Page 3

1391. Pierced dam. Set No. 2 from D.S. Alternate heightening blocks under construction. 1933-05-06

Album 27, Page 4

1392. Pierced dam. Set No. 1 from D.S. intermediate heightening blocks under construction. 1933-05-06

Album 27, Page 5

1394. East solid dam. Heightening block No. 250 from Downstream. 1933-05-16

Album 27, Page 6

1395. Pierced dam. Sets Nos. 1 & 2 from Upstream. 1933-05-23

Album 27, Page 7

1396. U.S. west berm - building steps at Reservoir gauge - U.S. west Solid dam. 1933-05-23

Album 27, Page 8

1398. Drilling 2" holes in East lock wall D.S. gate No. 1 for consolidating old masonry. 1933-05-23

Album 27, Page 9

1399. East solid dam from downstream looking West. Heightening block No. 250 completed. 1933-05-28

Album 27, Page 10

1400. East bank from upstream - pitching upstream berm. 1933-05-28

Album 27, Page 11

1401. Pierced dam from upstream looking east. 1933-05-28

Album 27, Page 12

1402. Pierced dam set No. 1 from downstream. Looking East. 1933-05-28

Album 27, Page 13

1404. Pierced dam set No. 6. Looking west - building inside face to downstream parapet. 1933-05-28

Album 27, Page 14

1406. Pierced dam set No. 15 looking West. Laying upstream trolley track. 1933-05-28

Album 27, Page 15

1407. West bank. Erection of new stores and workshops. 1933-05-28

Album 27, Page 16

1408. Dry granite pitching west of lock No. 2. 1933-05-28

Album 27, Page 17

Laying roadway setts U.S. side. 1933-05-28

Album 27, Page 18

Roadway cleared for laying of trolley rail bearers. 1933-06-17

Album 27, Page 19

1411. Shuttering for trolley rail bearers. 1933-06-17

Album 27, Page 20

1412. Concrete in shuttering for trolley rail bearers. 1933-06-17

Album 27, Page 21

1413. Completed section of trolley rails. 1933-06-17

Album 27, Page 22

1416. Masonry steps in pitching at west bank upstream of dam (R.L. 114 - 123). 1933-06-17

Album 27, Page 23

1417. Masonry steps giving access to new marble gauge upstream at west end showing sinkages for plaques. 1933-06-17

Album 27, Page 24

1418. Pitching of west berm upstream showing extension of stairway and new steps giving access to gauge. 1933-06-17

Album 27, Page 25

1419. General view of west end of dam showing new workshops on left and extension of U.S. kerb. 1933-06-17

Album 27, Page 26

1420. Progress in construction of new workshops with new offices above on 1st. floor. 1933-06-17

Album 27, Page 27

1421. New workshops, stores and Offices. 1933-06-17

Album 27, Page 28

1422. Turbine installation - discharge pipe and training wall at sluice No. 1 complete. 1933-06-17

Album 27, Page 29

1423. Discharge pipe and draft tube in sump from new turbine installation at sluice No. 1. Training wall complete. 1933-06-17

Album 27, Page 30

1424. West end of sluice dam with heightening complete - In foreground realignment of training wall and buttress No. 2 complete. 1933-06-17

Album 27, Page 31

1425. Cleaning of D.S. of dam and buttresses. 1933-06-17

Album 27, Page 32

1426. New pitching at East end of dam between R.L. 114 & R.L. 123. 1933-06-17

Album 27, Page 33

Subsidiary Dam No. 1 Sliding sluice gate 1.5 x 2.2 Metres erected complete. 1933-06-24

Album 27, Page 34

Subsidiary Dam No. 1 Operating Gear of Sliding sluice gate. 1933-06-24

Album 27, Page 35

Operating Gear of Sluice outlet at Measuring Tank looking South. 1933-06-29

Album 27, Page 36

Buttresses of Solid Dam with timber walkway in process of demolition. 1933-06-29

Album 27, Page 37

Building U.S. parapet of Solid Dam Eastend as far as boreholes permit. 1933-06-29

Album 27, Page 38

East bank - Pitching lower portion of extension to U.S. Berm. 1933-07-25

Album 27, Page 39

East Solid Dam. U.S. Parapet and coping under construction. 1933-07-25

Album 27, Page 40

East Solid Dam. Upstream parapet and coping. 1933-07-25

Album 27, Page 41

East Solid Dam - spreading new alluvial silt from the desert on site of works D.S. of dam and trench for 9" land drain at the toe of the buttresses. 1933-07-25

Album 27, Page 42

Pierced Dam - Set No. 13 - completing caps to buttresses. 1933-07-25

Album 27, Page 43

Locks - Flight of steps in dry granite pitching east of lock No. 2. 1933-07-25

Album 27, Page 44

Demolition of cill sluice No. 1 for inlet of lock gate operating pumps. 1933-07-25

Album 27, Page 45

Concrete weir wall in sluice No. 1 for lock gate operating pumps. 1933-07-25

Album 27, Page 46

Lock gate operating machine - Ashlar for turbine house in sluice No. 1. 1933-07-25

Album 27, Page 47

Dam from East Bank. 1933-07-26

Album 27, Page 48

Solid Dam - Recess in U.S. parapet for asphalt seal Steam Pipes. 1933-07-26

Album 27, Page 49

New operating Machine for sluice gates during construction. 1933-07-26

Album 27, Page 50

Pierced Dam - Laying and grouting in Roadway Setts. Set No. 3. 1933-07-26

Album 27, Page 51

Junction of Dam and East wall of Locks. 1933-07-26

Album 27, Page 52

Locks - Newel at bottom of East stairway lock No. 2. 1933-07-26

Album 27, Page 53

Locks - Building dry granite pitching U.S. of dam showing return end. 1933-07-26

Album 27, Page 54

High and low pressure turbines for operation of lock gates in position in sluice No. 1. 1933-07-26

Album 27, Page 55

Marble gauges fixed in Upstream West Solid Dam. 1933-07-26

Album 27, Page 56

Building new stores and workshops - West bank. 1933-07-26

Album 27, Page 57

Branch line to Shellal to bye-pass [sic] Dam No. 2 to permit completion - looking south from near dam No. 2. 1933-07-26

Album 27, Page 58 (Photo 1)

Reconstruction of sluice wells cavity filled with loose rubble discovered at R.L. 105. - between wells Nos. 51 and 52. 1933-08-23

Album 27, Page 58 (Photo 2)

No. 1453 Reconstruction of sluice wells cavity filled with loose rubble discovered at R.L. 105. Between wells Nos. 58 & 59. 1933-08-23

Album 27, Page 59

West Bank - Locks and approach to west Solid Dam. 1933-08-29

Album 27, Page 60

East Bank - Approach and Upstream berms - Looking West. 1933-08-29

Album 27, Page 61

West Bank - New Workshops and Offices - Looking North. 1933-08-29

Album 27, Page 62

West Bank - New workshops and Offices - Looking West. 1933-08-29

Album 28

Aswan Dam. Second heightening, 1933

Physical Description: 57 photographs in 1 volume ; images chiefly 22 x 27 cm, volume 28 x 38 cm

Scope and Content

This album contains 57 photographs.
Album title devised by cataloger. Volume spine label: "Aswam Dam 1933 / Photos Sept / [Vol.] 11." Photograph titles, dates, and numbers transcribed chiefly from typed titles below images, with some numbers handwritten numbers.
Album 28, Page 1

Locks. Turbine and pumps for lock gate operation in sluice No. 1 Looking downstream. 1933-08-29

Album 28, Page 2

Locks. Reinforcement of lock gate No. 2 side walls. Non-corrosive reinforcing bars being erected in position on east wall. 1933-08-29

Album 28, Page 3

Locks. Formation of pipe trench in side of No. 2 lock wall original masonry. 1933-08-29

Album 28, Page 4

Pierced dam buttress No. 131, capping and steps to observation platform. 1933-08-29

Album 28, Page 5

Solid Dam. Looking West. Preparing roadway for laying concrete bearers to D.S. trolley track. 1933-08-29

Album 28, Page 6

Solid Dam. Looking East. Boring Machines for reinforcement of U.S. face and D.S. Trolley track. 1933-08-29

Album 28, Page 7

Solid Dam. Looking East. Laying D.S. Trolley track. Boring machines for reinforcement of U.S. face on right. 1933-08-29

Album 28, Page 8

Solid Dam looking West. Shuttering for the concrete bearers of the D.S. trolley track. 1933-08-29

Album 28, Page 9

Pierced Dam set No. 16. Looking west laying roadway paving. 1933-08-29

Album 28, Page 10

West berm. Return end of pitching of U.S. west berm, South face. 1933-08-29

Album 28, Page 11

West Bank - Pitching Downstream lock No. 1. Looking East. 1933-08-29

Album 28, Page 12

Locks. Pitching East berm at set No. 1 Looking downstream. 1933-08-29

Album 28, Page 13

East Bank - Dry stone revetment of sand stone. U.S. of Eastern extension to dam. 1933-08-29

Album 28, Page 14

East Bank - Pitching Upstream east berm. 1933-08-30

Album 28, Page 15

Subsidiary Dams - Gap in subsidiary dam No. 2 closed looking upstream. 1933-08-30

Album 28, Page 16

1474. Eastern extension. Roadway looking West. 1933-09-25

Album 28, Page 17

1475. Eastern extension. Roadway looking East. 1933-09-25

Album 28, Page 18

1476. East end of Dam. Roadway looking East. 1933-09-25

Album 28, Page 19

1477. East Bank Reforming original pitching U.S. of Dam. 1933-09-25

Album 28, Page 20

1478. Pierced Dam. Main buttress No. 169 from Roadway. 1933-09-25

Album 28, Page 21

1479. West bank. Buffet looking North West. 1933-09-26

Album 28, Page 22

1480. West Bank. New Government Workshops, Office & Stores Looking West. 1933-09-26

Album 28, Page 23

1481. Pierced dam. Heating asphalt seals. Seal No. 164 - 163. Over flow of asphalt on first heating due to moisture being driven off. 1933-09-26

Album 28, Page 24

1482. Pierced dam. Heating of asphalt seals Nos. 165 - 166. Boiler and Steam economiser. 1933-09-26

Album 28, Page 25

1483. Cleaning sluice gates set 14. 1933-09-26

Album 28, Page 26

1484. R.L. 92.00 converted gates of set 17B (No. 168 in foreground) as removed from sluice wells for cleaning and painting. 1933-10-03

Album 28, Page 27

1485. R.L. 92. - converted gate No. 150 after cleaning and painting. 1933-10-03

Album 28, Page 28

1486. View showing the terraces at the turning of the road leading to the East end of the dam. 1933-10-21

Album 28, Page 29

1487. View East side showing the east berm dry pitching wall. 1933-10-21

Album 28, Page 30

1488. View East side showing the erection of trolley track and newel coping. 1933-10-21

Album 28, Page 31

1489. View showing the upstream East side pitching of slopes. 1933-10-21

Album 28, Page 32

1490. Operating machine lifting R.L. 92.00 gate No. 40 preparatory to lowering it into well. 1933-10-21

Album 28, Page 33

1491. Operating machine lowering R.L. 92.00 gate No. 40 into sluice well after cleaning and painting. 1933-10-21

Album 28, Page 34

1494. Top of R.L. 92. - gate No. 65 as removed from sluice well showing accumulated debris and water. 1933-10-21

Album 28, Page 35

1495. View of the top of the dam - showing the cleaning up of the roadway in progress. 1933-10-21

Album 28, Page 36

1496. Filling West of No. I lock. 1933-10-21

Album 28, Page 37

1497. East view of the workshops showing progress of work. 1933-10-21

Album 28, Page 38

1498. South view of the workshops, Office showing progress of work and general appearance. 1933-10-21

Album 28, Page 39

1499. Front view of the buffet on the West side showing progress of work. 1933-10-21

Album 28, Page 40

1500. View on the West side for the U.S. face of the dam showing the finished up arches and copes. 1933-10-21

Album 28, Page 41

1501. Scouring gate operating crabs. 1933-10-21

Album 28, Page 42

1504. Set 1. No. 3 R.L. 96 gate showing broken rope pulley and debris. 1933-10-25

Album 28, Page 43

1506. Dust and mortar amongst the bottom rollers of gates Nos. 6 to 10. 1933-10-25

Album 28, Page 44

1505. Set 1. - No. 3 R.L. 96 as removed from sluice well showing accumulated debris and mortar. 1933-10-25

Album 28, Page 45

1507. Set 1 - Roller pulleys and rope hooks covered in mortar. Gate Nos. 6 to 10. One wall bracket bolt badly bent. 1933-10-25

Album 28, Page 46

1508. View showing the erection of new hand rails for big buttress No. 1. 1933-10-26

Album 28, Page 47

1509. View showing the non-corrosive steel girders fro the reinforcement of the lock No. 1 East wall in position. 1933-10-26

Album 28, Page 48

1510. View showing the process of grouting up the non-corrosive girders in lock No. 1 - West wall. 1933-10-26

Album 28, Page 49

1511. View showing the grouted up non-corrosive steel girders in lock No. 2 East wall. 1933-10-26

Album 28, Page 50

1522. View showing the progress of work in the East approach road terraces. 1933-11-15

Album 28, Page 53

View showing the R.L. 117 berm adjacent to the East approach road. 1933-11-15

Album 28, Page 54

View showing the sand stone wall East side. 1933-11-15

Album 28, Page 55

View showing the cleaning up of the bore holes in the Solid dam. 1933-12-24

Album 28, Page 56

View showing progress of work in Office and Workshops. 1933-12-30

Album 28, Page 57

View showing the big buttress steps and new railing. 1933-12-30

Album 28, Page 58

View showing the cleaning up of the top of dam. 1933-12-30

Album 28, Page 59

View showing progress of work in buffet West bank. 1933-12-30